SIXTH STREET VIADUCT REPLACEMENT SIXTH STREET VIADUCT REPLACEMENT Gary Lee Moore, P.E. City Engineer Deborah Weintraub, AIA, LEED AP Chief Deputy City Engineer Alfred L. Mata, P.E. Project Manager City of Los Angeles Department of Public Works Engineering CMAA CMAA - - BREAKFAST OF CHAMPIONS BREAKFAST OF CHAMPIONS May 2, 2012 May 2, 2012

Upload: others

Post on 01-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • SIXTH STREET VIADUCT REPLACEMENTSIXTH STREET VIADUCT REPLACEMENT

    Gary Lee Moore, P.E.City Engineer

    Deborah Weintraub, AIA, LEEDAPChief Deputy City Engineer

    Alfred L. Mata, P.E.Project Manager

    City of Los AngelesDepartment of Public Works

    Engineering

    CMAA - BREAKFAST OF CHAMPIONS May 2, 2012

    CMAA CMAA -- BREAKFAST OF CHAMPIONS BREAKFAST OF CHAMPIONS May 2, 2012May 2, 2012

  • ““TTOO LLEADEAD TTHEHE TTRANSFORMATIONRANSFORMATION OOFF LLOSOS AANGELESNGELESIINTONTO TTHEHE WWORLDORLD’’SS MMOSTOST LLIVABLE IVABLE CCITYITY..””

    VISION STATEMENT

  • CITY OF LOS ANGELES | DEPARTMENT OF PUBLIC WORKS | BUREAU OF ENGINEERING

    BBUREAUUREAU OOFF EENGINEERINGNGINEERING PPROJECTSROJECTS

  • CITY OF LOS ANGELES | DEPARTMENT OF PUBLIC WORKS | BUREAU OF ENGINEERING

    BBUREAUUREAU OOFF EENGINEERINGNGINEERING PPROJECTSROJECTS

    PROJECTS COMPLETED SINCE JULY 1, 2005PROJECTS COMPLETED SINCE JULY 1, 2005 ACTIVE PROJECTSACTIVE PROJECTS

  • Sixth Street Viaduct Replacement ProjectIn Conjunction with FHWA & Caltrans

    Sixth Street Viaduct Replacement ProjectSixth Street Viaduct Replacement ProjectIn Conjunction with FHWA & In Conjunction with FHWA & CaltransCaltrans

    Sixth Street Sixth Street

    Fourth Street Fourth Street

  • Alkali Silica Reactivity (ASR) deterioration exists throughout Past repairs have been ineffective and ASR will continue Seismic reliability is poor, with high collapse probability Viaduct geometrics are functionally deficient

    Existing ConditionsExisting ConditionsExisting Conditions

    Light Damage Moderate to Severe DamageModerate Damage Severe Damage

  • L.A.R I V E R

    MATEOST .

    IMPERIAL ST.

    AVE.

    MESQUIT ST.

    RD.

    UPRR

    SCRRA (METROLINK)

    SCRRA (METROLINK)

    BNSF RAILWAY INC.

    LACMTA (METRO_)

    SANTA FE

    JESSEST.

    MISSION CLARENCE ST.

    ANDERSONST.

    6THST.

    6TH ST. Existing Viaduct

    Alignment 3BNO SCALE

    N

    Selected ProjectSelected ProjectSelected ProjectReplacementAlignment 3B

    Bridge Concept - Type 4

    $401M

    Benefits• Creates Roadway Shoulders• Provides Wider Sidewalks• Removes Kink in Bridge• Provides Safety Median Buffer• Multimodal: Peds & Bikes• River Access & Enhancements

