CLEANER ELECTRICITY CLEANER ELECTRICITY PRODUCTION FROM COAL in PRODUCTION FROM COAL in
TURKEY: TURKEY: IssuesIssues andand ProspectsProspects
MMüücella ERSOY, cella ERSOY, ChiefChief EngineerEngineerDr.SelahaddinDr.Selahaddin ANAC, General ANAC, General DirectorDirector
TURKISH COAL ENTERPRISESTURKISH COAL ENTERPRISES
Electricity Forum on Fostering Investment in Cleaner Electricity ProductionĐn the UNECE Region, 27 November 2007, Geneva
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
CLEANER ELECTRICITY PRODUCTION FROM COAL in TURKEYCLEANER ELECTRICITY PRODUCTION FROM COAL in TURKEY
-- CONTENTCONTENT• Policy• Role of Coal in Power Generation in Turkey• Restructuring of Coal & Power Sector in Turkey
– Regulatory & Administrative developments– Privatization developments– Investment developments
• Future Prospects for Power Generation• R&D Projects for Cleaner Power Generation from Coal
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
CleanerCleaner Electricity Electricity ProductionProduction fromfrom CoalCoal in in TurkeyTurkey
-- PolicyPolicy• Developing existing indigenous energy resources especially in the
coal sector,• Restructuring of coal mining & electricity sectors • Privatization of
– some inefficient and inactive coal mines– distribution grids– Generation plants
• Promoting the adoption of clean coal technologies in the utilization of coal in thermal power plants
• Since Turkey has a candidate country status for European Union (EU) membership, harmonization of Turkish legislation on coal, electricity and environment with EU legislation is underway.
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
Role of Role of CoalCoal in in TurkeyTurkey-- SharesShares of of coalcoal in in primaryprimary energyenergy consumptionconsumption
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
(x10
00 T
PE
)
1972
1974
1976
1978
1980
1982
1984
1986
1988
1990
1992
1994
1996
1998
2000
2002
2004
2006
Others
Hydraulic
Gas
Oil
Asphaltite
Lignite
Hardcoal
ALL 1972 2006Domestic: 68% 29%Imported: 32% 71%
COAL:1972 2006
Domestic: 25 % 14%Imported: 0% 12%Total: 25% 26%
N.GAS1972 2006
Domestic: 0% 0.8%Imported: 0% 27%Total: 0% 27.8%
Source:ETBK
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
Total Coal Reserves:• 1,3 billion tonnes hardcoal (all state)• 9,3 billion tonnes lignite (77% state)
• 68% of lignite reserves has lowcalorific value
Role of Role of CoalCoal in in TurkeyTurkey-- CoalCoal ReservesReserves
<1000 Kcal/kg
%3,18
>4000 Kcal/kg
%0,84
3001-4000
Kcal/kg
%5,16
2001-3000
Kcal/kg
%24,5
1000-2000
Kcal/kg
%66,32
2,5
4,7
2,1
0
0,5
1
1,5
2
2,5
3
3,5
4
4,5
5
(bill
ion
tons
)
TKI EUAS Private
Lignite reserves
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
Distribution of Lignite Consumption (60.9 Mt, 2006) Household ;
10%Industry; 7%
Power; 83%
Distribution of Hard Coal consumption (19.5 Mt, 200 6)
Coke Oven; 23%
Power; 27%
Industry; 45%
Household ; 5%
• ~90% of Lignite production state owned(TKĐ+EÜAŞ)
• (Shares of private sector within state productionby leasing or contract mining 20-25 %)
• Whole hardcoal production state owned (TTK),• 16 Mt hard coal imported in 2006.
Role of Role of CoalCoal forfor PowerPower GenerationGeneration in in TurkeyTurkey-- CoalCoal ProductionProduction & & ConsumptionConsumption
0
10000
20000
30000
40000
50000
60000
70000
(100
0 to
n)
Lignite 52758 53888 57387 65204 65109 60854 59572 51660 46168 43709 55282 60200
Hardcoal 2248 2441 2513 2156 1990 2392 2494 2319 2059 1946 2115 2215
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
Role of Role of CoalCoal in in PowerPower GenerationGeneration-- SharesShares of of coalcoal in in powerpower generationgeneration
38,340,3
24,7
6,6
12,1
19,7
3,3
15,2
21
16
0,62,2
0
5
10
15
20
25
30
35
40
45
(%)
Coal Oil N.Gas Nucleer Hyraulic Others
19732005
1973: 6116 TWh2005:18235 TWh
WORLD (Source: IEA)
1418,4
12,1
8
51,3
2,40
45,8
0 0
21
25,1
1,60,30
10
20
30
40
50
60
(%)
Lignite HardCoal
Oil N.Gas Nuclear Hyraulic Others
19732006
TURKEY (Source: TEIAŞ)1973: 12424 GWh2006: 176300 GWh
TURKEY1973 1986 2006
Coal (%) 26.1 49 26.4N.Gas(%) 0 6 45
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
1970-1984 :Turkish Electricity Enterprises (TEK)(State owned Monopoly- Generation+Transmission+Distribution)
RESTRUCTURING & PRIVATIZATION PERIOD IN TURKISH ELE CTRICITY SECTORRegulatory & Administrative Developments-
Law: 3096
1984 1994 1997 2001
3996-BOT law
4283-BO law
4628-El.Market law/ EPDK
2004
StrategyPaper
TEK
TEDAS TEAS
Distribution GenerationTransmission
EUAS
TEIAS
TETASTrade
Transmission
Generation
Road map for privatizationOf 20 distribution grids & Generation plants
InsufficientCompetitive liberalized
electricity market
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
RegulatoryRegulatory DevelopmentsDevelopments((continuecontinue))
• United Nations Framework Convention on Climate Change in Turkey (16 Oct 2003 4990 numbered law)
– First National Declaration has been prepared.
