CLT15201 Development Guidelines for the Lawrenceville Community Land Trust January 2017

Upload: others

Post on 16-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CLT15201 - Lawrenceville

CLT15201Development Guidelines for the Lawrenceville Community Land Trust

January 2017

Page 2: CLT15201 - Lawrenceville

© M

att D

ayak

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborativeii

Page 3: CLT15201 - Lawrenceville

BACKGROUNDThe Lawrenceville Corporation was formed in the 1980s in response to neighborhood decline, as a means to advocate for and invest in the community’s interest. After decades of disinvestment Lawrenceville is seeing a resurgence in the housing market and a strengthening of it’s neighborhood commercial core, Butler Street.

Having guided the community from decline to reinvestment, the Lawrenceville Corporation has adjusted it’s focus to ensure that the unique characteristics of the community remain, that existing residents are not displaced, and that new residents of all income levels can continue to purchase a home in the community.

To address the issues facing the community the Lawrenceville Corporation sought to establish Pittsburgh’s first Community Land Trust as a means to preserve affordability in the neighborhood. Through work with foundations, the City of Pittsburgh, and community partners, CLT15201 was established.

All photos in this document were created by Rothschild Doyno Collaborative or Lawrenceville Corporation unless otherwise noted.

PROJECT SUPPORTThis project would not be possible without the generous support of the following organizations:

� The Hillman Foundation � UPMC Health Plan � Anonymous � Bridgeway Capital � Duquesne Light � The Urban Redevelopment Authority of Pittsburgh � PNC Bank � Dollar Bank

PROJECT TEAMLawrenceville Corporation worked with Burlington Associates in Community Planning to provide technical assistance on the econmic and social structure of the Community Land Trust.

Rothschild Doyno Collaborative was engaged to develop the CLT Guidelines and design the initial seven homes as prototypes for future CLT home development. Ecocraft Homes was engaged as the builder for the initial phase of housing.

Open Streets PittsburghLawrenceville Community Garden

© O

pen

Stre

ets

Pitt

sbur

gh

© L

awre

ncev

ille

Gar

dene

rs

ACKNOWLEDGEMENTS

01-04-17 © Rothschild Doyno Collaborative iii

Page 4: CLT15201 - Lawrenceville

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborativeiv

Page 5: CLT15201 - Lawrenceville

TABLE OF CONTENTSI. INTRODUCTION 1II. PRESERVING AFFORDABILITY 9III. CLT15201 DEVELOPMENT GUIDELINES 17IV. PHASE 1 HOME DESIGN 33V. ASSURING AFFORDABILITY 51

01-04-17 © Rothschild Doyno Collaborative v

Page 6: CLT15201 - Lawrenceville

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborativevi

Page 7: CLT15201 - Lawrenceville

CHAPTER I:

INTRODUCTION

INTRODUCTION

01-04-17 © Rothschild Doyno Collaborative 1

Page 8: CLT15201 - Lawrenceville

Butler and 45th Streets

© R

alph

McG

ough

View of Butler Street, 1955Doughboy Square, 1937

©Th

e U

nive

rsity

of P

itt D

igita

l Pho

togr

aphi

c Li

brar

y

In the early 1700s, the area now known as Lawrenceville was settled by the Delaware Indians and was an important trading post for both English and French settlers.

In 1814, William Foster, father of the composer Stephen Foster, laid out the town of Lawrenceville and named it in honor of Captain James Lawrence who fought in the struggle against the English during the War of 1812. Lawrenceville was annexed by the City of Pittsburgh in 1868.

Lawrenceville was home to the Allegheny Arsenal, which manufactured munitions for the Civil War. In the early and mid-1800s, Lawrenceville and the Allegheny Arsenal experienced immense growth. Wave after wave of German and Irish

immigrants settled in Lawrenceville to work in the “Cradle of America’s Industry.” Iron and steel production, glass factories, breweries, petroleum industries and other manufacturing all thrived in Lawrenceville during the 1800s and early 1900s.

As industry in Pittsburgh declined, Lawrenceville lost nearly one third of its population, leaving many vacant structures in this dense urban neighborhood. With over 30,000 residents in 1940, Lawrenceville saw its lowest population in 2000 with just over 10,000 residents.

LOCATION Lawrenceville is composed of three neighborhoods: Upper, Central, and Lower Lawrenceville, stretching along the southern banks of the Allegheny River and bounded by the hilltop neighborhoods above.

Butler Street is the main east-to-west thoroughfare that connects all three neighborhoods.

Lower Lawrenceville, or LoLa, extends from 33rd Street to 40th Street / Arsenal School and south to Liberty Avenue. Doughboy Square serves as a highly visible neighborhood gateway.

Central Lawrenceville, home to Arsenal Park, Allegheny Cemetery, and Children’s Hospital of Pittsburgh, has experienced a surge in both residential and business development.

Upper Lawrenceville, known as the 10th Ward by residents, is characterized by its dense urban fabric and an increasing development energy along Butler Street.

A History of Lawrenceville

“THE CRADLE OF AMERICA’S INDUSTRY”CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative2

Page 9: CLT15201 - Lawrenceville

CENTRAL LAWRENCEVILLE

UPPER LAWRENCEVILLE

HIGHLAND PARK

HIGHLAND PARK

EAST LIBERTY

GARFIELD

BLOOMFIELD

SHADYSIDE

POINTBREEZE

FRICKPARK

SQUIRRELHILL

SCHENLEYPARK

HILLDISTRICT

STRIP DISTRICT

UPTOWN

NORTHSIDE

NORTHPARK

TROYHILL

OAKLAND

SOUTHSIDE FLATS

WEST END

LOWERLAWRENCEVILLE

ALLEGHENY CEMETERY

ALLEGHENY RIV

ER

3 MILES FROM DOWNTOWN

OHIO RIVER

CENTRALBUSINESSDISTRICT

UNIVERSITY OF PITTSBURGH

DUQUESNEUNIVERSITY

CCAC

CHILDREN'S HOSPITAL OF PITTSBURGH OF UPMC

CARNEGIE MELLON

UNIVERSITY

NORTH I-279 TO I-76

(TO OHIO)

EAST I-376 TO I-76

(TO PHILA)SOUTH HILLS

NEIGHBORHOODS

65 NORTH(TO OHIO RIVER

NEIGHBORHOODS )

28 NORTH(TO FOX CHAPEL)

WEST I-376 TO AIRPORT

(21 MILES)

MONONGAHELA RIVER

40TH

31ST

FORT

PITT

LIBER

TY

RiversCasino Heinz

Field3 Rivers Park

Point State Park

PNC ParkCHATHAM

UNIVERSITY

CHATHAM UNIVERSITY

EASTSIDE

BUTLER STREET

City Connections – Locating Lawrenceville in Relationship to Pittsburgh Neighborhoods and Institutions

Allegheny Cemetery

Site of the cottage where Stephen Foster was born

© M

att D

ayak

© M

att D

ayak

INTRODUCTION

01-04-17 © Rothschild Doyno Collaborative 3

Page 10: CLT15201 - Lawrenceville

2002

L AWRENCEVILLE CORPORATION

The Lawrenceville Corporation was formed in January 2000 as a merger of the Lawrenceville Development Corporation (LDC) and the Lawrenceville Business Association (LBA). Both the LBA and LDC had been in existence since the mid-1980s and were formed in response to neighborhood decline following Pittsburgh’s economic crisis during the 1970s and 1980s.

The merger yielded a new organization with a strong combined board of directors. The organizational mission, membership, and much of the programming trace back to the original two entities. Since the merger, the LC has gained local and national recognition for its innovative niche marketing programs like the 16:62 Design Zone and the

Doughboy branding campaign, recruitment efforts that have yielded numerous destination-type retail and restaurant businesses, and the commercial and residential efforts throughout the neighborhood.

VISIONLawrenceville Corporation’s vision for the community includes the following elements:

� A diverse community that embraces newcomers and long-time residents, homeowners and renters, children and senior citizens, low-income and middle-class families alike.

� A thriving and competitive business district that attracts customers from around the region with unique stores and products, while continuing to

meet the day-to-day needs of community residents.

� A safe, healthy, and clean community free from crime, drugs, prostitution, violence, and litter.

� An attractive neighborhood full of amenities including shopping, restaurants, green space, parks, and recreational facilities.

PRINCIPLESThe Lawrenceville Corporation is guided in its work by five main principles:

� Preserve Authenticity: preserve community diversity and working class heritage; and build on existing architectural assets.

To act as a catalyst and conduit for responsible growth and reinvestment in the Lawrenceville Community

20062003 20072004 20082005 2009 2010

‘02Children’s Hospital of Pittsburgh announces its move to Lawrenceville

‘05Lawrenceville Community Plan is completed

‘06-’08Housing Market Downturn

‘08-’09LoLa Plan

‘10LC begins agressively pursue property through the City of Pittsburgh land recycling program

Lawrenceville Timeline

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative4

Page 11: CLT15201 - Lawrenceville

(PRINCIPLES CONT.)

To act as a catalyst and conduit for responsible growth and reinvestment in the Lawrenceville Community

� Strategically Target Development Efforts: geographically concentrate development to maximize impact in targeted areas that have been identified as priorities by strategic or community planning processes.

� Market Our Assets: understand the neighborhood’s assets and its potential role in the city or regional marketplace; target regional and local customers that will advance our neighborhood’s revitalization; and develop lines of business that promote the neighborhood’s assets.

� Support High Quality Design: insist on top-notch design standards for all development and projects in the community.

� Engage in Visionary and Participatory Planning: work with local stakeholders to creatively envision the future potential of the neighborhood while keeping an eye on national and regional trends and local opportunities

BOARD OF DIRECTORS

George Arendas Will Bernstein Lauren Byrne Stephen Casey Bernadette Gerbe David Green Joseph Kelly

Owen Lampe Allison McGeary Juliette Murcko Kento Ohmori Brooks Robinson, Jr. David Tobiczyk Tiffany Wilhelm

STAFFMatthew Galluzzo Executive Director

Valerie Fleisher Director of Operations

Ed Nusser Real Estate and Planning Manager

Genevieve Barbee Marketing and Communications Coordinator

2011 20152012 20162013 20172014 Future

‘12New movers study identifies changes in housing market trends for the neighborhood

‘12-’13LC establishes an affordable housing strategy for Upper Lawrenceville

++Board of Directors votes to pursue a community land trust

‘16The City of Pittsburgh Releases the P4 Measures

‘17Seven CLT homes available for sale

‘15LC engages consultants to establish the structure and design of the CLT and the initial homes

FUTUREContinues development of CLT homes and refinement of the CLT structure and processes

‘15Legislation introduced creating the affordable Housing Task Force

‘16Affordable Housing Task Force presents findings

‘16LC establishes a CLT Advisory Board

INTRODUCTION

01-04-17 © Rothschild Doyno Collaborative 5

Page 12: CLT15201 - Lawrenceville

The Foundry at 41st Arsenal Terminal Redevelopment Doughboy Square Apartments

Lawrenceville is a thriving community undergoing a wave of investment. An increase in population, reinvigorated neighborhood business districts, a rapidly rising real estate market, and convenient access to downtown Pittsburgh and other adjacent employment centers via multiple transportation choices make Lawrenceville an attractive neighborhood.

This growth has brought with it certain development pressures. Median home sale price in Central Lawrenceville increased from $27,000 to $175,000 (648%) over the 15-year period between 2000 and 2015.

The Lawrenceville Corporation, in partnership with other community organizations, has engaged residents in formulating community goals that address issues of development, affordability, and resident displacement.

What’s happening todayNEIGHBORHOOD PLANNINGAs an advocate for community based planning, the Lawrenceville Corporation facilitated several planning processes with its constituents to understand what residents wished to see in their community. As the context in the neighborhood changed between 2005 and 2010, the Lawrenceville Corporation continued planning efforts to keep pace with residents’ goals as the market began to shift around them.

Through the Upper Lawrenceville Community Visioning Plan residents recognized that they did not want to match the pace of development and investment seen in Lower and Central Lawrenceville. Instead, residents wanted to focus on a locally initiated, slower paced development that would reinforce the existing character of the community and maintain affordability.

A GROWING COMMUNIT Y

© S

trada

REGIONAL PLANNINGConcurrent to neighborhood planning efforts, the City focused resources on reconnecting residents to the rivers. Both the Allegheny Riverfront Vision Plan and the Allegheny Riverfront Green Boulevard set forth goals to connect neighborhoods through new riverfront development and amenities.

In 2016 the City put forth a vision of a more livable city for all its residents through the P4 Initiative, with a goal to “make sure that new growth benefits people, enhances a sense of place, contributes to a healthier planet, and achieves the highest levels of financial and social performance.”

Each of these planning efforts set the stage for the development of CLT15201.

