city council july 12, 2011 nabors presentation
DESCRIPTION
TRANSCRIPT
TES History
Founded in 2000 by Raymond Owen with the goal of providing exceptional professional consultants to the Oil & Gas Industry with an office in Houston, TX.
Expanded to Midland, TX and the Permian Basin in May 2006.
TES History Cont.
TES has managed or assisted with the management of $300MM in capex budget for our clients from 2007 to 2009.
TES is capable of providing Total Project Management for up to 15 domestic rigs at one time.
TES has provided complete transitional operational management to publicly traded O&G companies during merger operations.
TES Currently provides technical expertise, project management, engineering, regulatory and superintendent services to a variety of clients.
Services
TES is capable of taking your project from “stake to valve” providing operational assistance in all phases of well life.
– Staking wells– Regulatory work– Location construction– Engineering– Securing bids– Drilling phase– Completion phase– Production maintenance
L.D. (Dave) Simon IV
Twenty three years of combined operations experience in the domestic and international petroleum industry. Previous work scope duties include supervising all operational phases during exploration, development, and completions. Operational expertise in the following environments; West Texas, Oklahoma, New Mexico, Wyoming, Colorado, Florida, South Texas, Off-shore California, Gulf of Mexico, & West Africa.
Clients in I-10 Corridor
Oxy Permian Petro Grande Harding Company Staley Operating Foundation Energy Stonegate Production MLC Operating Gunn Oil Company BP
Clients South of I-20
Atinum Hibernia Resources Henry Petroleum Reliance Energy BC Operating Oxy Permian
Clients North of I-20 & SE New Mexico
Triad Energy John M. Clark HL Brown Greystone Oil & Gas BC Operating Sheridan Production
Other Areas of Expertise
Total Energy Services has successfully managed projects in the following areas:
Offshore California Gulf of Mexico BLM and Federal Lands Pennsylvania
Local Expertise Matters
We can provide instantaneous expertise in Nabors Well Services core areas of interest
TES can reduce the “learning curve” and provide cost effective solutions
The Permian Basin is our home. We live here, we work here and we take pride in our region. The acreage position now held by Nabors Well Service is where we perform best.
Leveraging Professional Relationships
With decades of Permian Basin drilling experience within the firm, our reputation at Total Energy Services, proceeds us. – TES utilizes its position to leverage and procure
services at the most competitive prices. – TES recently provided these services to a client
which resulted in a 5% to 20% reduction of cost for specific air drilling services.
RRC Permit SATTC #1
RRC Permit SATTC #2
RRC Permit SATTC #3
Typical Cementing Process
Rig: Rig 1467 Surface Driller Plan Target / AFE+Supps:Spud Date:
Field:Nabors Training Facility County: Tom Green Co., TX
Formation Bits Hole MW, ppg Shoe
Wellhead Specs 20" Conductor set at 40'Surface: 13 3/8" SOW X 13 5/8" 3MProduction: 13 5/8" 3M x 11" 3M
Normaly we only tie the cement back in
with the surface casing like pictured here
but as you can see in the traning wells WBDs,
we are cementing all the way back to surface to unsure complete 750' MD 9 5/8" 36# J-55 STC protection of all water Surface Casingtables and shallow
formations
Surface Cement:14.8 lb/gal, TOC Surface
Production Cement: 7" 20#/ft J-55 LTC 12.4 lb/gal, TOC Surface 2,000' MD 0' to 2,000'
Production Casing
Nabors Well Service
Wellbore SketchExample of Typical Cementing Process
17 1/2"
12 1/4"
Double Barrier
Rig: Rig 1467 Surface Driller Plan Target / AFE+Supps:Spud Date:
Field:Nabors Training Facility County: Tom Green Co., TX
Formation Bits Hole MW, ppg Shoe
Wellhead Specs 16" Conductor set at 40'Surface: 9 5/8" SOW X 11" 3MProduction: 11" 3M x 7 1/16" 3M
8.6 ppg
250' MD 9 5/8" 36# J-55 STC
Surface Casing
Surface Cement:14.8 ppg, TOC Surface
Production Cement:12.4 ppg, TOC Surface
9.1 ppg
7" 20#/ft J-55 LTC 3,000' MD 0' to 2,000'
Production Casing
Nabors Well Service"Double Barrier"
Wellbore Sketch
12 1/4"
8 3/4"
Closing Remarks
Thank You for your time! Questions?