civil drawings bridge drawings - wicklow.ie

11
Appendix A Drawings A1 - Civil Drawings A2 - Bridge Drawings

Upload: others

Post on 22-Feb-2022

66 views

Category:

Documents


3 download

TRANSCRIPT

Appendix A

Drawings

• Civil Drawings

• Bridge Drawings A1 - Civil DrawingsA2 - Bridge DrawingsA1 - Civil DrawingsA2 - Bridge Drawings

RED LINE BOUNDARY

R

I

V

E

R

D

A

R

G

L

E

BRAY HARBOUR

EXISTING ROAD BRIDGE

EXISTING RAIL BRIDGE

PUMPING STATION

K

IL

L

IN

E

Y

G

R

E

Y

S

T

O

N

E

S

PROPOSED FUTURE

LUAS ALIGNMENT

(NOT PART OF PROJECT WORKS)

PROPOSED BRAY

SUSTAINABLE TRANSPORT

BRIDGE

NOTES:

1. ALL DIMENSIONS ARE SHOWN IN MILLIMETRES

UNLESS NOTED OTHERWISE.

2. ALL LEVELS ARE SHOWN IN METRES ABOVE

ORDNANCE DATUM.

BRAY SUSTAINABLE

TRANSPORT BRIDGE

BRIDGE

SITE LOCATION PLAN

RDPTB-ARUP-ZZZ-ZZZ-DR-CB-9000

P04

PD

CG

MS

20.03.20

AS SHOWN

S4

268095

T +353 1 233 4455

F +353 1 668 3169

W www.arup.com

E [email protected]

50 Ringsend Road

Dublin 4

D04 T6X0

Ireland

(i) This is a confidential document and must not be

copied,used, or its content divulged without prior

written consent.

(ii) All Levels refer to Ordnance Survey Datum, Malin

Head.

(iii) DO NOT SCALE, use figured dimensions only, if in

doubt ask.

Scale:

Amendment / IssueDateNo.

Project

App

Title

Date:

Drawn:

Checked:

Approved:

@ A1

D

r

n

.

C

h

k

.

Drg. No. Rev.Job No.

General Notes

(iv) Hard copies, dwf and pdf will form a controlled issue of the

drawing. All other formats (dwg etc) are deemed to be an

uncontrolled issue and any work carried out based on these

files is at the recipients own risk. The Designer will not accept

any responsibility for any errors from the use of these files,

either by human error by the recipient, listing of the

un-dimensioned measurements, compatibility with the

recipients software, and any errors arising when these files

are used to aid the recipients drawing production, or setting

out on site.

DRAFT

A1 A B C D E F G H I J K L M N

1

2

O

3

P

4

5

Status:

6

7

8

9

10

\\global\europe\dublin\jobs\268000\268095-00\4. internal\4-02 draw

ings\4-02-11 planning\bridge\rdptb-arup-zzz-zzz-dr-cb-9000.dw

g

philip.dunw

oody

27/01/2021 18:10:41

PART 8 APPLICATION

PLAN ON PROPOSED BRIDGE LOCATION

SCALE 1:1000

PROJECT

LOCATION

MAP OF IRELAND

SCALE N.T.S

P01 01/05/20

P

D

C

G

ISSUED FOR REVIEW AND COMMENT MS

LEGEND:

RED LINE BOUNDARY

PROPOSED FUTURE LUAS

ALIGNMENT (NOT PART OF

PROJECT WORKS)

P02 13/07/20

P

D

C

G

ISSUED FOR REVIEW AND COMMENT MS

P03 29/01/21

P

D

C

G

ISSUED FOR REVIEW AND COMMENT (S3) MS

P04 09/07/21

P

D

C

G

ISSUED FOR PART 8 APPLICATION (S4) MS

BRAY SUSTAINABLE

TRANSPORT BRIDGE

BRIDGE

PHOTOMONTAGE

RDPTB-ARUP-ZZZ-ZZZ-DR-CB-9015

P04

PD

CG

MS

20.03.20

AS SHOWN

S4

268095

T +353 1 233 4455

F +353 1 668 3169

W www.arup.com

E [email protected]

50 Ringsend Road

Dublin 4

D04 T6X0

Ireland

(i) This is a confidential document and must not be

copied,used, or its content divulged without prior

written consent.

(ii) All Levels refer to Ordnance Survey Datum, Malin

Head.

(iii) DO NOT SCALE, use figured dimensions only, if in

doubt ask.

Scale:

Amendment / IssueDateNo.

Project

App

Title

Date:

Drawn:

Checked:

Approved:

@ A1

D

r

n

.

C

h

k

.

Drg. No. Rev.Job No.

General Notes

(iv) Hard copies, dwf and pdf will form a controlled issue of the

drawing. All other formats (dwg etc) are deemed to be an

uncontrolled issue and any work carried out based on these

files is at the recipients own risk. The Designer will not accept

any responsibility for any errors from the use of these files,

either by human error by the recipient, listing of the

un-dimensioned measurements, compatibility with the

recipients software, and any errors arising when these files

are used to aid the recipients drawing production, or setting

out on site.

DRAFT

A1 A B C D E F G H I J K L M N

1

2

O

3

P

4

5

Status:

6

7

8

9

10

\\global\europe\dublin\jobs\268000\268095-00\4. internal\4-02 draw

ings\4-02-11 planning\bridge\rdptb-arup-zzz-zzz-dr-cb-9015.dw

g

philip.dunw

oody

27/01/2021 16:52:36

PART 8 APPLICATION

P01 01/05/20

P

D

C

G

ISSUED FOR REVIEW AND COMMENT MS

PHOTOMONTAGE OF PROPOSED BRIDGE

(RAMPS NOT SHOWN)

P02 13/07/20

P

D

C

G

ISSUED FOR REVIEW AND COMMENT MS

P03 29/01/21

P

D

C

G

ISSUED FOR REVIEW AND COMMENT (S3) MS

P04 09/07/21

P

D

C

G

ISSUED FOR PART 8 APPLICATION (S4) MS