© M

att D

ayak

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative6

Page 13: CLT15201 - Lawrenceville

The LoLa Plan

Allegheny Riverfront Vision Plan, 2011 Allegheny Riverfront Green Boulevard, 2013 Decreased industrial uses present green infrastructure and transpor-tation opportunities for our urban riverfront communities.

Pittsburgh P4 Performance Measures, 2016

LoLa Plan Upper Lawrenceville Community Visioning Plan, 2011 Strategic community planning studies focus on a diverse range of areas in Lawrenceville, from neighborhood areas, corridors, parks, and the riverfront.

Community planning for a diverse and vibrant neighborhood

Lawrenceville Community Plan, 2005

INTRODUCTION

01-04-17 © Rothschild Doyno Collaborative 7

Page 14: CLT15201 - Lawrenceville

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative8

Page 15: CLT15201 - Lawrenceville

CHAPTER II

PRESERVING AFFORDABILITY

PRESERVING AFFORDABILITY

01-04-17 © Rothschild Doyno Collaborative 9

Page 16: CLT15201 - Lawrenceville

The First Community Land Trust in Western Pennsylvania

The Lawrenceville Corporation has established a Community Land Trust (CLT) in response to the changing real estate market in the community.

In areas with large amounts of market rate development, longtime residents face the danger of being priced out of the market. A CLT brings balance to the market by helping to preserve affordability and provide a path for residents to build equity and become homeowners.

In January of 2016, Lawrenceville Corporation assembled the Lawrenceville CLT Advisory Board. This board was tasked with spending the year 2016 to work through the a planning process to answer key questions that every CLT start-up encounters. Questions include:

� How is the resale formula structured and governed?

� What stipulations are enforced in the CLT Ground Lease?

� Who should the CLT focus on serving?

Throughout 2016 the board met monthly to work through the questions above and many others. Throughout the planning process the Board was guided by Michael Brown of Burlington Associates in Community Development.

Dave Breingan Executive Director, Lawrenceville United Lawrenceville Corporation Board Member Sixth Ward Resident

Lauren Connelly Manager, Business Development, Allegheny County Economic Development Lawrenceville Corporation Board Member Tenth Ward Resident

CREATING CLT1520

MISSIONThe Lawrenceville Community Land Trust promotes, expands, and preserves permanently affordable hous-ing opportunities.

VALUES: � Provide high-quality homes

� Embrace sustainable development

� Seamlessly integrate affordable homes into neighborhood fabric

� Balance our neighborhood real estate market

� Utilize participatory and representative governance

PURPOSE OF THIS DOCUMENTBuilding upon previous community planning efforts, this document shares what we have learned in our initial planning and development of CLT projects across sites in Lawrenceville.

The guidelines and prototypes provided in this document will serve as a template for future CLT development within Pittsburgh and adjacent communities.

James Eash Real Estate Development Officer, Action-Housing

Matthew Galluzzo Executive Director, Lawrenceville Corporation

Dave Green Lawrenceville Corporation Board Member Tenth Ward Resident

LAWRENCEVILLE CLT ADVISORY BOARDThe “C” in CLT stands for “Community” and it was important to LC that this board be as broadly representative of the neighborhood as was possible. The founding members of the Lawrenceville CLT Advisory Board Are:

Deirdre Kane Owner, 52Nd Street Market Lawrenceville United Board Member Tenth Ward Resident

Amanda Neatrour Tenth Ward Resident

Ed Nusser Real Estate And Planning Manager, Lawrenceville Corporation

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative10

Page 17: CLT15201 - Lawrenceville

9Number of affordable rental units produced since 2012

925Number of rental units planned or under construction as of 2016

14.2%Residents who have lived in their current dwelling for at least 35 years

27%Lawrenceville residents that moved into neighborhood in past 5 years

29%Residential properties purchased by LLCs from 2012-2014

Lawrenceville Historic Sales by YearData provided by Lawrenceville Corporation

2016

2015

2014

2013

2012

2011

2010

2009

2008

2007

2006

2016

2015

2014

2013

2012

2011

2010

2009

2008

2007

2006

Median Single Family Sales PriceData provided by Lawrenceville Corporation

$68,599 $70,072 $73,004 $83,769

$94,586

$111,509

$142,257

$167,812

$190,062

$214,874 $211,277

116

103

79

94 93 102

131

178

147

164

150

Median sale prices grew by more than 290% between 2008 and 2016

The number of sales has increased bringing new residents to the community

PRESERVING AFFORDABILITY

01-04-17 © Rothschild Doyno Collaborative 11

Page 18: CLT15201 - Lawrenceville

Household Size

1 5432

50

80

100

$24,950 $38,450$35,600$32,050$28,500

$49,900 $76,900$71,200$64,100$57,000

$39,900 $61,550$56,950$51,300$45,600

CLT15201 STRUCTURE

Named for the zip code it serves, CLT15201 will create permanent affordable housing within Lawrenceville while allowing low and moderate income residents to build equity as homeowners.

With current market conditions, property in Lawrenceville is valued at a premium. The CLT’s ability to own the land and preserve it for affordable housing will take the increase in price associated with location and significantly reduce the cost incurred by the home purchaser. In this way the CLT will retain and maintain economic diversity in the community amid large amounts of market-rate development.

HOW IT WORKSCLT15201 will renovate or develop new homes throughout Lawrenceville. Homes will be sold to qualified home buyers and the CLT will retain ownership of the underlying land.

Long term ground leases with homeowners allow future home buyers to share in the affordability that was initially created and establishes a resale formula for the home that balances affordability with the realization of equity on improvements and the increase in value of the home.

WHO IT WILL SERVEThe CLT will serve households who earn 80% or less of the Area Median Income for their family size. To minimize displacement, home ownership opportunities will be offered first to existing residents in the neighborhood or feeder pattern for the local school. Home buyers must have a minimum credit score of 640 to qualify for a conventional mortgage. CLT15201 hopes to broaden the availability of homes as the program grows.

The Area Median Income is updated annually by the Department of Housing and Urban Development and is based on geographic location and family size. Pittsburgh’s Area Median income is based on data from Allegheny, Butler, Beaver, Westmoreland, Washington, and Fayette Counties.

Creating permanently affordable housing

Greater Pittsburgh Area Median Income for a Family of 4 in 2016

$71,200Area Median Income

$56,95080% Area Median Income

AM

I%

HOUSEHOLD SIZE

The CLT keeps permanent ownership of the land. The home buyer leases the land underneath from the CLT

New resident owns the house

How it works. Who it will serve. Households that earn 80% or less of the AMI for their family size are eligible for CLT Homes.

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative12

Page 19: CLT15201 - Lawrenceville

427

685

274

212410

603

300

584

257177

598

168

445

421

294

294

171

790

601

357

236

417

452

600

204

747

458

201

541

606

312

106

665

820

161

871201

230

495

295

443

234

232

133

132

653110

281

350

53 363

404

396

645

444429

LegendIncome - # Households in Census Block Group

270

Up to $19,999

$20,000-$44,999

$35,000-$49,999

$50,000-$74,999

$75,000+

Census Block Group Median IncomeUp to $19,999

$20,000 - $34,999

$35,000 - $49,999

$50,000 - $74,999

$75,000+

0 2,000 4,0001,000Feet

°Data sources: City of Pittsburgh GIS; 2009-2013 American Community Survey

Number of Households in the Census Block Group within each income range:

427

685

274

212410

603

300

584

257177

598

168

445

421

294

294

171

790

601

357

236

417

452

600

204

747

458

201

541

606

312

106

665

820

161

871201

230

495

295

443

234

232

133

132

653110

281

350

53 363

404

396

645

444429

LegendIncome - # Households in Census Block Group

270

Up to $19,999

$20,000-$44,999

$35,000-$49,999

$50,000-$74,999

$75,000+

Census Block Group Median IncomeUp to $19,999

$20,000 - $34,999

$35,000 - $49,999

$50,000 - $74,999

$75,000+

0 2,000 4,0001,000Feet

°Data sources: City of Pittsburgh GIS; 2009-2013 American Community Survey

Median Income of the Census Block Group:

KEY:

HOUSEHOLD INCOME DIVERSITY

GIS Base Map: City of Pittsburgh Income Data: 2009-2013 American Community Survey

0' 1600' 3200'Scale 1" = 1600'-0"

400' 800'

Parks/Cemetaries

INCOME INDICATORS

427

685

274

212410

603

300

584

257177

598

168

445

421

294

294

171

790

601

357

236

417

452

600

204

747

458

201

541

606

312

106

665

820

161

871201

230

495

295

443

234

232

133

132

653110

281

350

53 363

404

396

645

444429

LegendIncome - # Households in Census Block Group

270

Up to $19,999

$20,000-$44,999

$35,000-$49,999

$50,000-$74,999

$75,000+

Census Block Group Median IncomeUp to $19,999

$20,000 - $34,999

$35,000 - $49,999

$50,000 - $74,999

$75,000+

0 2,000 4,0001,000Feet

°Data sources: City of Pittsburgh GIS; 2009-2013 American Community Survey

Number of Households in the Census Block Group within each income range:

427

685

274

212410

603

300

584

257177

598

168

445

421

294

294

171

790

601

357

236

417

452

600

204

747

458

201

541

606

312

106

665

820

161

871201

230

495

295

443

234

232

133

132

653110

281

350

53 363

404

396

645

444429

LegendIncome - # Households in Census Block Group

270

Up to $19,999

$20,000-$44,999

$35,000-$49,999

$50,000-$74,999

$75,000+

Census Block Group Median IncomeUp to $19,999

$20,000 - $34,999

$35,000 - $49,999

$50,000 - $74,999

$75,000+

0 2,000 4,0001,000Feet

°Data sources: City of Pittsburgh GIS; 2009-2013 American Community Survey

Median Income of the Census Block Group:

KEY:

HOUSEHOLD INCOME DIVERSITY

GIS Base Map: City of Pittsburgh Income Data: 2009-2013 American Community Survey

0' 1600' 3200'Scale 1" = 1600'-0"

400' 800'

Parks/Cemetaries

INCOME INDICATORS

Lawrenceville Area Median IncomeUpper Lawrenceville, the location of the first phase of CLT homes, has an overall median income between $35,000 – $49,999 for all household sizes combined. The Area Median Income for all household sizes combined is $54,080 for the Pittsburgh metropolitan area.

PRESERVING AFFORDABILITY

01-04-17 © Rothschild Doyno Collaborative 13

Page 20: CLT15201 - Lawrenceville

JANUARYJULY

Making permanently affordable housing

Lawrenceville Corporation began developing the concept of CLT15201 in the summer of 2015, with a vote from the Board of Directors to create the first Community Land Trust in Western Pennsylvania. Throughout the course of 2015 and 2016 the Lawrenceville Corporation developed the CLT model with input from the community and stakeholders. They held numerous workshops and information sessions to explain the concepts to residents and gather feedback through the design process for the initial phase of homes.

RESIDENT SERVICESCLT15201 seeks to improve the lives of residents not only through home ownership but also through resident services. Initially residents will be connected to services on a case by case basis through partnerships with Lawrenceville United, Neighborworks, and Goodwill Industries.

DECEMBEROCTOBER FEBRUARY APRIL MAY

16LC Board formally votes to pivot real estate business line to create the 1st CLT in Western Pennsylvania

16LC hires Mike Brown of Burlington Associates in Community Development as CLT start-up consultant

8URA Board Approves Predevelopment Grant to Lawrenceville Corporation for CLT Phase 1

23 LC releases RFP for design services for the first phase of CLT Housing

1LC hires Rothschild Doyno Collaborative as project architect

8Anonymous source provides LC with CLT Planning and Predevelopment Grant

5Hillman Family Foundation provides an Opportunity Fund Grant to Lawrenceville CLT

16First CLT Community Meeting with Rothschild Doyno Collaborative

CLT15201 Timeline

20LC closes on 800 McCandless

23LC and LU create and seat the Lawrenceville CLT Advisory Board

2015 2016

7 LC and LU host “State of the Neighborhood” meeting to discuss neighborhood real estate trends

GOVERNANCE

CLT15201 will operate as a program of the Lawrenceville Corporation. A CLT Advisory Board will be formed to handle the general options of the CLT and will be composed of Lawrenceville homeowners, CLT homeowners, and issues experts that bring specific knowledge to guide and inform decision making.

The Lawrenceville Corporation Board of Directors will be responsible for key policy and financial decision making of CLT15201. A position on the Lawrenceville Corporations Board of Directors will be opened for a CLT resident to increase dialog and provide a residents perspective to inform decision making.

