![Page 1: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/1.jpg)
CITY OF KIRKLAND Department of Public Works 123 Fifth Avenue, Kirkland, WA 98033 425.587.3800 www.kirklandwa.gov
MEMORANDUM To: Kurt Triplett, City Manager From: Kathy Brown, Public Works Director Joel Pfundt, AICP CTP, Transportation Manager Lisa Hodgson, P.E., Design Engineering Manager, I-405/SR 167 Program Barrett Hanson, P.E., Engineering Manager, North End Projects Cynthia Padilla, I-405 BRT Project Manager, Sound Transit Date: March 8, 2018 Subject: WSDOT I-405/NE 132nd Interchange Project, NE 85th St Interchange and Inline Station Project RECOMMENDATION: That City Council hear a presentation from staff and the Washington State Department of Transportation regarding an update on the I-405/NE 132nd Street Interchange Project in the Totem Lake area. Sound Transit will also present an overview of the planned I-405 BRT system and the objectives and schedule for the NE 85th St Interchange and Inline Station Project. BACKGROUND DISCUSSION: The I-405/SR 167 Program team will provide a brief update on the preliminary design concept for the I-405/NE 132nd Street Interchange Project. The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is currently in the preliminary engineering and environmental review phase. WSDOT and Sound Transit will also provide an overview of the I-405 BRT system and the NE 85th St Interchange and Inline Station Project, which has just started conceptual design. Both of these projects were presented to the Kirkland Transportation Commission at its February 28, 2018 meeting. City staff is working with the Commission to prepare a summary of their comments on the two projects, which will be presented at the Study Session. Questions from the Council will be taken after the briefing. The update will include a presentation prepared by the I-405 project team covering the following topics:
1. I-405 Master Plan 2. I-405/NE 132nd St Interchange Project overview
a. Project history and timeline b. Preliminary engineering concepts c. Environmental review
Council Meeting: 03/20/2018Agenda: Study Session Item #: 3. a.
![Page 2: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/2.jpg)
d. Public outreach Project staff from both WSDOT and Sound Transit will provide a brief update on the NE 85th St Interchange and Inline Station Project. Attachments Attachment A: I-405/NE 132nd Interchange Project presentation Attachment B: I-405 BRT System and NE 85th Street Interchange and Inline Station presentation
![Page 3: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/3.jpg)
I-405/NE 132nd Street Interchange Project
Kirkland City Council – Study SessionMarch 20, 2018
Barrett Hanson, P.E.Engineering ManagerI-405/SR 167 Program
Lisa Hodgson, P.E.Design Engineering Manager
I-405/SR 167 Program
1
Karl Westby, Ph.D.Traffic Manager
I-405/SR 167 Program
Attachment A
![Page 4: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/4.jpg)
I-405 Master PlanRegional Consensus• EIS Record of Decision, 2002• Multimodal, multiagency plan
Roadways• 2 new lanes in each direction• Local arterial improvements
Transit & Transportation Choices• Bus Rapid Transit system• New transit centers • 50% transit service increase • HOV direct access ramps and flyer stops• Potential managed lanes system• 5000 new Park & Ride spaces• 1700 new vanpools
Environmental Enhancements
2
![Page 5: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/5.jpg)
3
Project History
Plan developed to replace the mainline structures over 132nd overpass
FHWA approval to leave existing structures in place, allowing interchange to be funded
Project funded in Connecting Washington
Start design development and coordination with City Bridge limitationsFederal injunction for fish passage
Project identified in the I-405 Corridor Program EIS as a part of Preferred Alternative
Plan developed to replace
FHWA approval to leave existing
Project funded in Connecting
Start designdevelopment and
Project identified in the I-405
2012
2008
2015
2017
2002
![Page 6: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/6.jpg)
I-405/NE 132nd Street Interchange Project
Description: • Builds a new half interchange to and
from the north at NE 132nd Street in Kirkland (Totem Lake area)
• Environmental enhancements
Estimated cost: $75 million funded by Connecting Washington
Project Goals: • Improve access to Totem Lake
regional growth center• Reduce reliance on heavily
congested Northeast 124th Street and Northeast 160th Street interchanges
4
![Page 7: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/7.jpg)
TOD
Totem Lake area improvements
5
TKingsgatePark&Ride
TotemLake
Village EvergreenMedicalCenter
H
LennarTotem Lake
TODTingsgatePark&Ride
T
A new halfinterchange to and from the north at NE 132nd Street to access I-405
A new Sound Transit BRT station at the existing Totem Lake Freeway station at Northeast 128th Street
KiKiP
Sound Transit's new 600 stall parking garage, which will provide 900 total stalls at Kingsgate P&R.
