CITY OF ARDMORE CIRCLE DRIVE DRAINAGE IMPROVEMENTS PROJECT NO. 011-0114 MAYOR AND BOARD OF COMMISSIONERS OF THE CITY OF ARDMORE MAYOR: SHERYL ELLIS VICE MAYOR: MARTIN DYER COMMISSONER: BOB GEURIN COMMISSONER: KEITH KING COMMISSONER: JOHN MOORE 1. TITLE SHEET 2. PAY QUANTITIES AND NOTES 3. PROJECT SURVEY DATA 4. PAVING P&P-1 5. PAVING P&P-2 6. STORM DRAIN P&P-1 7. STORM DRAIN P&P-2 8. STORM DRAIN P&P-3 9. SANITARY SEWER P&P-1 10. SANITARY SEWER P&P-2 11. STORM DRAIN DETAIL -1 12. STORM DRAIN DETAIL -2 13. STORM DRAIN DETAIL -3 14. STORM DRAIN DETAIL -4 15. STANDARD SEWER DETAIL -1 16. STANDARD SEWER DETAIL -2 17. STANDARD WATER SERVICE DETAIL APPROVED BY _____________ JD SPOHN, CITY MANAGER DATE : DESIGNED BY CITY ENGINEER 12/19/2013

Upload: phungxuyen

Post on 07-Mar-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

CITY OF ARDMORECIRCLE DRIVE DRAINAGE IMPROVEMENTS

PROJECT NO. 011-0114

MAYOR AND BOARD OF COMMISSIONERS OFTHE CITY OF ARDMORE

MAYOR: SHERYL ELLISVICE MAYOR: MARTIN DYERCOMMISSONER: BOB GEURINCOMMISSONER: KEITH KINGCOMMISSONER: JOHN MOORE

1. TITLE SHEET2. PAY QUANTITIES AND NOTES3. PROJECT SURVEY DATA4. PAVING P&P-15. PAVING P&P-26. STORM DRAIN P&P-17. STORM DRAIN P&P-28. STORM DRAIN P&P-39. SANITARY SEWER P&P-110. SANITARY SEWER P&P-211. STORM DRAIN DETAIL -112. STORM DRAIN DETAIL -213. STORM DRAIN DETAIL -314. STORM DRAIN DETAIL -415. STANDARD SEWER DETAIL -116. STANDARD SEWER DETAIL -217. STANDARD WATER SERVICE DETAIL

APPROVED BY

_____________JD SPOHN, CITY MANAGERDATE :

DESIGNED BY

CITY ENGINEER

12/19/2013

Page 2: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

OF 172

PAY

QUAN

TITI

ES A

ND N

OTES

Page 3: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

OF 17

PROJECT SURVEY DATA

THIS PROJECT IS LAYED OUT ON AN ASSUMED

COORDINATE GRID WHERE;

0,0 (ASSUMED) = 2227662.06,314753.51

(OKLAHOMA SOUTHERN ZONE, US FT)

AND

500,0 (ASSUMED= 2228162.06,314754.94

(OKLAHOMA SOUTHERN ZONE, US FT)

NOTE:

FOR COORDINATE DATA FOR THE

CONSTRUCTION OF THE STORM DRAIN SEE

STORM DRAIN P&P SHEETS

PR

OJE

CT

S

UR

VE

Y D

AT

A

SCALE: 1" = 60'