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative14

Page 21: CLT15201 - Lawrenceville

CLT 15201 Community MeetingLawrenceville Walkthrough of the McCandless Street renovation home

SEPTEMBER OCTOBER NOVEMBERJULY DECEMBER

162nd CLT Community Meeting with Rothschild Doyno Collaborative

26 – 30LC staff attends National CLT Conference hosted by Grounded Solutions Network

113rd CLT Community Meeting with Rothschild Doyno Collaborative

25First “CLT 101” Information Session for interested homebuyers

13ZBA Hearing for 5229-31 Poe Way and 52230-32 Duncan Street

27ZBA Hearing for 5230 Lotus Way and 5233 Duncan Street

29Second “CLT 101” Information Session for interested homebuyers

2Lawrenceville CLT is featured in NextCity

12Third “CLT 101” Information Session for interested homebuyers

1Fourth “CLT 101” Information Session for interested homebuyers

15Prospective homebuyer Intake Forms Due to LC

20CLT Informational Meeting with PEP Rally Parents

PRESERVING AFFORDABILITY

01-04-17 © Rothschild Doyno Collaborative 15

Page 22: CLT15201 - Lawrenceville

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative16

Page 23: CLT15201 - Lawrenceville

CHAPTER III

CLT15201 DEVELOPMENT GUIDELINES

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative 17

Page 24: CLT15201 - Lawrenceville

© M

att D

ayak

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative18

Page 25: CLT15201 - Lawrenceville

INTENT OF THE GUIDELINESThe guidelines establish goals for site and home design with the intention of establishing a framework for future CLT homes as they are developed. The guidelines have been informed by the initial phase of CLT homes planned for Upper Lawrenceville.

As each project moves forward and additional homes are developed, each project should demonstrate its response to the site and home design goals while considering the specific context and location.

P4 ALIGNMENTThe intent of CLT15201 aligns with the principles of the p4 organizing framework focusing on People, Place, Planet, and Performance. CLT15201 has engaged the community through each step of the development process to create long term affordable housing that reinforces the unique characteristics of the Lawrencville neighborhood.

Both the goals outlined here and the subsequent recommendations have taken into account components of the p4 performance measures. Future CLT development projects should consider documentation of the performance metrics to assess, guide, and inform future development efforts.

DESIGN GOALSCLT Guidelines: leading the way to a healthy and contextual built environment

Home design• Build and renovate homes for the next

century of living.

• Incorporate sustainable design principles to reduce energy use, conserve resources, and consider the life cycle cost of design choices.

• Create a range of home sizes and types to suit a range of individuals and families at various stages of life.

• Create homes that blend seamlessly into the neighborhood fabric while being of their own time.

Site design• Respond and relate to surrounding context

to seamlessly blend new and old.

• Promote an active, vibrant streetscape that enhances walkability and livability.

• Incorporate sustainable site design.

• Take advantage of the topography.

GOALS OF THE GUIDELINESA TE SEON N UE LARENEE FO LOTUS AY TO OE AY

REF.

W/D

UP

-

DINING

KITCHEN

BACKYARD

18' X 20'

37'-0" 18'-0"

4'-0"

16'-0"

OPEN TO

BELOW

20'-0"

UP

DN

3'-0"

MASTER

BEDROOM

11' x 14' 8"

BED 2

10' x 14' 8"

BATH

8' 3" x 7' 7"

W/C

5' 1" x 5' 2"

CLOSET

CLOSET

UP

DN

CLOSET

DN

BED 3

UNFINISHED

ATTIC SPACE

10' x 11'

55'-0"

CRAWLSPACE

ENTRY

MECH/

STORAGE

POWDER

RMLI

VING RM

25'-0"

This drawing, including its electronic form, is an Instrument

of Service for use solely with respect to this Project. The

Architect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and other

reserved rights, including copyrights.

DRAWING

TITLE

PRINTED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FOR

CONSTRUCTION

7/6/2016 10:08:11 AM

A101

FLOOR PLANS - STREET

HIGH

LAWRENCEVILLE

CORPORATION

COMMUNITY LAND TRUST

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

REVISIONS

NO.

DESCRIPTION

DATE

REF.

W/D

-

12'-0" 35'-0" 3'-0"

POW

DER

RM

KITC

HEN

LIVI

NG

RM

DIN

ING

RM

4'-0

"16

'-0"

50'-0"

20'-0

"

UP

DN

BATH

7' 2

" x 7

' 8"

CLO

SET

CLO

SET

MAS

TER

BED

RO

OM

14' 8

" x 1

0' 1

"

BED

214

' 8" x

9' 9

"

DN

CEL

LAR

CLO

SET

5' 7

" x 5

' 5"

MEC

H4'

10"

x 5

' 5"

CR

AWLS

PAC

E

BAC

KYAR

D

22'-10"

12' X

20'

15'-8 1/2"

UP

This

dra

win

g, in

clud

ing

its e

lect

roni

c fo

rm, i

s an

Inst

rum

ent

of S

ervi

ce fo

r use

sol

ely

with

resp

ect t

o th

is P

roje

ct. T

heAr

chite

ct is

the

auth

or a

nd s

ole

owne

r of s

aid

Inst

rum

ent

of S

ervi

ce a

nd re

tain

s al

l com

mon

law

, sta

tuto

ry a

nd o

ther

rese

rved

righ

ts, i

nclu

ding

cop

yrig

hts.

DR

AWIN

G

TITL

E

PRINTED

© R

OTH

SCH

ILD

DO

YNO

CO

LLAB

OR

ATIV

E

NO

T FO

RC

ON

STR

UC

TIO

N

7/1/20163:02:51PM

A101

FLO

OR

PLA

NS

- ALL

EYLO

W

141

45TH

STR

EET

PITT

SBU

RG

H, P

A

PRIC

ING

DR

AWIN

GS

MAY

3, 2

016

1/4

" = 1

'-0"

A1012

MAI

N F

LOO

R 1

/4" =

1'-0

"A1

013SE

CO

ND

FLO

OR

1/4

" = 1

'-0"

A1011

BASE

MEN

T

REV

ISIO

NS

NO

.D

ESCR

IPTI

ON

DATE

REF

.

W/D

-

4'-0

"16

'-0"

POW

DER

RM

CLO

SET

DIN

ING

KITC

HEN

LIVI

NG

RM

ENTR

Y

6' x

3'

20'-0

"

UP

DN

40'-0"15'-0"

BED

110

'-5" x

14'

-8"

BED

210

' x 1

4'-8

"

CLO

SET BA

TH8'

2" x

7' 7

"

W/C

5' 7

" x 5

' 2"

CLOSET

UP

DN

MAS

TER

BED

BATH

2

W/C

DN

9'-6

" X 1

4'-8

"

CEL

LAR

15' x

14'

3"

CLO

SET

5' 7

" x 5

' 4"

MEC

H

5' 4

" x 4

' 9"

CR

AWLS

PAC

E

BAC

KYAR

D

20' X

15'

22'-5"3'-0"

UP

40'-0"15'-0"

This

dra

win

g, in

clud

ing

its e

lect

roni

c fo

rm, i

s an

Inst

rum

ent

of S

ervi

ce fo

r use

sol

ely

with

resp

ect t

o th

is P

roje

ct. T

heAr

chite

ct is

the

auth

or a

nd s

ole

owne

r of s

aid

Inst

rum

ent

of S

ervi

ce a

nd re

tain

s al

l com

mon

law

, sta

tuto

ry a

nd o

ther

rese

rved

righ

ts, i

nclu

ding

cop

yrig

hts.

DR

AWIN

G

TITL

E

PRINTED

© R

OTH

SCH

ILD

DO

YNO

CO

LLAB

OR

ATIV

E

NO

T FO

RC

ON

STR

UC

TIO

N

7/6/201610:46:07AM

A101

FLO

OR

PLA

NS

- STR

EET

LOW

LAW

REN

CEV

ILLE

CO

RPO

RAT

ION

CO

MM

UN

ITY

LAN

D T

RU

STPI

TTSB

UR

GH

, PA

PRIC

ING

DR

AWIN

GS

MAY

3, 2

016

1/4

" = 1

'-0"

A1012

MAI

N F

LOO

R 1

/4" =

1'-0

"A1

013SE

CO

ND

FLO

OR

1/4

" = 1

'-0"

A1014

MEZ

ZAN

INE

1/4

" = 1

'-0"

A1011

BASE

MEN

T

REV

ISIO

NS

NO

.D

ESC

RIP

TIO

ND

ATE

REF.

-

W/D

POWDER

RM

6' x 3'

KITCHEN

DINING

RM

ENTRY

BACKYARD

12' X 20'

3'-0" 35'-0" 12'-0"

4'-0"

16'-0"

50'-0"

20'-0"

0"

LIVING RM

MECH

UP

UP

BED 2

14' 8" x 9' 9"

BATH

7' 2" x 7' 8"

CLOSET

CLOSET

MASTER

BEDROOM

14' 8" x 10' 1"

DN

This drawing, including its electronic form, is an Instrument

of Service for use solely with respect to this Project. The

Architect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and other

reserved rights, including copyrights.

DRAWING

TITLE

PRINTED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FOR

CONSTRUCTION

6/22/2016 10:45:38 AM

A101

FLOOR PLANS - ALLEY

HIGH

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"

A101 2

MAIN FLOOR

1/4" = 1'-0"

A101 3

SECOND FLOOR

REVISIONS

NO.

DESCRIPTION

DATE

DUNCAN STLOTUSWAY

POWAY

ALLEYHI

STREETLO

STREETHI

ALLEYLO

SOL PANE

ON-GRADE ME

VIS

VIS TO RIE VALE

OTNITE O SOL GANS & HARETIN

VITALEENTRY

VITALEENTRY

ENTRY AT T STREET

IRD STREETCAEWORN T HE SLOE

- REDUED BAEENT AE- ON-GRADE BAYARD ACES

GREING T AY

GRE SACE AT ERY ME

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative 19

Page 26: CLT15201 - Lawrenceville

SITE DESIGNPromote an active and vibrant streetscape that enhances walkability and livability

Lawrenceville is a vibrant urban neighborhood. In a dense urban setting with many homes in close proximity, it’s important to create comfortable outdoor spaces that encourage occupancy and interaction among neighbors. Several tools and design considerations to accomplish this are identified below.

StoopsWhere existing homes are directly adjacent to the street, stairs leading to the front entry often encroach into the public right of way. New homes should understand this context as an opportunity to enhance the design of homes with additional gathering space within the right of way.

The design configuration of new stairs should factor in the ability to create a planting zone adjacent to the

street, the ability for the homeowner to sit on the steps or on a chair at the top landing of the stoop, and the opportunities to personalize the entrance.

Porches Where porches form the context of the street, new and renovated porches should match the scale and depth of existing porches. Consider the degree of transparency/opening of the railing to provide privacy while still creating a street connection.

Interior and Exterior ConnectionsActive spaces within the home should overlook the street to enhance visibility and connection between the home and the public realm. When homes are located directly adjacent to the sidewalk, the ground floor should be situated a few feet above the street level to increase the comfort level of the interior spaces. Where

the ground floor of homes are level with the sidewalk to provide an accessible entry, a planting buffer between the sidewalk and the home should be considered.

StreetscapeAs homes are developed, streetscape improvements should be considered. Small planting areas at the front of the homes address stormwater runoff and provide an opportunity to personalize the character of the home. When considering street trees along the sidewalk, consult the Forestry Division or local shade tree commission to determine potential utility conflicts.

Walkability and TransitFuture CLT Homes should be located in proximity to public transit to promote alternative transportation opportunities. Enclosed bike storage should be accommodated within the home.

© M

att D

ayak

© M

att D

ayak

Stoops provide opportunities planting along the sidewalk Porches create connections to the sidewalk and street Decorative ironwork and planting enhance exterior connections

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative20

Page 27: CLT15201 - Lawrenceville

REF

.

W/D

-

4'-0

"16

'-0"

POW

DER

RM

CLO

SET

DIN

ING

KITC

HEN

LIVI

NG

RM

ENTR

Y

6' x

3'

20'-0

"

UP

DN

40'-0"15'-0"

BED

110

'-5" x

14'

-8"

BED

210

' x 1

4'-8

"

CLO

SET BA

TH8'

2" x

7' 7

"

W/C

5' 7

" x 5

' 2"

CLOSET

UP

DN

MAS

TER

BED

BATH

2

W/C

DN

9'-6

" X 1

4'-8

"

CEL

LAR

15' x

14'

3"

CLO

SET

5' 7

" x 5

' 4"

MEC

H

5' 4

" x 4

' 9"

CR

AWLS

PAC

E

BAC

KYAR

D

20' X

15'

22'-5"3'-0"

UP

40'-0"15'-0"

This

dra

win

g, in

clud

ing

its e

lect

roni

c fo

rm, i

s an

Inst

rum

ent

of S

ervi

ce fo

r use

sol

ely

with

resp

ect t

o th

is P

roje

ct. T

heAr

chite

ct is

the

auth

or a

nd s

ole

owne

r of s

aid

Inst

rum

ent

of S

ervi

ce a

nd re

tain

s al

l com

mon

law

, sta

tuto

ry a

nd o

ther

rese

rved

righ

ts, i

nclu

ding

cop

yrig

hts.

