Thermal Generation CIPREL III V ridi - Thermal Power Plant Extension of the existing CIPREL power plant as EPC contractor of the CIPREL III (115 MW at site ambient conditions). The scope of work included : . the complete civil works, . the GE “9E” gas turbine and its auxiliaries, . the electrical and mechanical balance of plant, and its integration within the existing one, . the automation & monitoring and control, . the connection to the 90 kV grid through a new switchyard bay, . the transportation, customs clearance, erection and commissioning. SOLUTION IMPLEMENTED TURNKEY PROJECT Activity Civil Works, Structures, Mechanics, Automation monitoring and control Technologies Used GE 9 FA Gas turbine, Dual Fuel Customer Benefits . Ability to deliver a turnkey solution, customized to CIPREL’s requirements . Addition 50% capacity to its existing plant without disturbing its operation Business Units Involved Omexom Power Plants - Thermal Philippe LENTZ - [email protected] Xavier DUCLOS - [email protected] Country: Ivory Coast Site: Vridi, suburbs of Abidjan Budget (k€): 54,000 Start Date: 05/2008 End Date: 03/2010 Contacts SCAN WITH UBLEAM APPLICATION

Upload: lytu

Post on 06-Mar-2018

231 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: CIPREL III Vridi - Thermal Power Plant - · PDF fileThermal Generation CIPREL III Vridi - Thermal Power Plant Extension of the existing CIPREL power plant as EPC contractor of the

Thermal Generation

CIPREL III

Vridi - Thermal Power Plant Extension of the existing CIPREL power plant as EPC contractor of the CIPREL III (115 MW at site ambient conditions). The scope of work included : . the complete civil works, . the GE “9E” gas turbine and its auxiliaries, . the electrical and mechanical balance of plant, and its integration within the existing one, . the automation & monitoring and control, . the connection to the 90 kV grid through a new switchyard bay, . the transportation, customs clearance, erection and commissioning.

SOLUTION IMPLEMENTED

TURNKEY PROJECT Activity

Civil Works, Structures, Mechanics, Automation & monitoring and control

Technologies Used GE 9 FA Gas turbine, Dual Fuel

Customer Benefits . Ability to deliver a turnkey solution, customized to CIPREL’s requirements . Addition 50% capacity to its existing plant without disturbing its operation

Business Units Involved Omexom Power Plants - Thermal

Philippe LENTZ - [email protected] DUCLOS - [email protected]

Country: Ivory Coast Site: Vridi, suburbs of Abidjan Budget (k€): 54,000 Start Date: 05/2008 End Date: 03/2010