  • Project ConstraintsProject ConstraintsProject Constraints

    Railroad CorridorsRailroad Corridors

    High Voltage High Voltage Transmission LinesTransmission Lines

    Los Angeles RiverLos Angeles River

  • Preferred Project ElementsPreferred Project ElementsPreferred Project Elements

    Safety is Paramount: Railroads, Businesses, Public

    Temporary and Permanent, 20 Intersections

    In-Water Work, Pedestrian Access, Revitalization Plans

    Safety Shields, River Access Tunnel

    Avoid Transmission Lines, Relocate Others

    Four Lanes with Median, Shoulders and Sidewalks

    Cast in Place Box Girders, including Hwy 101 Crossing

    Four Span Extradosed Concrete Box Girder

    Alignment 3B Bridge Concept 4

    Iconic Bridge:

    Viaduct:

    Roadway:

    Utility Relocations:

    Railroad Corridors:

    LA River:

    Street Improvements:

    Demolition:

  • Architectural Enhancement and DesignArchitectural Enhancement and DesignArchitectural Enhancement and Design

    As part of the RFQ/P released on 4/25/12, the City will conduct a design competition to refine the bridge concept to ensure an

    architecturally distinctive and cost-effective design expression.

  • RenderingsRenderingsRenderings

    Looking west to downtown

    Looking south

  • Architectural Expressions Architectural Expressions Architectural Expressions Rio-Antirio Bridge (Greece)

  • Architectural Expressions Architectural Expressions Architectural Expressions

    Proposed Final Design

    Gerald Desmond BridgePort of Long Beach, California

    Existing

  • Architectural Expressions Architectural Expressions Architectural Expressions Willamette River Bridge Collection

    Portland, Oregon

    Existing

    Under Construction

  • Architectural Expressions Architectural Expressions Architectural Expressions Modern Bridges

    Millau Viaduct (France)

    Dusseldorf, Germany

  • Sun Dial BridgeRedding, California

    Missouri River BridgeOmaha, Nebraska

    Architectural Expressions Architectural Expressions Architectural Expressions

    Slanted Tower Illuminated Towers

  • Project BudgetProject BudgetProject Budget

    Project Phase $ Amount(in millions)

    Preliminary Engineering and Environmental Clearance

    17

    Program Management and Final Design

    24

    Right-of-Way 101

    Construction and Construction Management

    259

    Total (incl. Bond Financing Cost) 401

  • Construction Budget by Element Construction Budget by Element Construction Budget by Element

    Design Consultant Scope $ Amount(in millions)

    New Viaduct 140

    Demolition 12

    Roadway and Intersection Improvements 10

    Other Street Improvements 13

    Tunnel and Railroad Improvements 10

    River, Landscaping, Bicycle, Pedestrian 5

    Subtotal 190

  • Project ScheduleProject ScheduleProject Schedule

    Milestone Date

    City Approval of Project and Financial Plan Nov 18, 2011

    Record of Decision Issued Dec 21, 2011

    Issue Design Consultant RFP Apr 25, 2012

    Begin Right-of-Way Acquisition Process May 2012

    Begin Final Design Dec 2012

    Complete Final Design Aug 2014

    Advertise for Construction Bids Sep 2014

    Begin Advance Construction Early 2015

    Begin Bridge Construction Mid 2015

    Complete Construction 2018

  • Project DeliveryProject DeliveryProject Delivery

    Program Management: City and Consultant

    Design: International Design Competition, For RFQ/P, register at www.labavn.org Design Aesthetic Advisory Committee

    Construction Management: City and Consultant

    Utility Relocations: Utility Agencies and Contractor

    Potential Construction Packages: Utility Relocations, Intersections, Demolition

    Construction: Conventional Design-Bid-Build or

    Construction Manager / General Contractor

  • For Contracting OpportunitiesFor Contracting OpportunitiesFor Contracting Opportunities

    • www.labavn.org - City of LA Business Assistance Virtual Network

    • Contracting Opportunities are Posted on www.labavn.org• Construction Bid Documents• RFQ’s• RFP’s

    • To download documents, your company must be registered (free) on BAVN.

    • Use BAVN for outreach to subcontractors/subconsultants

  • Sixth Street Viaduct Replacement ProjectSixth Street Viaduct Replacement ProjectSixth Street Viaduct Replacement Project

    For more information:Project Manager: Alfred L. Mata, P.E.

    [email protected]