DR

AWIN

G

TITL

E

PRINTED

© R

OTH

SCH

ILD

DO

YNO

CO

LLAB

OR

ATIV

E

NO

T FO

RC

ON

STR

UC

TIO

N

7/6/201610:46:07AM

A101

FLO

OR

PLA

NS

- STR

EET

LOW

LAW

REN

CEV

ILLE

CO

RPO

RAT

ION

CO

MM

UN

ITY

LAN

D T

RU

STPI

TTSB

UR

GH

, PA

PRIC

ING

DR

AWIN

GS

MAY

3, 2

016

1/4

" = 1

'-0"

A1012

MAI

N F

LOO

R 1

/4" =

1'-0

"A1

013SE

CO

ND

FLO

OR

1/4

" = 1

'-0"

A1014

MEZ

ZAN

INE

1/4

" = 1

'-0"

A1011

BASE

MEN

T

REV

ISIO

NS

NO

.D

ESC

RIP

TIO

ND

ATE

REF.

-

W/D

POWDER

RM

6' x 3'

KITCHEN

DINING

RM

ENTRY

BACKYARD

12' X 20'

3'-0" 35'-0" 12'-0"

4'-0"

16'-0"

50'-0"

20'-0"

0"

LIVING RM

MECH

UP

UP

BED 2

14' 8" x 9' 9"

BATH

7' 2" x 7' 8"

CLOSET

CLOSET

MASTER

BEDROOM

14' 8" x 10' 1"

DN

This drawing, including its electronic form, is an Instrument

of Service for use solely with respect to this Project. The

Architect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and other

reserved rights, including copyrights.

DRAWING

TITLE

PRINTED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FOR

CONSTRUCTION

6/22/2016 10:45:38 AM

A101

FLOOR PLANS - ALLEY

HIGH

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"

A101 2

MAIN FLOOR

1/4" = 1'-0"

A101 3

SECOND FLOOR

REVISIONS

NO.

DESCRIPTION

DATE

Respond and relate to the surrounding context to seamlessly blend new and old

The City of Pittsburgh zoning ordinance outlines a series of development standards for new homes within high density residential zoning districts. Often these standards do not match the existing built environment of the historic neighborhood context.

New siting of new homes should address the specific context of their immediate surroundings. This can be accomplished in the following manner:

Contextual SetbacksWhen siting a home on a lot, consider using contextual setbacks to align the structure with nearby homes. Consider providing a zero lot line on one side of the

DUNCAN STREET

LOTUSWAY

building while providing access to the side and rear of the home with a contextual setback on the opposite side.

ParkingConsider the need for off-street parking given the availability of public transit and pursue a parking variance as appropriate. Where off-street parking is provided it should be located in the rear of the property accessed from the alley. New homes should avoid ground level curb cuts and parking with garage doors facing primary streets.

Site Specific Design Home types should be selected based on their

compatibility with the site context and modified as necessary to best relate to the surroundings. As the CLT expands and new prototypes are developed the range of choices will increase.

Street Context and Alley ContextSubdivide lots where feasible to create a presence on both the street side and alley side of a lot. Lawrenceville alley homes offer an unique opportunity for providing shared amenities as identified in the Upper Lawrenceville Community Plan.

ALLEY STREET

FRONT SETBACK: 3’

SIDEYARD SETBACK: 4’ | 0’

REAR YARD SETBACK: 12’

LOT SIZE: 1000 SF LOT SIZE: 1100 SF

REAR YARD SETBACK: 15’

SIDEYARD SETBACK: 4’ | 0’

FRONT SETBACK: 0’

Example of splitting a single lot into two lots: one lot for the alley home and the other lot for the street home.

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative 21

Page 28: CLT15201 - Lawrenceville

SITE DESIGNIncorporate Sustainable Site Design

WaterUpper Lawrenceville is part of a historic “run” to the river along McCandless Avenue. As identified in the Upper Lawrenceville Community Plan, the community has made stormwater management improvements along this corridor a priority. For new homes along the cross streets to McCandless, the goal is to reduce the amount of surface storm water before it reaches the intersection or catch basins along the way.

Individual lots should consider harvesting stormwater from roofs with rain barrels connected to downspouts. The collected water can be used to irrigate on-site landscaping or adjacent tree plantings within the right-of-way. Additionally, to reduce the amount of impervious surface, each site should consider the incorporation

of planting areas along the street to collect surface stormwater and permeable pavement for on lot sidewalks and patios.

New homes along the hillside, such as those in the initial phase, should incorporate strategies to mitigate stormwater runoff to adjacent downhill lots and provide subsurface drainage measures to prevent moisture related issues on the downhill homes.

HealthNew homes should be constructed with below grade passive radon mitigation systems to prevent any infiltration or air quality issues within homes.

Resources should be available to promote gardening and composting. Outdoor storage should be provided to store necessary tools and equipment.

ConnectivityEnclosed storage should be provided for bikes to promote the use of alternative transportation and encourage an active lifestyle.

District SystemsAs the number of CLT homes increases, opportunities for district based solutions should be considered for stormwater management.

Cen

ter f

or N

eigh

borh

ood

Tech

nolo

gy

Downspouts connected to rain barrels can be used for on site irrigation Planting areas adjacent to sidewalks Permeable patio paving

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative22

Page 29: CLT15201 - Lawrenceville

Take advantage of the topography

A TE SEON N UE LARENEE FO LOTUS AY TO OE AY

REF.

W/D

UP

-

DINING

KITCHEN

BACKYARD

18' X 20'

37'-0" 18'-0"

4'-0"

16'-0"

OPEN TO

BELOW

20'-0"

UP

DN

3'-0"

MASTER

BEDROOM

11' x 14' 8"

BED 2

10' x 14' 8"

BATH

8' 3" x 7' 7"

W/C

5' 1" x 5' 2"

CLOSET

CLOSET

UP

DN

CLOSET

DN

BED 3

UNFINISHED

ATTIC SPACE

10' x 11'

55'-0"

CRAWLSPACE

ENTRY

MECH/

STORAGE

POWDER

RMLI

VING RM

25'-0"

This drawing, including its electronic form, is an Instrument

of Service for use solely with respect to this Project. The

Architect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and other

reserved rights, including copyrights.

DRAWING

TITLE

PRINTED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FOR

CONSTRUCTION

7/6/2016 10:08:11 AM

A101

FLOOR PLANS - STREET

HIGH

LAWRENCEVILLE

CORPORATION

COMMUNITY LAND TRUST

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

REVISIONS

NO.

DESCRIPTION

DATE

REF.

W/D

-

12'-0" 35'-0" 3'-0"

POW

DER

RM

KITC

HEN

LIVI

NG

RM

DIN

ING

RM

4'-0

"16

'-0"

50'-0"

20'-0

"

UP

DN

BATH

7' 2

" x 7

' 8"

CLO

SET

CLO

SET

MAS

TER

BED

RO

OM

14' 8

" x 1

0' 1

"

BED

214

' 8" x

9' 9

"

DN

CEL

LAR

CLO

SET

5' 7

" x 5

' 5"

MEC

H4'

10"

x 5

' 5"

CR

AWLS

PAC

E

BAC

KYAR

D

22'-10"

12' X

20'

15'-8 1/2"

UP

This

dra

win

g, in

clud

ing

its e

lect

roni

c fo

rm, i

s an

Inst

rum

ent

of S

ervi

ce fo

r use

sol

ely

with

resp

ect t

o th

is P

roje

ct. T

heAr

chite

ct is

the

auth

or a

nd s

ole

owne

r of s

aid

Inst

rum

ent

of S

ervi

ce a

nd re

tain

s al

l com

mon

law

, sta

tuto

ry a

nd o

ther

rese

rved

righ

ts, i

nclu

ding

cop

yrig

hts.

DR

AWIN

G

TITL

E

PRINTED

© R

OTH

SCH

ILD

DO

YNO

CO

LLAB

OR

ATIV

E

NO

T FO

RC

ON

STR

UC

TIO

N

7/1/20163:02:51PM

A101

FLO

OR

PLA

NS

- ALL

EYLO

W

141

45TH

STR

EET

PITT

SBU

RG

H, P

A

PRIC

ING

DR

AWIN

GS

MAY

3, 2

016

1/4

" = 1

'-0"

A1012

MAI

N F

LOO

R 1

/4" =

1'-0

"A1

013SE

CO

ND

FLO

OR

1/4

" = 1

'-0"

A1011

BASE

MEN

T

REV

ISIO

NS

NO

.D

ESC

RIP

TIO

ND

ATE

REF

.

W/D

-

4'-0

"16

'-0"

POW

DER

RM

CLO

SET

DIN

ING

KITC

HEN

LIVI

NG

RM

ENTR

Y

6' x

3'

20'-0

"

UP

DN

40'-0"15'-0"

BED

110

'-5" x

14'

-8"

BED

210

' x 1

4'-8

"

CLO

SET BA

TH8'

2" x

7' 7

"

W/C

5' 7

" x 5

' 2"

CLOSET

UP

DN

MAS

TER

BED

BATH

2

W/C

DN

9'-6

" X 1

4'-8

"

CEL

LAR

15' x

14'

3"

CLO

SET

5' 7

" x 5

' 4"

MEC

H

5' 4

" x 4

' 9"

CR

AWLS

PAC

E

BAC

KYAR

D

20' X

15'

22'-5"3'-0"

UP

40'-0"15'-0"

This

dra

win

g, in

clud

ing

its e

lect

roni

c fo

rm, i

s an

Inst

rum

ent

of S

ervi

ce fo

r use

sol

ely

with

resp

ect t

o th

is P

roje

ct. T

heAr

chite

ct is

the

auth

or a

nd s

ole

owne

r of s

aid

Inst

rum

ent

of S

ervi

ce a

nd re

tain

s al

l com

mon

law

, sta

tuto

ry a

nd o

ther

rese

rved

righ

ts, i

nclu

ding

cop

yrig

hts.

DR

AWIN

G

TITL

E

PRINTED

© R

OTH

SCH

ILD

DO

YNO

CO

LLAB

OR

ATIV

E

NO

T FO

RC

ON

STR

UC

TIO

N

7/6/201610:46:07AM

A101

FLO

OR

PLA

NS

- STR

EET

LOW

LAW

REN

CEV

ILLE

CO

RPO

RAT

ION

CO

MM

UN

ITY

LAN

D T

RU

STPI

TTSB

UR

GH

, PA

PRIC

ING

DR

AWIN

GS

MAY

3, 2

016

1/4

" = 1

'-0"

A1012

MAI

N F

LOO

R 1

/4" =

1'-0

"A1

013SE

CO

ND

FLO

OR

1/4

" = 1

'-0"

A1014

MEZ

ZAN

INE

1/4

" = 1

'-0"

A1011

BASE

MEN

T

REV

ISIO

NS

NO

.D

ESC

RIP

TIO

NDA

TE

REF.

-

W/D

POWDER

RM

6' x 3'

KITCHEN

DINING

RM

ENTRY

BACKYARD

12' X 20'

3'-0" 35'-0" 12'-0"

4'-0"

16'-0"

50'-0"

20'-0"

0"

LIVING RM

MECH

UP

UP

BED 2

14' 8" x 9' 9"

BATH

7' 2" x 7' 8"

CLOSET

CLOSET

MASTER

BEDROOM

14' 8" x 10' 1"

DN

This drawing, including its electronic form, is an Instrument

of Service for use solely with respect to this Project. The

Architect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and other

reserved rights, including copyrights.

DRAWING

TITLE

PRINTED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FOR

CONSTRUCTION

6/22/2016 10:45:38 AM

A101

FLOOR PLANS - ALLEY

HIGH

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"

A101 2

MAIN FLOOR

1/4" = 1'-0"

A101 3

SECOND FLOOR

REVISIONS

NO.

DESCRIPTION

DATE

DUNCAN STLOTUSWAY

POWAY

ALLEYHI

STREETLO

STREETHI

ALLEYLO

SOL PANE

ON-GRADE ME

VIS

VIS TO RIE VALE

OTNITE O SOL GANS & HARETIN

VITALEENTRY

VITALEENTRY

ENTRY AT T STREET

IRD STREETCAEWORN T HE SLOE

- REDUED BAEENT AE- ON-GRADE BAYARD ACES

GREING T AY

GRE SACE AT ERY ME

Section diagram illustrating the topography of Upper Lawrenceville Phase 1 homes. Working with the existing slope provides opportunities for capturing views and additional exterior and interior space.

