BOLIVAR | BRAHMA LODGE | BURTON | CAVAN | DIREK | DRY CREEK | EDINBURGH | ELIZABETH VALE GLOBE DERBY PARK | GREEN FIELDS | GULFVIEW HEIGHTS | INGLE FARM | MAWSON LAKES | PARA HILLS PARA HILLS WEST | PARA VISTA | PARAFIELD | PARAFIELD GARDENS | PARALOWIE | POORAKA | SALISBURY SALISBURY DOWNS | SALISBURY EAST | SALISBURY HEIGHTS | SALISBURY NORTH | SALISBURY PARK SALISBURY PLAIN | SALISBURY SOUTH | ST KILDA | VALLEY VIEW | WALKLEY HEIGHTS | WATERLOO CORNER
CITY PLAN
2035DR
AF
T
F O R C O N S U L T A T I O N
The City Plan shapes everything that Council does, across the entire City – it defines the vision for our City and identifies the critical actions that Council will deliver over the next four years. It also guides our advocacy with governments and other stakeholders, as well as our strategy development and planning for the longer term. We are currently reviewing it as we need to make sure it is relevant to the changing needs of our community.
It is important to note that preparation of the draft City Plan 2035 occurred in late 2019 and early 2020, before the impacts of Australia’s response to the Covid 19 pandemic had begun. We appreciate that this event is probably one the biggest economic and social disruption that we have ever experienced. With this in mind, it is expected that changes may need to be made because of this.The City of Salisbury has already announced a number of initiatives to help address the immediate-term impacts of this situation (please see our 20/21 Annual Plan which is also currently on public consultation for details), and there may be additional actions inserted into the City Plan as a result of further consideration during the consultation period.
A new vision for the City of Salisbury has been prepared and underpins what the City Plan is working towards.
This draft vision has been developed by Council’s Elected Members to articulate what Council wants the City be, and to act as a shared and positive focus for the community and Council moving forward. It has a strong emphasis on community – our residents, businesses and workers, community groups and neighbourhoods - and seeks to encapsulate our desire for:• Ongoing sustainability to meet the needs of the
current community and future generations.
• Connection in all its forms. Salisbury is made up of 32 suburbs, 143,000 people, from many cultures, 7,200 actively trading businesses and significant amounts of open space. The importance of connectivity is increasingly recognised as a determinant of community wellbeing. This takes many forms – connections between people and nature, connections residents have with job opportunities, the physical connections between our suburbs, the social connections fostered through organisations such as clubs and schools and economic connections our businesses have with each other and global markets
• A progressive outlook, with our residents, businesses and the Council administration being forward looking and willing to try new things.
Recongising that we take pride in our past and using this as a foundation on which to build new opportunities and respond to challenges.
We would like to hear your views on the draft vision, and whether the actions identified in the draft City Plan address the issues you see as being priorities for the City and our community over the medium to longer term.
Please review the information contained in this document and complete an online survey at www.salisbury.sa.gov.au/Haveyoursayto tell us your views.
Alternatively we can send a copy of the survey to you.
If you would like further information about City Plan 2035, please contact Natalya Boujenko on 08 7006 2655 or via email at:[email protected]
Consultation on the draft City Plan closes on
27 May 2020.CITY PLAN 2035 | 1
CITYPLAN 2035
Draft vision: “A sustainable, connected and progressive community”
Have Your Say
DR
AF
T
2 | CITY PLAN 2035 CITY PLAN 2035 | 3
The draft City Plan 2035 has considered a range of things including:• An assessment of the economic, environmental,
social and demographic trends that affect the City, or are likely to impact on us in the future.
• An assessment of current State Government policies and directions such as the State Infrastructure Strategy, Growth Plan, Planning and Design Code and Climate Change strategy (noting that some of these are yet to be finalised).
• An assessment of the regional development projects and initiatives that will influence the City in the future (see the map on pages 4-5 for further details)
• Previous strategies prepared by Council since the adoption of the current City Plan, including the Adapting Northern Adelaide Climate Adaptation Plan, Intercultural Plan, Youth Action Plan, Growth Action Plan and Ability Inclusion Strategic Plan, as well as other strategy and policy development that is currently underway such as our draft Place Activation Strategy and Digital Strategy.
• An economic positioning paper for the City that analysed economic, demographic and socio-economic indicators and identified a range of opportunities and actions to grow the local economy and deliver more prosperity to the people who live here
• A range of organisational initiatives and research such as the organisational values review, Council’s bi-annual community perception survey and the smart cities agenda.