• Harmonisation of Turkish regulation with EU coal, electricity andenvironment related regulation is underway. – Harmonisation with EU Electricity Liberalisation Directive (2001)
– Amendment in Mining Law (2004)• to promote foreign investment & privatization
– Amendment in Environment Law (2006)
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
RESTRUCTURING OF COAL SECTOR in RESTRUCTURING OF COAL SECTOR in TURKEYTURKEY
-- PrivatizationPrivatization of of coalcoal depositsdeposits
1957
TTKHarcoalProd.
TKILignite Prod.
(15 activemines, 2006)
1983
1989- Sivas-Kangal Mine+1995- Afşin-Elbistan Mine+2000- Ankara-Çayırhan Mine
EÜAŞElectricity &Lignite
Sivas-Kangal Mine Private SectorLignite Prod.
Ankara-Çayırhan Mine &Çayırhan Pow. Station
Private SectorLignite &Electricity Generation
Afşin-Elbistan Dep &Elbistan A Pow. Stat.
EÜAŞLignite & Elect. Gen.
2002- 2007 :. in 9 minesprod. Activities have beenstopped and privatized byleasing, contract miningand sale methods
in total: 15 mines leased2contract mining1 mine sold
TKIPrivatization
TKILignite+ Hardcoal Prod.
EÜAŞ-Private Sector- 2006 -Elbistan B Power Station- March 2007 –Lignite Prod. B (Çöllalar )*
TTKPrivatized Hardcoal Mines
2005- Amasra-B*2005- Alacaağzı-Kandilli*2005- Gelik Dik Kanat*22 small deposit
* Leasing
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
CurrentCurrent CapacityCapacity forfor LigniteLignite --BasedBased Electricity Electricity GenerationGeneration
1376(17.000)* Afsin Elbistan B
8.016**61.100TOTAL(Lignite)
4565.400Sivas-Kangal
6305.350Mugla-Yatagan
4203.750Mugla-Milas-Sekkoy (Yenikoy)
6305.000Mugla-Husamlar (Kemerkoy)
10328.200Manisa-Soma B
3662.300Kutahya- Tuncbilek
6005.500Kütahya-Seyitomer
3201.800Canakkale-Can
2101.500Bursa-Orhaneli
6204.300Ankara-Cayirhan
135618.000Afsin-Elbistan A
Installed Capacity(MW)
ConsumptionCapacity(x1000 t/y)
Project Name
* Mine to feed Elbistan B power plant was leased to private sector in March 2007.** Except autoproducers
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
WhatWhat areare thethe futurefuture prospectsprospects forfor coalcoal in in electricityelectricity productionproduction in in TurkeyTurkey ??