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative 23

The Lawrenceville community includes both hillside and a riverfront “flats” areas. As CLT homes are established each site should take advantage of the unique opportunities of either a sloped or flat site.

In Upper Lawrenceville the lots slope approximately 20’-0” in elevation from the high side of a street or alley to the low side. The initial phase of home design was strongly influenced by the hillside location and the relationships between the home, the street, and the yard. As future home designs are established these relationships should be taken into account.

Homes on the high side of the street or alley have the opportunity to create a bonus space at the street or alley level that’s open to the second floor in order to preserve connectivity to the street while creating a yard space off one of the primary living levels. Homes on the low side of the street/alley have a bonus space at the lowest level, below the street, that opens out to the back yard.

Site walls or grading establish yard spaces on different levels to increase the privacy from one yard to the adjacent home and offer the optimum connection from the house to the yard.

Homes on the low side of the street should be visitable on the first floor, either from the front, side, or rear entrance that slopes from the street to the home.

Page 30: CLT15201 - Lawrenceville

EXTERIOR: THE BUILDING ENVELOPENew home construction should meet or exceed high performance standards that will become code minimums in the near future. As such, the model criteria is to be compliant with the latest available International Building Code (IBC) and International Energy Conservation Code (IECC). Long lasting construction methods and promotion of energy conservation metrics will extend the value of the homes into the future.

Air Tight ConstructionReduce air leakage at the homes exterior by including a continuous weather barrier membrane and sealing all framing gaps and through-wall penetrations for venting and utilities.

WindowsInstall new high performance, Energy Star windows and provide flashing and sealant around door and window openings to improve the air tight construction. Locate window openings to optimize solar heat gains and shading conditions as well as promote substantial daylighting in each occupiable area.

Insulation ValuesThe target for insulation values is to meet the most recent available energy code requirements—currently the 2015 IRC energy conservation code—as a baseline minimum. As the program moves into the future, the performance should advance with the latest codes available.

The Phase 1 new homes will incorporate high performance wall cavity insulation and 1” of continuous exterior insulation and new air/moisture barrier around the perimeter of the home. The roof will be a combination of blown-in attic insulation and insulation above the roof decking to accomplish the recommended code R-values.

Siding / Veneer CladdingExterior cladding will be selected from a range of options promoting long lasting, durable, and low maintenance solutions.

RoofingNew roofing materials should be of long lasting materials to extend the value of the home long into the future. “White roofing” strategies to reduce heat gains and urban heat island effect should be integrated for flat roofing scenarios.

Foundation WallsFoundation walls should be insulated to comply with the code standards referenced above. Waterproofing should be included with perimeter drainage where occupiable spaces are below grade.

On Grade Conditions Conditioned basement spaces should have a floor slab and continuous vapor barrier below the floor slab. All penetrations through the vapor barrier should be sealed and taped. Insulation should comply with the referenced code standards above.

Demising WallsIf a new home has a shared wall to an adjacent existing home, and the existing wall does not meet current code requirements for fire ratings and insulation values, the new construction should provide the current code requirements for fire separations and construction methods relating to piping and ductwork in the walls and insulating values.

HOME DESIGNNew home construction for the next century of living

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative24

Page 31: CLT15201 - Lawrenceville

INTERIOR: BUILDING SYSTEMSNew homes are to meet or exceed latest available ICC energy performance code standards. Integrating sustainable design strategies creates healthy living environments that are sustainable into the future while also extending the value of the homes into the future.

Lighting / DaylightingNew homes should incorporate strategies for optimized daylighting and energy efficient electrical lighting. Window locations should promote natural light to each occupiable space. Lighting should be LED fixtures whenever possible to promote energy conservation. Exterior lighting should be minimized to provide lighting at the entry areas for safe entry and egress and provide a sense of active occupancy on the street at night.

Mechanical SystemsThe goal of the mechanical system design and selection is to promote energy conservation, indoor air quality, and occupant comfort. With each home, design services should be included for an engineer to evaluate and present system options and ultimately provide a system design and equipment schedule. Additionally, programmable thermostats are to be included.

Electrical SystemsNew electrical systems should be installed throughout. If any existing electrical utilities or wiring is to be maintained, a certified electrical inspector should assess the conditions and provide a written report of the findings.

Plumbing SystemsNew homes will have new water utility connections and distribution. New sewer connections will include two lines: one for sewer and one for stormwater extending to the property line. Lines will “Y” together to connect into the existing sewer until new separate utilities are provided at the street. Each home will include site strategies to reduce stormwater runoff and rainwater harvesting.

Plumbing Fixtures & AppliancesEach home will include low flow WaterSense fixtures for toilets, faucets, and showers. Installed appliances will be Energy Star Certified.

Indoor Air QualityNew home design should promote indoor air quality standards. Material selections should include Low and Zero VOC products for all interior finishes including flooring, adhesives and sealants, paints, cabinetry, and other finish materials. Air filtration standards should be at a minimum MERV___. CO2 and carbon monoxide monitors are to be included. All combustion equipment should be ventilated to the exterior including gas cooktop ranges.

Fresh air makeup ventilation should be included with an energy recovery ventilator. Operable windows are required and should be located to promote enhanced ventilation. New homes should be constructed with below grade passive radon mitigation systems to prevent any infiltration or air quality issues within homes.

Sustainable MaterialsIn addition to Low and Zero VOC materials, locally sourced, manufactured, and purchased products should be promoted. Locally crafted products also should be considered for inclusion to promote the sustainability of local businesses.

Fire Protection SystemCurrently, as of 2015, sprinkler systems are not required for single family free standing homes or duplex homes. This requirement and other life safety requirements should be confirmed with each new home renovation as the current standards may change.

Renewable Energy SourcingRenewable energy source strategies are encouraged to improve energy conservation and reduce grid dependency. These strategies assist in moving toward a “net-zero” solution acknowledging the Architecture 2030 challenge target of new construction being at net-zero by 2030. Electrical service connections will be anticipated in all homes for inclusion of solar PV systems at day one or for future home owner hook up. Geothermal and other strategies will be considered as appropriate for each home site and if energy modeling demonstrates an improved performance strategy that exceeds other engineering solutions.

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative 25

Page 32: CLT15201 - Lawrenceville

HOME DESIGN

EXTERIOR: THE BUILDING ENVELOPEHome renovations should be designed to bring the construction up to or exceed high performance standards that will become code minimums in the near future. As such, the model criteria is to be compliant with the latest available International Building Code (IBC) and International Energy Conservation Code (IECC). Long lasting construction methods and promotion of energy conservation metrics will extend the value of the homes into the future.

Air Tight Construction Reduce air leakage at the homes exterior by including a continuous weather barrier membrane and sealing all framing gaps and through wall penetrations for venting and utilities.

WindowsReplace existing windows with new high performance Energy Star windows and provide flashing and sealant around door and window openings to improve the air tight construction.

Insulation ValuesIt is common in Lawrenceville to find existing load bearing framing walls that are only 2x4 construction. Current energy code requirements will require increasing the framing cavity and/or including exterior insulation outside of the framing wall. The target for insulation values is to meet or exceed the latest available IRC energy conservation code, which is currently the 2015 Edition. As the program moves into the future, the performance would advance with the model codes in effect.

The Phase 1 renovation home will incorporate cellulose blown in framing cavity insulation and 1” of exterior insulation with a new air/moisture barrier continuous around the perimeter of the home. The roof will be a combination of blown in attic insulation and insulation above the roof decking to accomplish the recommended code R-values with the existing roof framing conditions.

Siding / Veneer CladdingIn most cases, the renovation homes have multiple layers of exterior siding added over the years. The renovation program will evaluate the existing conditions for insulation values, air and moisture transfer, and condition of the materials to determine the extent of removal. In many cases, the exterior materials will be removed down to the original layer of siding. This layer will remain as an integral part of the framing conditions unless recommended by a structural engineer to be removed.

A new layer of sheating and air/moisture barrier will be added with additional insulation as needed to accomplish the energy conservation targets. New siding will be selected from a range of options promoting long lasting, durable, and low maintenance solutions. A brick home has not been included in the Phase 1 renovations. An additional strategy will need to be developed where structural brick exterior walls exist.

RoofingThe existing roofing materials should be evaluated for extent of an expected life cycle and water infiltration as well as an integrated solution to the insulation strategy. New roofing materials should be of long lasting materials to extend the value of the home long into the future.

Foundation Walls Existing foundations should be evaluated for structural integrity and moisture migration. Both aspects should be addressed as a priority. Each home will be individually evaluated to understand appropriate performance solutions for insulating and conditioning the existing foundations. Most existing foundations are stone foundations that allow moisture migration to move freely to both sides of the walls. Excavating on the exterior of old foundation walls should be evaluated with a structural engineer before proceeding.

On Grade Conditions Conditioned basement spaces should have a floor slab and continuous vapor barrier below the floor slab. Perimeter drainage should be added if water infiltration exists beyond infiltration that can be addressed with proper roof water collection and grading sloping away from the foundations.

Existing ChimneysOpen chimneys should be blocked off to eliminate the loss of heating. If the chimney is a shared chimney with an existing house, the flue should be insulated and capped off at the roof. A free standing home could have the chimney taken down to below the new roofing.

Demising Walls: Often the shared wall to an adjacent home does not meet current code requirements for fire ratings and insulation values. The existing conditions should be brought up to the current code requirements for fire separations and construction methods relating to piping and duct work in the walls and insulating values.

Renovate homes for the next century of living

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative26

Page 33: CLT15201 - Lawrenceville

BUILDING SYSTEMS INTERIORHome renovations are to meet or exceed latest available ICC energy performance code standards. Integrating sustainable design strategies creates healthy living environments that are sustainable into the future while also extending the value of the homes into the future.

Lighting / DaylightingRenovation homes should incorporate strategies for improved daylighting and energy efficient electrical lighting. Window locations should promote natural light to each occupiable space. Lighting should be LED fixtures whenever possible to promote energy conservation. Exterior lighting should be minimized to provide lighting at the entry areas for safe entry and egress and provide a sense of active occupancy on the street at night.

Mechanical SystemsThe goal of the mechanical system design and selection is to promote energy conservation, improve indoor air quality, and improve occupant comfort. With each home, design services should be included for an engineer to evaluate and present system options and ultimately provide a system design and equipment schedule. Additionally, programmable thermostats are to be included.

Electrical SystemsNew electrical systems should be installed throughout. If any existing electrical utilities or wiring is to be maintained a certified electrical inspector should assess the conditions and provide a written report of the findings.

Plumbing SystemsExisting homes typically will have new water utility connections and distribution. If existing utility water taps are used the water quality should be tested. New sewer connections will include two lines, one for sewer and one for stormwater extending to the property line. Lines will “Y” together to connect into the existing sewer until new separate utilities are provided at the street. Each home will include site strategies to reduce stormwater runoff and rainwater harvesting.

Plumbing Fixtures & AppliancesEach home will include low flow WaterSense fixtures for toilets, faucets, and showers. Installed appliances will be Energy Star Certified.

Indoor Air QualityRenovations should promote improved indoor air quality standards. Material selections should include Low and Zero VOC products for all interior finishes including flooring, adhesives and sealants, paints, cabinetry, and other finish materials. Air filtration standards should be at a minimum MERV___. CO2 and carbon monoxide monitors are to be included. All combustion equipment should be ventilated to the exterior including gas cooktop ranges.

Fresh air makeup ventilation should be included with an energy recovery ventilator. Operable windows are required and should be located to promote enhanced ventilation.

Sustainable MaterialsIn addition to Low and Zero VOC materials, Locally sourced, manufactured, and purchased products should be promoted. Locally crafted products should also be considered for inclusion to promote the sustainability of local businesses.

Fire Protection SystemMany existing homes do not meet current life safety regulations. Demising walls and exterior walls should meet applicable code requirements. This will often result in improved separations between homes. Currently, as of 2015, sprinkler systems are not required for single family free standing homes or duplex homes. This requirement and other life safety requirements should be confirmed with each new home renovation as the current standards may change.

Safe HomesExisting homes should be evaluated for lead, asbestos, and other toxic materials that could be present. Material testing should be completed before the demolition phase. Proper abatement and/or treatment of known conditions must be addressed.

Renewable Energy SourcingRenewable energy source strategies are encouraged to improve energy conservation and reduce grid dependency. These strategies assist in moving toward a “net-zero” solution acknowledging the Architecture 2030 challenge target of new construction being at net-zero by 2030. Electrical service connections will be anticipated in all homes for inclusion of solar PV systems at day one or for future home owner hook up. Geothermal and other strategies will be considered as appropriate for each home site and if energy modeling demonstrates an improved performance strategy that exceeds other engineering solutions.