A suite of indicators that will be used to gauge the progress we are making towards the City Plan aspirations will also be prepared and incorporated into the final City Plan 2035.
How has the draft City Plan 2035 been prepared?
Salisbury’s Vision: A sustainable, connected and progressive community
CRITICAL ACTIONS
Covers a range of issues that impact on the
liveability of the City and the health and wellbeing
of our community including community
safety, social connection, the look and feel of our
neighbourhoods and the range of community facilities and programs available to support our community’s aspirations.
Strategic ProjectsSignificant stand alone projects to be delivered by Council within the
next four years
Strategy DevelopmentStrategies and plans this Council will develop or
review that are important for delivering our
City Vision
Recognises the diverse environmental features of our City and seeks to strike
a balance between our useable green space and the natural environments
that support our biodiversity. It seeks to ensure we
make the best use of our resources and enable our community, environment and infrastructure to be resilient to a changing
climate.
Operational FocusServices that Council has
identified as priorities through feedback from
our community
Advocacy PrioritiesPriority projects for which we will seek investment into our community from
other organisations
Guides how we can ensure the success and
growth of our businesses and in-turn create more
job opportunities for our residents. Attracting investment and ensuring our infrastructure supports
economic activity are focus areas of this direction, as is well
planned urban growth throughout the City.
This direction focuses on how Council will ensure it provides exceptional
experiences to the community, delivers quality outcomes and
is recognised as a great place to work.
A welcomingand liveable
CityA sustainable
CityA growing City
that creates new opportunities
Innovation and Business Development
You can see and read more about what Council is proposing to focus on over the next few pages.
Our critical actions fall into several categories and range from operational and site specific projects that will have immediate impact, and others which are more strategic in nature and will guide how and what we do as a Council in the longer term.
Several ‘Foundations’ are then identified for each of the 4 directions.These are essentially the goals Council has identified for the City and guide what we do and how
we operate. They are supported by critical actions that identify the priorities Council will deliver over the life of this City Plan.
The draft City Plan is based upon 4 Key Directions that we believe capture the wide ranging spectrum of influences on our City and community, and directly respond to our Vision:
Immediately noticeable impact Medium to longer term impact
4 | CITY PLAN 2035 CITY PLAN 2035 | 5
City Shaping Activities
6 | CITY PLAN 2035 CITY PLAN 2035 | 7
A welcoming and liveable City
Delivering and supporting programs that promote active living, health and wellbeing throughout the community
Continuing to deliver and maintain community and sporting facilities that cater for a diverse range of interests and needs, and support clubs and community groups to increase participation
Connecting our community to information, people and programs that help them achieve their goals
Celebrating and catering to our community’s diversity, in all its forms
Designing services, places and programs that are safe and inclusive of the whole community
Informing, connecting and empowering our community and neighbourhoods to increase their self-reliance
Providing experiences that make our places lively and interesting
Facilitating provision of a range of housing choices
Encouraging business to become more involved in our community
In addition to these critical actionsCouncil will continue to deliver on our foundations by:
FoundationsOur City is attractive and well maintainedThe health and wellbeing of our community is a priorityPeople are valued and they feel safe, included and connectedWe are proud of our strengths, achievements and cultural diversityOur community is resilient and adaptive to change
Strategic Projects• Upgrade the community hubs at Burton & Ingle Farm• Implement St Kilda and Paddocks Masterplans• Complete Bridgestone Athletics facility and maximise
its use• Provide at least 15% affordable Housing through
Council’s development projects• Implement the Regional Public Health Plan and
wellbeing agenda• Enhance visual appearance and amenity of public
space through an expanded verge maintenance program, appropriate lighting and increased greening of reserves
• Increasing investment and improving facilities in local and district playgrounds
• Implement the Ability Inclusion Strategic Plan, including the provision of increased infrastructure for local and district play spaces
Future Planning• Develop a Place Activation Strategy• Assess future social infrastructure needs• Update the City Pride strategy
Operational Focus• Improve quality and cleanliness of residential areas • Promptly remove rubbish dumped on public land• Implement Council’s community safety strategy with
a focus on a range of evidence based fit-for-purpose community safety initiatives including, but not limited to, CCTV coverage
• Ensure our public spaces are accessible and sporting facilities are maintained and well used
• Provide support and grants to sporting and community groups
• Work closely with our Community Centres to deliver community programs
• Deliver programs to support intercultural partnerships, build connections and increase collaboration among community groups and service providers
Advocacy Priorities• Resourcing and services to make our community a
safer place• Improved public transport options that better connect
our community with services, recreation and job opportunities
• Improved infill development policies and better urban design
• Programs and services to address mental health, housing and income inequality issues
Critical Actions
3
3
3
3
3
›
›
›
›
›
›
›
›
›
8 | CITY PLAN 2035 CITY PLAN 2035 | 9
A sustainable City
Exploring and supporting opportunities to improve community and industry efficiencies
Assisting the community and businesses to reduce waste, water and energy usage and the cost of living
Improving energy and cost efficiencies in Council operations
Continuing to promote and support the establishment of a circular economy to eliminate or reduce usage of water, waste and energy.
