Angel 2014-05 Page 1 of 1 Level 14, 58 Mounts Bay Road Perth Western Australia 6000 Tel: +61 8 9480 1000 Fax: +61 8 9486 9146 www.sapurakencana.com.au CLIENT: Woodside Energy Limited Scope of Work: The scope of work consisted of transport and installation of the topside platform required on the Angel Gas Field Development, off Karratha on the North West Shelf, Western Australia. The Angel Field is located in 80 metres of water, approximately 49 kilometres east of the venture’s North Rankin A and Goodwyn A platforms. This work was performed by SapuraKencana Australia under a joint venture with Aker. The engineering, construction and installation project entailed transportation and installation of the Angel topside module, weighing about 7,500 tonnes. The JV chartered the HLV Black Marlin from Dockwise to carry out the transport and installation of the topside module. The workscope included additional hook-up work for the module to the pre-installed jacket. To be installed by others, the client’s facilities incorporate a 6,500 tonne launched steel jacket with grouted piles and a 5,200 tonne integrated deck tied to three subsea wells. The installation of the Topside module took place on 1 April 2008. The hook-up scope of work was completed as scheduled in June 2008. Angel Platform Topside Floatover PROJECT DETAILS: Location: North West Shelf, Western Australia Contract Period: November 2005 - June 2008 Safety Statistics: Manhours: 227,962 LTIFR: 4.38

Upload: others

Post on 15-Jan-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CLIENT: Woodside Energy Limited - SapuraKencana · CLIENT: Woodside Energy Limited Scope of Work: The scope of work consisted of transport and installation of the topside platform

Angel 2014-05 Page 1 of 1

Level 14, 58 Mounts Bay RoadPerth Western Australia 6000Tel: +61 8 9480 1000 Fax: +61 8 9486 9146www.sapurakencana.com.au

CLIENT: Woodside Energy Limited

Scope of Work: The scope of work consisted of transport and installation of the topside platform required on the Angel Gas Field Development, off Karratha on the North West Shelf, Western Australia. The Angel Field is located in 80 metres of water, approximately 49 kilometres east of the venture’s North Rankin A and Goodwyn A platforms.

This work was performed by SapuraKencana Australia under a joint venture with Aker.

The engineering, construction and installation project entailed transportation and installation of the Angel topside module, weighing about 7,500 tonnes. The JV chartered the HLV Black Marlin from Dockwise to carry out the transport and installation of the topside module. The workscope included additional hook-up work for the module to the pre-installed jacket. To be installed by others, the client’s facilities incorporate a 6,500 tonne launched steel jacket with grouted piles and a 5,200 tonne integrated deck tied to three subsea wells.

The installation of the Topside module took place on 1 April 2008.

The hook-up scope of work was completed as scheduled in June 2008.

Angel Platform Topside Floatover

PROJECT DETAILS:

Location: North West Shelf, Western Australia

Contract Period: November 2005 - June 2008

Safety Statistics: Manhours: 227,962

LTIFR: 4.38