clough downer joint venture

1
Client: Santos Design: Flour Australia Head Contractor: Clough Downer Joint Venture Completed: Under construction Location: QLD Size: 420,000m 2 Material Quantity: 1,260,000m 2 Scope: Supply and installation of triple layer lining system, permanent ballast- ing of the floor, animal egress and water level indicators to the following associate ponds: 200ML Associated Water Balance Pond 340ML Permeate Pond 4 x 350ML Brine Ponds A, B, C & D Design and Construction: The Flour design was a triple layer system consisting of triplanar drain- age net covered by geosynthetic clay liner, followed by a 1.5mm HDPE smooth geomembrane liner as the primary layer. The primary liner floor of each pond was electrical tested to ASTM D7007 Standard Practices for Electrical Methods for Locating Leaks in Geomembranes Covered with Water or Earth Minerals, and the walls to ASTM D7703 Standard Practices for Electrical Leak Location on Ex- posed Geomembranes using the Water Lance System. The primary liner was secured to spillways and sump structures using Fablock sup- plied prefabricated by Fabtech, and precast into the concrete struc- tures. Fabtech was recognised by Clough Downer Joint Venture for diligence regarding all aspects of safety on site. Santos | GLNG Upstream Project - Fairview HUB 04 Design Tesng Supply Installaon www.fabtech.com.au Shawn Brown being presented an award for diligence regarding all aspects of safety onsite.

Upload: fabtech-australia-pty-ltd

Post on 17-Aug-2015

150 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Clough Downer Joint Venture

Client: Santos

Design: Flour Australia

Head Contractor: Clough Downer Joint Venture

Completed: Under construction

Location: QLD

Size: 420,000m2

Material Quantity: 1,260,000m2

Scope:

Supply and installation of triple layer lining system, permanent ballast-ing of the floor, animal egress and water level indicators to the following associate ponds:

200ML Associated Water Balance Pond

340ML Permeate Pond

4 x 350ML Brine Ponds A, B, C & D

Design and Construction:

The Flour design was a triple layer system consisting of triplanar drain-age net covered by geosynthetic clay liner, followed by a 1.5mm HDPE smooth geomembrane liner as the primary layer.

The primary liner floor of each pond was electrical tested to ASTM D7007 Standard Practices for Electrical Methods for Locating Leaks in Geomembranes Covered with Water or Earth Minerals, and the walls to ASTM D7703 Standard Practices for Electrical Leak Location on Ex-posed Geomembranes using the Water Lance System. The primary liner was secured to spillways and sump structures using Fablock sup-plied prefabricated by Fabtech, and precast into the concrete struc-tures.

Fabtech was recognised by Clough Downer Joint Venture for diligence regarding all aspects of safety on site.

Santos | GLNG Upstream Project - Fairview HUB 04

Design Testing Supply Installation

www.fabtech.com.au

Shawn Brown being presented an award for diligence

regarding all aspects of safety onsite.