CITY OF KARRATHA TOWN PLANNING SCHEME NO. 8
LOCAL SCHEME AMENDMENT
KARRATHA HIGH SCHOOL
LOT 4615 (RESERVE 30602) SEARIPPLE ROAD, BULGARRA
PREPARED BY
ON BEHALF OF
FEBRUARY 2016
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 2
LOCAL SCHEME AMENDMENT NO. xxx
TABLE OF CONTENTS
Resolution Deciding to Amend a Local Planning Scheme 4
Minister for Planning Proposal to Amend a Town Planning Scheme
5
SCHEME AMENDMENT REPORT
1.0 INTRODUCTION
6
2.0 SITE DETAILS
2.1 Property Location and Ownership 7
2.2 Existing Land Use 7
2.3 Surrounding Context 7
2.4 Topography 8
2.5 Access & Servicing 8
2.6 Potential Site Contamination 8
2.7 Indigenous and European Heritage & Native Title 13
2.8 Flooding 14
3.0 PLANNING CONTEXT
3.1 City of Karratha Town Planning Scheme No. 8 9
3.2 City of Karratha Local Planning Strategy 9
3.3 Karratha Revitalisation Strategy 9
4.0 PLANNING RATIONALE 10
5.0 SUBDIVISION CONCEPT PLAN 12
6.0 INFRASTRUCTURE & SERVICING
6.1 Wasterwater 14
6.2 Water Supply 14
6.3 Power 14
6.4 Telecommunications 14
6.5 Gas 14
6.6 Site Works 15
6.7 Roads 15
6.8 Stormwater Drainage 15
7.0 CONCLUSION 16
Resolution to Adopt a Local Planning Scheme & Scheme Amendment Map 17
SCHEME AMENDMENT MAP
18
FIGURES
Figure 1 Location Plan
Figure 2 Cadastral & Aerial Plan
Figure 3 Surrounding Context
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 3
APPENDICES
1 Certificate of Title
2 Preliminary Servicing Report
3 Subdivision Concept Plan
Adoption & Final Approval of Scheme Amendment 24
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 4
PLANNING AND DEVELOPMENT ACT 2005
RESOLUTION DECIDING TO AMEND A LOCAL PLANNING SCHEME
CITY OF KARRATHA
TOWN PLANNING SCHEME NO. 8
AMENDMENT No. xxx
RESOLVED that the Council, in pursuance of Section 75 of the Planning and Development Act 2005, amend the
above local planning scheme by:
1. Reclassification of Lot 4615 (Reserve 30602) Searipple Road, Bulgarra from Public Purposes -
Education local scheme reservation to Urban Development zone and amending the Scheme Map
accordingly.
The Amendment is complex under the provisions of the Planning and Development (Local Planning Schemes)
Regulations 2015 for the following reasons:
- The proposed scheme amendment seeks to reclassify land reserved under the Scheme for public
purpose in order to facilitate future urban development. The proposed reclassification is not identified
or provided for under the City of Karratha Local Planning Strategy.
Dated this _____ day of ________________ 2016
____________________________
Chief Executive Officer
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 5
MINISTER FOR PLANNING
PROPOSAL TO AMEND A TOWN PLANNING SCHEME
LOCAL AUTHORITY : City of Karratha
DESCRIPTION OF
TOWN PLANNING SCHEME : Town Planning Scheme No. 8
TYPE OF SCHEME : District Scheme
SERIAL NUMBER OF AMENDMENT : Amendment No. xxx
PROPOSAL : To reclassify Lot 4615 (Reserve 30602) Searipple Road,
Bulgarra from Public Purposes - Education to Urban
Development, to enable the subject land (excluding the
existing Primary School and Family Centre) to be
redeveloped to a suitable sequential land use,
consistent with the objectives and provisions of Town
Centre zone under TPS 8.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 6
SCHEME AMENDMENT REPORT
1.0 INTRODUCTION
This report presents a proposal to initiate a Local Scheme Amendment to the City of Karratha Town
Planning Scheme No. 8 (TPS 8). The proposal seeks to reclassify Lot 4615 (Reserve 30602) Searipple
Road, Bulgarra from Public Purposes - Education local scheme reservation to Urban Development
zone.
The Karratha High School on the subject site is a redundant Western Australian Department of
Education asset and has been closed. Pupils have been relocated to the new Department of Education
public high school, which has been developed at the Karratha College Campus site.
The State Government has proposed to dispose of the subject site through the Land Asset Sales
Programme (LASP) process to the market. The proposal seeks to rationalise the public purpose
reservation use of the land by reclassification to the Urban Development zone under TPS 8.
The reclassification to Urban Development will provide opportunity to redevelop the site for a suitable
sequential land use, subject to the preparation and approval of a Structure Plan pursuant to Planning and
Development (Local Planning Schemes) Regulations 2015 Schedule 2 - Deemed provisions for local
planning schemes Part 4 Structure Plans. It is proposed that a Structure Plan is approved concurrently
with this local scheme amendment application.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 7
2.0 SITE CONDITIONS
2.1 PROPERTY LOCATION AND OWNERSHIP
Lot 4615 (Reserve 30602) Searipple Road, Bulgarra (the subject site) is approximately 1.5km east of
Karratha town centre. The following is a table of the subject site details:
Lot Number Land details
Registered Proprietor
4615
Reserve 30602
Certificate of Title LR3110/961 Crown Land - State of Western
Australia
Management Order issued to
Minister for Education with
power to lease
Plan/Diagram Deposited Plan
193623
Lot Area 9.44ha
Figure 1 shows the location of the subject land in relation to the town of Wickham. Figure 2 shows the
cadastral boundaries and context of the subject site. The subject site Certificate of Title is contained in
Appendix 1.
2.2 EXISTING LAND USE
Lot 4615 is set aside as Crown Reserve 30602 with a Management Order issued to the Minister for
Education for use as Education. The former Karratha High School is located in the western portion of
the subject site, with school buildings in the south-west and the playing field in the north-west.
Currently the Karratha Primary School is situated within the south-east portion of the site and has
recently been upgraded. Within the north-western portion of the subject site is a family centre, which
has recently undergone refurbishment with additional landscaping upgrades. There is an existing utility
compound adjacent to the internal road off Searipple Road in the northern central portion of the subject
site. The primary school, utility and family centre are proposed to be retained as part of structure
planning, however the high school buildings and infrastructure is proposed to be demolished and
removed.
2.3 SURROUNDING CONTEXT
The subject site is bound on the western and eastern sides by Parks, Recreation and Drainage
reservation corridors (approximately 40m wide). Residential zoned land is the predominant
surrounding land use, with a density R-Code of R20. Surrounding established residential development is
predominantly detached single dwellings on 650m2
750m2
lots orientated north-south. Immediately to
the north on the opposite side of Searipple Road is undeveloped reserved land for Parks, Recreation and
Drainage and Conservation Recreation and Natural Landscapes, except for a Water Corporation
wastewater pumping stations and utility site. Further north is an existing short and long-stay
accommodation (Searipple Village) development. Figure 3 provides an overview of the surrounding
context.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 8
2.4 TOPOGRAPHY
The subject site is relatively flat, with gentle undulations throughout. In general levels range between
7.0m AHD to 8.0m AHD across the site, with the highest point approximately 9.0m AHD in the south
and the lowest point approximately 6.0m AHD adjacent to Searipple Road in the north-west.
2.5 ACCESS & SERVICING
The subject site has direct frontage to Searipple Road and Turnery Way, both of which are sealed
roads. Services such as reticulated water, sewer, power and telecommunications are available.
A preliminary engineering servicing report (Appendix 2) has been prepared as a baseline investigation
ascertaining the feasibility for urban redevelopment, in particular, with reference to the Subdivision
Conept Plan (Appendix 3) included in this report. The findings of the engineering investigations
confirm that the subject site can be adequately serviced.
2.6 POTENTIAL SITE CONTAMINATION
A search of the Department of Environment Regulation Contaminated Sites Database indicates that
there are no recorded contaminated sites for the subject site.