HighHigh GrowthGrowth of of DemandDemand ExpectedExpected
Consumption GWh
Source: TEIAS,2007
High Scenario Demand GWh Low Scenario Demand GWh
Peak Load MW High Scenario Demand MW Low Scenario Demand MW
2007-2016: Secanario 1 8.1 %Secanario 2: 6.3 %
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
AvailableAvailable AdditionalAdditional CapacityCapacity forfor Electricity Electricity
GenerationGeneration -- ExpectedExpected ReliazedReliazed byby PRIVATE SECTORPRIVATE SECTOR
Project Name Reserve (1000 ton)
Prod. Capacity (1000 t/y)
Installed Capacity (MW)
Planned Power Pl. Technology
Description
TKĐ-LeasingSilopi(Asphaltite) 50000 300 135 Fluidized Bed investment period for pow.pl.constructionBolu- Göynük 39000 1200 150 Fluidized Bed leased by TKI, applied for el.prod.licenceBursa-Davutlar 39000 1200 160 Fluidized Bed leased to private sector by TKITekirdağ-Saray 129000 2500 300 Fluidized Bed leased to private sector by TKI
Total I 257000 5200 745TKĐ-OthersBingöl-Karlıova 26000 1115 100 Evaluation phaseAdana-Tufanbeyli 214000 7200 600 Negotiation phaseManisa-Eynez 100000 3400 600 Evaluation phaseKütahya-Derin Sahalar 100000 3000 300 Evaluation phase
Total II 440000 14715 1600
TKĐ TOTAL 697000 19915 2345
LIGNITE/ ASPHALTITE PROJECTS:LIGNITE/ ASPHALTITE PROJECTS:
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
Project Name Reserve (1000 ton)
Prod. Capacity (1000 t/y)
Installed Capacity (MW)
Planned Power Plant Technology
Description
EÜAŞ
Elbistan A(5,6),B,C,D,E,F 2818000 86400 6650Increase in reserve +high tech.: 8600 MW (100 million t/y)
(Elbistan B) (17000) (1440) Pulverized Power St.in operation, Çöllolar Deposit leased to Ciner Group
(Elbistan C,D) (29000) (2400) Pulverized Power St+Mining Leasing Bids: New tender specs. will be prepared
Cayirhan B n.a. n.a. 450Private Sector
Adana-Tufanbeyli 236000 6200 450Ciner Group sold mining licence to EnerjiSa, el.prod.licence was received
Çankırı-Orta 51000 1500 165 Fluidized Bed TKI sold mining licence to Calık NTF. Elect.prod. licence was received.
Konya-Ilgın 152000 3100 500Adıyaman-Gölbaşı 49000 1400 150
Total 488000 12200 1265
GENERAL TOTAL 4003000 118515 10710
AvailableAvailable AdditionalAdditional CapacityCapacity forfor Electricity Electricity GenerationGeneration ---- ExpectedExpected toto be be ReliazedReliazed byby PRIVATE SECTORPRIVATE SECTOR
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
Total Total CapacityCapacity forfor ElecticityElecticity GenerationGeneration
Project Name Power St. Cap. (1000 t/y)
Installed Cap (MW)
Lignite (current)TKĐ 33400 4208EÜAŞ + Private 27700 3808Total (current) 61.100 8016Lignite(additional) 118515 10710TOTAL 179.615 18726
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
RequiredRequired InvestmentInvestment forfor AdditionalAdditionalPowerPower PlantPlant installationinstallation
2007-2016 Government Electricity Demand Prospects
Additional capacity:• 17570 MW low scenario, 6,3%• 29921 MW high scenario, 8.1%
(TEIAS, 2007)
Share of Coal in Total Additional Capacitybased on TEIAS, Electricity Generation Prospects, 2004
2007- 2016 2017-2020 2007-2020Lignite 5880 4480 10360Hard Coal 0 1200 1200Imported Coal 0 4500 4500
Received Elecricity prod. Licences(November 2007)Lignite: 920 MWHard Coal: 960 MW
Applied for Elec.Prod.Licences(November 2007) :Lignite:570 MWImpoted Hardcoal: 7055 MW
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
Investments done to install coalwashing plants
Hard Coal Washing Plants• Capacity (50-750 t/h) 12 plants to wash all produced
hardcoal.
Lignite Washing Plants:• Capacity (50-800 t/h) 15 plants to wash 30% of produced
lignite.
Source: G.Özbayoğlu, 2007
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
FGD Plants (Çayırhan I-II, Kemerköy, Orhaneli, YatağanYeniköy)After 1986 FGD plant is compulsory (Kangal III, Çayırhan III-IV,Elbistan B)
ESP –all existing power plants
High efficiency technology
-Atmospheric Fludized Bed Combumstion-Çan 18 Mart Power Plant (42%)
SOX Control Tekn .
Particulate Matter
CO2
Investments done to reduce CO2, SO2, and other emissionsfrom existing power plants
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
R&D R&D ProjectsProjects forfor CleanerCleaner ElectricityElectricityProductionProduction fromfrom CoalCoal
• Pilot-scaled CTL project in cooperation with Universities,2007
• CBM projects, for both hardcoal & lignite(Electricity licences were received by EPDK for installing 2 PowerPlants based on hardcoal +Methane having capacity 650 MW and50 MW)
• Project on desulphurization of lignite by washing lignite within a special solvent, 2007
• Benefication of Turkish Lignite Coals to produce clean fuel byshaking table, Multi Gravire Separator and Flotation Methods
Ersoy & Anac, Electricity Forum, Ersoy & Anac, Electricity Forum, 27 Nov 2007, Geneva27 Nov 2007, Geneva
• Increasing of energy demand and dependency to foreign energyresources(71%) are the main issues of Turkey.
• Coal is the the most important energy resource.
• To increase in usage of domestic coal for electricity generation is government policy
• Selection of clean coal technologies for new coal-based power plants toreduce harmful emissions
• restructuring of coal and electircity sectors and modernisation activities tobe survived,
• More importance to be given to R&D Projects in cooperation with ResearchInstitions and Universities
CONCLUSIONCONCLUSION