cinema pdr, ucb/ssl 1 august 22, 2008 cinema communications & ground systems manfred bester

14
CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

Upload: christopher-harrington

Post on 18-Jan-2018

223 views

Category:

Documents


0 download

DESCRIPTION

CINEMA PDR, UCB/SSL 3 August 22, 2008 Concept of Operations −Mission Orbit Spin Stabilized Spacecraft Baseline Orbit 650 km Circular at 72° Inclination −Pass Coverage Typically 4 Passes/day with 30 min Access Time Tracking via TLEs Downloaded from USSTRATCOM −Data Recovery Store-and-forward Scheme, Downlink at 1 Mbps Recoverable Science Data Volume 760 Mbits/day −Ground Segment MOC and Ground Station Located at UCB/SSL Look into Using Heritage Control System (ITOS)

TRANSCRIPT

Page 1: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 1 August 22, 2008

CINEMACommunications & Ground Systems

Manfred Bester

Page 2: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 2 August 22, 2008

Agenda

• Agenda− Concept of Operations− S-Band Communications− Ground Systems− Flight Software− Future Work

Page 3: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 3 August 22, 2008

Concept of Operations

• Concept of Operations− Mission Orbit

Spin Stabilized SpacecraftBaseline Orbit 650 km Circular at 72°

Inclination− Pass Coverage

Typically 4 Passes/day with 30 min Access Time

Tracking via TLEs Downloaded from USSTRATCOM

− Data RecoveryStore-and-forward Scheme, Downlink at 1

MbpsRecoverable Science Data Volume 760

Mbits/day− Ground Segment

MOC and Ground Station Located at UCB/SSL

Look into Using Heritage Control System (ITOS)

Page 4: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 4 August 22, 2008

CINEMA Ground Track

Page 5: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 5 August 22, 2008

BGS 3mEng TLM/CMD2400-2450 MHz

BGS 11mScience TLM2200-2300 MHz

CINEMA

MOC at UCB/SSL

Communications Concept

Page 6: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 6 August 22, 2008

S-Band Communications

• S-Band Communications− Telecom Trades

− Transceivers− Flight Antennas− Flight Software− Ground Software

− Ground Stations− BGS 11m− BGS 3m

− Link Budgets− STDN and WiFi Links

− Spectrum Licensing

Page 7: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 7 August 22, 2008

STDN Telemetry LinkFrequency 2250 MHzModulation BPSKSpacecraft Antenna Gain -6.0 dBicSpacecraft EIRP -3.0 dBWRange 3000 kmPath Loss 169.1 dBPolarization and Pointing Losses 1.0 dBGround Station G/T (11-m Dish) 26.0 dB/KData Rate 1000 kbpsBandwidth 1000 kHzCoding Gain (Reed-Solomon) 4.3 dBBER 10-6

Required Eb/No 6.2 dBPredicted Eb/No 19.6 dBImplementation Loss 2.3 dBLink Margin 11.1 dB

S-Band Link Budgets

• Link Budgets for STDN and WiFi TLM LinksWiFi Telemetry Link

Frequency 2425 MHzModulation (Spread Spectrum) 8FSKSpacecraft Antenna Gain 1.0 dBicSpacecraft EIRP 0.0 dBWRange 3000 kmPath Loss 169.8 dBPolarization and Pointing Losses 0.5 dBGround Station G/T (3-m Dish) 10.0 dB/KData Rate 86 kbpsBandwidth 458.7 kHzCoding Gain (Rate-1/2 Convol.) 5.7 dBBER 10-6

Required Eb/No 4.2 dBPredicted Eb/No 11.7 dBImplementation Loss 2.0 dBLink Margin 5.5 dB

Page 8: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 8 August 22, 2008

STDN S-Band Link

• STDN S-Band Link− Transceiver Options: SpaceQuest, Emhiser− Heritage: CHIPSAT, Various Others− Spectrum Licensing: Need NTIA License− Trades

Advantages: Can Use BGS “As Is”High Link MarginLow Risk

Disadvantages: Onboard Software Changes

Ground Software Changes

SpaceQuest TX-2400 Transmitter

Page 9: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 9 August 22, 2008

WiFi S-Band Link

• WiFi S-Band Link− Transceiver Options: MicroHard− Heritage: GENESAT− Spectrum Licensing: Need Amateur Radio

License− Trades

Advantages: Reuse Existing Flight Hardware

and SoftwareDisadvantages: Need Additional Ground

StationUnknown Impact of Local

WiFi Interference

MicroHard MHX-2440 Transceiver

Page 10: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 10 August 22, 2008

S-Band Prototype Antennas

• First Prototype Model− Linear Polarized Patch Antenna

Overall Dimensions 70.2 x 70.2 mm2

− RT/Duroid 6002 Material OrderedThickness 3.048 mm, Copper Cladding 0.035 mm, εr = 2.94

− Fabricate Antenna at SSL− Test with BGS 11-m Antenna in Far Field

Page 11: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 11 August 22, 2008

S-Band Flight Antennas

• Flight Models− Circular Polarized Patches:

Need 4− Typical Gain Pattern:

Hemispherical with Taper− Performance Goals

See Table Below

Patch Antenna Performance GoalsParameter θ = 90° θ = 30° θ = 5°

Efficiency > 80% > 80% > 80%

Gain > 7 dBic > 0 dBic > -10 dBic

Axial Ratio < 1 dB < 6 dB < 10 dB

Page 12: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 12 August 22, 2008

Ground Systems

• Ground Systems− Mission Operations

− Command and Control System− Mission Planning Products− Ground Station

− Science Data Processing

Page 13: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 13 August 22, 2008

Flight Software FunctionsTasks Functions

Command Processing Real-time Commands, Execution of Stored Table Commands

Telemetry Downlink Interleaving of Real-time and Playback Data

Instrument Control Deployments, High Voltages, Other Parameters

Attitude Control ACS Modes

Power Control Monitoring of Power Subsystem, Control Switched Services

Thermal Control Monitor Temperatures

Engineering Data Recording Read-out and Record Sensor Data and Software Parameters

Science Data Acquisition Read-out and Store Science Data

Memory Management Manage Flash Memory

Flight Software Functions

Page 14: CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester

CINEMA PDR, UCB/SSL 14 August 22, 2008

Future Work

• Future Work− Communications Design

Trades for Selection of Radios OngoingS-Band Antenna Prototyping Ongoing

− Ground SystemsGround Station Options Tied to Selection of

RadiosCommand & Control Systems

− Flight SoftwareReceived PharmaSat Code from ARCNeed to Look into Modifying CodeDevelop Code to Interface to High-rate

TransmitterConsider Other OptionsLook into CCSDS Compatibility