3

Page 4: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

VARIABLE CROSS SLOPE

4+00 5+00 6+00 7+00 8+00

T.C. = 104.43

4+54.49

T.C. = 103.82

SA

N. M

H

ST

A 4

+2

6.6

0 2

.5

9' R

T

P.C

. 3

5' C

EN

. L

IN

E R

AD

ST

A 3

+9

9.6

4

P.T

. 3

5' C

EN

. L

IN

E R

AD

ST

A 4

+5

4.4

9

V.P

.I. S

TA

4

+5

0

SLO

PE

01.1%

SLO

PE

01.5

%

4+25

T.C. = 104.16

4+50

T.C. = 103.88

4+75

T.C. = 103.51 T.C. = 103.13

4+32.80

T.C. = 104.07

ST

RM

IN

LE

T

ST

A 4

+3

2.8

0 1

3.0

' R

T

5+25

T.C. = 102.76

5+50

T.C. = 102.38

5+75

T.C. = 102.01

6+25

T.C. = 101.26

6+50

T.C. = 100.88

6+75

T.C. = 100.51

7+25

(LT) T.C. = 100.00

7+50

(LT) T.C. = 99.86

7+75

(LT) T.C. = 99.86T.C. = 101.63 T.C. = 100.13 (LT) T.C. = 99.98

V.P

.I. S

TA

7

+0

0

(RT) T.C. = 99.89 (RT) T.C. = 99.65 (RT) T.C. = 99.62 (RT) T.C. = 99.79

(VPI RT) T.C. = 99.53

(VPI LT) T.C. = 99.79

V.P.I

STA. 7+62.32

SA

N. M

H

ST

A 7

+6

2.5

4 1

.6

9' R

T

TR=103.85

TR=99.14

SLOPE (RT) 0.96%

SLOPE (LT) 0.54%

SLOPE (RT) 0

.69%

P.C

. 3

5' C

EN

. L

IN

E R

AD

ST

A 7

+3

5.1

6

P.T

. 3

5' C

EN

. L

IN

E R

AD

ST

A 7

+9

0.3

1

(RT) T.C. = 99.80

(LT) T.C. = 99.94

(RT) T.C. = 99.73

(LT) T.C. = 99.93

TOP OF CURB ELEVATION

16" C.I. WL.

16" C.I. WL.

4+00

6+

00

7+

00

8+00

5+

00

3+75

R/W

L

IN

E

EXISTING DRIVE

1

1

2

" LIP

6" P.C.C (ODOT 3000 PSI, CLASS AP)

1

4

" EXPANSION JOINT

OF 17

26.0'

2.0' 2.0'22.0'

1.0' Min. 1.0' Min

TYPICAL SECTION (w/C&G)

TYPICAL SECTION (MONOLITIC)

7.0' 7.0'

6" 3000 PSI ODOT CLASS A CONCRETE

8" AGGREGATE BASE

6" BARRIER CURB

30" #4 BARS 30" O/C

95.00

100.00

104.00

103.00

102.00

101.00

99.00

98.00

97.00

96.00

STA. 3+75

B.O.P.

STA. 3+99.66 - P.C.

BEGIN P.C.C.

PAVEMENT.

ASPHALT TRANSITION

S

T

A

.

4

+

2

6

.

6

0

2

.

5

9

'

R

T

.

S

S

M

H

22.0' RAD

S

T

A

.

4

+

3

2

.

8

0

1

3

.

0

'

R

T

.

S

D

ST

A. 4

+5

4.4

9 - P

.T

.

12' TYP.

SHALLOW 6" WL

16" C.I. - WL

22.0' RAD.

ST

A. 7

+3

5.1

6 - P

.C

.

A

4

SCALE: 1" = 30'

ALL DRIVEWAYS TO BE REMOVED AND REPLACED

AS DIRECTED BY THE ENGINEER

3.0'

5.0'

DRIVEWAY DETAIL

10' MIN.

A

SECTION A - A

NOTE:

PRIOR TO THE APPLICATION OF THE ROCK BASE THE SUBGRADE SHALL BE GRADED

TO DESIGN GRADE LINES AND COMPACTED TO PASS PROOF ROLL WITH A LOADED

TANDUM AXLE DUMP TRUCK PROVIDED BY THE CONTRACTOR.

PA

VIN

G P

&

P

- 1

REMOVED AND REPLACED SIDEWALKS

AS DIRECTED

Page 5: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

VARIABLE CROSS SLOPE

7+00 8+00 9+00 10+007+25

(LT) T.C. = 100.00

7+50

(LT) T.C. = 99.86

7+75

(LT) T.C. = 99.86

8+25

(LT) T.C. = 100.11

8+50

(LT) T.C. = 100.23

8+75

(LT) T.C. = 100.36

9+25

T.C. = 100.67

9+50

T.C. = 100.86

9+75

T.C. = 101.12T.C. = 100.13 (LT) T.C. = 99.98 T.C. = 100.48 T.C. = 101.44

10+25

T.C. = 101.75

V.P

.I. S

TA

7

+0

0

(RT) T.C. = 99.89 (RT) T.C. = 99.65 (RT) T.C. = 99.62 (RT) T.C. = 99.79 (RT) T.C. = 99.97 (RT) T.C. = 100.14 (RT) T.C. = 100.31

(VPI RT) T.C. = 99.53

(VPI LT) T.C. = 99.79

V.P.I

STA. 7+62.32

SA

N. M

H

ST

A 7

+6

2.5

4 1

.6

9' R

T

TR=99.14

SLOPE (RT) 0.96%

SLOPE (LT) 0.54%

SLOPE (RT) 0

.69%

SLOPE (LT) 0.50%

V.P

.I. S

TA

9

+0

0

V.P

.I. S

TA

9

+5

9.3

3

P.C

. (R

T) - E

ND

O

F P

RO

JE

CT

SLOPE 0.75%

SLO

PE

1.2

5%

P.C

. 3

5' C

EN

. L

IN

E R

AD

ST

A 7

+3

5.1

6

P.T

. 3

5' C

EN

. L

IN

E R

AD

ST

A 7

+9

0.3

1

(RT) T.C. = 99.80

(LT) T.C. = 99.94

(RT) T.C. = 99.73

(LT) T.C. = 99.93

9+59.33

T.C. = 100.93

10+15.33

T.C. = 101.63

ST

A 9

+8

7.3

7

IN

TE

RS

EC

TIO

N C

EN

-L

IN

E

ST

A 1

0+

15

.3

3

P.T

. (R

T)

TOP OF CURB ELEVATION

16" C.I. WL.

8+

00

9+

00

10+

00

BACKER ROAD

3

8

" DIAMETER

SILICONE JOINT

SEALER

T/3

1/4" SAWED JOINT

1/8"

1/8"

SAWED AND SEALED

CONTRACTION AND LONGITUDINAL

JOINTS

GENERAL NOTES

1. ALL JOINTS SHALL BE CLEANED IN PRIOR TO THE

PLACEMENT OF BACKER ROD AND SEALANT. WATER

FLUSHING AND AIR CLEANING OF JOINT SHALL BE IN

ONLY ONE DIRECTION-FORWARD. SANDBLASTING

SHALL BE PERFORMED IN TWO PASSES, ONE FOR EACH

FACE OF THE JOINT.

2. THE SHAPE FACTOR COMBINED WITH JOINT CLEANNESS

IS THE CRITICAL COMBINATION NECESSARY TO

GUARANTEE DESIRED BONDING AND FUNCTION OF

SEALED JOINTS. NO TOLERANCE EXCEPT THOSE

SHOWN HERE WILL BE ALLOWED.

3. THE JOINT SHAPE FACTOR IS DEFINED AS THE FINAL

PRESSED SHAPE OF THE SILICONE MATERIAL. THE

TOOLING OPERATION WILL FIRMLY PRESS THE FRESHLY

APPLIED MATERIAL INTIMATELY AGAINST THE CUT SIDES

OF THE RECESS AND THE BACKER ROD SURFACES.

THE ROUNDED SHAPE ON TOP AND BOTTOM OF THE

SILICONE ALLOWS THE SEALANT TO PROPERLY FLEX

BUT MAINTAIN ADHERANCE TO THE PAVING.

4. LONGITUDINAL BUTT JOINTS SHALL NOT BE SAWED OR

SEALED UNLESS OTHERWISE SHOWN ON THE PLANS.

5. ON ALL SAWED JOINTS, THE KERF DEPTH SHALL CLEAR

DOWEL BARS, TIE BARS AND/OR REINFORCING STEEL

BY A MINIMUM OF 1/2''.

6. CONTRACTION JOINTS IN JOINTED P. C. PAVEMENT SHALL

BE AT APPROXIMATELY 12'-0'' CENTERS, UNLESS

OTHERWISE SPECIFIED ON THE PLANS.

1" 2"

1"

T/2

KEYWAY DETAIL

T

EDGE WITH

1

2

" TOOL

FULL LENGTH OF JOINT

EACH SIDE

#4 DOUBLE BENT BAR

ABUTTING PAVEMENT JOINT - KEYWAY TIE

SEE KEYWAY DETAIL

THIS SHEET

OF 1795.00

100.00

104.00

103.00

102.00

101.00

99.00

98.00

97.00

96.00

22.0' RAD.

STA. 7+35.16 - P.C.

S

T

A

.

7

+

6

2

.

3

2

-

1

3

.

0

'

R

T

.

S

D

S

T

A

.

7

+

6

2

.

5

4

-

1

.

6

9

'

R

T

.

S

S

M

H

ST

A. 7

+9

0.3

1 - P

.T

.

