civil drawings bridge drawings - wicklow.ie
TRANSCRIPT
Appendix A
Drawings
• Civil Drawings
• Bridge Drawings A1 - Civil DrawingsA2 - Bridge DrawingsA1 - Civil DrawingsA2 - Bridge Drawings
RED LINE BOUNDARY
R
I
V
E
R
D
A
R
G
L
E
BRAY HARBOUR
EXISTING ROAD BRIDGE
EXISTING RAIL BRIDGE
PUMPING STATION
K
IL
L
IN
E
Y
G
R
E
Y
S
T
O
N
E
S
PROPOSED FUTURE
LUAS ALIGNMENT
(NOT PART OF PROJECT WORKS)
PROPOSED BRAY
SUSTAINABLE TRANSPORT
BRIDGE
NOTES:
1. ALL DIMENSIONS ARE SHOWN IN MILLIMETRES
UNLESS NOTED OTHERWISE.
2. ALL LEVELS ARE SHOWN IN METRES ABOVE
ORDNANCE DATUM.
BRAY SUSTAINABLE
TRANSPORT BRIDGE
BRIDGE
SITE LOCATION PLAN
RDPTB-ARUP-ZZZ-ZZZ-DR-CB-9000
P04
PD
CG
MS
20.03.20
AS SHOWN
S4
268095
T +353 1 233 4455
F +353 1 668 3169
W www.arup.com
50 Ringsend Road
Dublin 4
D04 T6X0
Ireland
(i) This is a confidential document and must not be
copied,used, or its content divulged without prior
written consent.
(ii) All Levels refer to Ordnance Survey Datum, Malin
Head.
(iii) DO NOT SCALE, use figured dimensions only, if in
doubt ask.
Scale:
Amendment / IssueDateNo.
Project
App
Title
Date:
Drawn:
Checked:
Approved:
@ A1
D
r
n
.
C
h
k
.
Drg. No. Rev.Job No.
General Notes
(iv) Hard copies, dwf and pdf will form a controlled issue of the
drawing. All other formats (dwg etc) are deemed to be an
uncontrolled issue and any work carried out based on these
files is at the recipients own risk. The Designer will not accept
any responsibility for any errors from the use of these files,
either by human error by the recipient, listing of the
un-dimensioned measurements, compatibility with the
recipients software, and any errors arising when these files
are used to aid the recipients drawing production, or setting
out on site.
DRAFT
A1 A B C D E F G H I J K L M N
1
2
O
3
P
4
5
Status:
6
7
8
9
10
\\global\europe\dublin\jobs\268000\268095-00\4. internal\4-02 draw
ings\4-02-11 planning\bridge\rdptb-arup-zzz-zzz-dr-cb-9000.dw
g
philip.dunw
oody
27/01/2021 18:10:41
PART 8 APPLICATION
PLAN ON PROPOSED BRIDGE LOCATION
SCALE 1:1000
PROJECT
LOCATION
MAP OF IRELAND
SCALE N.T.S
P01 01/05/20
P
D
C
G
ISSUED FOR REVIEW AND COMMENT MS
LEGEND:
RED LINE BOUNDARY
PROPOSED FUTURE LUAS
ALIGNMENT (NOT PART OF
PROJECT WORKS)
P02 13/07/20
P
D
C
G
ISSUED FOR REVIEW AND COMMENT MS
P03 29/01/21
P
D
C
G
ISSUED FOR REVIEW AND COMMENT (S3) MS
P04 09/07/21
P
D
C
G
ISSUED FOR PART 8 APPLICATION (S4) MS
BRAY SUSTAINABLE
TRANSPORT BRIDGE
BRIDGE
PHOTOMONTAGE
RDPTB-ARUP-ZZZ-ZZZ-DR-CB-9015
P04
PD
CG
MS
20.03.20
AS SHOWN
S4
268095
T +353 1 233 4455
F +353 1 668 3169
W www.arup.com
50 Ringsend Road
Dublin 4
D04 T6X0
Ireland
(i) This is a confidential document and must not be
copied,used, or its content divulged without prior
written consent.
(ii) All Levels refer to Ordnance Survey Datum, Malin
Head.
(iii) DO NOT SCALE, use figured dimensions only, if in
doubt ask.
Scale:
Amendment / IssueDateNo.
Project
App
Title
Date:
Drawn:
Checked:
Approved:
@ A1
D
r
n
.
C
h
k
.
Drg. No. Rev.Job No.
General Notes
(iv) Hard copies, dwf and pdf will form a controlled issue of the
drawing. All other formats (dwg etc) are deemed to be an
uncontrolled issue and any work carried out based on these
files is at the recipients own risk. The Designer will not accept
any responsibility for any errors from the use of these files,
either by human error by the recipient, listing of the
un-dimensioned measurements, compatibility with the
recipients software, and any errors arising when these files
are used to aid the recipients drawing production, or setting
out on site.
DRAFT
A1 A B C D E F G H I J K L M N
1
2
O
3
P
4
5
Status:
6
7
8
9
10
\\global\europe\dublin\jobs\268000\268095-00\4. internal\4-02 draw
ings\4-02-11 planning\bridge\rdptb-arup-zzz-zzz-dr-cb-9015.dw
g
philip.dunw
oody
27/01/2021 16:52:36
PART 8 APPLICATION
P01 01/05/20
P
D
C
G
ISSUED FOR REVIEW AND COMMENT MS
PHOTOMONTAGE OF PROPOSED BRIDGE
(RAMPS NOT SHOWN)
P02 13/07/20
P
D
C
G
ISSUED FOR REVIEW AND COMMENT MS
P03 29/01/21
P
D
C
G
ISSUED FOR REVIEW AND COMMENT (S3) MS
P04 09/07/21
P
D
C
G
ISSUED FOR PART 8 APPLICATION (S4) MS