cna 2019 bruce power supplier forum

14
CNA 2019 Bruce Power Supplier Forum February 27, 2019 CONFIDENTIAL 1

Upload: others

Post on 30-Jan-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CNA 2019 Bruce Power Supplier Forum

CNA 2019

Bruce Power Supplier Forum

February 27, 2019

CONFIDENTIAL 1

Page 2: CNA 2019 Bruce Power Supplier Forum

Safety First

IN CASE OF EMERGENCY:

Dial 7777 from any house phone

or

9-911 from any

house phone

or

911 from your mobile

phone

Bruce Power Supplier Forum

2 CONFIDENTIAL

Page 3: CNA 2019 Bruce Power Supplier Forum

3 CONFIDENTIAL

Page 4: CNA 2019 Bruce Power Supplier Forum

4

2019 – By the Numbers

ZERO lost-time injuries

47 TWh of generation (five million homes for one year)

287 outage days

<365 days until MCR U6 breaker-open

$1.5B site investment

277 projects (AM & Sustaining Capital) worth $500M

CONFIDENTIAL 4

Page 5: CNA 2019 Bruce Power Supplier Forum

The Road to Excellence

Safety First

Operational Excellence

Project Excellence

Innovation and Sustainability

People and Community

5 CONFIDENTIAL

Page 6: CNA 2019 Bruce Power Supplier Forum

Investment at the Bruce Site

6 CONFIDENTIAL

2019 2020 2021 2022 2023 2024

Outage

Inage

Sustaining Capital

Asset Management

MCR

MCR Outage Days 0 366 365 365 657 395

Oper. Outage Days 287 241 252 283 101 312

Page 7: CNA 2019 Bruce Power Supplier Forum

Services Spend – in 2019

5%

6%

14%

16%

27%

32%

0 50 100 150 200 250 300 350 400

Maintenance

IT/Software

Fuel

NuclearServices

Construction

Engineering

2019 Services Spend ($M)

CONFIDENTIAL 7 7

Services: 75% of total spend

Page 8: CNA 2019 Bruce Power Supplier Forum

Materials Spend – in 2019

8

5%

7%

9%

11%

15%

53%

0 50 100 150 200 250

Instrumentation

Valves

Material Handling

Miscellaneous

Electrical

Process Equipment

2019 Materials Spend ($M)

CONFIDENTIAL

Materials: 25% of total spend

Page 9: CNA 2019 Bruce Power Supplier Forum

2019 Key Procurements

Materials Services

Active Procurements • Valves • Large Pumps • Protective Relays • Fuel Handling Kits • Transformers (w/OPG) • I&C Control Systems • DCC Installation

• Engineering MATOC • Laundry Services • Valve Services • RP Outage Support • Extended West Shift Plus • HX Engineering & Services • Nuclear Construction MATOC

Upcoming Procurements

• Small Motors (Q2) • Small Pumps (Q2) • Batteries (Q2) • MCC (Q3) • Amplifiers (2020) • Moderator HX (2020)

• B13 HVAC (Q2/Q3) • I&C Services • Buried Piping • PHT Decontam/Scrap

CONFIDENTIAL 9

Page 10: CNA 2019 Bruce Power Supplier Forum

OPG Collaboration

FOCUS AREA: PARTS, PROCUREMENT, PERFORMANCE & PEOPLE

Collaboration Options include:

1. Joint Procurement 2. Assessment of Collaborative Procurement Opportunities 3. Information Sharing

Opportunity Category

$$$ Transformers, Laundry Services, Valves, Design Services

$$ Steam Generator & Turbine, Switchgear, Large Metal Objects/Waste, Small Pumps/Small Motors

$ Testing & Analysis, Non-Destructive Testing, Batteries

2019 – Joint Procurement Opportunities:

CONFIDENTIAL 10

Page 11: CNA 2019 Bruce Power Supplier Forum

Supplier Performance – 2017/2018

Performance (Safety, Quality, Cost and Schedule)

2017 - Key Suppliers 2018 - Key Suppliers Areas of Improvement

Consistently strong performance in all metrics

3 2 • Maintain stable

performance

Performance Improving 3 9

• Cost Performance • Manufacturing

schedules • Schedule Adherence • HU Performance

Needs Improvement 6 6*

• Quality/rework • Capacity & capability

Local presence: 20 new supplier office openings in Grey/Bruce/Huron in 2018

*Note: includes a tier 3 supplier

CONFIDENTIAL 11

11

Page 12: CNA 2019 Bruce Power Supplier Forum

Supplier Performance – 2017/2018

CONFIDENTIAL 12

12

Page 13: CNA 2019 Bruce Power Supplier Forum

Cost of Poor Quality

13

Quality is a partnership; it’s win/win, or lose/lose.

Impacts: • Generation Loss • Additional work and rework, oversight • Erosion of trust and morale • Financial claims/recovery

Estimated cost of poor quality in 2017/2018:

$83M

CONFIDENTIAL

Page 14: CNA 2019 Bruce Power Supplier Forum

Breakout Sessions

• 3 x 15-min breakout sessions, consisting of DISCUSSION + Q&A

• Four breakout locations around the room

• Breakout session hosts:

– Mike Rencheck, President & CEO

– Ian Rowley, VP Outage and Maintenance Services

– Jeff Phelps, VP Major Projects

– James Scongack, EVP Corporate Affairs & Operational Services

• 1600 hrs: end of Bruce Power Supplier Forum