Transit Oriented Development (TOD) is being studied in 2018 for the Kingsgate P&R site
Local arterial improvements along NE 132nd Street
Totem Lake area designated as a Puget Sound Regional Council growth center.
Northeast 116th Street
![Page 8: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/8.jpg)
Project Timeline• 2017: Begin preliminary engineering, right-of-way, and environmental review • 2018: Begin right-of-way acquisition • 2021: Construction start (est. Spring 2021) • 2023: Open to traffic
6
![Page 9: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/9.jpg)
Existing Conditions
7
Apartment access
116th Ave NE
Fish Barrier
Existing structures
N
![Page 10: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/10.jpg)
8
Concepts evaluated - Signalized intersectionsRelocate access to
Woodlake Aptswith new signal
~100’ pedestrian crossing (6 lanes)
5 foot wide bike
lanes
Split traffic behind
columnsDelay and back
up issues
5 foot wide bike lanes
5 ft. wide bike lanes and 6 ft. wide sidewalk on north and south side
Undergroundfish culvert –
potential fatal flaw
![Page 11: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/11.jpg)
9
Cross sections - NE 132nd St under I-405 overpass
NE 132nd Street at southbound I-405 overcrossing
~~ ' , r-rr WB r:~:-r -.~-TrT SW 1-405 116TH 132ND S~ .. .. .. .. .. .. .. .. .. .. .. ..
EXISTING SECTION (FACING EAST)
SIGNALIZED SECTION ( F' ACING EAST)
.... wWSDOT
-rr--- - -- - ---- -11
~ -,
r ...,
-rr---- - -------11
1-1 r ...,
![Page 12: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/12.jpg)
Existing Conditions under I-405
NE 132nd St.
For reference:Richards Rd.
(Signalized Intersections)
10
![Page 13: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/13.jpg)
Concepts evaluated - Roundabouts
11
10 foot sidewalk
ootwalk
Stream channel
Eliminates need for left turn lanes
(4 lanes instead of 7)
Eliminates need for new signalized
intersection~35’ pedestrian
crossings
Maintains access
location to Woodlake Apts
Improved traffic flow vs. signals
5 foot wide bike lanes on north and south side
ed ow als
Keeps all lanes within existing
columns
![Page 14: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/14.jpg)
12
Cross sections - NE 132nd St under I-405 overpass
NE 132nd Street at southbound I-405 overcrossing
.... wWSDOT
B IIKE LA liE
'--------~ -~-8-------- ~ .I .w.l. l. ,-:. .1)1~~ .I. 1~2~0 .1.1 :w 1.
EXISTING SECTION (FACING EAST)
ROUNDABOUT SECTION (FACING EAST)
S IDEWALK
-rr------ ---- --11
I -I I I
-n- - - - - - - - - - - - •
I I r .J I
![Page 15: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/15.jpg)
Roundabout Safety Benefits
For more information, visit: www.wsdot.wa.gov/Safety/Roundabouts13.....
wWSDOT
Intersection
32 Vehicle conflicts
D 24 Pedestrian conflicts
Roundabout
8 Vehicle conflicts
D 8 Pedestrian conflicts
![Page 16: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/16.jpg)
Roundabout Safety Benefits
For more information, visit: www.wsdot.wa.gov/Safety/Roundabouts14
• Better traffic flow
• One-way travel
• Safety performance
![Page 17: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/17.jpg)
SR 522 and W Main St Interchange in
Monroe
NE 145th St/ Redmond-Woodinville Rd NE in Woodinville
Roundabouts in the region
15
![Page 18: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/18.jpg)
Project Timeline• 2017: Begin preliminary engineering, right-of-way, and environmental review • 2018: Begin right-of-way acquisition • 2021: Construction start (est. Spring 2021) • 2023: Open to traffic
17
![Page 19: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/19.jpg)
Questions?