2.7 INDIGENOUS AND EUROPEAN HERITAGE &NATIVE TITLE
Indigenous Heritage
A search of the Department of Indigenous Affairs Aboriginal Heritage Inquiry System indicates that
no Indigenous Heritage sites exist on the land.
Native Title
There are no outstanding Native Title claims affecting the subject site.
European Heritage
There are no places or sites of cultural significance within the subject site under the City of Karratha
Municipal Heritage Inventory and State Heritage Register.
2.8 FLOODING
The City of Karratha undertook a Coastal Vulnerability Study in August 2012. The study indicated that
2110 flood mapping affected some parts of the northern portion of the subject site. It is likely that
areas within the northern portion of the subject site will need fill. This is discussed further in section
6.0 of this report.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 9
3.0 PLANNING CONTEXT
3.1 CITY OF KARRATHA TOWN PLANNING SCHEME NO. 8
Lot 4615 (Reserve 30602) Searipple Road, Bulgarra is currently reserved as Public Purposes -
Education local scheme reservation under TPS 8. If the subject site were reclassified to Urban
Development zone, the provisions of TPS 8 require a Development Plan (or Structure Plan) to be
prepared and approved. A Structure Plan would need to be prepared and approved pursuant to
Planning and Development (Local Planning Schemes) Regulations 2015 Schedule 2 - Deemed provisions
for local planning schemes Part 4 Structure Plans. It is proposed that a Structure Plan is approved
concurrently with this local scheme amendment application.
A Structure Plan would identify the future redevelopment area of the subject site, being an area which
excludes the area required for the existing Karratha Primary School and Family Centre. A suitable
curtilage would be provided in the Development Plan to incorporate the primary school and centre for
retention, with the balance land available for redevelopment.
At present, under Clause 2.2 of TPS 8, a person shall not carry out any development on a reservation or
change the use of a reservation without first applying for and obtaining the written approval of the City
of Karratha. As such, a prospective purchaser of the subject site could potentially apply for
development approval and seek the Citys discretionary development approval for a particular use. The
City could grant discretionary development approval after considering any development proposal on its
merits and taking into consideration Clause 2.2 and Clause 4.4 of TPS 8. However, to remove
uncertainty created by the existing local scheme reservation of the subject site, it is more appropriate to
reclassify the subject site to Urban Development zone, with an approved Development Plan. This
would provide the necessary planning framework and guidance for any future subdivision and/or
development approval for sequential redevelopment of the subject site.
3.2 CITY OF KARRATHA LOCAL PLANNING STRATEGY
The City of Karratha Local Planning Strategy identifies the future growth options for Karratha townsite.
However, the Strategy does not specifically identify the future redevelopment land use options for the
subject site.
3.3 KARRATHA REVITALISATION STRATEGY
The Karratha Revitalisation Strategy provides a guide for the future growth and development
opportunities for Karratha townsite. The Strategy identifies the subject site as relatively unconstrained for
future redevelopment, with retention of the existing primary school. The Subdivision Concept Plan
contained in this report is based on the conceptual redevelopment ideas for the subject site contained in
the Strategy. This will be further discussed in the report.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 10
4.0 PLANINNG RATIONALE
The Department of Education and State Government has determined that the Karratha High School on
the subject site is now surplus to the States requirements and can be disposed as a freehold lot. This
will require conversion of the Crown Land into Freehold Title, excluding the existing Primary School and
Family Centre site.
A new high school facility has been developed at the Karratha College Campus site. Pupils have been
relocated to the new high school and the current former Karratha high school on the subject site has
been closed.
As an interim measure, security fencing has been provided around the former Karratha High School
facility. The Department of Education is required to continue on-going maintenance of the high school
buildings and grounds, until the site can be disposed. The Department of Education is seeking to
dispose of the high school land as soon as possible given that:
- The discontinued use of the high school buildings and grounds attract vandalism and anti-social
behavior; and
- The Department is required to finance the maintenance of the school buildings, playing fields
and grounds even though the high school is redundant and has been vacated.
The existing Karratha Primary School and Family Centre facility will be retained on a separate balance
reserve. The State Government has proposed to dispose of the surplus high school land through the
LASP process.
This proposed reclassification seeks to rationalise the public purpose reservation of the land by reclassifying
the land to the more appropriate Urban Development zone under TPS 8. The Urban Development zone
will provide opportunity to prepare and obtain approval for a Development Plan (or Structure Plan), which
can guide future land use under an appropriate statutory framework.
Aside from the land being redundant to Department of Education and State Government, the proposed
reclassification for the subject site to Urban Development is logical given that:
- The high school land is located within an established urban area, within the townsite of
Karratha, with access to existing roads, services and infrastructure;
- The high school land presents an opportunity for a relatively large urban infill development
project to occur, which can contribute to housing diversity and choice to accommodate
population growth;
- The potential high school land development site does not abut any private property, (i.e. there
are buffers, such as roads and open space, between the development site and existing
residences), therefore there will be limited impact on existing amenity;
- The requirements of the Urban Development zone for the preparation and approval of a
Structure Plan provides opportunity to plan for the delivery of a high quality residential
development, which would contribute to the amenity of the local neighbourhood and provide
land use diversity around the Karratha Primary School node;
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 11
- Redevelopment of the high school land is consistent with maximising efficient use of the urban
land, without compromising the residential amenity of the neighbourhood and
- The whole Lot 4615 (subject site) being reclassified to Urban Development as the Structure
Plan can identify the balance area containing the existing Primary School and Family Centre as
Public Purpose. The final balance area will be determined subject to structure planning,
feature survey and detailed subdivision design.
The surplus high school land includes an oval that is currently available as recreational open space for
the general public after school hours. Although this has been the case, it should be noted that the
former Karratha High School oval is not a formal Crown Reserve dedicated as public open space.
The primary public open space servicing the neighbourhood and locality is the Bulgarra Oval and
recreational facilties (i.e. Crown Reserve 32320 managed by the City of Karratha). The existing
Karratha Primary School oval is currently unfenced and this also is be used by the public after school
hours as open space. However, similar to the high school oval, it should be noted that the primary
school oval and grounds is not formally dedicated as public open space.
It is envisaged in the preparation and approval of a Structure Plan that the existing Karratha Primary
School would be retained on a site approximately 4.17 hectares. The proposed primary school site
area is consistent with WAPC DC Policy 2.4 School Sites, which prescribes a minimum public primary
school site area of 4.0 hectares. In addition, a sufficient area has been set aside for the Family Centre,
including the existing carpark being used by the Centre.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 12
5.0 SUBDIVISION CONCEPT PLAN
A Subdivision Concept Plan (SCP) (Appendix 3) has been prepared as part of this report to show
potential future redevelopment of the subject site, whilst retaining the primary school and family centre
either on individual sites or within a balance reserve.
The Urban Development zone requires the preparation and approval of a Structure Plan, which would
identify future land uses and spatial layout of land uses. The Structure Plan could be prepared based
on the SCP baseline proposal. The subdivision concept plan generally provides for:
- The existing high school buildings and infrastructure to be demolished and the site remediated for residential development.
- The high school buildings are considered dated and would require substantial upgrades and maintenance for the buildings to be readapted for a sequential land use (i.e. offices or
commercial). Preliminary investigations of the existing high school buildings indicates that
upgrading the existing school building/s to the required Australian Standards for alternative
commercial use would be cost prohibitive. However, a Structure Plan could provide flexibility
for alternative sequential land use of the high school buildings, to retain such options for any a
prospective purchaser;
- A new north - south road (i.e. minimum 20m road reserve) to provide permeability and access to the primary school, which would include school bus embayments on the western side of the
school for pupil drop-off and pick-ups. The exact width of this road would be determined in
consultation with the Department of Education at the detailed subdivision design stage and
subject to feature survey;
- The existing primary school northern car park being retained within the proposed primary school site. The primary school northern lot boundary has been located to provide opportunity
to retain the existing carpark and for potential future expansion of the carpark. Expansion
plans could include provision of a new row of car bays on the northern side of the existing
primary school car parking access road. The lot boundary also provides adequate area for a
1.0m landscaping strip along the northern boundary of the primary school site, to provide a
vegetation buffer between residential lots and the school site. The exact subdivision boundary
would be determined by Department of Education at the detailed subdivision stage and subject
to feature survey;
- The existing primary school southern car park is retained within the proposed primary school site, with access to the new north-south spinal road and Turner Way;
- It is noted that existing dwellings in McKenzie Way, Hooley Street, Hall Street and Shakespeare Street (on the western side of Reserve 32335) are not orientated towards the drainage swale.