Managing impacts of increased heat, flooding, intense storms and bushfires throughout the City
Educating and empowering our community to ensure they are ready and able to adapt to extreme weather events
Supporting our community to better understand and be actively involved in caring for and enjoying the environment
Understanding, protecting and supporting the restoration of our biodiversity, including management of our coastal environments, to ensure their future natural, economic and recreational value
In addition to these critical actionsCouncil will continue to deliver on our foundations by:
FoundationsWe have a balance of green spaces for our residents and natural environments that support biodiversityWe make the most of our resources including water, waste and energyOur community, environment and infrastructure are adaptive to a changing climate
Strategic Projects• Replace all Council-owned street lights in the city with
appropriate energy efficient lighting • Improve environmental performance of Council’s
buildings• Enhance biodiversity of corridors along Dry Creek and
Little Para and in environmentally sensitive areas such as our coastal mangroves
• Deploy sensors and pilot community programs to better monitor our environment’s health
• Develop new markets for recyclable materials through the Northern Adelaide Waste Management Authority
Future Planning• Review Council’s sustainability strategy to include
a focus on waste and energy management, cooler suburbs and water
• Complete the Dry Creek Stormwater Management Plan to protect our City from flooding
• Identify potential projects to showcase good design techniques that improve the environmental performance of housing and streets
Operational Focus• Utilise recycled or re-used materials where possible in
Council’s construction and maintenance programs• Maintain weekly rubbish collection for residents and
promote initiatives that reduce waste to landfill• Adopt practices and infrastructure to make our City a
cooler place in an increasingly warm climate• Stabilise major creek lines and banks to improve
biodiversity and reduce scour and silting • Asset management and planning is responsive to the
needs arising from a changing climate
Advocacy Priorities• Investment into programs that reduce waste to landfill
such as incentives to increase recycling and “circular economy” initiatives
• Integrated urban water planning and associated funding to address catchment wide issues
Critical Actions
3
3
3
›
›
›
›
›
›
›
›
10 | CITY PLAN 2035 CITY PLAN 2035 | 11
A growing City that creates new opportunities
Growing jobs and investment
Building work readiness in our community to respond to the needs of industry
Raising community aspirations and increase awareness of emerging job opportunities
Being a business friendly Council
Shaping and repositioning perceptions of Salisbury’s economic strengths
Providing services and infrastructure that support entrepreneurs and emerging industry sectors,
Providing a safe transport network that enables efficient freight and commuter movements
Enhancing and capitalising on Salisbury’s digital connectivity
Ensuring activity centres throughout the City are interesting places to visit, attractive places to invest and great locations to work
Having modern, well maintained commercial areas
Ensuring that new development enhances our community
In addition to these critical actionsCouncil will continue to deliver on our foundations by:
FoundationsSalisbury’s businesses are successful and a part of our communitySalisbury is a place of choice for businesses to start, invest and growInfrastructure supports investment and business activityOur urban growth is well planned and our centres are active
Strategic Projects• Enhance the Salisbury City Centre by upgrading Church
and John Streets and attract private sector investment and development into surplus Council sites
• Attract new firms into Salisbury providing job opportunities for our residents
• Link Technology Park and Edinburgh Parks with other innovation precincts in Adelaide
• Deliver a residential development program through utilising Council land
Future Planning• Develop a structure plan for the land west of Port
Wakefield Road to open up new development opportunities while preserving the existing character of Globe Derby and St Kilda
• Review the existing economic growth strategy • Review Council’s Growth Action Plan • Develop guidelines and polices to improve quality of
infill development with an initial focus on Ingle Farm• Develop investment plans for Technology Park and
Edinburgh Parks
Operational Focus• Support new and existing businesses and industries to
grow and create jobs• Improve infrastructure, signage, safety, streetscapes
and upkeep of our commercial and industrial areas to directly support economic sustainability and growth
• Improve access and parking in Salisbury City Centre, Mawson Lakes Central, business and recreation precincts
• Streamline processes to improve the way we work with businesses
Advocacy Priorities• Redevelopment of the Salisbury and Mawson Lakes