ST

A. 7+

90.04 - 9.35' LT

.S

S M

H

12.0' TYP.

ST

A. 9

+0

0

EN

D V

AR

IA

BL

E

CR

OS

S S

LO

PE

ST

A. 9

+4

6.3

0

EN

D P

.C

.C

.

PA

VE

ME

NT

ST

A. 9

+5

9.3

3

EN

D O

F P

RO

JE

CT

ASPHALT TRANSITION

5

SCALE: 1" = 30'

ALL DRIVEWAYS TO BE REMOVED AND REPLACED

AS DIRECTED BY THE ENGINEER

REMOVED AND REPLACED

SIDEWALKS AS DIRECTED

PA

VIN

G P

&

P

- 2

Page 6: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

0+00 2+003+00

1+00

P.I. S

TA

1

+6

8.4

7

P.I. S

TA

0

+5

1.8

7

ST

RU

CT

. #

2

EX

IS

TIN

G S

TR

UC

T.

ST

RU

CT

. #

1

ST

A 0

+0

+0

0

OUT=90.52

TOP OF STRUCT.ELEV.=95.23

IN=92.73

=91.03

=91.61 =91.88

196.13 LF OF 36" RCP

P.I. S

TA

2

+4

8

ST

RU

CT

. #

3

=93.08

340.82 LF OF 44"x27" ARCH RCP

51.87 LF OF 44"x27" ARCH RCP

INSERT NEW PIPE THROUGH

BACK WALL OF EXISTING

STRUCTURE.

EXISTING GROUND PROFILE

MEET EXISTING

ELEV.=90.38

SLOPE 0.50%

IN=90.65

SLOPE 0.8

4%

OUT=92.27

T.C.=99.53

8" SAN. SEWER LINE

0

+

0

0

.

0

0

0

+

0

0

.

0

0

0

+

0

0

.

0

0

1+00.001+00.001+00.00

2+00.00

2+00.00

2+00.00

3

+

0

0

.

0

0

3

+

0

0

.

0

0

3

+

0

0

.

0

0

0

+

5

0

.

0

0

1+50.00

2+50.00

3

+

5

0

.

0

0

OF 17

4' CHAIN LINK FENCE

REMOVE AND REPLACE

AS REQUIRED

EXISTING 24" CGMP

(REMOVE & BACKFILL)

P.I. STA.1+68.47

ALL DISTURB AREAS TO BE FINELY GRADED

WITH A MIN. OF 2" OF TOP SOIL AND

COVERED WITH SLAB SOD

PP

TELE. PED.

P.I. STA. 0+51.87

STRUCT. #2

N 34.66

E 709.84

N 34.66

E 657.97

N 114.52

E 573.00

B.O.P. STA. 0+00

STRUCT. #3

STA.2+48

N 171.10

E 517.24

TREES (2)

(REMOVE)

B.M.

X - CHISELED IN DRIVEWAY

ASSUMED ELEV. = 100.00

N 207.82

E 539.72

E

X

.

1

5

"

R

C

P

E

X

.

1

5

"

R

C

P

CUT & CAP EXISTING

15" STORM DRAIN

OUTSIDE OF WORK

AREA

REMOVE EXISTING

JUNCTION BOX

NOTE:

LOCATION OF UTILITIES IS APPROXIMATE.

THE CONTRACTOR IS TO FIELD VERIFY EXACT

LOCATIONS PRIOR TO COMMENCING WORK.

EXISTING INLET

(REMOVE)SCALE 1"=30'

6

REMOVE EXISTING

METAL ARCH PIPE

ST

OR

M D

RA

IN

P

&P

- 1

4' CHAIN LINK FENCE

REMOVE AND REPLACE

AS REQUIRED

Page 7: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

3+00 4+00 5+00 6+00

IN=92.73

P.I. S

TA

2

+4

8

ST

RU

CT

. #

3

340.82 LF OF 44"x27" ARCH RCP

SLOPE 0.69%

OUT=95.08

IN=98.00

P.I. S

TA

5

+8

8.8

2

ST

RU

CT

. #

4

=93.08 =93.77 =94.47 =98.20

340.82 LF OF 44"x27" ARCH RCP

EXISTING GROUND PROFILE

OUT=92.27

T.C.=99.53

T.C.=104.07

8" SAN. SEWER LINE

2

+

0

0

.

0

0

2

+

0

0

.