Dwellings are orientated north-south and side onto Reserve 32335. There is no significant
amenity for dwellings to orientate towards the drainage swale (Reserve 32335). As such,
proposed Lots 1, 8, 15, 31, 32 & 47 within the SCP are orientated to face and provide a
positive contribution to the residential streetscape, rather than orientate towards the drainage
swale.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 13
- Orientating proposed Lots 1, 8, 15, 31, 32 & 47 will also provide for a more efficient development design (i.e. reduce development costs) by not having to provide a full width road
reserve and infrastructure along the western boundary of the subject site to provide for lots to be
orientated towards the drainage swale;
- Two 6m wide slip roads are provided along the western boundary of the site for vehicular permeability, access and for waste service vehicles;
- The existing fence at the northern end of the oval provides an indicative demarcation for provision of an interface strip between future development and Searipple Road reserve. No lots
are proposed with frontage to Searipple Road to avoid development costs (i.e. fill) to bring lots
up to a desirable servicing level with the road;
- The existing power infrastructure (compound) is retained on proposed Lot 49, which could be set aside as a Utility Reserve;
- The existing child health care centre is proposed to be retained on a separate lot with direct access to Searipple Road. The proposed lot could be set aside as a reserve for community
purpose. This site could be redeveloped for strata units if the centre is no longer required and
is demolished/relocated;
- The primary school site, utility site and family centre site could be identified as Public Purpose reservations under a Structure Plan, with the balance high school land identified as Residential
zone (i.e. a density code of R30);
- The open drain to the west could provide opportunity for urban stormwater drainage for the subject site subdivision and development; and
- There is opportunity for a proposed future road link between Turner Way and Emma Street as envisaged under the Karratha Revitalisation Strategy. This can be investigated at the structure
planning stage.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 14
6.0 INFRASTRUCTURE & SERVICING
A Preliminary Engineering Servicing Report (Appendix 2) has been undertaken for the subject site. The
subject site is surrounded by existing urban development and would be considered an urban infill
development site, as opposed to a greenfield development site, which is usually found on the urban
fringe and which requires major extension of services and infrastructure.
In this instance, all major services run past the subject land and the subject site can be adequately and
readily connected to major service infrastructure subject to the necessary extensions and upgrades.
6.1 WASTEWATER
There is an existing large deep gravity reticulated sewer main within Searipple Road, which discharges
to the pumping station on the opposite side of Searipple Road. Existing reticulated gravity sewer mains
also exist within Turner Way and surrounding residential streets. Preliminary advice from Water
Corporation indicates future urban development of the subject site could be readily connected to
existing infrastructure.
6.2 WATER SUPPLY
Preliminary investigations indicate that there are existing reticulated water mains within the immediate
and surrounding streets, including Turner Way and Searipple Road. These water mains have capacity
to supply reticulated water to the proposed development within the subject site. Extensions would be
required to service future development within the subject site. Further consultation will be required with
Water Corporation as to the design requirements for future reticulated water supply infrastructure.
6.3 POWER
Preliminary desktop analysis indicates that there is sufficient capacity in the existing grid for development
of the subject site as proposed in the scheme amendment. There is an existing power sub-station in the
central northern portion of the subject site, which would likely be retained.
6.4 TELECOMMUNICATIONS
The subject site can be serviced by the existing telecommunications infrastructure within Searipple Road
and Turner Way. There is also existing optic fibre running through the subject site.
6.5 GAS
There is no reticulated gas network in Karratha.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 15
6.6 SITE WORKS
Although the subject land is generally flat with gentle localised grades from north to south across the
site, earthworks to an extent is expected to create roads and level lots for dwelling construction,
adequate drainage for treatment, storage and disposal of stormwater and provision of services.
Siteworks will generally comprise of clearing the land, removal of unwanted materials (following
demolition of the high school buildings and infrastructure) and possibly some minor localised cut to fill.
As previously mentioned under section 2.8 Flooding, some areas of the northern portion of the site
maybe affected by 2110 flood mapping. It is likely that some filling within the northern portion of the
subject site will be required to accommodate future urban development. Retaining walls are likely to be
required to account for final finished filling and lot levels across the site, with all proposed residential
lots having a finished floor level 500mm above the 100 year flood level. This will be further
investigated as part of structure planning and subdivision design.
6.7 ROADS
Access to the subject site is currently from Searipple Road and Turner Way. The SCP proposes access
from these roads, with the proposal of a main north-south spinal internal road to service future
residential development and the existing primary school.
Proposed local roads can be considered as part of the structure planning and subdivision stage. Any
potential upgrades to existing roads can also be considered at the structure planning and subdivision
stage, along with any other potential external linkages with the surrounding road network.
6.8 STORMWATER DRAINAGE
There are two relatively wide drainage swales on both the western and eastern side of the subject site.
Preliminary stormwater drainage investigations indicate that the majority of stormwater generated from
the proposed urban development of the subject site (based on the SCP) could be directed into the
western drainage swale. Stormwater would potentially be directed towards the western drainage swale
via overland flow within the proposed road reserves.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 16
7.0 CONCLUSION
The former Karratha High School on the subject site is a redundant Western Australian Department of
Education asset and has been closed. Pupils have been relocated to the new Department of Education
public high school, which has been developed at the Karratha College Campus site.
This report presents a proposal to initiate a Local Scheme Amendment to the City of Karratha Town
Planning Scheme No. 8 (TPS 8). The proposal seeks to reclassify Lot 4615 (Reserve 30602) Searipple
Road, Bulgarra from Public Purposes - Education local scheme reservation to Urban Development
zone.
The whole Lot 4615 (subject site) being reclassified to Urban Development as a Structure Plan can
identify the balance area containing the existing Primary School and Family Centre as Public Purpose.
The final balance area and lot boundaries would be determined subject to structure planning, feature
survey and detailed subdivision design.
The reclassification to Urban Development will provide opportunity to redevelop the site for a suitable
sequential land use, subject to the preparation and approval of a Structure Plan pursuant to Planning and
Development (Local Planning Schemes) Regulations 2015 Schedule 2 - Deemed provisions for local
planning schemes Part 4 Structure Plans.
This local scheme amendment report outlines the proposal and demonstrates that the site can be
adequately planned, serviced and developed for future urban development.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 17
PLANNING & DEVELOPMENT ACT 2005
CITY OF KARRATHA
DISTRICT TOWN PLANNING SCHEME NO. 8
AMENDMENT NO. xxx
RESOLVED that the Council, in pursuance of Section 75 of the Planning and Development Act 2005, amend the
above local planning scheme by:
1. Reclassification of Lot 4615 (Reserve 30602) Searipple Road, Bulgarra from Public Purposes -
Education local scheme reservation to Urban Development zone and amending the Scheme Map
accordingly.