18..... ~WSDOT
![Page 20: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/20.jpg)
Contact
Carryn Vande GriendPublic Outreach(425) 456-8663 [email protected]
For more information, visit: www.wsdot.wa.gov/Projects/ I405/NE132ndStInterchange
19
![Page 21: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/21.jpg)
I-405 Bus Rapid TransitKirkland City Council Study SessionMarch 20, 2018
Attachment B
![Page 22: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/22.jpg)
• Opens in 2024 • Two corridors (I-405 and SR 522/SR 523)• Transit speed, reliability and access improvements • BRT stations (signage, shelter, amenities)• Parking facilities• New BRT bus fleet • Bus operations and maintenance facility • Branding• Rider information system
A new line of service
Example BRT – Community Transit SwiftSource: Community Transit Blogspot
Example BRT – Minneapolis Metro A Line
![Page 23: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/23.jpg)
I-405 BRT infrastructure designed for fast, frequent and reliable service • 10-minute peak,15-minute off-peak
headways for I-405 BRT• Up to 19 hours of service Monday
through Saturday• Up to 17 hours on Sunday
Fast, frequent, reliable service
![Page 24: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/24.jpg)
Travel time upon opening will be similar to 2040 travel time with use of Express Toll Lanes
I-405 BRT Travel times
![Page 25: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/25.jpg)
Connecting the regionLINK connectionsI-405 BRT
Redmond-Seattle-LynnwoodLynnwood City Center & Bellevue Downtown
Issaquah-Bellevue-South KirklandBellevue Downtown
Everett-Seattle-West SeattleLynnwood City Center
Ballard-TacomaTukwila International Boulevard Station
SR 522 BRT
Redmond-Seattle-LynnwoodShoreline South/145th
Everett-Seattle-West SeattleShoreline South/145th
![Page 26: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/26.jpg)
I-405 BRT highlights37-mile corridor: Lynnwood to Burien
• North Corridor: Lynnwood to Bellevue
• South Corridor: Bellevue to Burien, via Renton
• 11 BRT stations across 7 cities • 3 parking facilities • 1 transit center
![Page 27: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/27.jpg)
SR 522 BRT highlights8-mile corridor: Shoreline to Bothell/Woodinville • Connects to light rail at South
Shoreline/145th
• 8 miles of BRT
• Completes gaps in BAT lanes
• 9 Station pairs
• Expanded Transit Center UW Bothell
• Additional parking (Lake Forest Park, Kenmore, Bothell)
• Buses every 10 minutes on SR 522/523, 20 minutes to Woodinville
![Page 28: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/28.jpg)
Operations & maintenance facility• Supports BRT program • Accommodate 60 buses, 80 in future• Coordination with ST Express bus base
Project development activities • Right-of-way and property acquisition • Preserve option for Bothell/Canyon Park
bus base
Facility amenities Maintenance
Offices and support areas
Repair shop
Parts storage
Fuel, wash, service areas
Bus operations, dispatching, and employee facilities
Bus parking
Employee and visitor parking
1 percent for art
Illumination
Landscaping
![Page 29: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/29.jpg)
Project schedule
Q4 2017• Consultant selection• Key issue
identification
Q1 2018- Q1 2019• Partnering agreements• ST3 representative
project refinement• Facility siting• Projects with WSDOT:
NE 85th Street in KirklandNE 44th Street in Renton.
Q1 2019 - Q4 2019• Environmental
review and Conceptual Engineering
Q1 2020• ST Board selects
project to be built• Preliminary
Engineering begins
PE consultant procurement NTP IssuedAdvance design & determine project delivery method
Overall schedule
24-monthlook-ahead
2018 2019 2020 2021 2022 2023 2024
ST3 Representative Project Refinement
Environmental Conceptual Engineering
Preliminary Engineering
Final Design Construction Opens for Service
![Page 30: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/30.jpg)
PartneringCollaborative process• Partnering agreements• Elected leadership group • Interagency group • Stakeholder involvement• Streamline permitting • Land use approvals
![Page 31: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/31.jpg)
Blake Jones, Outreach Supervisor206-398-5470blake.jones@soundtransit.orgsoundtransit.org/system
Cynthia Padilla, Project [email protected]
![Page 32: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/32.jpg)
I-405 BRT Program• Kingsgate TOD Feasibility Study• I-405 NE 85th Street Interchange
and Inline Station
![Page 33: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/33.jpg)
TOD
Totem Lake area improvements
32
TKingsgatePark&Ride
TotemLake
Village EvergreenMedicalCenter
H
LennarTotem Lake
TODTKingsgatePark&Ride
T
Transit Oriented Development (TOD) is being studied in 2018 for the Kingsgate P&R site
Totem Lake area designated as a Puget Sound Regional Council growth center.
