Cochin Smart Mission Limited (CSML)
Page 1 of 32
Cochin Smart Mission Limited
9th Floor, Revenue Tower, Park Avenue, Kochi - 682 011, India.
Phone: 0484-2350355, 2380980 E-mail: [email protected]
Date: 11/03/2020
To:
All participating Bidders
Dear Sir,
Sub:- Minutes of the Pre Bid Meeting, CORRIGENDUM II and ADDENDUM II, III and IV for the Request for Qualification cum Proposals for Detailed Design, Construction, Testing & Commissioning of Redevelopment of Ernakulam Market, Ernakulam, Kerala on EPC Basis Under Smart City Mission -Reg.
Ref: (1) Tender ID: 2020_KMRL_339243_1
(2) RFP: CSML/E&E/MAR/RFP/001 Dated : 28/01/2020
With reference to the above, the Minutes of the Pre-Bid Meeting, CORRIGENDUM II and ADDENDUM II, III and IV with respect to the above-mentioned Request for Proposal (RFP) is enclosed. Bidders shall make note of the same and submit their proposals accordingly.
Encl: 1) Minutes of the Pre-Bid Meeting
2) CORRIGENDUM II
2) ADDENDUM II, III, IV
Cochin Smart Mission Limited
Cochin Smart Mission Limited (CSML)
Page 2 of 32
Minutes of the Pre-Bid meeting held at 9th Floor CSML office, on 17th February 2020, at 15:00 hrs for the Request for Qualification cum Proposals for Detailed Design, Construction, Testing & Commissioning of Redevelopment of Ernakulam Market, Ernakulam, Kerala on EPC Basis Under Smart City Mission.
Attendees of the Pre Bid Meeting
Sl. No.
Name Designation Organization
Representatives of Authority
Ms. Raji.R General Manager CSML
Ms. Anitha Mohandas Associate Environmental Engineer
CSML
Mr. Joseph Ciby DGM (Procurement) KMRL
Mr. Subin PV SPGM KMRL
Mr. Ajayakumar Team Leader PMC- Smart City Kochi
Mr. Jayaprakashan. V Construction Manager PMC- Smart City Kochi
Mr. Jishnu K Assistant Construction Manager
PMC- Smart City Kochi
Mr. Ramanujam Architect PMC- Smart City Kochi
Mr. M.E.H Ansari Company Secretary CSML
Representatives of firm / Agency present
1 Mr. Prabhakaran Contractor URCC
2 Mr. Sivakumar S Assistant General Manager URCC
3 Mr. P.K Paul Contractor K.V.Joseph & Sons.
4 Mr. Binu Bahanan Contractor Marymatha Infrastructure
5 Mr. Hazeem Director Crescent construction company
6 Mr. Nidhin PB Contractor Crescent construction company
Cochin Smart Mission Limited (CSML)
Page 3 of 32
Sl. No.
Name Designation Organization
7 Mr. Arun Jose Contractor Kool Homes
CSML welcomed the representatives of authority & representative of the firms / agencies to the Pre-Bid Meeting. The following clarifications are issued to the queries received through email.
Cochin Smart Mission Limited (CSML)
Page 4 of 32
Sl. No
.
Pre-Bid Queries
Clarifications RFP Document Reference (Clause
No.)
RFP Document Reference (Page No.)
Content of the RFP requiring clarification
Change Requested/ Clarification required
1. 3.1.7 (a)
EPC Agreement
Page 21
Make, or cause to be made, necessary applications to the relevant Government Instrumentalities with such particulars and details as may be required for obtaining Applicable Permits set forth in Schedule-F and obtain and keep in force and effect such Applicable Permits in conformity with the Applicable Laws
1. Does the EPC contractor have to obtain Building Permit?
2. Building permit status need to be confirmed by CSML.
All statutory permits including building permits shall be taken in the name Kochi Municipal Corporation. EPC contractor will assist in obtaining them. All statutory payment shall be reimbursed on production of receipt.
2. 3.1.7 (o) , (p) EPC Agreement
Page 22
Adhering to updated National Green Tribunal (NGT) guidelines and also their monthly mandatory Compliances reports and required documentation. Documentation and compliances required for obtaining IGBC / GRIHA Certification during the currency of the contract and also at the time of handover
Is the proposed building to be designed as a green building? If yes, under which organization should the same be applied or (GRIHA/LEED) and for which rating? Will the green building consultant be appointed by employer for getting the certification?