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 18
SCHEME AMENDMENT MAP
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 19
FIGURES
-
(Source: Google Maps, 2015 - modified)
FIGURE 1
LOCATION PLAN
-
(Source: Landgate - modified, 2014)
FIGURE 2
CADASTRAL/AERIAL PLAN
-
(Source: Landgate, 2015 - modified)
FIGURE 3
SURROUNDING CONTEXT
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 20
APPENDIX 1
CERTIFICATES OF TITLE
-
LANDGATE COPY OF ORIGINAL NOT TO SCALE
www.landgate.wa.gov.au
JOB 50136715Mon Feb 15 10:29:32 2016
-
LANDGATE COPY OF ORIGINAL NOT TO SCALE
www.landgate.wa.gov.au
JOB 50136715Mon Feb 15 10:29:32 2016
-
City of Karratha
Local Scheme Amendment No. xxx
Page | 21
APPENDIX 2
SERVICING REPORT
-
Job No: 15-009
Karratha High School Subdivision
for
Whelans
Revision Description Date
0 Issued for Review 13/02/2015
1
-
15-009 Karratha High School Subdivision Page i
Table of Contents
Table of Contents i
1 Introduction 2
2 Site Conditions 2
2.1 Geology 2
2.2 Topography 2
2.3 Groundwater Atlas 2
2.4 Acid Sulphate Soils (ASS) 2
2.5 Earthworks 2
3 Infrastructure 3
3.1 Roads 3
3.2 Stormwater Drainage 3
3.3 Sewerage Reticulation 3
3.4 Water Reticulation 4
3.5 Electrical Supply 4
3.6 Communications 4
3.7 Gas 4
4 Conclusion 5
Appendices
Appendix One: Subdivision Concept Plan
Appendix Two: Environmental Geology Series Maps
Appendix Three: 100 Year Flood Mapping
Appendix Four: Preliminary Earthworks Levels
Appendix Five: City of Karratha Review of Concept Plan
Appendix Six: City of Karratha Stormwater Design Guidelines for Residential Developments
Appendix Seven: Existing Water Corporation Sewer Infrastructure
Appendix Eight: Existing Water Corporation Water Infrastructure
Appendix Nine: Horizon Power Dial-Before-You-Dig
Appendix Ten: Existing Communication Infrastructure
-
15-000 Karratha High School Subdivision Page 2
1 Introduction
Pritchard Francis has been engaged by Whelans to undertake an Engineering Services Report for a proposed
subdivision on the existing Karratha High School (KHS) site.
This report outlines existing site conditions, adjacent services and likely development constraints. This report is based
on the subdivision concept plan contained within Appendix One.
2 Site Conditions
The site covers approximately 4.5ha in area and has frontages to an existing open drain to the west, Searipple Road to
the north, Turner Way to the south and Karratha Primary School to the southeast.
The site currently contains the Karratha High School which is to be demolished.
2.1 Geology
The Dampier sheet of the 1:250,000 scale Environmental Geology series maps, Appendix Two, indicates the site as
having soil profiles as follows:
Sand, silt, and clay in distal outwash fans, with gilgai surface in areas of expansive clays.
A detailed geotechnical investigation would need to be done to confirm the soil profile.
2.2 Topography
Water Corporation contours for the site indicate that it grades from approximately 9m AHD in the south to 6m AHD
adjacent to Searipple Road.
2.3 Groundwater Atlas
No historical groundwater data exists for the site but considering the sites close proximity to the coast there is
potential for a high groundwater table. The groundwater levels will need to be confirmed via geotechnical investigation
and/or monitoring bores.
2.4 Acid Sulphate Soils (ASS)
Department of Environment Regulations ASS mapping indicates that the site has a low risk of ASS and PASS. Due to
its proximity to areas in Karratha which do have high risk of ASS and PASS it is recommended an ASS investigation is
undertaken on the site.
2.5 Earthworks
The site currently grades from south to north with approximately 3m of fall across the site. It is expected that based on
other sites in Karratha the site will contain reactive soils however the level of reactiveness would need to be confirmed
via a geotechnical investigation.
-
15-000 Karratha High School Subdivision Page 3
JDA Consultant Hydrologists undertook a coastal vulnerability study in August 2012. As part of this study they
modelled 100 year flood levels for the 2010 climate and predicted 2060 and 2110 climates. The flood levels on the
northern side of Searipple Road for 2010, 2060 and 2110 are 5.5m AHD, 5.6m AHD and 5.8m AHD respectively, refer
Appendix Three for 100 year flood mapping. The 2110 flood map shows some flooding of the northern area of the site.
It is advised that a review is done of the drainage modelling for the site to confirm flood levels but at this stage it could
be assumed the northern portion of the site will need fill. Retaining walls will be required to account for the fall across
the site. All lots will need to have finsished floor levels 500mm above 100year flood levels
Refer Appendix Four for preliminary earthwork levels
3 Infrastructure
3.1 Roads
The main access to the site will be from Searipple Road to the north. A detailed intersection analysis will be required
for this intersection in order for it to cater for expected traffic volumes.
Secondary access will be via Turner Way to the south.
The City if Karratha have undertaken a preliminary review of the development plan and have queried how access will
be maintained for the Child Health Care site, refer Appendix Five.
3.2 Stormwater Drainage
There are two large swales on the west of the site and on the east of the site. Based on preliminary comments from the
City of Karratha the majority of the site will be drained into the western swale. The City of Karrathas Stormwater
Design Guidelines For Residential Developments, refer Appendix Six, states that post development flows should not
exceed pre-development flows.
It is possible that some compensation areas will be required but considering the relatively small area of the
development, the current semi-developed nature of the site and the fact the site is at the downstream end of the overall
catchment, it is likely the City will allow water to be flow directly into the adjacent swales without compensation.
Stormwater flows will be directed towards the main drainage system via overland flow within the road reserves.
It is likely lots 48-62 will drain directly towards Searipple Road.
3.3 Sewerage Reticulation
There is existing deep gravity sewer on the northern side of Searipple Road which discharges into a pump station
opposite the northeast corner of the site. There is also an existing 430mm pressure main on the western boundary of the
site which will need to be protected throughout construction. It is expected there is capacity in this existing gravity
system to accept sewer from the site. A planning request has been submitted to the Water Corporation but no response
had been received at the time of publishing of this report.
-
15-000 Karratha High School Subdivision Page 4
Existing Water Corporation Sewer Infrastructure can be found in Appendix Seven.
3.4 Water Reticulation
The site currently has 150mm asbestos water mains on its northern, western and southern boundaries in Searipple
Road, McKenzie Way and Turner Way respectively. It is likely that connections into the mains in Searipple Road and
Turner Way will be able to supply the site with water. A planning request has been submitted to the Water Corporation
but no response had been received at the time of publishing of this report.
Existing Water Corporation Water Infrastructure can be found in Appendix Eight.
3.5 Electrical Supply
Existing electrical infrastructure adjacent to the site includes:
High and low voltage underground cables in Searipple Road.
High voltage cable on the western boundary of the site.
High voltage and low voltage cable on Turner Way.
Substation in north of site.
Substation in south of site.
Low voltage underground cables within the site.
It is likely the existing network will have spare capacity to service the site. Refer Appendix Nine for Horizon Power
Dial-Before-You-Dig information.
3.6 Communications
There is existing Telstra copper network located in Searipple Road and Turner Way as well as within the site. There is
also existing optic fibre running through the site. The Telstra infrastructure within the site would need to be realigned
to suit the proposed road layout. It is expected that there will be capacity in the system to service the site.
It would need to be confirmed with NBN Co as to whether they would service this development. However, as it is less
than 100 lots they may choose not to. If this is the case then Telstra would service the development. Regardless of
which authority services the development, the developer will be required to install pit and pipe at their expense. Refer
to Appendix Ten for Existing Communication Infrastructure.
3.7 Gas
There is no reticulated gas network in Karratha.
-
15-000 Karratha High School Subdivision Page 5
4 Conclusion
The development of the Karratha High School Site would not appear to be constrained by service capacities or
upgrades with all services in close proximity to the site.
It is expected that existing sewer and water networks will have capacity however formal advice is yet to be received
from the Water Corporation.
There is an existing low and high voltage power network adjacent to the site as well as existing infrastructure within
the site.
Communications infrastructure within the site will need to be realigned to suit proposed road reserves.
Imported fill will likely be required in the north of the site to ensure finished lot levels are above 100 year flood levels.