0

0

2

+

0

0

.

0

0

3+00.003+00.003+00.00

4+00.004+00.004+00.00

5+00.005+00.005+00.00

6+

00.00

6+

00.00

6+

00.00

2+50.00

3+50.00

4+50.00

5+50.00

OF 17

B.M.

X - CHISELED IN DRIVEWAY

ASSUMED ELEV. = 100.00

N 207.82

E 539.72

EXISTING

SANITARY M.H.

STRUCT. #3

STA. 2+48

N 171.10

E 517.24

CENTER - STRUCT. #4

44"x27" ARCH. R.C.P

EXISTING

SANITARY M.H.

CENTER - STRUCT. #4

36" R.C.P.

N 167.71

E 175.17

N 166.44

E 176.92

B.M.

X - CHISELED IN DRIVEWAY

ASSUMED ELEV. = 101.84

N 147.71

E 340.16

ST

A. 3

+1

7

WA

TE

R S

ER

VIC

E L

IN

E

ST

A. 3

+2

0

S.S

. L

AT

ER

AL

L

IN

E

ST

A. 3

+8

4

WA

TE

R S

ER

VIC

E L

IN

E

ST

A. 3

+9

9

S.S

. L

AT

ER

AL

L

IN

E

ST

A. 3

+6

7

6" W

AT

ER

L

IN

E

ST

A. 3

+3

0

16

" W

AT

ER

L

IN

E

ST

A. 4

+4

3

S.S

. L

AT

ER

AL

L

IN

E

ST

A.4

+5

7

WA

TE

R S

ER

VIC

E L

IN

E

ST

A.5

+2

8

WA

TE

R S

ER

VIC

E L

IN

E

ST

A. 5

+3

5

S.S

. L

AT

ER

AL

L

IN

E

ST

A.5

+7

7

WA

TE

R S

ER

VIC

E L

IN

E

ST

A. 5

+8

1

S.S

. L

AT

ER

AL

L

IN

E

8" CLAY SEWER LINE

ST

A. 2

+6

2

WA

TE

R S

ER

VIC

E L

IN

E

ST

A. 2

+5

4

S.S

. L

AT

ER

AL

L

IN

E

8" CLAY SEWER LINE

6" C.I. WATERLINE

6" C.I. WATERLINE

6" C.I. WATERLINE

6

"

C

.

I

.

W

A

T

E

R

L

I

N

E

6

"

C

.

I

.

W

A

T

E

R

L

I

N

E

1

6

"

C

.

I

.

W

A

T

E

R

L

I

N

E

1

6

"

C

.

I

.

W

A

T

E

R

L

I

N

E

NOTE:

LOCATION OF UTILITIES IS APPROXIMATE.

THE CONTRACTOR IS TO FIELD VERIFY EXACT

LOCATIONS PRIOR TO COMMENCING WORK.

SCALE 1"=30'

7

ST

OR

M D

RA

IN

P

&P

- 2

E

X

. 15" R

C

P

E

X

. 15" R

C

P

Page 8: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

4+00 5+00 6+00 7+00

340.82 LF OF 44"x27" ARCH RCP

SLOPE 0.69%

OUT=95.08

IN=98.00

OUT=101.35

P.I. S

TA

5

+8

8.8

2

ST

RU

CT

. #

4

168.93 LF OF 36" RCP

=93.77 =94.47 =98.20 =100.22

SLO

PE

2.0

%

EXISTING

4x4 RCB

T.C.=104.07EXISTING GROUND PROFILE

TOP OF WALLELEV.=106.35

=104.35

7+59.94

4+00.004+00.004+00.00

5+00.005+00.005+00.00

6+

00.00

6+

00.00

6+

00.00

7+

00.00

7+

00.00

7+

00.00

4+50.00

5+50.00

6+

50.00

7+50.00

OF 17

N 144.63

E 8.88

CENTER - STRUCT. #4

44"x27" ARCH. R.C.P

EXISTING

SANITARY M.H.

N 167.71

E 175.17

N 166.44

E 176.92

B.M.

X - CHISELED IN DRIVEWAY

ASSUMED ELEV. = 101.84

N 147.71

E 340.16

CENTER - STRUCT. #4

36" R.C.P.

CENTER - STRUCT. #5

36" R.C.P.

EXISTING

4'x4' R.C.B.

E.O.P.