Yes.
GRIHA / LEED / IGBC rating should be obtained. Accredited consultant has to be appointed by contractor. All related expenditure in connection with obtaining rating shall be borne by the EPC contractor.
All statutory payment shall be reimbursed on production of receipt.
Cochin Smart Mission Limited (CSML)
Page 5 of 32
3. Architectural specifications
General
Schedules
Page 38
The Contractor shall provide a performance guarantee to provide for expenses, to cover the risk and cost of rectification of defect, noticed during guarantee period. Guarantee period to start from the date of completion of the project. Such performance guarantees shall be provided for anti-termite treatment, waterproofing works and all other works as specified in the tender. The price quoted by the bidder shall be deemed to include the cost of all such performance guarantees.
What is the value of performance guarantee to be provided by the EPC contractor after completion of works for the guarantee period. Please specify the form of submission and period of the guarantee also.
Pl refer the CORRIGENDUM II, Sl no 6
4. Clause 19.2.1 EPC Agreement Page 108
The Employer shall make an interest bearing advance payment @ of 10% per annum -(the “Advance Payment”), equal in amount to 10 (ten) percent of the Contract Price, for mobilisation expenses and for acquisition of equipment. The Advance Payment shall be made in three instalments. The first installment shall be an amount equal to 2% (two percent) of the Contract Price, the second installment shall be equal to 3% (Three percent) of the Contract Price, and the third instalment shall be equal
Kindly provide 10% interest free mobilization advance in a single installment and secured advance for supplied material.
No change in tender condition
Cochin Smart Mission Limited (CSML)
Page 6 of 32
to 5% (Five percent) of the Contract Price.
5. Clause 1.17.1 Schedules
Page 98
Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of specified grade of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads .
Can hydraulic rings be used for piling?
Can be used, provided after site inspection the feasibility may be ensured by the contractor.
6. Clause 1.17.1 Schedules
Page 98
Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform and or construction of test cap and dismantling of test cap after test etc. preparation of pile head complete as per specification & the direction of Engineer in-
Does the contractor have to cast test pile and conduct initial pile load test
Test pile casting and Initial pile load testing and Routine tests as per IS2911-2010 has to be done by the contractor. It is in the contractor’s scope. No extra payment shall be made to the contractor on
Cochin Smart Mission Limited (CSML)
Page 7 of 32
charge. Initial test Routine test Integrity testing of Pile using Low Strain/ Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerized equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge
this account.
7. Clause 1.17.4 Schedules
Page 100
Parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement -Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer-in-Charge.
For reinforcement works does the EPC contractor have to provide couplers only instead of laps, is it mandatory, as couplers are not available for lower dia steel bars. Please confirm if the contractor can choose whether to use coupler or provide lap.
Lapping is also permitted. However, use of coupler shall be given preference.
8. Clause 1.17.5 Schedules Designing, providing and fixing of TR60+ trapezoidal composite floor decking of profile depth
Is it mandatory to use trapezoidal composite floor decking sheet and light weight foam concrete for slabs?
Not mandatory.
Cochin Smart Mission Limited (CSML)
Page 8 of 32
Page 104 60mm and cover width 666mm. manufactured from Hot Dip galvanized structural quality of grade S350 (minimum yield strength of 350 MPa) steel coil to BS EN 10143 & BS EN 10346 of specified thickness and with a minimum galvanized coating mass of 275g/m2.
Providing and laying of light weight foam concrete of density 600 kgs/cum or designed density using fine sand, cement and foaming chemical from Lloyd or approved manufacture as filling material complete .
9. Clause 1.17.5 Schedules
Page 109
Providing and laying roof insulation 100 mm thick with density 40kgs/cum extruded polystyrene of approved manufacture having compressive strength not less than 250 kpa as per ASTM 1621with the thermal conductivity shall be greater than 0.026 W / mK and water absorption of less than 0.1on over deck surface thorughly cleaned with wire brushes, minute gaps shall be filled and entire surface shall be fortiied against fungal growth by application of 2-3 coats of black Japan paint primer, slip sheet
Can the EPC contractor adopt any innovative water proofing techniques or is it mandatory
Any other innovative water proofing methods as permitted in IS standards with guarantee for specified period are permitted after approval of Engineer/Employer.