Onsite stormwater compensation will also likely be required following consultation with the City of Karratha
-
15-000 Karratha High School Subdivision Page 6
Appendices
Appendix One: Subdivision Concept Plan
Appendix Two: Environmental Geology Series Maps
Appendix Three: 100 Year Flood Mapping
Appendix Four: Preliminary Earthworks Levels
Appendix Five: City of Karratha Review of Concept Plan
Appendix Six: City of Karratha Stormwater Design Guidelines for Residential Developments
Appendix Seven: Existing Water Corporation Sewer Infrastructure
Appendix Eight: Existing Water Corporation Water Infrastructure
Appendix Nine: Horizon Power Dial-Before-You-Dig
Appendix Ten: Existing Communication Infrastructure
-
Appendix One: Subdivision Concept Plan
-
Appendix Two: Environmental Geology Series Maps
-
SITE
-
Appendix Three: 100 Year Flood Mapping
-
#*
#*
#*
#*#*
#*
#*
#*
#*
#*#*
#*#*
#*#*#*
#*
#*
#*
#*
#*#*
#*#* #* #* #* #* #*
#*#*
#* #* #*
#*#*
#*#*
#*
#*
#*#* #*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#* #* #* #*#*
#*
#*
#*
#* #* #*#* #* #*
#* #*#* #* #*
#* #* #* #*
#*
#*#* #*
#*#*
#*
#*
#* #* #* #*#*
#*
#*
#*#*#*#*
#*
#*
#*#*
#*
#*
#*
#*#*#*#*#*#*#*#*#*#*#*
#*#* #*
#* #* #* #* #*
#*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*#*#*#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*#*
#*#*
#*#*
#*
#*#* #*
#*#*
#*
#*#*
#*#*#*#*
#*
#* #*#*
#*
#*
#*
#*
8
6
6
7
6
6
5
6666
6 6
66
77
7
12
30 25
18
2510
10
17
6.3
9.1 5.96.3
8.3
8.6
6.3
8.35.9
6.3
6.3
6.4
6.2
6.2
6.2
6.3
6.1
6.7 6.6 6.5 5.9
6.9 6.7
6.3
5.25.8
6.16.3
7.1
6.3
6.96.56.36.3
6.3
6.3
6.26.1
5.9
5.9
5.85.8
7.96.6
5.49.3
7.46.2
5.35.2
5.75.2 5.25.2 4.9
5.5
5.14.7
5.95.95.95.96.6 6.5 6.5 6.5 6.4 6.4 6.3 6.3 6.2 6.2 6.2 6.2
6.16.1
6.1 6.16.1
6.1 5.9 5.95.9
6.16.16.16.16.2
6.26.26.26.26.2
6.26.2
6.36.46.46.46.46.46.56.56.66.76.86.86.86.96.9
6.16.16.16.36.46.46.36.36.3
6.36.36.36.35.6
6.25.66.3
6.46.56.76.56.1
6.36.56.5
5.86.46.66.66.8
6.86.96.76.86.86.86.8
6.76.6 6.5 6.3
6.5 6.36.46.5
6.86.6
6.6
7.4
18.7 14.1 10.3
31.1 29.5
29.328.731.8
28.132.936.4
26.2
25.9 24.123.1 21.1
36.2
26.9
31.1
25.2 23.323.4 21.320.1
18.8
24.4
29.3
19.918.2
16.5
13.1
14.613.114.816.5
18.3 16.6
20.624.4
15.3
21.619.9
17.7
15.614.7
13.411.9
10.7
Tag Points(WaterLevel)(m AHD)#*
100yr Flood Extent0.5m Contour (m AHD)Cadastre
Job No. J4812
COPYRIGHT JIM DAVIES & ASSOCIATES PTY. LTD. 20110 0.5 1 1.5 2KilometersScale:1:22,000 LandCorpKarratha Coastal Vulnerability Study :Main ReportFigure 12B: 100yr ARI Flood Elevation - 2010 Climate Scenario - Sheet B
FEDBA CKarratha
NickolBay
1:500,000
Map Index
Note: No Water Levels are shownwithin town creeks due to model grid limitations
-
#*
#*
#*
#*#*
#*
#*
#*
#*
#*#*
#*#*
#*#*#*
#*
#*
#*
#*
#*#*
#*#* #* #* #* #* #*
#*#*
#* #* #*
#*#*
#*#*
#*
#*
#*#* #*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#* #* #* #*#*
#*
#*
#*
#* #* #*#* #* #*
#* #*#* #* #*
#* #* #* #*
#*
#*#* #*
#*#*
#*
#*
#* #* #* #*#*
#*
#*
#*#*#*#*
#*
#*
#*#*
#*
#*
#*
#*#*#*#*#*#*#*#*#*#*#*
#*#* #*
#* #* #* #* #*
#*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*#*#*#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*#*#*
#*
#* #*#*
#*
#*
7 6
6
8
5
77
6
76
7
10
6.6
9.2 6.26.26.6
8.3
6.2
6.7
6.2
6.3
6.5
6.8
6.5
6.6
6.5
6.6
6.4
6.9 6.9 6.1
7.3 7.2
6.5
5.7
6.36.8
7.47.5
6.5
6.76.66.66.6
6.6
6.6
6.46.4
6.3
6.2
6.2
6.16.1
6.86.25.7
9.47.6
6.35.6
5.65.85.3 5.3
5.3 5.1
5.65.1
4.8
6.26.26.26.26.26.36.36.36.9 6.9 6.9 6.8 6.8 6.7 6.7 6.6 6.6 6.5 6.5 6.56.4
6.46.4 6.4
6.46.3 6.3 6.3 6.2 6.2
6.2
6.36.36.46.46.46.46.5
6.56.56.56.56.5
6.56.5
6.66.76.86.76.76.86.86.96.97.17.17.17.2
6.46.46.56.66.66.76.66.56.5
6.66.66.56.6
6.65.66.6
6.76.96.86.2
6.96.76.9
6.76.96.9
7.2 6.87.17.17.37.17.17.17.1
7.37.1 7.3 6.8
6.9 6.86.76.8
7.37.1
7.1
7.3
7.6
31.2 29.6 24.2
36.2
26.9
31.2
25.2 23.418.918.1
24.5
25.1
18.3
16.5
13.1
14.8
18.3
24.5
21.8
17.917.215.8
14.813.512.1
10.8
Tag Points(WaterLevel)(m AHD)#*
100yr Flood Extent0.5m Contour (m AHD)Cadastre
Job No. J4812
COPYRIGHT JIM DAVIES & ASSOCIATES PTY. LTD. 20110 0.5 1 1.5 2KilometersScale:1:22,000 LandCorpKarratha Coastal Vulnerability Study :Main ReportFigure 14B: 100yr ARI Flood Elevation - 2060 Climate Scenario - Sheet B
FEDBA CKarratha
NickolBay
1:500,000
Map Index
Note: No Water Levels are shownwithin town creeks due to model grid limitations
-
#*
#*
#*
#*#*
#*
#*
#*
#*
#*#*
#*#*
#*#*#*
#*
#*
#*
#*
#*#*
#*#* #* #* #* #* #*
#*#*
#* #* #*
#*#*
#*#*
#*
#*
#*#* #*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#* #* #* #*#*
#*
#*
#*
#* #* #*#* #* #*
#* #*#* #* #*
#* #* #* #*
#*
#*#* #*
#*#*
#*
#*
#* #* #* #*#*
#*
#*
#*#*#*#*
#*
#*
#*#*
#*
#*
#*
#*#*#*#*#*#*#*#*#*#*#*
#*#* #*
#* #* #* #* #*
#*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*#*#*#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*#*
#*#*
#*#*
#*
#*#* #*
#*
#*#* #*
#*
#*#*#*
#*#*
#*
#*#*
#*
#*
#*#*
#* #*#*
#*
#*
#*
#*
#*
7
7
7
7
7
7 7
777
7777
77
7
77
8
2730 20
10
10
2018
6.9
5.9
8.1
9.2 6.96.96.9
8.3
6.66.6
8.6
7.3
8.46.8
6.8
6.3
6.9
6.8
6.8
6.7
6.8
7.6 7.5 7.4 7.2 7.1
7.8 7.7
7.4
6.46.7
7.57.6
7.97.9
6.3
6.96.86.86.8
6.9
6.8
6.7
6.6
6.66.6
8.16.9
6.25.99.4
7.76.3
5.85.8
6.25.5 6.26.4 5.5
5.85.5
5.55.5
6.66.76.76.76.76.76.86.87.3 7.3 7.2 7.2 7.2 7.1 7.1 6.9 6.9 6.96.9
6.86.8 6.8
6.86.8 6.7 6.8 6.7 6.7
6.7
6.86.86.86.86.96.96.9
6.96.96.96.9
7.17.27.37.37.37.47.57.57.57.57.5
6.96.96.96.97.16.96.9
6.96.96.96.9
6.87.17.2
7.17.17.27.26.5
7.27.37.57.4
7.47.57.5 7.57.67.47.57.57.57.57.6
7.9 7.7 7.67.5 7.4
7.57.67.8
8.18.2
8.1
8.3
17.6 10.912.1
18.8 16.8 14.1
12.1
10.3
35.8 31.3 29.6
29.428.831.8
26.928.232.936.4
26.2 25.1
26.1 24.323.2 21.2
36.2
26.9
31.2
25.2 23.323.4 21.420.2
18.918.1
24.5
29.3
25.1
18.3
16.6
13.1
16.414.613.214.916.6
18.3 16.7
20.724.5
22.7
15.4
21.8
17.315.9
14.913.612.2
10.8
Tag Points(WaterLevel)(m AHD)#*
100yr Flood Extent0.5m Contour (m AHD)Cadastre
Job No. J4812
COPYRIGHT JIM DAVIES & ASSOCIATES PTY. LTD. 20110 0.5 1 1.5 2KilometersScale:1:22,000 LandCorpKarratha Coastal Vulnerability Study :Main ReportFigure 17B: 100yr ARI Flood Elevation - 2110 Climate Scenario - Sheet B
FEDBA CKarratha
NickolBay
1:500,000
Map Index
Note: No Water Levels are shownwithin town creeks due to model grid limitations
-
Appendix Four: Preliminary Earthworks Levels
-
Appendix Five: City of Karratha Review of Concept Plan
-
To link this development with the dual use path 2.5m wide already in place on McKenzie and continue along Searipple road
Stormwater outlets with rock protection for the drains
Stormwater outlets with rock protection for the drains
Footpaths to be on property boundary line and not back of kerb
What happened to access road for the Child Health Care.
