city west link improvement work - transport for nsw

3
Roads and Maritime Services is increasing the capacity of City West Link by adding an additional eastbound lane between Waratah Street at Haberfield and James Street at Leichhardt. The improvement of this two kilometre section of City West Link will: help ease existing congestion and improve traffic flow provide better network integration between City West Link and the New M4 project have capacity for five lanes, three eastbound and two westbound. Work will start on Sunday, 2 September 2018 and is expected to be complete early 2019, weather permitting. Key features An additional eastbound traffic lane between Waratah Street at Haberfield and James Street at Leichhardt New road pavement on City West Link which will reduce road surface noise Construction of a new median and new line marking to allow for the five lane configuration Reconfiguration of the existing road space, with no impact beyond the kerb, including pedestrian footpaths Changes to traffic lights at City West Link and Timbrell Drive/ Mortley Avenue intersection at Haberfield to improve safety Improving safety and traffic noise by extending the existing 60 km/h speed limit from Boomerang Street to James Street. Project benefits Reduced congestion and queueing to improve travel times along City West Link, particularly during morning peaks Improved capacity of the road network to cater for needs of traffic in the region, particularly following the completion of the New M4 tunnel project Improved traffic flow and safety with a three lane connection between the New M4 and City West Link Improved average peak hour travel time and speeds between Waratah Street and James Street Minimal construction impact to the surrounding community and environment by using the existing road footprint Improved roadside amenity by reducing congestion on the road and improving traffic flow, particularly for users of the shared path along City West Link. City West Link improvement work Community update August 2018 Dobroyd Parade

Upload: others

Post on 26-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: City West Link improvement work - Transport for NSW

Roads and Maritime Services is increasing the capacity of City West Link by adding an additional eastbound lane between Waratah Street at Haberfield and James Street at Leichhardt.

The improvement of this two kilometre section of City West Link will:

• help ease existing congestion and improve traffic flow

• provide better network integration between City West Link and the New M4 project

• have capacity for five lanes, three eastbound and two westbound.

Work will start on Sunday, 2 September 2018 and is expected to be complete early 2019, weather permitting.

Key features• An additional eastbound traffic

lane between Waratah Street at Haberfield and James Street at Leichhardt

• New road pavement on City West Link which will reduce road surface noise

• Construction of a new median and new line marking to allow for the five lane configuration

• Reconfiguration of the existing road space, with no impact beyond the kerb, including pedestrian footpaths

• Changes to traffic lights at City West Link and Timbrell Drive/Mortley Avenue intersection at Haberfield to improve safety

• Improving safety and traffic noise by extending the existing 60 km/h speed limit from Boomerang Street to James Street.

Project benefits• Reduced congestion and

queueing to improve travel times along City West Link, particularly during morning peaks

• Improved capacity of the road network to cater for needs of traffic in the region, particularly following the completion of the New M4 tunnel project

• Improved traffic flow and safety with a three lane connection between the New M4 and City West Link

• Improved average peak hour travel time and speeds between Waratah Street and James Street

• Minimal construction impact to the surrounding community and environment by using the existing road footprint

• Improved roadside amenity by reducing congestion on the road and improving traffic flow, particularly for users of the shared path along City West Link.

City West Link improvement work Community update

August 2018

Dobroyd Parade

Page 2: City West Link improvement work - Transport for NSW

LEGEND

WestConnex New M4 Project (delivered by Sydney Motorway Corporation)

Reconfiguration of line markings only

City West Linkimprovement work

Iron Cove Creek

Dobroyd Parade

Haw

thor

ne C

anal

Boom

eran

g St

reet

Robson Park

Timbrell D

rive

UTS Rowing Club

Blackmore Oval

Norton Street

Norton Street

City West Link

Darley Road

Mortley Avenue

Waratah Street

James Street

TrafficA temporary speed limit reduction from 70km/h to between 40km/h and 60km/h will be in place on City West Link between Waratah Street and James Street for the duration of the work.

This reduction will improve road safety and minimise traffic and noise impacts during construction.

There are no changes to road access as part of this work. Lane closures are required and will generally occur outside of peak periods. Please keep to speed

limits and follow signs. Traffic changes may affect travel time. For the latest traffic updates, you can call 132 701, visit livetraffic.com or download the Live Traffic NSW App.

Construction hoursMost of the work will be carried out during the night. Generally, our night work hours will be between 8pm and 5am from Monday to Friday, 8pm and 8am Saturday and 8pm and 9am Sundays, weather permitting. This will allow minimal impact

to traffic and other road users, including pedestrians and cyclists accessing the shared path.

Noisy work would be planned and managed to minimise impact on residents. Residents will be provided advance notice of any traffic impacts and noisy work. Noisier work will be staged at different locations and carried out earlier during the night. Some work may also be carried out during the day where there is no impact or change to traffic.

Page 3: City West Link improvement work - Transport for NSW

RMS.18.959

Dobroyd Parade

Privacy Roads and Maritime Services (“RMS”) is subject to the Privacy and Personal Information Protection Act 1998 (“PPIP Act”) which requires that we comply with the Information Privacy Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of assisting the assessment of this proposal. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise RMS will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by RMS. You have the right to access and correct the information if you believe that it is incorrect.

This document contains important information about transport projects in your area. If you need an interpreter, please call the Translating and Interpreting Service on 131 450 and ask them to call the Project Team on 1800 951 212. The interpreter will then help you with translation.

WestConnex New M4The New M4 is the first underground section of WestConnex, extending around 6.5 kilometres from Homebush to Haberfield. The twin motorway tunnels are three lanes in each direction and will allow road users to bypass up to 22 sets of traffic lights and increase travel reliability. The New M4 is expected to open to traffic in early 2019.

WestConnex M4-M5 LinkThe M4-M5 Link is the final stage of WestConnex, featuring twin tunnels between the New M4 at Haberfield and the New M5 at St Peters as well as an Interchange at Rozelle. Each tunnel will be around 7.5 kilometres long and able to accommodate up to four lanes of traffic in each direction. The M4-M5 Link will help ease congestion on Victoria Road and City West Link, while providing more green space for the community to enjoy.

For more information about these projects visit westconnex.com.au.