Page 2: City council 7 16-13 river project

River Improvements ProjectJuly 16, 2013

Page 3: City council 7 16-13 river project

River Improvements Project

Page 4: City council 7 16-13 river project

River Improvements Project• Funding Sources: Half-Cent Sales Taxes and nearly

$2,000,000 in grants including 2 from Texas Parks and Wildlife, San Angelo Health Foundation, Texas Commission on Environmental Quality and National Endowment for the Arts.

• Improvements to Include: stabilization of the banks from Oakes Street upriver to the vicinity of Sulphur Draw, additional trails and trail improvements, new lighting, an outdoor exercise area, public art, shaded sitting areas, water features and other special elements.

• Work outside of contract includes trail section on SAHF property and some existing trail renovation.

• Note: dredging of the river occurred in 2009 from Sulphur Draw upriver to 14th Street at a cost of about $1,500,000.

Page 5: City council 7 16-13 river project

River Improvements Project• Construction Manager at Risk: Templeton Construction, Inc.• Time Summary

• Contract Date: October 1, 2011• Completion Date: September 2013

• Budget Summary• Project Budget = $10,120,432.34• Total Change Orders to date = $820,432.34• Billed to Date (Gross) = $9,057,928.50• Retainage Held to Date (3%) = $268,297.19• Billed to Date (Less Retainage) = $8,789,631.32• % Complete = 87%• Pay app #21 pending @ $314k, bringing % to 92%

Page 6: City council 7 16-13 river project

River Improvements Project• Change Order Summary ($820,432.34):

• Addl. bank stabilization (Sulphur Draw to 1st St.) – largest CO @ almost $700k.

• Repair of pedestrian bridge west of Abe St.• 8 addl. LED lights (Oakes and Chadbourne 4 ea.).• Removal of dead trees.• Addl. lights at some areas.• Column adjustment.• Addl. drinking fountain.

Page 7: City council 7 16-13 river project

River Improvements Project

River Trail refurbishments near Bell Street

Page 8: City council 7 16-13 river project

River Improvements Project

River trail chat sections refurbishing

Page 9: City council 7 16-13 river project

River Improvements Project

Interpretive area below Oakes

Page 10: City council 7 16-13 river project

River Improvements Project

Interpretive area below Oakes

Page 11: City council 7 16-13 river project

River Improvements Project

Page 12: City council 7 16-13 river project

River Improvements Project

River bank fountain filter and pump station

Page 13: City council 7 16-13 river project

River Improvements Project

Fountain at Celebration Bridge

Page 14: City council 7 16-13 river project

River Improvements Project

Fountain by Oakes Street

Page 15: City council 7 16-13 river project

River Improvements Project

Mosaic panel west of Oakes

Page 16: City council 7 16-13 river project

River Improvements Project

New bench near Celebration Bridge

Page 17: City council 7 16-13 river project

River Improvements Project

Shade structures near main fountain

Page 18: City council 7 16-13 river project

River Improvements Project

New landscaped area above main fountain

Page 19: City council 7 16-13 river project

River Improvements Project

Central Fountain below Neff’s

Page 20: City council 7 16-13 river project

River Improvements Project

Central Fountain below Neff’s

Page 21: City council 7 16-13 river project

River Improvements Project

Steps and railing near main fountain

Page 22: City council 7 16-13 river project

River Improvements Project

Trail lights below Neff’s area

Page 23: City council 7 16-13 river project

River Improvements Project

Art work below Chadbourne

Page 24: City council 7 16-13 river project

River Improvements Project

Games Court Area

Page 25: City council 7 16-13 river project

River Improvements Project

Fountain below Games Court Area

Page 26: City council 7 16-13 river project

River Improvements Project

Fountain near Games Court

Page 27: City council 7 16-13 river project

River Improvements Project

Sculpted Panels

Page 28: City council 7 16-13 river project

River Improvements Project

Page 29: City council 7 16-13 river project

River Improvements Project

Page 30: City council 7 16-13 river project

River Improvements Project

Chess board

Page 31: City council 7 16-13 river project

River Improvements Project

Games area – washer playing area and Tivoli lights

Page 32: City council 7 16-13 river project

River Improvements Project

Sub-surface drip irrigation on existing trees where no spray irrigation

Page 33: City council 7 16-13 river project

River Improvements Project

Dia de los Muertos

Page 34: City council 7 16-13 river project

River Improvements Project

Restrooms at games area near Irving

Page 35: City council 7 16-13 river project

River Improvements Project

Entrance to games area

Page 36: City council 7 16-13 river project

River Improvements Project

River crossing at Irving Ramp to new trail on SAHF propertyWalkways at Irving Street