-
Appendix Six: City of Karratha Stormwater Design Guidelines for Residential Developments
-
Stormwater Design Guidelines for
Residential Developments
June 2011
-
Stormwater Design Guidelines June 2011 Residential Developments
Contents
1 Introduction 3 1.1 General 3 1.2 Background 3 1.3 Developer Responsibilities 3 1.4 Development within Drainage Reserves 4 1.5 Water Sensitive Urban Design (WSUD) 4 1.6 Innovation 5 1.7 Other texts 5
2 Design Parameters for Small Developments 6 2.1 General 6 2.2 Flood Events 6
3 Design Parameters for Large Developments 7 3.1 General 7 3.2 Flood Events 7 3.3 Maintenance 8
4 Vegetation 9 4.1 General 9
Table Index
Table 1 Design Storm Events 4 Table 2 Recommended species for establishment in new drainage reserves 9
-
Stormwater Design Guidelines June 2011 Residential Developments
1 Introduction
1.1 General This document has been prepared to assist developers meet the expectations of the Shire of Roebourne
(the Shire) in drainage of any development in a residential area.
The Shire is the authority responsible for the future care, control and management of the road and
stormwater drainage infrastructure. All designs submitted will be checked against these guidelines and
the Shire reserves the right to request revisions or further details if they are not satisfied with the
information supplied.
1.2 Background Typically the drainage network in the developed areas of the Shire operate by capturing flows within
developed residential area and conveying the water to topographic low points and discharging through
open drainage channels. The channels vary in size and shape, depending on the volumes of water they
convey.
The current drainage network within the Shire has proven to be an effective system that performs its
function well. Any proposed modifications will undergo close scrutiny as it may impact on the hydraulic
capacities of drainage control points such as road crossings. It is important that new developments are
designed to ensure post development flows do not exceed pre development flows so additional pressures
are not placed on these drainage points within the network.
1.3 Developer Responsibilities Any developer subdividing or developing land for residential purposes is required to undertake
stormwater drainage design. Although the extent of the design will vary in accordance with the size of the
development, in a basic context it will involve examination of the total drainage catchment area to ensure
any upstream drainage may pass through the development is included in the design and the drainage
system developed is capable of carrying the ultimate design flow from the upstream catchment as well as
the developed land. The drainage system shall be designed to cater for two different storm events:
1. The initial storm
2. The major storm
1.3.1 Shared Drainage Systems Developers whose land shares a common drainage catchment have a responsibility for ensuring that the
whole of the catchment, including major roads are drained.
Larger developments which may have a staged development process will be required to demonstrate an
overall drainage plan for the entire catchment prior to obtaining approval for any individual stages.
1.3.2 Existing Drainage Systems If, during the design phase it is determined that existing drains do not meet the requirements of the new
development then the developer must arrange appropriate approvals for altering the existing
infrastructure prior to undertaking any works. Under no circumstances will any alteration to existing drain
be permitted without authorisation.
1.3.3 Outfall to Private Property In instances where stormwater is to be discharged into private land downstream of a development, the
developer must ensure that an easement is provided over the route of the drain in addition to constructing
and/or improving the drainage outlet. The easement shall be in favour of the Shire of Roebourne
-
Stormwater Design Guidelines June 2011 Residential Developments
1.3.4 Preliminary Drainage Proposal A preliminary drainage proposal and investigation will be required which defines the drainage
requirements for initial and major storms, identifies types and location for Water Sensitive Urban Design
(WSUD) strategies, considers upstream and downstream catchments, identified necessary floodways
and any upgrades required to existing infrastructure. Results of this investigation shall be included on a
masterplan for drainage which shall be provided to the Shire for approval prior to commencing any
development.
1.3.5 General Design Parameters The developer in consultation with the drainage designer will be responsible for determining suitable
runoff coefficients and characteristics for a drainage system based on the ultimate development of all
allotments for the relevant land zoning. Storm events shall be in accordance with table 1 below
Table 1 Design Storm Events
Catchment Zoning Initial Storm Major Storm
All open spaces 2 year 100 year
All other Zones 5 Year 100 year
1.4 Development within Drainage Reserves Any proposed development that impinges on drainage reserves will require detailed investigation. The
Local Government Guidelines for Subdivision Development 2009 Edition 2 (IPWEA 2009) illustrate a
floodplain development strategy and identify a flood fringe that can be utilised if necessary. The minimum
requirement for this type of impingement will include a hydrologic and hydraulic assessment to
demonstrate:
Minimum habitable floor level of 0.5 m above the 100 year ARI flood level.
Total development within the flood fringe does not raise the 100 year ARI flood level by more than
0.15 m
Environmental considerations are also major design requirements for all drainage infrastructure and
subdivision designs must be undertaken in consultation with relevant agencies. In particular, soil erosion
and sediment control will be necessary both during construction and maintenance periods.
To avoid mosquito breeding and associated issues, all drainage systems and associate structures should
be designed in consultation with the Department of Health.
1.5 Water Sensitive Urban Design (WSUD) The Shire supports the principles of WSUD and recommends they be adopted to suit the climatic and
ground condition of the region. All developers are to maintain surface and groundwater quality at pre-
development levels (winter concentrations) and improve the quality of water leaving the developed area,
if possible. All runoff contained in the drainage infrastructure network needs to receive treatment prior to
discharge into the environment consistent with the Stormwater management manual (DoW, 2004-2007). The following elements can be considered as part of the design:
Combining drainage reserves and recreation reserves with appropriate landscaping. This should include
an assessment of irrigation water demands to determine whether the water supply network has adequate
capacity. Landscaping should not impact on the hydraulic function of the drainage system.
WSUD at the source of stormwater generation by encouraging landscaping to reduce peak flows to open
drains.
-
Stormwater Design Guidelines June 2011 Residential Developments
Use of v-notched weirs or drop structures within open drains to provide detention and treatment of low
flows with the aim of reducing flow velocities to limit erosion and reduce downstream sedimentation.
1.6 Innovation The Shire supports innovation in stormwater design, however good supportive evidence must be supplied
with any proposal.
1.7 Other texts The Shire acknowledges that the Local Government Guidelines for Subdivisional Development by the
Institute of Public Works Engineers Australia (Guidelines for Subdivision) are considered as the minimum
standard for subdivision development and are to be read in conjunction with this document and other
policies and legislations relevant to Agencies associated with subdivisional approvals.
