coal mining pakistan

8
COAL MINING IN BALOCHISTAN United Musakhel Mining Company Pakistan www.ummc.com.pk ,

Upload: yahya-musakhel

Post on 24-May-2015

102 views

Category:

Business


0 download

DESCRIPTION

This Presentation is about coal mining in Pakistan, Industry needs Government attention.

TRANSCRIPT

Page 1: Coal Mining Pakistan

COAL MINING IN BALOCHISTAN

United Musakhel Mining Company Pakistan

www.ummc.com.pk,

Page 2: Coal Mining Pakistan

Coal Mining in Balochistan Existing

Traditional Mining Long-wall method Wastage of coal and coal use full parts Majority used in brick kiln’s and

industries No proper scientific work yet

www.ummc.com.pk,

Page 3: Coal Mining Pakistan

Quality of Balochistan Coal

Contents Balochistan Coal Imported coal Reason

Moisture 1.9-2.5 % 1-2 % Cleaning

Volatile Matter 32-47.2 % 25-42 % Nil

Ash 16-21 % 14-18 % Processing

Fix Carbon 29.6-51% 34-51 % Nil

GCV 5400-6200KCL/Kg 3400-6200KCL/Kg Nil

Total Sulfur 2.9-4.5 % 0.5-2% Washing

Page 4: Coal Mining Pakistan

Coal Mining in Kingri Ditrict Musakhel

Proved resource Near to Market Passage of all coal agents/dealer from

Punjab Secured place in point of security All facilities available Labor availability

Page 5: Coal Mining Pakistan

Why to invest in coalIndustrial needs Pakistan importing 1.5 million

tons/annually for cement, steel and other industries

Pakistani Nationals send 2,500-3,000 Millions USD for coal importing

Per ton on Karachi port is 18,000 rupees (5000-5400 GCV)/ton

Pakistani coal of same GCV on Mine Mouth is 6,000-7,500 rupees/ton

Page 6: Coal Mining Pakistan

Energy Requirements Now

Pakistan is energy deficient country 20 coal based power plants are under

establishment 20,000 MW will be produced from coal 50,000 tons of coal will be required per

day to run these power plants Trillion dollar will be send to other

countries………………………………Why?

Page 7: Coal Mining Pakistan

Coal Washing Plant All coal from Duki, Chmamalang, Harnai, Shahrag, Khost

passage from This way Daily 15000-20000 tons passing through this route Washing plant will help in reducing coal from wastage Quite decrease in importing coal from other countries

Page 8: Coal Mining Pakistan

Cost and Profit per Mine

Per Mine labor cost till coal is 28000 USD One mine time to reach to coal 2 Months One mine in traditional style produced

25-50 tons/ day Per ton x-mine price 6500-7000 (Pak) 72

USD Per ton expense 3000 (Pak) 32 USD Saving Per ton 4000 Pak 40USD Total Saving per day is +15000 Pak 1500

USDwww.ummc.com.pk,