Page 37: City council 7 16-13 river project

River Improvements Project

New walkway from Irving Street to Visitors’ Center

Page 38: City council 7 16-13 river project

River Improvements Project

Page 39: City council 7 16-13 river project

River Improvements Project

Parking area near Koenigheim

Page 40: City council 7 16-13 river project

River Improvements Project

Ramp east of Koenigheim

Page 41: City council 7 16-13 river project

River Improvements Project

Mosaic cars below Koenigheim

Page 42: City council 7 16-13 river project

River Improvements Project

LED lights below Koenigheim

Page 43: City council 7 16-13 river project

River Improvements Project

Overlook on north bank under Koenigheim

Page 44: City council 7 16-13 river project

River Improvements Project

New drinking fountain on north bank under Koenigheim

Page 45: City council 7 16-13 river project

River Improvements Project

Exercise equipment near Kids’ Kingdom

Page 46: City council 7 16-13 river project

River Improvements Project

Bank stabilization below “Kids’ Kingdom” Park

Page 47: City council 7 16-13 river project

River Improvements Project

Mosaic panel below South Abe

Page 48: City council 7 16-13 river project

River Improvements Project

Landscaped area on north bank near pedestrian bridge

Page 49: City council 7 16-13 river project

River Improvements Project

Small “amphitheater” area east of South Abe

Page 50: City council 7 16-13 river project

River Improvements Project

Repairs to pedestrian bridge west of Abe St.

Page 51: City council 7 16-13 river project

River Improvements Project

Installation of irrigation system, Santa Fe Park

Page 52: City council 7 16-13 river project

River Improvements Project

Bank stabilization, before and after

Page 53: City council 7 16-13 river project

River Improvements Project

Bank stabilization below Santa Fe Park

Page 54: City council 7 16-13 river project

River Improvements Project

Bank stabilization down river from Beauregard Bridge

Page 55: City council 7 16-13 river project

River Improvements Project

Bank stabilization between Pecos and Beauregard Bridges

Page 56: City council 7 16-13 river project

River Improvements Project

Bank stabilization just down river from Pecos Bridge

Page 57: City council 7 16-13 river project

River Improvements Project

Bank stabilization below Central High School

Page 58: City council 7 16-13 river project

River Improvements Project

Trail refurbishments near 14th St.

Page 59: City council 7 16-13 river project

River Improvements Project

Trail refurbishments near 14th St.

Page 60: City council 7 16-13 river project

River Improvements Project

Dead tree removal

Page 61: City council 7 16-13 river project

River Improvements Project

Page 62: City council 7 16-13 river project

River Improvements Project

Page 63: City council 7 16-13 river project

River Improvements Project

Page 64: City council 7 16-13 river project

River Improvements Project

Page 65: City council 7 16-13 river project

River Improvements Project• Possible Enhancements – post contracted work:

• Funding Available $905,490• Commitments/Contingencies:

• Reserve (Council requested) $500,000• Purchase of Property (survey, $48,000

Phase I, closing costs -- $45-$48k)• Addl. tree work (if needed) $50,000• Total

$598,000• Avail. post commitments/contingencies $307,490

Page 66: City council 7 16-13 river project

River Improvements Project• Avail. post commitments/contingencies $307,490• Possible enhancements with estimated costs:

• Secure loose river rock by art work $15,000• Additional signage and wayfinding $150,000• Games & Food Court Concessions

& Restoration of putt-putt area $175,000• Turn-around parking by Koenigheim $50,000• Maint. Drive from El Paseo to pumps $35,000• Expanded drip irrigation $175,000

Page 67: City council 7 16-13 river project

River Improvements Project• Avail. post commitments/contingencies $307,490• Possible enhancements (cont.):

• Suspension bridge under Concho Ave.• River trail connections to downtown• Supplemental funding for landscaping• Addl. bank stabilization from Johnson Dam• River trail, Irving to Celebration Bridge (Edgewater Inn)

Page 68: City council 7 16-13 river project

River Improvements Project