ST

A. 3

+8

4

WA

TE

R S

ER

VIC

E L

IN

E

ST

A. 3

+9

9

S.S

. L

AT

ER

AL

L

IN

E

ST

A. 4

+4

3

S.S

. L

AT

ER

AL

L

IN

E

ST

A.4

+5

7

WA

TE

R S

ER

VIC

E L

IN

E

ST

A.5

+2

8

WA

TE

R S

ER

VIC

E L

IN

E

ST

A. 5

+3

5

S.S

. L

AT

ER

AL

L

IN

E

ST

A.5

+7

7

WA

TE

R S

ER

VIC

E L

IN

E

ST

A. 5

+8

1

S.S

. L

AT

ER

AL

L

IN

E

NOTE:

LOCATION OF UTILITIES IS APPROXIMATE.

THE CONTRACTOR IS TO FIELD VERIFY EXACT

LOCATIONS PRIOR TO COMMENCING WORK.

8" CLAY SEWER LINE

6" C.I. WATERLINE

6

"

C

.

I

.

W

A

T

E

R

L

I

N

E

ALL DISTURB AREAS TO BE FINELY GRADED

WITH A MIN. OF 2" OF TOP SOIL AND

COVERED WITH SLAB SOD

EXISTING FENCE TO BE REMOVED

AND REPLACED AS REQUIRED

TO CONSTRUCT STRUCTURE

E

X

. 15" R

C

P

E

X

. 15" R

C

P

E

X

. 15" R

C

P

CUT & CAP EXISTING

15" STORM DRAIN

OUTSIDE OF WORK

AREA

SCALE 1"=30'

8

ST

OR

M D

RA

IN

P

&P

- 3

Page 9: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

336 LF 8" PVC SDR 35 @ 0.450%

16" C.I. WATER MAINVERIFY THE DEPTH

EXISTING WASTEWATER MAIN(CLAY)

STA.

4+26

.60 -

2.59'

R.T

REPL

ACE

EXIS

TING

MAN

HOLE

RIM

ELEV

. = 10

3.85

PROPOSED 27" X 43" ARCH RCPSTORM DRAIN

STA.

7+62

.54 -

1.69'

RT.

REPL

ACE

EXIS

TING

MAN

HOLE

RIM

ELEV

. = 99

.25

=98.50

=97.20

=95.63

=95.53

=95.36

STA.

7+90

- 9.2

7' LT

.RE

PLAC

E EX

ISTI

NG M

ANHO

LERI

M EL

EV. =

99.40

26 LF 8" PVC @ 0.45 % =95.40

REPLACE MANHOLE

EXISTINGWASTEWATER MAIN

REPLACE MH

NEW 27" X 44" ARCH RCPSTORM DRAIN

NEW STORM INLET& JUNCTION BOX NEW STORM INLET

& JUNCTION BOX

EX. 6" WATER MAIN

EX. 16" WATER MAINVERIFY THE LOCATION AND

DEPTH ON SITE BEFORECONSTRUCTION BEGINS

w

w

w w w

wwwwwwwwww

w

STA.

4+35

.00

STA.

4+82

.00

STA.

5+74

.00

STA.

6+18

.00

STA.

6+96

.00

STA.

7+56

.00

STA.

6+92

.00

STA.

6+20

.00

CO CO CO CO

CO

CO

CO

5+00

6+00

7+00

4+00

8+00

S

w

NEW 8"Ø PVCWASTEWATER MAIN

CO

CO

OF 174+00 5+00 6+00 7+00 8+004+50 5+50 6+50 7+50

90.00

95.00

100.00

9

SANI

TARY

SEW

ER_P

& P

-1

Page 10: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

STA.

7+62

.54 -

1.69'

RT.

REPL

ACE

EXIS

TING

MAN

HOLE

RIM

ELEV

. = 99

.25

=95.63

=95.53

=95.36

=95.40

=96.40

=96.65

STA.

9+87

.00 -

9.0' L

T.RE

PLAC

E EX

ISTI

NG M

ANHO

LERI

M EL

EV. =

100.9

5

STA.

