Page 1: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 2: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 3: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 4: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 5: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 6: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 7: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 8: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 9: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 10: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 11: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 12: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 13: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 14: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 15: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 16: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 17: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 18: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 19: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 20: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 21: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 22: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 23: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 24: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 25: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 26: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 27: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 28: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 29: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 30: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 31: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the
Page 32: CIVIL01 · pondage is provided to supply daily peak load of demand with a load factor of 70%. Assuming the plant efficiency of 55%, determine the maximum generating capacity of the