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative 27

Page 34: CLT15201 - Lawrenceville

CLT homes should include a range of homes including renovations that bring new life to the historic structures of the neighborhood. Over the years many homes in the neighborhood have been remodeled in a manner that changes the character of the original design intent. CLT homes should be renovated to restore the original character of the home while updating materials and performance to reflect modern standards.

While the level of renovation may vary based on the condition of the home, the recommendations are based on a substantial building renovation and systems replacement.

New homes will incorporate sustainable design principles and practices. We’ve identified economic, social, and physical sustainability considerations.

EconomicEconomically, the design should consider both first cost and maintenance cost of choices and how this will impact the ongoing cost for low income owners.

Social Socially, the CLT will provide a support structure for new homeowners that will provide resources on financial management and connection to other social service providers.

PhysicallyPhysically, homes will incorporate high performing systems, a tight building envelope, and long lasting durable materials. Additional guidelines and strategies for the physical development are identified on the following pages.

HOME DESIGNIncorporate Sustainable Design Principles

Butler Street townhomes in Lower Lawrenceville Renovated attached home in Central LawrencevilleEcoCraft Home

© M

att D

ayak

© J

eff Z

oet

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative28

Page 35: CLT15201 - Lawrenceville

• Low flow water sense fixtures a. shower heads b.toilets c. faucets• Landscaping not requiring irrigation• Rain barrels for watering plants

• Small house=Small mech. system• On-site photovoltaic system• Energy Star compliant high-performance

windows• Energy Star appliances• Daylighting design• Solar shading• LED light bulbs• Programmable thermostats• Building envelope a. Increased r-value b. Air tight construction• Energy recovery ventilators

• Low VOC paints• Ventilation• Air quality a.airfiltration• Thermal comfort• Reduced air leakage• Improved acoustics• CO2 and carbon monoxide monitors• Operable windows located for natural

ventilation

• Shade canopy a. street trees• Stormwater management• Urban heat Island• White roof on low sloping roofs• Rain gardens (small) a.collection of roof water into planters• Permeable pavement and swales (where

site permits)• Environmental impact a. Reduced construction noise, dust, and pollution from off-site factory construction

• Durable• Long lasting• Low maintenance• Age gracefully• Locally manufactured materials• Natural renewable materials

MATERIALS WATER

ENERGY EFFICIENT HOMES

INDOORENVIRONMENT

SUSTAINABLE SITES

CODECOMPLIANCE

(2009 IRC +ENERGY CODE)

ENERGY STAR V3

HOMES

LEED FOR HOMES

PASSIVEHOUSE

BUILDING A SUSTAINABLE COMMUNITY • CLT creates affordable home ownership options• Educational programs focused on

sustainability for residents• Area dedicated for recycling bins• Tenant survey feedback program • Published home owner guidelines for sustainable

home improvements and maintenance• Bike storage/access

SUSTAINABILIT Y METRICSINGRAINED SUSTAINABLE DESIGN PRINCIPLES IDENTIFIABLE IN THE ARCHITECTURAL CHARACTER

Sketchbook page showing a range of different sustainabiity metrics and rating systems that may be considered for CLT homes.

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative 29

Page 36: CLT15201 - Lawrenceville

HOME DESIGNCreate a range of home sizes and types to a diversity of buyers at various stages of life

The initial phase of homes established four new housing types. The types were based on whether the homes faced a street or an alley and whether they were on the high side (uphill) of the street or the low side (downhill) side of the street.

The homes range in size from 1,100 square feet to 1,900 square feet, each with different amenities and configurations to appeal to a broad spectrum of prospective buyers.

The smaller alley homes are two stories with two bedrooms and one and a half bathrooms. The alley home on the low side of the street includes a lower level bonus room that could appeal to a family as a play room or act as a third bedroom for intergenerational families.

The larger street facing homes are three stories with three bedrooms and two and a half baths. Each of these homes has a bonus space, one facing the street and the other facing the yard, which could appeal to larger families.

Lawrenceville Corporation CLT

10-11-16 © Rothschild Doyno Collaborative

UNIT SUMMARY

06-07-16 © Rothschild Doyno Collaborative

ESTABLISHING THE RIGHT MIX/DIVERSITY IN HOME SIZES, AMMENITIES & LOCATIONS

REF

.

W/D

-

12'-0

"35

'-0"

3'-0

"

POWDERRM

KITCHEN

LIVING RM

DININGRM

4'-0" 16'-0"

50'-0

"

20'-0"

UP

DN

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

BED 214' 8" x 9' 9"

DN

CELLAR

CLOSET5' 7" x 5' 5"

MECH4' 10" x 5' 5"

CRAWLSPACE

BACKYARD

22'-1

0"

12' X 20'

15'-8

1/2

"

UP

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/1 /

2016

3:02

:51

PM

A101

FLOOR PLANS - ALLEYLOW

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

Alley Low (2 homes in Phase I) - 2 stories - 2 bedrooms + bonus rm - 1.5 baths - 1,500 sf - On-street parking - Visitable entry level (Improving accessibility)

Alley

Duplex Model ALLEY LOW

REF

.

W/D

UP

-

DINING

KITCHEN

BACKYARD18' X 20'

37'-0

"18

'-0"

4'-0" 16'-0"

OPEN TOBELOW

20'-0"

UP

DN

3'-0

"

MASTERBEDROOM11' x 14' 8"

BED 210' x 14' 8"

BATH8' 3" x 7' 7"

W/C5' 1" x 5' 2"

CLO

SET

CLOSET

UP

DN

CLOSET

DN

BED 3

UNFINISHEDATTIC SPACE

10' x 11'

55'-0

"

CRAWLSPACE

ENTRY

MECH/STORAGE

POWDERRM

LIVING RM

25'-0

"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:0

8:11

AM

A101

FLOOR PLANS - STREETHIGH

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

REVISIONS

NO. DESCRIPTION DATE

Street High (2 homes in Phase I) - 3 stories - 3 bedrooms - 2.5 baths - 1,800 sf - On-street parking

Street

STREETHIGHREF.

W/D

-

4'-0" 16'-0"

POWDERRM

CLOSET

DINING

KITCHEN

LIVING RM

ENTRY

6' x 3'

20'-0"

UP

DN

40'-0

"15

'-0"

BED 110'-5" x 14'-8"

BED 210' x 14'-8"

CLOSET

BATH8' 2" x 7' 7"

W/C5' 7" x 5' 2"

CLO

SET

UP

DN

MASTER BED

BATH 2

W/C

DN

9'-6" X 14'-8"

CELLAR15' x 14' 3"

CLOSET5' 7" x 5' 4"

MECH

5' 4" x 4' 9"

CRAWLSPACE

BACKYARD

20' X 15'

22'-5

"3'

-0"

UP

40'-0

"15

'-0"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:4

6:07

AM

A101

FLOOR PLANS - STREETLOW

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1014 MEZZANINE

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

Street Low (1 home in Phase I) - 2.5 stories - 3 bedrooms + bonus rm - 2.5 baths - 1,900 sf - On-street parking

Street

STREETLOW

REF

.

-

W/D

POWDERRM

6' x 3'

KITCHEN

DININGRM

ENTRY

BACKYARD

12' X 20'

3'-0

"35

'-0"

12'-0

"

4'-0" 16'-0"

50'-0

"

20'-0" 0"

LIVING RM

MECH

UP

UP

BED 214' 8" x 9' 9"

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

DN

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

6/2 2

/201

610

:45 :

38AM

A101

FLOOR PLANS - ALLEYHIGH

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

REVISIONS

NO. DESCRIPTION DATE

Alley High (1 home in Phase I) - 2 stories - 2 bedrooms - 1.5 baths - 1,100 sf - On-street parking - Green Space - Sustainable DesignAlley

ALLEY HIGH

The first CLT renovation is a two story, plus basement, two bedroom home with one and a half baths. This home has a larger yard.

As the number of CLT homes grows and new homes are designed, they should consider the breadth of the market and the needs of the households in the targeted income range.

Sketchbook page illustrating the different housing types provided in the initial CLT homes offering.

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative30

Page 37: CLT15201 - Lawrenceville

Create homes that blend seamlessly into the neighborhood fabric while being of their time

Diverse communities with a blend of affordable and market rate homes side by side are most successful when it is impossible to distinguish or identify affordable homes from market rate homes. This blending removes the stigma associated with affordable housing and creates a community designed for all.

The CLT homes will blend into the neighborhood by respecting the historic architectural patterns while creating homes that take advantage of current technology and building techniques. Each home should be selected or designed based on the context of its location and the character of the surrounding homes.

Key design characteristics are identified below.

Scale and MassingAlign with the scale of the surrounding homes by relating to the number of stories and floor to floor heights. Relate to the massing of existing homes by using familiar roof forms, pitches, and eave lines.Restore the large window and door openings characteristic of older homes in the neighborhood.

Exterior Materials and DetailingCreate homes that fit in with surrounding houses and blend into the neighborhood fabric while being of their

own time. Exterior materials should be a high quality, durable, and long lasting. New homes should not mimic the historic detail of existing homes, but detailing should meet or exceed the level of craft or care of existing detailing while reflecting current standards and practices.

RenovationAs future CLT homes are established through the renovation of existing homes, this will further reinforce existing neighborhood patterns.

Increased daylighting with taller windows

Material accent and detail at entry

Adjacent developments underwayNEIGHBORHOOD PATTERNSTAL STREET & ALLEY HOES N UE LARENEE

L

H

H & o v f t t

H & o v f t t

H

L

Ob Bt

STREET HOE ALLEY HOE

Typical Upper Lawrenceville neighborhood patterns found in street and alley homes Designing new and renovated homes that relate to existing neighborhood fabric

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative 31

Page 38: CLT15201 - Lawrenceville

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative32

Page 39: CLT15201 - Lawrenceville

CHAPTER IV

PHASE 1 HOME DESIGN

PHASE 1 HOME DESIGN

01-04-17 © Rothschild Doyno Collaborative 33

Page 40: CLT15201 - Lawrenceville

PHASE 1 HOMES

The first phase of homes are located between Poe Way and Lotus Way near McCandless Street. Lots between Lotus Way and Duncan Street and Duncan Street and Poe Way will be sub-divided, creating six lots from three existing parcels. The size of the newly created lots are consistent with the historic neighborhood patterns of street-facing homes and alley-facing homes.

The homes will include six newly constructed units and one extensive renovation of an existing structure. A variety of unit sizes and types will create a range of available homes for new buyers.

Home Types for Phase 1

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative34

800 McCandless Ave.1,450 SF Lot

5230 Lotus Way2,100 SF Lot

5231 Duncan Street2,100 SF Lot

5229 Poe Way2,100 SF LotD

A B

C

Page 41: CLT15201 - Lawrenceville

PHASE 1 HOME DESIGN

01-04-17 © Rothschild Doyno Collaborative 35

Phase 1 Locations: Seven new homes in four sites

52nd Street

McCandless Street

Wick

liff S

treet

Dunca

n Stre

et

Holmes

Street

B

D

C

ALo

tus W

ay

Poe

Way

Map of Upper Lawrenceville showing the four locations for the phase 1 projects.

Page 42: CLT15201 - Lawrenceville

Homes range in size from 1,100 SF to 1,900 SF to appeal to a wide range of residents and families. Building along the hillside in Upper Lawrenceville offers opportunities to increase the unique aspects of the homes by providing bonus spaces for larger or multigenerational families based on where the homes sit relative to the grade. New homes contain either 2 or 3 bedrooms with a powder room on the ground floor and the primary bath and laundry on the second floor.

New homes are designed to be prefabricated off-site as modular units. This approach minimizes the disturbance to surrounding neighbors during construction. Fabricating the homes in a controlled environment can result in a tighter building envelope and construction efficiencies to help keep costs down.

New homes can be developed as single family detached homes, duplexes, or rowhouses. As the CLT continues into future phases, new home prototypes may be established to respond to the needs of new owners and unique site locations.

HOMES T YPES

REF.

W/D

-

4'-0" 16'-0"

POWDERRM

CLOSET

DINING

KITCHEN

LIVING RM

ENTRY

6' x 3'

20'-0"

UP

DN

40'-0

"15

'-0"

BED 110'-5" x 14'-8"

BED 210' x 14'-8"

CLOSET

BATH8' 2" x 7' 7"

W/C5' 7" x 5' 2"

CLO

SET

UP

DN

MASTER BED

BATH 2

W/C

DN

9'-6" X 14'-8"

CELLAR15' x 14' 3"

CLOSET5' 7" x 5' 4"

MECH

5' 4" x 4' 9"

CRAWLSPACE

BACKYARD

20' X 15'

22'-5

"3'

-0"

UP

40'-0

"15

'-0"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:4

6:07

AM

A101

FLOOR PLANS - STREETLOW

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1014 MEZZANINE

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

REF

.