7+90

- 9.2

7' LT

.RE

PLAC

E EX

ISTI

NG M

ANHO

LERI

M EL

EV. =

99.40

6" HDPE WATER MAINVERIFY THE DEPTH

197 LF 8" PVC SDR 35 @ 0.50%

26 LF 8" PVC @ 0.45 % =95.40

EXISTING WASTEWATER MAIN(CLAY)

REPLACE MANHOLE

REPLACE MH

NEW STORM INLET

& JUNCTION BOX

ww

STA. 7+56.00

CO

8+00

S S S S S ww

w

w w w w w w w w w w w w w

NEW 8"Ø PVCWASTEWATER MAIN REPLACE MH

REPLACE EXIXTING WASTEWATERMAIN WITH 1-13' JOINTS OF8"Ø PVC SDR 35(MINIMUM GRADE 0.40%

REPLACE EXIXTING WASTEWATERMAIN WITH 2-13' JOINTS OF8"Ø PVC SDR 35(MINIMUM GRADE 0.40%

9+00 10+00

EXIXTING WASTEWATER

NEW 8"Ø PVC

WASTEW

ATER MAIN

EX. 6" WATER MAIN

EX. 6" WATER MAIN

EXIXTING WASTEWATER

EX. 6" WATER MAINVERIFY THE LOCATION AND

DEPTH ON SITE BEFORECONSTRUCTION BEGINS

CO CO

STA.

8+80

.00

STA.

9+56

.00

OF 177+00

90.00

8+00 9+00 10+00

95.00

100.00

7+50 8+50 9+50

10

SANI

TARY

SEW

ER_P

& P

-2

Page 11: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

7'-2"

7'-6"

PLAN

36" RCP

44"x27" ARCH

CONCRETE PIPE111°37'

111°37'

136°47'

B

B

CC

A

A

H1 BARSV1 BARS

H2 BARS

Vx BARS

V1 BARS

V1 BARS

V1 BARSH1 BARS

H2 BARS

3'-11 1/2"

9"

8"

12"

SECTIONC-C

2 1/2" CLEAR

8"8"

H1 BARS #4 @12" C/C

V1 BARS#4 @ 16" C/C

H3 BARS#4 @ 6" C/C

SECTIONA-A

H2 BAR

H4 BARS #4@ 6" C/C

V1 BAR

in =90.65

TOP OF STRUCTUREELEV = 95.23

V1 BAR V1 BAR

SECTIONB-B

H4 BARS #4@6" C/C

H2 BARS #4 @6" C/C

Vx BARS#4 @16" C/C

out =90.52

H2 - 6'-6"

H1 - 6'-10"

3"12"

12"3"

12"

H3 - 7'-0"

4"

4"

18"

V1 - 4'-6"4'-3"

3" RAD.

H4 - 6'-8"

BAR BENDING DIAGRAMS

OF 17

STRUCTURE #2 - JUNCTION BOX (SEE SHEET #XX FOR COVER DETAIL)

11

ST

OR

M D

RA

IN

D

ET

AIL - 1

Page 12: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

PLAN OF CONCRETE COVER

7'-6"

7'-2"

2" CLEAR

9"

H5 BARS #7 @9" C/C

H6 BARS #4 @9" C/C

H7 BARS #4 @4"C/CPLACED AS SHOWN

CATCH BASIN FRAME & GRATE(NEENAH #R-6134 OR EQUIVILANT)

SECTIONA-A

A A

TOP OF STRUCTUREELEV = 95.23

H6 BARS #4 @9" C/C

H5 BARS #7 @9" C/C

OF 17

STRUCTURE #2- COVER DETAIL (SEE SHEET #XX FOR JUNCTION BOX)

12

ST

OR

M D

RA

IN

D

ET

AIL - 2

Page 13: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

OF 17

STRUCTURE #3 CURB INLETSTRUCTURE #4 CURB INLET

13

ST

OR

M D

RA

IN

D

ET

AIL - 3

Page 14: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

OF 17

STRUCTURE#5 DROP INLET

14

ST

OR

M D

RA

IN

D

ET

AIL - 4

Page 15: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

15

STAN

DARD

SEW

ER D

ETAI

LS -1

OF 17

Page 16: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

16

STAN

DARD

SEW

ER D

ETAI

LS -2

OF 17

Page 17: CITY OF ARDMORE CIRCLE DRIVE DRAINAGE …ardmorepublic.lib.ok.us/eng/Bid Documents/14-100/14-100 Circle Dr... · begin p.c.c. pavement. asphalt transition sta. 4+26.60 2.59' rt.ss

OF 17

STAN

DARD

WAT

ER S

ERVI

CE D

ETAI

L

17