Page 1: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Garpenberg expansionCMD 21 November 2013

Peter RichardsonProject Managerj gGarpenberg 2.5

Page 2: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Garpenberg Expansion - recap

Capex SEK 3.9 billion Period 2011 - 2014 New industrial area

‒ New underground facilities‒ New concentrator‒ New infrastructure

From 1.4 to 2.5 mt of ore/year Ramp up 2 mt/year 2014 to full Ramp-up, 2 mt/year 2014 to full

production end 2015 Average grades in mineral reserve

‒ Zinc 5.1 %‒ Lead 2.0 %‒ Silver 131 g/t

Good geological potential

2013-11-21Boliden CMD 2013 2

Page 3: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Environmental performance

Decreased energy consumption per t f d dton of produced ore

Decreased water usage per ton of produced ore

Lower noise levels to nearby ycommunity

New environmental permit granted in January 2012

2013-11-213Boliden CMD 2013

Page 4: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Garpenberg expansion – Capex components

MineE i 11%

Total 3,9 SEK bn

‒ Excavation‒ Hoisting, crushing and skip station‒ Mine ventilation‒ Media-, paste-, electric system

M bil i t 11%

3%

11%

‒ Mobile equipment‒ EPCM (DP-management, engineer work

etc) Concentrator

Ore stock

47%11%

‒ Ore stock‒ Concentrator‒ EPCM

InfrastructureRoads ground work project area

28%

‒ Roads, ground work, project area‒ Buildings‒ Electric power - distribution, switch gear‒ EPCM

Joint other

Mine ConcentratorInfrastructure Joint projectOth Joint, other

2013-11-214Boliden CMD 2013

Other

Page 5: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Garpenberg Garpenberg northNew shafts and

0 Z

200Z

DammsjönGruvsjöschaktet Schakt

p gindustrial area

400Z

LappbergetPotential LappbergetDammsjön

800Z

600Z

Kyrkan-Tyskgården

Finnhyttan870 Z

Gransjön

Kaspersbo

Kyrkan-Tyskgården

Finnhyttan

1200Z

910 ZStrand 1000Z

K l

Potential

Potential

1400ZPotential

Kvarn-berget

Kanal

Potential

Mined out

Mineral reserve

Mineral resource

2013-11-215Boliden CMD 2013

Page 6: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Milestones

January 17, 2011 Project approved

January 18, 2011 Start raise boring shafts

April, 2011 Procurement started

January 31, 2012 Environmental permit grantedJanuary 31, 2012 Environmental permit granted

February 1, 2012 Start civil works

February, 2013 Concentrator erected

July, 2013 Production shaft open

Fall 2013 Mechanical installations

Fall 2013 Electrical installations

2014 H1 Production

2015 Production of 2,5 Mton

2013-11-216Boliden CMD 2013

Page 7: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Underground facilities

Production shaft

Production shaft

Ventilation shafts

Personnel shaft Ventilation shafts Crushing stations Ore handling system Pumpstations

Personnel shaftPersonnel shaft

2013-11-21Boliden CMD 2013 7

Page 8: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Crushing station 1087 – March 2012

Page 9: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Crushing station 1087 – Sep 2013

Page 10: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Head frames

Page 11: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Production hoist

Page 12: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Personnel shaft

Page 13: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Crushing station

Page 14: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Ore handling system

Page 15: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

New industrial area

2013-11-2115Boliden CMD 2013

Page 16: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Industrial site – April 2012

Page 17: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Industrial site – May 2013

Page 18: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Ore storage

Page 19: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Concentrator

Page 20: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Grinding

Page 21: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Flotation

Page 22: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Power supply

Page 23: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Project control and management

Lessons learned postp

Challenges ongoing

Opportunities future

2013-11-2123Boliden CMD 2013

Page 24: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Lessons learned post

Organizational

Project manual

Project resources

Procurement process Procurement process

Cooperation with contractors

Reuse successful solutions

2013-11-2124Boliden CMD 2013

Page 25: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Challenges ongoing

Safety

Engineering

Shaft works

Time planning Time planning

Coordination

Creativity – flexibility..

2013-11-2125Boliden CMD 2013

Page 26: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Opportunities future

Preparatory work

Project manual

Experienced personnel

Standardised engineering solutions Standardised engineering solutions

Preferred suppliers

2013-11-2126Boliden CMD 2013

Page 27: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Conclusion

Nearly doubling of production Lower production cost per

tonne of ore Long life of mine in spite of g p

higher production Geological potential high Project on planProject on plan

2013-11-2127Boliden CMD 2013

Page 28: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

Disclaimer

This presentation has been prepared by Boliden for information purposes only. Nothing in this material shall be construed as an offer or solicitation to buy or sell any security or product, or to y y y p ,engage in or refrain from engaging in any transaction.

This presentation has been prepared as per the indicated date and Boliden does not undertake any obligation to correct or update the information or any statements made therein. Views that may have been expressed may be subject to change without notice.

Certain statements in this presentation are forward-looking and are based on plans, estimates, ti j ti d t ti d bj t t i k d t i ti I dditiassumptions, projections and expectations and are subject to risks and uncertainties. In addition

to the factors explicitly discussed, other circumstances may also have a material effect on the actual outcome. Such factors include, but are not limited to, general economic or political conditions, fluctuations in exchange or interest rates or metal prices, technological factors, interruptions in supply or production, actions of courts, regulators, governmental agencies, competitors, customers, suppliers, employees or other third parties.p , , pp , p y p

Nothing contained herein shall constitute any representation or warranty as to the accuracy or completeness and Boliden accepts no responsibility or liability as to the accuracy or completeness of the information contained herein. The material may include information from third party sources believed to be reliable. However, Boliden has not made an independent verification of the information provided.S b i l i iti thi t i l t b i d t itt d di l d Save as by prior approval in writing, this material may not be copied, transmitted or disclosed, whether in print, electronic or any other format. All rights to the material are reserved.

Boliden does not accept any liability whatsoever for any direct, indirect, consequential or other loss arising from or in connection with any use of this information.

This material has not been reviewed, registered or approved by any authority under any applicable laws

2013-11-2128Boliden CMD 2013

applicable laws.

Page 29: CMD 21 November 2013 Peter Richardson Projjgect Manager …investors.boliden.com/sites/default/files/event/boliden... · 2013-11-22 · Roads ground work project area 28% ‒ Roads,

2013-11-2129Boliden CMD 2013