Better Urban Water Management (WAPC 2008) was developed to facilitate better urban water
management of our urban water resources by ensuring an appropriate level of consideration is given to
the total water cycle at each stage of the planning system and should also be considered in association
with Local Government Guidelines for Subdivisional Development during the development process within
the Shire.
-
Stormwater Design Guidelines June 2011 Residential Developments
2 Design Parameters for Small Developments
2.1 General Small developments are classed as developments on less than five lots. This includes any development
of enhancement of a pre-existing developed lot. Typically they will not incorporate any provision for public
roads or servicing and stormwater disposal requirements will be local in nature.
In general the drainage system and all associated structures should be designed as follows:
Maximum flow velocities in open channels shall not exceed 2 m/s in open channels without suitable
erosion protection (can be arrested by the inclusion of drop structures);
Mortared stone pitching shall be provided in open drains at all outlet structures, junctions and bends
greater than 22.5o
Detention storage areas may be provided at suitable locations (can be in line) to reduce peak flow
rates to the capacity of downstream facilities
The minimum habitable floor level shall be 500 mm above the 100 year ARI flood level.
Drainage channels should be constructed with minimum 1:4 side slopes and vegetated where
possible to limit erosion of drain sides
Appropriate safety measures shall be provided to protect the public from being trapped within a drain
during flash flooding
2.2 Flood Events Storm recurrence intervals for the two defined storm events shall be in accordance with the following:
2.2.1 Minor Events The roof of any building shall not contain downpipes and will discharge directly to the lot.
Lots should be landscaped to prevent direct runoff from impervious surfaces to the drainage network
(roads or arterial drains) and to prevent erosion.
Open drains provided as part of the development will be designed to convey the 5 yr ARI event flows,
2.2.2 Major Events Any additional capacity within drainage reserves will be designed to convey 100 yr ARI flows
-
Stormwater Design Guidelines June 2011 Residential Developments
3 Design Parameters for Large Developments
3.1 General Large developments are classed as developments of five lots or greater and will typically include public
services like roads, parks and utilities. Stormwater disposal requirements will primarily be catchment
focussed.
The ideal drainage network in this case is represented by utilising kerbed roads as the initial conveyor of
stormwater, with kerb breaks located at topographic low points discharging to large open channels that
direct the stormwater away from the urban zone.
In general the drainage system and all associated structures should be designed as follows:
The top water level for the design of open channels shall be greater than 300 mm below the level of
the road shoulder for the 5-year ARI event
Maximum flow velocities in open channels shall not exceed 2 m/s in open channels (can be arrested
by the inclusion of drop structures)
Mortared stone pitching shall be provided in open drains at all outlet structures, junctions and bends
greater than 22.5o
Detention storage areas may be provided at suitable locations to reduce peak flow rates to the
capacity of downstream facilities
The minimum habitable floor level shall be 500 mm above the 100 year ARI flood level
Drainage channels should be constructed with minimum 1:4 side slopes and vegetated where
possible to limit erosion of drain sides
3.2 Flood Events Flood events should be catered for as follows:
3.2.1 Minor Events The roof of any building shall not contain downpipes and will discharge directly to the lot.
Lots should be landscaped to prevent direct runoff from impervious surfaces to the drainage network
(roads or arterial drains) and to prevent erosion.
The road network will be used as the primary conveyor of stormwater, designed with kerbs to contain all
flows within the 5 Yr ARI event.
Kerb breaks will be provided at appropriate low points throughout the road network to discharge
stormwater to drainage reserves and vegetated open channels in a controlled manner.
The main channel in open drains will be designed to contain the 5 year ARI event and where appropriate
Water Sensitive Urban Design (WSUD) principles in the form of sedimentation basins, gabions, V notch
weir structures incorporated to maintain low flow velocities and allow settling of suspended solids
Mortared stone pitching or other suitable scour protection shall be provided in open drains at all outlet
structures kerb breaks, kerb returns, open drain junctions and bends greater than 22.5o
-
Stormwater Design Guidelines June 2011 Residential Developments
3.2.2 Major Events Flow generated in excess of the 5 Yr ARI event will form overland flow paths by flooding of the road
reserve directing stormwater to drainage reserves.
The drainage reserves will be designed to contain all 100 yr ARI flows.
Developments will need to demonstrate that the 100-year flood level in downstream drainage reserves
does not increase by more than 0.15 m as a result of the development.
Weir structures or other drop structures shall be provided in arterial drains to limit downstream
sedimentation and ensure velocities do not exceed 2 m/s.
3.3 Maintenance The drainage system shall take into consideration requirements of future maintenance activities including
the provision for safe plant access for cleaning, silt removal and maintenance of vegetation.
-
Stormwater Design Guidelines June 2011 Residential Developments
4 Vegetation
4.1 General Maintaining a level of vegetation cover in constructed features such as drainage reserves is important for
increasing soil stabilisation and reducing erosion. Vegetation can act to inhibit stormwater flows and
potentially lead to flooding in serious cases; however a balance of vegetation cover is required to ensure
the optimal drainage system performance.
Drainage channels should be vegetated with native grasses whilst trees should occupy drainage
reserves. It is preferred that shrubs not be used in drainage reserves due to the additional maintenance
requirements. Species should be selected to reduce water requirements with watering to assist in
establishment and reduced to zero by handover. Table 2 below has examples of species that are
considered suitable however this is not an exhaustive list and other species approved by the Shire can be
considered
Table 2 Recommended species for establishment in new drainage reserves
Category Species Habitat
Trees
Eucalyptus victrix (Western Coolibah); 1 12 m
Floodplains and flats
Terminalia canescens (Joolal); 1 10 m
Variety of habitats
Grasses
Cymbopogan ambiguus (scent grass)
Variety of habitats
Themeda triandra Variety of habitats
-
Appendix Seven: Existing Water Corporation Sewer Infrastructure
-
BULGARRA
Page 2
Page 5
Page 6
Page 4
Page 3
20/01/2015
Sequence No:
1Page:
The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.of 6 Sewer
Information Brochure Damage43457587Print Date:
WARNING - CRITICAL PIPELINERefer toPrevention andLegend for details
Scale: 1:4567
Index Page
-
20/01/2015
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.
Sequence No: 43457587
Print Date:
Scale: Centre Point:
Sewerof 62Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.855, -20.729
-
20/01/2015
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.
Sequence No: 43457587
Print Date:
Scale: Centre Point:
Sewerof 63Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.858, -20.732
-
20/01/2015
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.
Sequence No: 43457587
Print Date:
Scale: Centre Point:
Sewerof 64Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.859, -20.729
-
20/01/2015
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.
Sequence No: 43457587
Print Date:
Scale: Centre Point:
Sewerof 65Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.858, -20.727
-
20/01/2015
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.
Sequence No: 43457587
Print Date:
Scale: Centre Point:
Sewerof 66Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.862, -20.732
-
Appendix Eight: Existing Water Corporation Water Infrastructure
-
BULGARRA
Page 3
Page 4
Page 6
Page 2
Page 5
20/01/2015
Sequence No:
1Page:
The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.of 6 Water
Information Brochure Damage43457587Print Date:
WARNING - CRITICAL PIPELINERefer toPrevention andLegend for details
Scale: 1:4567
Index Page
-
20/01/2015
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.
Sequence No: 43457587
Print Date:
Scale: Centre Point:
Waterof 62Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.855, -20.729
-
20/01/2015
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.
Sequence No: 43457587
Print Date:
Scale: Centre Point:
Waterof 63Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.858, -20.732
-
20/01/2015
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.
Sequence No: 43457587
Print Date:
Scale: Centre Point:
Waterof 64Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.859, -20.729
-
20/01/2015
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.
Sequence No: 43457587
Print Date:
Scale: Centre Point:
Waterof 65Page:
WARNING - CRITICAL PIPELINERefer toInformation Brochure DamagePreventionandLegend for details
116.858, -20.727
-
20/01/2015
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 3496.
