City CouncilJuly 16, 2013
![Page 2: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/2.jpg)
River Improvements ProjectJuly 16, 2013
![Page 3: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/3.jpg)
River Improvements Project
![Page 4: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/4.jpg)
River Improvements Project• Funding Sources: Half-Cent Sales Taxes and nearly
$2,000,000 in grants including 2 from Texas Parks and Wildlife, San Angelo Health Foundation, Texas Commission on Environmental Quality and National Endowment for the Arts.
• Improvements to Include: stabilization of the banks from Oakes Street upriver to the vicinity of Sulphur Draw, additional trails and trail improvements, new lighting, an outdoor exercise area, public art, shaded sitting areas, water features and other special elements.
• Work outside of contract includes trail section on SAHF property and some existing trail renovation.
• Note: dredging of the river occurred in 2009 from Sulphur Draw upriver to 14th Street at a cost of about $1,500,000.
![Page 5: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/5.jpg)
River Improvements Project• Construction Manager at Risk: Templeton Construction, Inc.• Time Summary
• Contract Date: October 1, 2011• Completion Date: September 2013
• Budget Summary• Project Budget = $10,120,432.34• Total Change Orders to date = $820,432.34• Billed to Date (Gross) = $9,057,928.50• Retainage Held to Date (3%) = $268,297.19• Billed to Date (Less Retainage) = $8,789,631.32• % Complete = 87%• Pay app #21 pending @ $314k, bringing % to 92%
![Page 6: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/6.jpg)
River Improvements Project• Change Order Summary ($820,432.34):
• Addl. bank stabilization (Sulphur Draw to 1st St.) – largest CO @ almost $700k.
• Repair of pedestrian bridge west of Abe St.• 8 addl. LED lights (Oakes and Chadbourne 4 ea.).• Removal of dead trees.• Addl. lights at some areas.• Column adjustment.• Addl. drinking fountain.
![Page 7: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/7.jpg)
River Improvements Project
River Trail refurbishments near Bell Street
![Page 8: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/8.jpg)
River Improvements Project
River trail chat sections refurbishing
![Page 9: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/9.jpg)
River Improvements Project
Interpretive area below Oakes
![Page 10: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/10.jpg)
River Improvements Project
Interpretive area below Oakes
![Page 11: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/11.jpg)
River Improvements Project
![Page 12: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/12.jpg)
River Improvements Project
River bank fountain filter and pump station
![Page 13: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/13.jpg)
River Improvements Project
Fountain at Celebration Bridge
![Page 14: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/14.jpg)
River Improvements Project
Fountain by Oakes Street
![Page 15: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/15.jpg)
River Improvements Project
Mosaic panel west of Oakes
![Page 16: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/16.jpg)
River Improvements Project
New bench near Celebration Bridge
![Page 17: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/17.jpg)
River Improvements Project
Shade structures near main fountain
![Page 18: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/18.jpg)
River Improvements Project
New landscaped area above main fountain
![Page 19: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/19.jpg)
River Improvements Project
Central Fountain below Neff’s
![Page 20: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/20.jpg)
River Improvements Project
Central Fountain below Neff’s
![Page 21: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/21.jpg)
River Improvements Project
Steps and railing near main fountain
![Page 22: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/22.jpg)
River Improvements Project
Trail lights below Neff’s area
![Page 23: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/23.jpg)
River Improvements Project
Art work below Chadbourne
![Page 24: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/24.jpg)
River Improvements Project
Games Court Area
![Page 25: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/25.jpg)
River Improvements Project
Fountain below Games Court Area
![Page 26: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/26.jpg)
River Improvements Project
Fountain near Games Court
![Page 27: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/27.jpg)
River Improvements Project
Sculpted Panels
![Page 28: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/28.jpg)
River Improvements Project
![Page 29: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/29.jpg)
River Improvements Project
![Page 30: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/30.jpg)
River Improvements Project
Chess board
![Page 31: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/31.jpg)
River Improvements Project
Games area – washer playing area and Tivoli lights
![Page 32: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/32.jpg)
River Improvements Project
Sub-surface drip irrigation on existing trees where no spray irrigation
![Page 33: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/33.jpg)
River Improvements Project
Dia de los Muertos
![Page 34: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/34.jpg)
