  • Broadway Avenue Streetscape ProjectCity of Albert Lea

    Streetscape Design Committee Meeting

    October 29, 2012

    1

  • Presentation Outline

    � Street Widths, Sidewalk Widths and Bump-Out Configuration

    � Decorative Sidewalk and Crosswalk Treatment

    � Water Street Plaza

    � William Street Plaza

    � Fountain Lake Park Improvements

    2

    � Fountain Lake Park Improvements

    � Light Fixtures on Broadway

    � Stormwater Discussion

  • STREET WIDTHS, SIDEWALK WIDTHS

    AND BUMP-OUT CONFIGURATION

    3

  • Street Widths, Sidewalk Widths and

    Bump-Out Configuration

    � Based on input from City Staff, Streetscape Design Committee

    and City Council, proceed with current street width and bump-

    out configuration

    � Dropped curb at intersections

    � Reduce or eliminate reverse curves at curb tie-ins (to extent

    4

    � Reduce or eliminate reverse curves at curb tie-ins (to extent

    practical)

    � Remove existing signal systems and replace with four-way stops

  • Typical Block Layout

    5

  • Proposed Street/Sidewalk Section

    6

  • A Sample Block

    7

  • Bumpouts w/ Amenities

    8

  • DECORATIVE SIDEWALK,

    CROSSWALK, AND PAVEMENT

    TREATMENT

    9

    TREATMENT

  • Decorative Sidewalk, Crosswalk and

    Pavement Treatment� Based on input from City Staff, Streetscape Design Committee

    and City Council, proceed with concrete pavers for decorative

    sidewalk, crosswalks and pavement (pedestrian plaza)

    � Color: Millstream (Red and Grey Mix)

    � Pattern: Herringbone

    � Pavers in Sidewalk:

    10

    � Pavers in Sidewalk:

    – Size: 7⅞” x 3⅞” x 2⅝”

    – Subbase type: Concrete w/ sand setting bed

    � Paver on Crosswalk

    – Size: 7⅞” x 3⅞” x 3⅛”

    – Subbase type: Concrete w/ bituminous setting bed

  • Enhanced Pavement

    11

  • Enhanced Pavement

    12

  • WATER STREET PLAZA

    13

  • Water Street Plaza

    � Based on input from City Staff, Streetscape Design Committee

    and City Council, consider two options:

    � Full Streetscape Treatment (Estimated Cost $160,000)

    – Decorative concrete pavers for street and sidewalk

    – Trees and tree grates

    – Decorative street lighting

    14

    – Other landscaping amenities – benches, litter receptacles, planters

    � Limited Streetscape Treatment (Estimated Cost $125,000)

    – Eliminate decorative concrete pavers in sidewalk and pavement areas

    and use plain concrete

    – Trees, decorative street lighting, and other landscaping amenities same

    as full streetscape design

  • Water Street Plaza

    15

  • Water Street Plaza

    16

    Preliminary Cost EstimateWater Street Pedestrian Plaza : $161,700

  • Water Street Plaza

    17

    Preliminary Cost EstimateReduced Scope Water Street Pedestrian Plaza: $125,000

    ($36,700 less than full design)

  • WILLIAM STREET PLAZA

    18

  • William Street Plaza

    � Based on input from City Staff, Streetscape Design Committee

    and City Council, utilize limited streetscape treatment :

    � Full Streetscape Treatment: ($115,000)

    – Plain concrete for street and sidewalk

    – Trees and tree grates

    – Decorative street lighting

    19

    – Decorative street lighting

    – Other landscaping amenities – benches, litter receptacles, planters

  • William Street Plaza

    20

    Preliminary Cost EstimateWilliam Street Pedestrian Plaza______________$115,000

  • FOUNTAIN LAKE PARK

    IMPROVEMENTS

    21

  • Fountain Lake Park Improvements

    � Based on input from City Staff, Streetscape Design Committee

    and City Council, proceed with Broadway Avenue/Fountain

    Street intersection and Fountain Lake Park as previously

    presented

    � Items requiring further investigation/discussion:

    – Size, configuration, design of dock

    22

    – Size, configuration, design of dock

    – Repairs to overlook

  • Fountain Lake Park

    23

  • Fountain Street Connection

    24

  • Fountain Lake ParkAccessible/Maintenance Access

    25

  • Fountain Lake Park

    26

  • Fountain Lake Park

    27

  • Fountain Lake Park

    28

  • Fountain Lake ParkLookout Area

    29

  • Fountain Lake ParkLookout Seating

    30

  • Fountain Lake Park

    31

    Preliminary Cost EstimateFountain Lake Park Improvements______________$350,000

  • STREETSCAPE AMENITIES

    32

  • Bench – Litter Receptacle

    33

  • PlantersConcrete

    34

  • Bollards

    35

  • Kiosk - Wayfinding

    36

  • LIGHT FIXTURES ON BROADWAY

    37

  • Light Fixtures on Broadway Avenue� Based on input from City Staff, Streetscape Design Committee

    and City Council, the following street lighting design is

    recommended:

    � Mid-block street lights:

    – 15-foot high standards: Black or Dark Green decorative poles

    – LED Acorn-style fixture: Lumec Serenade or similar, dimmable

    – Fixtures for hanging banners – 10 feet to bottom of banner

    38

    – Fixtures for hanging banners – 10 feet to bottom of banner

    – Duplex outlets up towards the top of pole for festive lights

    � Intersection street lights:

    – 30-foot high standards: Black or Dark Green decorative poles

    – LED drop globe downlight -style fixture: Lumec Domus or similar,

    dimmable

    – Fixtures for hanging banners – 10 feet to bottom of banner

    – Duplex outlets

  • Mid-Block Street Lights

    39

  • Intersection Street Lights

    40

  • STORM SEWER AND STORMWATER

    TREATMENT DISCUSSION

    41

  • Previous Storm Sewer and Storm Water

    Treatment Option– Area north of Clark Street:

    � Collect storm water run-off in a storm sewer system that runs north to lake

    � Treat storm water in rain garden in Fountain Lake Park before discharging to lake

    – Area south of Clark Street:� Collect storm water run-off from area south of Clark Street in a storm sewer

    system that connects to existing storm sewer on William Street

    � Storm sewer system on William Street flows to Morin Park storm water lift

    42

    � Storm sewer system on William Street flows to Morin Park storm water lift

    station

    � Treat storm water using tree filter boxes

    – Tree filter boxes:� Expensive to construct

    � Will require frequent cleaning and maintenance

    � Limits tree grate configuration and size of tree

  • 43

  • Tree Box Filters

    44

  • Alternative Storm Sewer and Storm Water

    Treatment Option (Preferred)

    – Collect storm water run-off from entire project corridor in a storm

    sewer system that runs north to lake

    – Treat storm water in rain garden in Fountain Lake Park before

    discharging to lake

    – Treatment effectiveness will be reduced slightly – larger drainage

    area flowing to rain garden

    45

    area flowing to rain garden

    – Storm sewer on Broadway Avenue will be deeper (approx 9’ max).

    – No storm water will be directed to storm sewer on William Street

    – Area draining to Morin Park storm water lift station will be reduced

    slightly (approx 1.3 acres)

    – max.)

  • 46

  • Preliminary Cost Estimate

    47

  • Broadway Avenue Streetscape Project

    Thanks for your time!