W/D

-

12'-0

"35

'-0"

3'-0

"

POWDERRM

KITCHEN

LIVING RM

DININGRM

4'-0" 16'-0"

50'-0

"

20'-0"

UP

DN

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

BED 214' 8" x 9' 9"

DN

CELLAR

CLOSET5' 7" x 5' 5"

MECH4' 10" x 5' 5"

CRAWLSPACE

BACKYARD

22'-1

0"

12' X 20'

15'-8

1/2

"

UP

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/1 /

2016

3:02

:51

PM

A101

FLOOR PLANS - ALLEYLOW

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

UNIT SUMMARY

Street Flat - 2.5 stories - 3 bedrooms - 2.5 baths - 1,600 sf - On-street parking

06-07-16 © Rothschild Doyno Collaborative

Alley Flat - 2 stories - 2 bedrooms - 1.5 baths - 1,100 sf - On-street parking

Alley

Street

ETLSN HE RIT MI/DIET N ME SIZES, AEITIE & LOTION

ALLEY FL AT

STREETFLAT

Home Types for Phase 1

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative36

Page 43: CLT15201 - Lawrenceville

UNIT SUMMARY

06-07-16 © Rothschild Doyno Collaborative

ETLSN HE RIT MI/DIET N ME SIZES, AEITIE & LOTION

REF

.

W/D

-

12'-0

"35

'-0"

3'-0

"

POWDERRM

KITCHEN

LIVING RM

DININGRM

4'-0" 16'-0"

50'-0

"

20'-0"

UP

DN

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

BED 214' 8" x 9' 9"

DN

CELLAR

CLOSET5' 7" x 5' 5"

MECH4' 10" x 5' 5"

CRAWLSPACE

BACKYARD

22'-1

0"

12' X 20'

15'-8

1/2

"

UP

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/1 /

2016

3:02

:51

PM

A101

FLOOR PLANS - ALLEYLOW

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

Alley Low (2 homes in Phase I) - 2 stories - 2 bedrooms + bonus rm - 1.5 baths - 1,500 sf - On-street parking - Visitable entry level (Improving accessibility)

Alley

Duplex Model ALLEY LOW

REF

.

W/D

UP

-

DINING

KITCHEN

BACKYARD18' X 20'

37'-0

"18

'-0"

4'-0" 16'-0"

OPEN TOBELOW

20'-0"

UP

DN

3'-0

"

MASTERBEDROOM11' x 14' 8"

BED 210' x 14' 8"

BATH8' 3" x 7' 7"

W/C5' 1" x 5' 2"

CLO

SET

CLOSET

UP

DN

CLOSET

DN

BED 3

UNFINISHEDATTIC SPACE

10' x 11'

55'-0

"

CRAWLSPACE

ENTRY

MECH/STORAGE

POWDERRM

LIVING RM

25'-0

"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:0

8:11

AM

A101

FLOOR PLANS - STREETHIGH

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

REVISIONS

NO. DESCRIPTION DATE

Street High (2 homes in Phase I) - 3 stories - 3 bedrooms - 2.5 baths - 1,800 sf - On-street parking

Street

STREETHIGHREF.

W/D

-

4'-0" 16'-0"

POWDERRM

CLOSET

DINING

KITCHEN

LIVING RM

ENTRY

6' x 3'

20'-0"

UP

DN

40'-0

"15

'-0"

BED 110'-5" x 14'-8"

BED 210' x 14'-8"

CLOSET

BATH8' 2" x 7' 7"

W/C5' 7" x 5' 2"

CLO

SET

UP

DN

MASTER BED

BATH 2

W/C

DN

9'-6" X 14'-8"

CELLAR15' x 14' 3"

CLOSET5' 7" x 5' 4"

MECH

5' 4" x 4' 9"

CRAWLSPACE

BACKYARD

20' X 15'

22'-5

"3'

-0"

UP

40'-0

"15

'-0"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:4

6:07

AM

A101

FLOOR PLANS - STREETLOW

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1014 MEZZANINE

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

Street Low (1 home in Phase I) - 2.5 stories - 3 bedrooms + bonus rm - 2.5 baths - 1,900 sf - On-street parking

Street

STREETLOW

REF

.

-

W/D

POWDERRM

6' x 3'

KITCHEN

DININGRM

ENTRY

BACKYARD

12' X 20'

3'-0

"35

'-0"

12'-0

"

4'-0" 16'-0"

50'-0

"

20'-0" 0"

LIVING RM

MECH

UP

UP

BED 214' 8" x 9' 9"

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

DN

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

6/2 2

/201

610

:45 :

38AM

A101

FLOOR PLANS - ALLEYHIGH

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

REVISIONS

NO. DESCRIPTION DATE

Alley High (1 home in Phase I) - 2 stories - 2 bedrooms - 1.5 baths - 1,100 sf - On-street parking - Green Space - Sustainable DesignAlley

ALLEY HIGH

PHASE 1 HOME DESIGN

01-04-17 © Rothschild Doyno Collaborative 37

Page 44: CLT15201 - Lawrenceville

STREET LOW

DESCRIPTION

• 2.5 stories

• 3 Bedrooms + Bonus room

• 2.5 Bathrooms

• 1,940 gsf

• On-street parking

REF.

W/D

-

4'-0" 16'-0"

POWDERRM

CLOSET

DINING

KITCHEN

LIVING RM

ENTRY

6' x 3'

20'-0"

UP

DN

40'-0

"15

'-0"

BED 110'-5" x 14'-8"

BED 210' x 14'-8"

CLOSET

BATH8' 2" x 7' 7"

W/C5' 7" x 5' 2"

CLO

SET

UP

DN

MASTER BED

BATH 2

W/C

DN

9'-6" X 14'-8"

CELLAR15' x 14' 3"

CLOSET5' 7" x 5' 4"

MECH

5' 4" x 4' 9"

CRAWLSPACE

BACKYARD

20' X 15'

22'-5

"3'

-0"

UP

40'-0

"15

'-0"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:4

6:07

AM

A101

FLOOR PLANS - STREETLOW

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1014 MEZZANINE

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

REF.

W/D

-

4'-0" 16'-0"

POWDERRM

CLOSET

DINING

KITCHEN

LIVING RM

ENTRY

6' x 3'

20'-0"

UP

DN

40'-0

"15

'-0"

BED 110'-5" x 14'-8"

BED 210' x 14'-8"

CLOSET

BATH8' 2" x 7' 7"

W/C5' 7" x 5' 2"

CLO

SET

UP

DN

MASTER BED

BATH 2

W/C

DN

9'-6" X 14'-8"

CELLAR15' x 14' 3"

CLOSET5' 7" x 5' 4"

MECH

5' 4" x 4' 9"

CRAWLSPACE

BACKYARD

20' X 15'

22'-5

"3'

-0"

UP

40'-0

"15

'-0"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:4

6:07

AM

A101

FLOOR PLANS - STREETLOW

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1014 MEZZANINE

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

REF.

W/D

-

4'-0" 16'-0"

POWDERRM

CLOSET

DINING

KITCHEN

LIVING RM

ENTRY

6' x 3'

20'-0"

UP

DN

40'-0

"15

'-0"

BED 110'-5" x 14'-8"

BED 210' x 14'-8"

CLOSET

BATH8' 2" x 7' 7"

W/C5' 7" x 5' 2"

CLO

SET

UP

DN

MASTER BED

BATH 2

W/C

DN

9'-6" X 14'-8"

CELLAR15' x 14' 3"

CLOSET5' 7" x 5' 4"

MECH

5' 4" x 4' 9"

CRAWLSPACE

BACKYARD

20' X 15'

22'-5

"3'

-0"

UP

40'-0

"15

'-0"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:4

6:07

AM

A101

FLOOR PLANS - STREETLOW

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1014 MEZZANINE

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

REF.

W/D

-

4'-0" 16'-0"

POWDERRM

CLOSET

DINING

KITCHEN

LIVING RM

ENTRY

6' x 3'

20'-0"

UP

DN

40'-0

"15

'-0"

BED 110'-5" x 14'-8"

BED 210' x 14'-8"

CLOSET

BATH8' 2" x 7' 7"

W/C5' 7" x 5' 2"

CLO

SET

UP

DN

MASTER BED

BATH 2

W/C

DN

9'-6" X 14'-8"

CELLAR15' x 14' 3"

CLOSET5' 7" x 5' 4"

MECH

5' 4" x 4' 9"

CRAWLSPACE

BACKYARD

20' X 15'

22'-5

"3'

-0"

UP

40'-0

"15

'-0"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:4

6:07

AM

A101

FLOOR PLANS - STREETLOW

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1014 MEZZANINE

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

Floor plan Layout of the Street Low Home

Location Plan

Basement Main Floor Second Floor Mezzanine

Street Low Floor Plan

Cellar Level

Ground steps to rear yard Planting area

16’ x 40’ Street Home Prototype

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative38

Page 45: CLT15201 - Lawrenceville

Rendering image of a typical street low home.

Conceptual Image of a Street Low Home

PHASE 1 HOME DESIGN

01-04-17 © Rothschild Doyno Collaborative 39

Page 46: CLT15201 - Lawrenceville

DESCRIPTION

• 3 stories

• 3 Bedrooms

• 2.5 Bathrooms

• 1,835 gsf

• On-street parking

Floor plan Layout of the Street High Home

STREET HIGH

REF

.

W/D

UP

-

DINING

KITCHEN

BACKYARD18' X 20'

37'-0

"18

'-0"

4'-0" 16'-0"

OPEN TOBELOW

20'-0"

UP

DN

3'-0

"

MASTERBEDROOM11' x 14' 8"

BED 210' x 14' 8"

BATH8' 3" x 7' 7"

W/C5' 1" x 5' 2"

CLO

SET

CLOSET

UP

DN

CLOSET

DN

BED 3

UNFINISHEDATTIC SPACE

10' x 11'

55'-0

"

CRAWLSPACE

ENTRY

MECH/STORAGE

POWDERRM

LIVING RM

25'-0

"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:0

8:11

AM

A101

FLOOR PLANS - STREETHIGH

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

REVISIONS

NO. DESCRIPTION DATE

REF

.

W/D

UP

-

DINING

KITCHEN

BACKYARD18' X 20'

37'-0

"18

'-0"

4'-0" 16'-0"

OPEN TOBELOW

20'-0"

UP

DN

3'-0

"

MASTERBEDROOM11' x 14' 8"

BED 210' x 14' 8"

BATH8' 3" x 7' 7"

W/C5' 1" x 5' 2"

CLO

SET

CLOSET

UP

DN

CLOSET

DN

BED 3

UNFINISHEDATTIC SPACE

10' x 11'

55'-0

"

CRAWLSPACE

ENTRY

MECH/STORAGE

POWDERRM

LIVING RM25

'-0"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:0

8:11

AM

A101

FLOOR PLANS - STREETHIGH

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

REVISIONS

NO. DESCRIPTION DATE

REF

.

W/D

UP

-

DINING

KITCHEN

BACKYARD18' X 20'

37'-0

"18

'-0"

4'-0" 16'-0"

OPEN TOBELOW

20'-0"

UP

DN

3'-0

"

MASTERBEDROOM11' x 14' 8"

BED 210' x 14' 8"

BATH8' 3" x 7' 7"

W/C5' 1" x 5' 2"

CLO

SET

CLOSET

UP

DN

CLOSET

DN

BED 3

UNFINISHEDATTIC SPACE

10' x 11'

55'-0

"

CRAWLSPACE

ENTRY

MECH/STORAGE

POWDERRM

LIVING RM

25'-0

"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:0

8:11

AM

A101

FLOOR PLANS - STREETHIGH

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

REVISIONS

NO. DESCRIPTION DATE

REF

.

W/D

UP

-

DINING

KITCHEN

BACKYARD18' X 20'

37'-0

"18

'-0"

4'-0" 16'-0"

OPEN TOBELOW

20'-0"

UP

DN

3'-0

"

MASTERBEDROOM11' x 14' 8"

BED 210' x 14' 8"

BATH8' 3" x 7' 7"

W/C5' 1" x 5' 2"

CLO

SET

CLOSET

UP

DN

CLOSET

DN

BED 3

UNFINISHEDATTIC SPACE

10' x 11'

55'-0

"

CRAWLSPACE

ENTRY

MECH/STORAGE

POWDERRM

LIVING RM

25'-0

"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:0

8:11

AM

A101

FLOOR PLANS - STREETHIGH

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

REVISIONS

NO. DESCRIPTION DATE

Basement Main Floor Second Floor Mezzanine

Street High Floor Plan

16' x 40' Street Home Prototype

Location Plan

Rear yard access from main living level

3 1/2 Stories

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative40

Page 47: CLT15201 - Lawrenceville

Rendering image of a typical street high home.