River Improvements Project
Restrooms at games area near Irving
![Page 35: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/35.jpg)
River Improvements Project
Entrance to games area
![Page 36: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/36.jpg)
River Improvements Project
River crossing at Irving Ramp to new trail on SAHF propertyWalkways at Irving Street
![Page 37: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/37.jpg)
River Improvements Project
New walkway from Irving Street to Visitors’ Center
![Page 38: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/38.jpg)
River Improvements Project
![Page 39: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/39.jpg)
River Improvements Project
Parking area near Koenigheim
![Page 40: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/40.jpg)
River Improvements Project
Ramp east of Koenigheim
![Page 41: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/41.jpg)
River Improvements Project
Mosaic cars below Koenigheim
![Page 42: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/42.jpg)
River Improvements Project
LED lights below Koenigheim
![Page 43: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/43.jpg)
River Improvements Project
Overlook on north bank under Koenigheim
![Page 44: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/44.jpg)
River Improvements Project
New drinking fountain on north bank under Koenigheim
![Page 45: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/45.jpg)
River Improvements Project
Exercise equipment near Kids’ Kingdom
![Page 46: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/46.jpg)
River Improvements Project
Bank stabilization below “Kids’ Kingdom” Park
![Page 47: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/47.jpg)
River Improvements Project
Mosaic panel below South Abe
![Page 48: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/48.jpg)
River Improvements Project
Landscaped area on north bank near pedestrian bridge
![Page 49: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/49.jpg)
River Improvements Project
Small “amphitheater” area east of South Abe
![Page 50: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/50.jpg)
River Improvements Project
Repairs to pedestrian bridge west of Abe St.
![Page 51: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/51.jpg)
River Improvements Project
Installation of irrigation system, Santa Fe Park
![Page 52: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/52.jpg)
River Improvements Project
Bank stabilization, before and after
![Page 53: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/53.jpg)
River Improvements Project
Bank stabilization below Santa Fe Park
![Page 54: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/54.jpg)
River Improvements Project
Bank stabilization down river from Beauregard Bridge
![Page 55: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/55.jpg)
River Improvements Project
Bank stabilization between Pecos and Beauregard Bridges
![Page 56: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/56.jpg)
River Improvements Project
Bank stabilization just down river from Pecos Bridge
![Page 57: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/57.jpg)
River Improvements Project
Bank stabilization below Central High School
![Page 58: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/58.jpg)
River Improvements Project
Trail refurbishments near 14th St.
![Page 59: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/59.jpg)
River Improvements Project
Trail refurbishments near 14th St.
![Page 60: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/60.jpg)
River Improvements Project
Dead tree removal
![Page 61: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/61.jpg)
River Improvements Project
![Page 62: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/62.jpg)
River Improvements Project
![Page 63: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/63.jpg)
River Improvements Project
![Page 64: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/64.jpg)
River Improvements Project
![Page 65: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/65.jpg)
River Improvements Project• Possible Enhancements – post contracted work:
• Funding Available $905,490• Commitments/Contingencies:
• Reserve (Council requested) $500,000• Purchase of Property (survey, $48,000
Phase I, closing costs -- $45-$48k)• Addl. tree work (if needed) $50,000• Total
$598,000• Avail. post commitments/contingencies $307,490
![Page 66: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/66.jpg)
River Improvements Project• Avail. post commitments/contingencies $307,490• Possible enhancements with estimated costs:
• Secure loose river rock by art work $15,000• Additional signage and wayfinding $150,000• Games & Food Court Concessions
& Restoration of putt-putt area $175,000• Turn-around parking by Koenigheim $50,000• Maint. Drive from El Paseo to pumps $35,000• Expanded drip irrigation $175,000
![Page 67: City council 7 16-13 river project](https://reader035.vdocuments.net/reader035/viewer/2022062703/554d866fb4c905390c8b5240/html5/thumbnails/67.jpg)
River Improvements Project• Avail. post commitments/contingencies $307,490• Possible enhancements (cont.):
• Suspension bridge under Concho Ave.• River trail connections to downtown• Supplemental funding for landscaping• Addl. bank stabilization from Johnson Dam• River trail, Irving to Celebration Bridge (Edgewater Inn)