Sequence No: 43457587
Print Date:
Scale: Centre Point:
Waterof 66Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.862, -20.732
-
Appendix Nine: Horizon Power Dial-Before-You-Dig
-
Appendix Ten: Existing Communication Infrastructure
-
RD
SEARIPPLE
SEARIPPLE
SC
HO
OL
ST
RD
WY
WY
ST
TURNER
TURNER
LO
CK
YE
R
WY
WY
WY
SAMSON
ST
WY
L107
7
DP21
1475
30
1432
1828
16
12
KARRATHA
PRIMARY SCHOOL
4615
2224
2026
3113
15
2927
2517
KARRATHA SENIOR HIGH SCHOOL
947497 45
1311
5531
53 515
14
12
13
31
U4
U3U
5
U6
U1
U2
U3 U4 U5 U6
U1 U2
2927
32
253133 29
27
193739
2335
21
43
171541
3216 18
30
1236 34
14
24
2226 2428
20
2123
27
1925
1729311513
3311
26L680
DP71335
U6
U7
U8
U9
U1
U2
U3
30
U4
U5
25L11
U5U
6
U1U
2U3U
4
L2895
444
42646
2840 38
10
935
395 7
3734143
1
1133
109
11
810
7
5
2
10
34.8
P50c1:M
2251
-2259
c1:M
2275
P35
10
D
C97
.2
P35
c1:M2
289-22
90
P50 10 PEHJ
10LEFT IN SITU
5
47.9
P504x2 PEHJ
49.110 PEHJ
10LEFT IN SITU
22
49.15O201-210
10 PEHJ
O2351DEAD O227
1DEAD
O2071DEAD
O2291DEAD
O2041DEAD
O2021DEAD
47.9
2
49.7
49.710LEFT IN SITU
2 2
510
1010 PRO241-250
102x2
54.4
2 2
6
P50
10
9.5
5
2
5
O221-2233DEADO227
2DEADO230
O2111DEAD
O241-25019.010 PEHJC
P50
19.0
22/0.64
CG
20
50.5
50 CPFUTc1:M2261-229020DEAD
50 CPFUT
12.011.2P35
50 CPFUT
4
P3550 CPFUT
24.5
D
P3520
20/0.
64
P35
2020
15.6
42.4
2DEAD1DEA
D
c1:M
2294
-229
8
4DEA
D
c1:M2251-230
0
P50
50 PEHJC
6.050 PEHJC
69.0
P50
5
P20
c1:M2
251-22
80
c1:M2
281-22
90
20DEA
D
2x30
72.3
P50
10DEAD
10DE
AD
31.2
P20
10.0
10 PE
C
2P2010/0.64 PE
46.6
c1:M2291-2300
10 PE
2
54.2
P20
50.8
c1:M2291-2293
c1:M2298
6DE
AD
10 PE
2x2 PE
10/0
.64
PE
10 PE
CP50
c1:M2291-2293
c1:M2298
6DE
AD
P20
60.5
1DEAD
c1:M2294-2298
4DEAD
10.0P
20
10/0.64 PEC
29.8CP50
10 PE
RM1
O2011DEAD
2
O2211DEAD
O205-206O2081DEAD
2x2
O2221DEAD
2
O2421DEAD
33.0P20
102x2 5
48.85
O2481DEAD
O2441DEAD
O246O250
O2631DEAD
O2701DEAD
53.610
O2641DEAD
5
5
O2811DEAD
O201-250O271-28515DEADO251-270
13.7
MC 5.0MC
4
MC 50 PEHJ30 PR20 PEHJ
30/0.64 MBHJC
20 PR20 PEHJ2x2 PR
O251-300O201-250O14O208DEAD
O61-70O71-80O1-20
84.12x20 PR2 PEHJ
P352x50 PEHJ10 PEHJ
MC 48.2
245.4
44.1
P2010.0
10 PEHJ2x50 PEHJ
P35
10 P
EH
J
2
MC
O201-250O271-28515DEAD
O201-250O271-28515DEADO251-270
50 P
EH
J30
20 P
EH
J19.3
MC 12.1 5M
C
4
50 PEHJ30 PR20/0.64
50 PEHJ
3020/0.64
10.0
50 PEHJ30 PEHJ
34.4MC
4
45.1
P5015DEADO286-300
30.5
30
P50MC
22
20 P
EH
JP
20
6
O25
1-27
0
48.0P35
O181DEAD
O61-80O1-20
20 PR20 PEHJ4x2 PR O17
O19
O231DEAD
O351DEAD
30 PEHJ20 PEHJ
O371DEAD
O61-8010DEADO1-20
30 PR
O131DEAD
520/0.64
45.7
2 2
2
5
O21-40
O41-60
46.9
20/0.64
O21-40
46.6
20/0.64 B
P50
B
46.6
O361DEAD
20LEFT IN SITU
20/0.64
O491DEAD
O381DEAD
21.8P5020 PEHJ50 PR50 PEHJO61-80O1-50O201-250
O151DEAD
O341DEAD
P50 46.0
2 2
5
46.0
O21-4010DEAD
20/0.64
42.4
2 2
5
42.4
P50
5
2
30 PEHJC
20LEFT IN SITU
20/0.64D
2
O2921DEAD
O2821DEAD
B
91.7
89.8
O95
1DE
AD
3DE
AD
O94
-100
20D
EA
D
O98
1DE
AD
O10
01D
EA
D
2
O97
1DE
AD
O96
1DE
AD
2x50
PE
HJ
O25
1-30
0O
201-
250
O94
1DE
AD
2
50 PEHJO251-300
MC
2
305
23.0 21.8
MC
5
5
P35
10.0
2
O891DEAD
2
O881DEAD
O871DEAD
2
2
2
2
2
2
2
P5030 PR
O921DEAD
O901DEADO911DEAD
5
76.5
10.0
10 PE2DEAD
P20
2
2DEAD
P202x2 PE
B
7.0
1
2
80.0
80.0
2x2C
90.0
2x2
PE
HJ90
.0
2x2 PE
HJ
P20M
C
MC 2x2 PEHJ
2.0C
MC
31.8
544.8
P6:O
1-100P
6:O101-125
P6:O
146P
6:O127-130
O221DEAD
O691DEAD
MC 44.85 PEHJ3x2 PEHJ
2
O671DEAD
O681DEAD
O241DEAD
248.2
2 2
5
30LEFT IN SITU
O61-8010DEAD M
C
47.8
47.82x2 PEHJ30 PEHJ
2
30
MC 45.1
47.8
2
210/0.64 MBHJ
10LEFT IN SITU
MC
25.0
30
41.7
541.7
O61-8010DEAD
15D
EA
DO
286-
300
3032.0
4x2 PEHJ30 PEHJ
MC
2 2
5
O25O27
O28O24
O731DEAD
O711DEAD
O291DEAD
O21-30
10
O21-30 44.8
5
B
45.710 PEHJC
O41-50
10
10
10LEFT IN SITU
O79-80
15DEADO286-300
O311DEAD
O751DEAD
O771DEAD
O271DEAD
O261DEAD
46.6
2 2
P50
5
5
10
46.610 PEHJCO21-30
10
P50
10
10LEFT IN SITU
10LEFT IN SITU
28.510LEFT IN SITU
2.010 PR
2
215.8 2
O1511DEAD
O451DEAD
10LEFT IN SITU
O1471DEAD
O461DEAD
O1411DEAD
O601DEAD
2 2
45.7 22 2
O421DEAD
O411DEAD
O1531DEAD
O1561DEAD
O441DEAD
O431DEAD
O1541DEAD
O1551DEAD
102
B
46.6
6
46.3
10
2
2
45.4
10
MC B
O1851DEAD
O1901DEAD
50LEFT IN SITU
10 PEHJC
10LEFT IN SITU
O181-190
50
1046.6
46.6
B
P50
22
546.6
20/0.64
46.6
50 PEHJC
O151-160
10 B
70.6
2
547.0
47.0
10
MC
O101-14010DEAD
O1871DEAD
O1841DEAD
O1671DEAD
O1701DEAD
O1881DEAD
O14
01D
EA
DO
137
1DE
AD
O13
91D
EA
DO
136
1DE
AD6x274.2
85.0
2
4P35
50 PEHJC
O101-14010DEAD
O131-14020DEAD
49.630 C
11.3