class 1 - cpm problem

Upload: saurabh-sao

Post on 24-Feb-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/24/2019 Class 1 - CPM Problem

    1/2

    CPM Problem: 03rdFeb 2016

    Dear all

    A project consists of the followin tas!s" #he predecessor relationship and thed$ration of the tas!s are i%en below"

    Draw the precedence diaram and emplo& the CPM techni'$e to identif& thecritical path"

    TaskPredecessor

    (s)Duration(weeks)

    Crash Time(Weeks)

    Normal Cost($)

    Crash Costper week (S)

    A ( ) 2 *000 *00

    + A 3 2 3*00 1000

    C A * 3 ,000 -00

    D + - ) 1*000 ,00. +/C 6 3 20000 1)00

    F D ) 3 6000 )00

    ./F 6 3 ,000 00

    F * 2*000 1100

    / * 2 000 600

    a 4hat is the critical path5 4hat is the d$ration of the critical path5

    b 4hat is the normal cost of the project5

    c f the project has to be nished in 26 wee!s/ what is the increase in cost54hich tas!s wo$ld &o$ choose to crash5 n what order5 4hat wo$ld be thecritical path7s8 in this case5

    d 4hat is the minim$m time needed to nish the project5 4hat is the cost ofthe project in this case5

  • 7/24/2019 Class 1 - CPM Problem

    2/2

    9ol$tion: