click to edit master title style recoil separator for rea12 workshop program and goals wolfgang...

5
Click to edit Master title style Recoil Separator for ReA12 Workshop Program and Goals Wolfgang Mittig MSU-NSCL NSCL 12 th July 2014 For the organizing committee

Upload: mervyn-stevenson

Post on 05-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Click to edit Master title style Recoil Separator for ReA12 Workshop Program and Goals Wolfgang Mittig MSU-NSCL NSCL 12 th July 2014 For the organizing

Click to edit Master title style

Recoil Separator for ReA12Workshop Program and Goals

Wolfgang Mittig

MSU-NSCL NSCL 12th July 2014

For the organizing committee

Page 2: Click to edit Master title style Recoil Separator for ReA12 Workshop Program and Goals Wolfgang Mittig MSU-NSCL NSCL 12 th July 2014 For the organizing

Click to edit Master title styleFacts

•FRIB is under construction•Low energy (~10MeV/n) re-accelerated beams are an important part of the program

Page 3: Click to edit Master title style Recoil Separator for ReA12 Workshop Program and Goals Wolfgang Mittig MSU-NSCL NSCL 12 th July 2014 For the organizing

Click to edit Master title styleReaccelerated Beams ProgramDo we need a spectrometer?

•why, for what physics? W. Nazarewicz, draft of whitepaper

•what physics cannot be done without a spectrometer?•how we can improve the draft of the whitepaper?•what type of spectrometerdo we agree with the recommendation of the preparatory writing workshop?

Page 4: Click to edit Master title style Recoil Separator for ReA12 Workshop Program and Goals Wolfgang Mittig MSU-NSCL NSCL 12 th July 2014 For the organizing

Click to edit Master title styleRecent work

http://meetings.nscl.msu.edu/CommunityMeeting2013/recoil.htm

Questionnaire:

Writing workshop June 12-13 2014 • excel file of proposals• draft of the whitepaper• recommendation These documents were attached to the mail to the today’s workshop registered participants

Page 5: Click to edit Master title style Recoil Separator for ReA12 Workshop Program and Goals Wolfgang Mittig MSU-NSCL NSCL 12 th July 2014 For the organizing

Click to edit Master title styleContext and Goal •FRIB with re-acceleration will be completed in 2022•construct a spectrometer needs 5 years 2022-5=2017•2017-2014 = 3 years for the project approved/funded•http://www.lecmeeting.org/ Texas A&M, Aug. 21-23•Long Range Plan (LRP) for nuclear physics

•Goal: present at the LECM a well documented scientific and technical project that can be endorsed by the community: white paper + recommendation