CMS PRODUCTION CENTER AT PINSTECH

PAEC1 is participating in CMS Collaborationprogramme by establishing its Production centre at

Computer Division, PINSTECH since September 2002.

Established Cluster of 10 PCs in July 2003

Members

[email protected]@cern.ch

1. Naheed Batool

[email protected]. Shahid Aslam

[email protected]. Asad Mahmood

[email protected]. Altaf Ahmed Huqqani

[email protected]. Asif Osman

e-mailName

18 CassettesDLT Tape Drive 40/80 GBBackup Device

6Pentium-IV 2.4 GHz512MB RAM, 80GB Disk

Cluster Nodes

5Pentium-IV 2.4 GHz512MB RAM, 80GB Disk

Grid Nodes

110

Dell Power Volt 320 GBIDE Drives

Storage Capacity

11 MbpsRadio Link

QuantitySpecificationItems

Hardware ResourcesHardware Resources

Production Activities

• Participated in LHC Data Challenges 2004 (DC-04)• Produced Simulated Data and Transferred to CERN• LCG Grid Deployment• Preparing our site for CMS production• Pre-release Testing of Production Tools• Published report on “Deployment of Grid Node”

April-2005

PAEC1 (PINSTECH) Production Center

No. of Assignments Completed = 79

•Data Produced = 370GB

•Total No. of Events produced = 654.2k

•No. of Files transferred to CERN= 5095

CMS Production

0.2K02

275.6 K22

30.1 K04

254.3 K30

94 K21

PINSTECHNo.Assign. =79

DSTDigitizationdigi

ReformattingOOHit

SimulationOSCAR/ CMSIM

Generation

Center

Pre-release testing

Participated in MCRunjob pre-releases testingTested McRunjob_fin050211b final releaseTested CMS Glide for Publishing service(Rel. Mon_Mar_28_09_35-25_2005)Tests based on full chain of productioncycle

Grid Deployment PAKGRID-LCG2

Yes2112PINSTECH

Registered WNSECEUICenter

CMKIN_4_1_0_dar

LCG-2_1_1

OSCAR_3_6_5_SLC3_dar

ORCA_8_7_1_SLC3_dar

Physics SWPackages

LCG-2_4_0LCG-2_3_1LCG-2_3_0LCGUpgraded

Feb-2005PAKGRID-LCG2 Uptime

743 hrs.CE Processing Hours4707No. of Jobs executed on PAKGRID- LCG2

6 Jobs176 Jobs1939 Jobs2459 Jobs 53.69 %LHCB

0.13 %ATLAS3.84 %CMS42.34 %DTEAM

CMS Production on LCG2CMS Production on LCG2

Used the LCG Tools: APTGET & YAIMUsed OS: Scientific Linux 3CMKIN test Assignment CompletedOSCAR test Assignment CompletedPublished Data for OSCARDigi step is in progress

PK Production Centers PK Production Centers

24.6K

0

24K

275.6 K

Digitisation DSTReConstructionOOHit

SimulationOSCAR

GenerationProduction Centers

Software DevelopmentNIIT

--4.5K154.9K655KNCP44

--0020.1KKINPO

--4K54.3K24.3KHMC3

0.2K30.1 K254.3 K94 KPINSTECH79