Conceptual Image of a Street High Home

PHASE 1 HOME DESIGN

01-04-17 © Rothschild Doyno Collaborative 41

Page 48: CLT15201 - Lawrenceville

DESCRIPTION

• 2 stories

• 2 Bedrooms + Bonus Room

• 1.5 Bathrooms

• 1,475 gsf

• On-street parking

• Visitable entry level

Floor plan Layout of the Alley Low Home

ALLEY LOW

Basement

REF

.

W/D

-

12'-0

"35

'-0"

3'-0

"

POWDERRM

KITCHEN

LIVING RM

DININGRM

4'-0" 16'-0"

50'-0

"

20'-0"

UP

DN

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

BED 214' 8" x 9' 9"

DN

CELLAR

CLOSET5' 7" x 5' 5"

MECH4' 10" x 5' 5"

CRAWLSPACE

BACKYARD

22'-1

0"

12' X 20'

15'-8

1/2

"

UP

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/1 /

2016

3:02

:51

PM

A101

FLOOR PLANS - ALLEYLOW

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

REF

.

W/D

-

12'-0

"35

'-0"

3'-0

"

POWDERRM

KITCHEN

LIVING RM

DININGRM

4'-0" 16'-0"

50'-0

"

20'-0"

UP

DN

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

BED 214' 8" x 9' 9"

DN

CELLAR

CLOSET5' 7" x 5' 5"

MECH4' 10" x 5' 5"

CRAWLSPACE

BACKYARD

22'-1

0"

12' X 20'

15'-8

1/2

"

UP

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/1 /

2016

3:02

:51

PM

A101

FLOOR PLANS - ALLEYLOW

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

REF

.

W/D

-

12'-0

"35

'-0"

3'-0

"

POWDERRM

KITCHEN

LIVING RM

DININGRM

4'-0" 16'-0"

50'-0

"

20'-0"

UP

DN

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

BED 214' 8" x 9' 9"

DN

CELLAR

CLOSET5' 7" x 5' 5"

MECH4' 10" x 5' 5"

CRAWLSPACE

BACKYARD

22'-1

0"

12' X 20'

15'-8

1/2

"

UP

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/1 /

2016

3:02

:51

PM

A101

FLOOR PLANS - ALLEYLOW

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

Location Plan

Main Floor Second Floor

Alley Low Floor Plan

Planting area

Cellar Level

Ground steps to rear yard

16' x 35' Alley Home Prototype

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative42

Page 49: CLT15201 - Lawrenceville

Rendering image of a typical alley low home.

Conceptual Image of an Alley Low Home

PHASE 1 HOME DESIGN

01-04-17 © Rothschild Doyno Collaborative 43

Page 50: CLT15201 - Lawrenceville

DESCRIPTION

• 2 stories

• 2 Bedrooms

• 1.5 Bathrooms

• 1,100 gsf

• On-street parking

• Green Space

• Sustainable Design

Floor plan Layout of the Alley High Home

ALLEY HIGH

REF

.

-

W/D

POWDERRM

6' x 3'

KITCHEN

DININGRM

ENTRY

BACKYARD

12' X 20'

3'-0

"35

'-0"

12'-0

"

4'-0" 16'-0"

50'-0

"

20'-0" 0"

LIVING RM

MECH

UP

UP

BED 214' 8" x 9' 9"

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

DN

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

6/2 2

/201

610

:45 :

38AM

A101

FLOOR PLANS - ALLEYHIGH

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

REVISIONS

NO. DESCRIPTION DATE

REF

.

-

W/D

POWDERRM

6' x 3'

KITCHEN

DININGRM

ENTRY

BACKYARD

12' X 20'

3'-0

"35

'-0"

12'-0

"

4'-0" 16'-0"

50'-0

"

20'-0" 0"

LIVING RM

MECH

UP

UP

BED 214' 8" x 9' 9"

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

DN

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

6/2 2

/201

610

:45 :

38AM

A101

FLOOR PLANS - ALLEYHIGH

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

REVISIONS

NO. DESCRIPTION DATE

16’ x 35’ Alley Home Prototype

Location Plan

Main Floor Second Floor

Alley High Floor Plan

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative44

Page 51: CLT15201 - Lawrenceville

Rendering image of a typical alley high home.

Conceptual Image of an Alley High Home

PHASE 1 HOME DESIGN

01-04-17 © Rothschild Doyno Collaborative 45

Page 52: CLT15201 - Lawrenceville

DESCRIPTION

• 2.5 stories

• 3 Bedrooms + Bonus room

• 2.5 Bathrooms

• 1,580 gsf

*Location not yet established

REF.

W/D

-

4'-0" 16'-0"

POWDERRM

CLOSET

DINING

KITCHEN

LIVING RM

ENTRY

6' x 3'

20'-0"

UP

DN

40'-0

"15

'-0"

BED 110'-5" x 14'-8"

BED 210' x 14'-8"

CLOSET

BATH8' 2" x 7' 7"

W/C5' 7" x 5' 2"

CLO

SET

UP

DN

MASTER BED

BATH 2

W/C

DN

9'-6" X 14'-8"

CELLAR15' x 14' 3"

CLOSET5' 7" x 5' 4"

MECH

5' 4" x 4' 9"

CRAWLSPACE

BACKYARD

20' X 15'

22'-5

"3'

-0"

UP

40'-0

"15

'-0"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:4

6:07

AM

A101

FLOOR PLANS - STREETLOW

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1014 MEZZANINE

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

REF.

W/D

-

4'-0" 16'-0"

POWDERRM

CLOSET

DINING

KITCHEN

LIVING RM

ENTRY

6' x 3'

20'-0"

UP

DN

40'-0

"15

'-0"

BED 110'-5" x 14'-8"

BED 210' x 14'-8"

CLOSET

BATH8' 2" x 7' 7"

W/C5' 7" x 5' 2"

CLO

SET

UP

DN

MASTER BED

BATH 2

W/C

DN

9'-6" X 14'-8"

CELLAR15' x 14' 3"

CLOSET5' 7" x 5' 4"

MECH

5' 4" x 4' 9"

CRAWLSPACE

BACKYARD

20' X 15'

22'-5

"3'

-0"

UP

40'-0

"15

'-0"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:4

6:07

AM

A101

FLOOR PLANS - STREETLOW

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1014 MEZZANINE

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

REF.

W/D

-

4'-0" 16'-0"

POWDERRM

CLOSET

DINING

KITCHEN

LIVING RM

ENTRY

6' x 3'

20'-0"

UP

DN

40'-0

"15

'-0"

BED 110'-5" x 14'-8"

BED 210' x 14'-8"

CLOSET

BATH8' 2" x 7' 7"

W/C5' 7" x 5' 2"

CLO

SET

UP

DN

MASTER BED

BATH 2

W/C

DN

9'-6" X 14'-8"

CELLAR15' x 14' 3"

CLOSET5' 7" x 5' 4"

MECH

5' 4" x 4' 9"

CRAWLSPACE

BACKYARD

20' X 15'

22'-5

"3'

-0"

UP

40'-0

"15

'-0"

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

7/6 /

2016

10:4

6:07

AM

A101

FLOOR PLANS - STREETLOW

LAWRENCEVILLECORPORATION

COMMUNITY LAND TRUSTPITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

1/4" = 1'-0"A1014 MEZZANINE

1/4" = 1'-0"A1011 BASEMENT

REVISIONS

NO. DESCRIPTION DATE

Street Flat

Second Floor Mezzanine

Street Flat Floor PlanConceptual Image of a Street Flat Home

Floor plan Layout of a Street Flat Home

FUTURE PHASE: FL AT LOTS

Main Floor

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative46

Page 53: CLT15201 - Lawrenceville

REF

.

-

W/D

POWDERRM

6' x 3'

KITCHEN

DININGRM

ENTRY

BACKYARD

12' X 20'

3'-0

"35

'-0"

12'-0

"

4'-0" 16'-0"

50'-0

"

20'-0" 0"

LIVING RM

MECH

UP

UP

BED 214' 8" x 9' 9"

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

DN

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

6/2 2

/201

610

:45 :

38AM

A101

FLOOR PLANS - ALLEYHIGH

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

REVISIONS

NO. DESCRIPTION DATE

REF

.

-

W/D

POWDERRM

6' x 3'

KITCHEN

DININGRM

ENTRY

BACKYARD

12' X 20'

3'-0

"35

'-0"

12'-0

"

4'-0" 16'-0"

50'-0

"

20'-0" 0"

LIVING RM

MECH

UP

UP

BED 214' 8" x 9' 9"

BATH7' 2" x 7' 8"

CLOSET

CLOSET

MASTERBEDROOM

14' 8" x 10' 1"

DN

This drawing, including its electronic form, is an Instrumentof Service for use solely with respect to this Project. TheArchitect is the author and sole owner of said Instrument

of Service and retains all common law, statutory and otherreserved rights, including copyrights.

DRAWING

TITLE

PRIN

TED

© ROTHSCHILD DOYNO COLLABORATIVE

NOT FORCONSTRUCTION

6/2 2

/201

610

:45 :

38AM

A101

FLOOR PLANS - ALLEYHIGH

141 45TH STREET

PITTSBURGH, PA

PRICING DRAWINGS

MAY 3, 2016

1/4" = 1'-0"A1012 MAIN FLOOR

1/4" = 1'-0"A1013 SECOND FLOOR

REVISIONS

NO. DESCRIPTION DATE

Street Flat

Main Floor Second Floor

Alley Flat Floor PlanConceptual Image of an Alley Flat Home

Floor plan Layout of an Alley Flat Home DESCRIPTION

• 2 stories

• 2 Bedrooms

• 1.5 Bathrooms

• 1,120 gsf

• Green Space

• Sustainable Design

*Location not yet established

PHASE 1 HOME DESIGN

01-04-17 © Rothschild Doyno Collaborative 47

Page 54: CLT15201 - Lawrenceville

Renovation

Basement Main Floor Second Floor Mezzanine

Renovation Floor PlanLocation Plan

800 MCCANDLESS AVE

Location Plan

DESCRIPTION

• 2.5 stories

• 2 Bedrooms

• 1.5 Bathrooms

• 1,410 gsf

• On-street parking

Existing home before the renovation

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative48

Page 55: CLT15201 - Lawrenceville

Renovation Exterior Design

Elevations of the Renovation Home

PHASE 1 HOME DESIGN

01-04-17 © Rothschild Doyno Collaborative 49

Page 56: CLT15201 - Lawrenceville

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative50

Page 57: CLT15201 - Lawrenceville

CHAPTER IV

ASSURING AFFORDABILITY

ASSURING AFFORDABILITY

01-04-17 © Rothschild Doyno Collaborative 51

Page 58: CLT15201 - Lawrenceville

GROWING CLT 15201

The Lawrenceville Corporation and its community partners have acquired fifteen parcels with the goal of creating eighteen additional CLT homes. Future phases offer some homes clustered together while others are scattered throughout the neighborhood. The development will be pursued in phases as funding is available for renovation and construction.

Natrona NeighborsDevelopment of seven of the parcels, located in the 5200 block Natrona Way, will create a collection of new alley homes, infilling the vacant, overgrown sites. Two of the lots have existing structures that will be evaluated for possible renovation. Three of the lots that connect to Keystone Street can be subdivided, adding three street facing homes.

Lawrenceville LocatedThe remaining parcels are scattered throughout Upper, Central, and Lower Lawrenceville, offering an opportunity to blend CLT homes into different areas of the community.

Future AcquisitionAs the private market continues to grow in Lawrenceville, acquisition of homes through the City’s Land Recycling program may become a challenge. CLT15201 should explore additional acquisition strategies to secure subsequent phases of development. Strategies may include private purchase of homes at market value, negotiations with large property owners within the community, or legacy property donations from longtime Lawrenceville residents.

PHASE 1NATRONA

NEIGHBORS

Phase I parcelsFuture CLT parcelsCemeteriesCity parcelsURA parcels

Upper Lawrenceville property ownership

Future Development Sites

CLT15201 DEVELOPMENT GUIDELINES

01-04-17 © Rothschild Doyno Collaborative52

Page 59: CLT15201 - Lawrenceville

Lower Lawrenceville property ownership Central Lawrenceville property ownership

Phase I parcelsFuture CLT parcelsCemeteriesCity parcelsURA parcels

Phoenix Apartments under construction

CMU Robotics Center

Arsenal Park

Estelle Campbell Boys and Girls

Club

Sullivan Field

Doughboy Square

Lawrenceville Corporation and Action Housing, low income housing development underway

ASSURING AFFORDABILITY

01-04-17 © Rothschild Doyno Collaborative 53