Northeast 116th Street
![Page 34: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/34.jpg)
Recap: Day 1 August 2017 Charrette
Day 1 workshopAugust 17, 2017
Interagency participation:• Sound Transit• City of Kirkland• King County Metro• WSDOT
Objectives:• All participants will have a good understanding of the I-405 Master Plan, Sound
Transit and King County transit plans for the NE 85th Street area, and Kirkland’s land use and transportation vision.
• WSDOT will gather input on items of importance and priorities from stakeholders.
• Group will identify screening criteria to set up second session for evaluation of concepts.
31
![Page 35: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/35.jpg)
Items of importance (from Aug 2017 charrette)
Transit ConnectivityProvide transit connectivity between I-405 BRT and NE 85th Street transit routesImprove ST Express, King County Metro, and I-405 BRT OperationsMaintain/enhance ability to connect to Cross-Kirkland CorridorFacilitate connectivity (ease of transfer between I-405 BRT and NE 85th Street routes)Rider experience/environment while waiting during transfers (lighting, shelter, etc.)Consider paratransit connectionsFacilitate connections to existing park and ride capacity (e.g. 70th)
Non-Motorized Mobility/ConnectivityProvide non-motorized connectivity to major destinations east and west of I-405 (bike/walk combination)Minimize pedestrian travel time (all pedestrians in general area)Create safe, comfortable pedestrian experience/environment for all ages/abilities (art, experience, placemaking)Consider grades/gaps when planning for pedestrian facilitiesIncorporate bike lockers/racks
35
![Page 36: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/36.jpg)
Items of importance
Kirkland VisionBe consistent with existing and future land use plans and facilitate future growth opportunitiesProvide Express Toll Lane access from NE 85th Street corridorLeverage/create partnership opportunities with local businesses/services re: transit/carpool operations and drop-off/pick-up locationsProvide for flexibility and creativity through design options
Compatibility with Master PlansDo not preclude Master Plan alternatives and minimize added future costBuild toward the Master Plans
Vehicular Traffic Operations/Interchange PerformanceMaintain or improve I-405 express toll lane and general purpose operationsImprove multimodal local area operations (e.g., NE 85th Street vicinity)Optimize transit movements
CostMaximize project benefits within budgetBe creative with ST budget proviso commitments (last mile)Pursue other funding opportunities if neededMeet schedule and minimize construction duration
36
![Page 37: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/37.jpg)
Next steps – Near term
37
NE 85th Street Interchange and In-line Freeway Station
Feb March April May June July
Kickoff
Stakeholder Charrette
Feasibility Study Report
Kirkland • • • Transportation Commission
Kirkland City • • • Council
Public Meeting • Interagency Group (Sound Transit) • • • • Elected Leadership • Group (Sound Transit)
Sound Transit Board
L~ Task Order Two
..... ~WSDOT
![Page 38: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/38.jpg)
Next steps – Long term
38
BRT start of operations
Work Element #1 Project Administration
Work Element #2 Conceptual Design Development
Work Element #3 Conceptual Design Development
Work Element 3.1 15% Design Conceptual Plan
Work Element 3.2 Traffic Analysis and IJR
Work Element 3.3 Design-Build Contract Development
Work Element #4 Enviromental Clearance and Permitting
Wor1< Element #5 Public and Stakeholder Communications Involvement
Work Element #6 Right of Way Acquisition
Procurement
Construction
..... wWSDOT
NE 85th Street Interchange and In-line Freeway Station
2017 2021 2022 2023 2024
Project Order
![Page 39: CITY OF KIRKLANDCouncil/Council+Packets/032018/3a_Study... · The project builds a new half diamond interchange to and from the north at NE 132nd Street in Kirkland. The project is](https://reader030.vdocuments.net/reader030/viewer/2022040514/5e6d7c9d6ba6dd1f1b508a6a/html5/thumbnails/39.jpg)
WSDOT I-405 Corridor Program Public Outreach Manager
Carryn Vande Griend [email protected] (425) 456-8663
ST I-405 BRT Project Manager (Bellevue to Lynnwood):Cynthia Padilla [email protected] 206.903.7385
ST I-405 BRT Community Outreach Corridor Supervisor:Blake Jones [email protected] 206.398.5470