Interchanges • Improvement to east-west roads including increasing
the capacity of Kings Road and Waterloo Corner Road, duplication and extension of Elder Smith Road, and road/rail grade separation of Park Terrace & Kings Road
• Appropriate and well planned development of the Dry Creek Salt Fields
• Edinburgh Parks to be business ready as a modern industrial area with efficient freight routes to the Northern Connector, fast digital connectivity and alternative energy sources and recycled water
Critical Actions
3
3
3
3
›
›
›
›
›
›
›
›
›
›
›
12 | CITY PLAN 2035 CITY PLAN 2035 | 13
Innovation and Business Development
Facilitating collaborative and effective interactions and putting our community first
Meaningfully engaging with our community and stakeholders in decision making and planning
Embedding long term thinking, planning and innovation across the organisation
Improving the use of data to inform decision making and understand what our community values
Ensuring efficiencies and support continuous improvement of our processes and technology to deliver high quality outcomes driven by the needs of our community
Working in partnership to deliver facilities, services, programs and infrastructure to meet community needs
Working together to promote the City and advocate for our priorities
Strengthening and promoting the Salisbury brand
Developing an agile and empowered workforce that is committed to delivering outcomes and lives the organisational values
Investing in the development of Council staff and Elected Members
Maintaining sustainable financial management and a reputation as a transparent and accountable organisation
In addition to these critical actionsCouncil will continue to deliver on our foundations by:
FoundationsOur community receives an exceptional experience when interacting with CouncilWe deliver quality outcomes that meet the needs of our communityThe City of Salisbury is recognised as a great place to workWe plan effectively to address community needs and proactively identify new opportunities
Strategic Projects• Use technology so our community can better access
Council services• Implement a change plan so Council provides an
exceptional community experience, delivers quality outcomes and is a great place to work
• Upgrade Council’s Operations Centre on Cross Keys Road to facilitate the business transformation of Field/Operations Services
Future Planning• A City of Salisbury digital strategy and a framework to
implement technology-based initiatives to improve the management of the city
• Review our community engagement strategy so we better respond to and anticipate our community’s needs
• Review Council’s Strategic Asset Management Plan • Enable our community to monitor our progress in
implementing this Plan and compare our performance with other Councils
• Identify opportunities to increase non-rates revenue • Council governance practices and processes
Operational Focus• Improve how we use data to better inform our
decision making • Buy locally and sustainably, with an emphasis on reuse
and recycled materials, where appropriate • Deliver the commitments made in our Annual Plan • Continuous improvement program• Enhance our engagement with, and understanding
of, our community so we can better anticipate and respond to needs
• Communicate more effectively with our community to increase awareness of Council initiatives, investment and services
Advocacy Priorities• Develop deeper and more effective relationships with
government agencies, and other organisations, to progress the priorities identified in this City Plan and its supporting strategies
Critical Actions
3
3
3
3
›
›
›
›
›
›
›
›
›
›
›
14 | CITY PLAN 2035 CITY PLAN 2035 | 15
February 2020
City Plan 2035major projects for a sustainable, connectedand progressive community
16 | CITY PLAN 2035 CITY PLAN 2035 | 17
Next steps››Once consultation has finished, Council will consider the range of feedback it receives
and will consider what changes it wishes to make in response to this feedback. Staff will prepare a final City Plan document for Council endorsement and it is anticipated that this
will be presented to Council in June 2020.
A range of indicators will be prepared which will serve as a means for keeping track of our progress using a number of different measures and statistics. This will be supported by an
online and publicly accessible dashboard to visually demonstrate how we are going.
To ensure the City Plan is relevant and addresses the anticipated longer term impacts of Australia’s response to the Covid 19 pandemic, a further review of the City Plan may be
undertaken before the end of the 20/21 financial year.
We are also considering a dedicated webpage on the City of Salisbury website where you will be able to access information about the progress of critical actions, and find further
information about the supporting strategies and action plans that Council has developed to support the delivery of our City Plan.
Annual reporting will also continue to be provided through Council’s existing Annual Plan reporting process, pursuant to the requirements of the Local Government Act 1999.
››
›