Cochin Smart Mission Limited (CSML)
Page 9 of 32
such as polythene film of 170 gms (min) should be laid on top of (water proofing membrane to prevent damage to it by Fines and Grit being washed down). Extruded polystyrene sheets shall then be installed on the slip sheet using CPRX compound to secure them firmly with their drain channels facing down, 3/4 inch space allowed at penetration and cant strips, insulation and joints staggered boards ship lapped tightly with maximum 3/8 inch gap allowed and finishing done by filling and / or covering the joints with CPRX and / or self adhesive insulation tapes complete as directed and as shown on drawings.
10. Can the building be constructed as a composite structure including precast members, steel members etc.
No
No change in tender conditions.
11. Clause 1.17.10 Schedules
Page 116
Providing and fixing to the required profile and shape 2 layers of 12.5mm thick Gypsum board on GI framework comprising 40x40x18G galvanized tubular frame 610x610mm center to center
The baffle wall for operable partition is given as gypsum board, since gypsum boards will get damaged on exposure to dampness, and there is every chance for dampness as it is the market area, please confirm if the EPC could adopt
Any better alternative may be used with prior approval from the employer/Engineer.
Cochin Smart Mission Limited (CSML)
Page 10 of 32
fixed on Roof Structure with 40x40x5 MS cleat, 100mm long 1200 c/c and ceiling framework with welded connections. The Gypsum board to be backed with 50mm thick resin bonded fiberglass cut to size and inserted in GI framework and held in place with 28G x 12mm GI wire netting. The first layer of Gypsum board to have joints over frame and second layer of Gypsum board to have joint staggered with respect to the first layer, all joints between board in both layers to be taped with paper tape and filled with sealing compound. Gypsum board layer to be sealed at junction with Roof sheeting / structure and false ceiling below with the non-hardening mastic compound, so as to provide smooth surface. Entire work to be done as per drawing, specifications and as per directions of Engineer-in-charge.
other innovative partition systems.
12. Clause 14.4 Schedules
Page 144 para 3
in case of failure of KSEB supply. Adequate capacity of UPS system shall be provided for lifts, fire alarm system, emergency lighting etc.
Is it mandatory to provide UPS backup for lift as there is already generator backup and an additional UPS backup will considerably increase cost.
UPS is not required for lifts
Pl refer the CORRIGENDUM II, Sl no 3
Cochin Smart Mission Limited (CSML)
Page 11 of 32
13. See Clauses10.1 (iv) and 19.3)
SCHEDULE H
Please confirm whether the electrical metering will be done by KSEB or client.
Electrical metering will be done by KSEB
14. Clause 4.7 Schedules
Page 30
Though, as per KMBR, parking requirement for G+2 market complex requires space allocation only for 101 car units, in the proposal, 123 car parking lots are proposed. Basement area with 97 car-parking slots along with surface parking provision for 26 car/ LCV units are proposed. Parking cum loading/ unloading slots for 8 trucks are proposed at Market Complex and for 2 trucks are proposed at Market Square. For two- wheeler parking, 230 sq. m area is dedicated at basement while 75 sq. m at ground surface. Apart from this, in another project, robotic MLCP with capacity to park 96 cars is proposed at Market Square. This shall meet the future parking demand likely to arise in the area.
1. Parking spaces is a serious issue in the Ernakulam market in this regard we may suggest to use the terrace floor for parking. For the proposed building all floors are to be designed by considering the live load of LMV/Truck. If we provide a car lift up to the terrace floor, the terrace floor can be used for car parking by the owners of the commercial space until its future development. In addition vehicle access to all floors can be achieved and the space provided for ramp can be converted for commercial use which will add the revenue of owner.
2. Ramp to first floor can it be avoided and alternate method like car lift can be provided.
Tender condition prevails.
Cochin Smart Mission Limited (CSML)
Page 12 of 32
15. 10.2.1 (iii) EPC Agreement
Page 48
On the issue of a Notice in respect of the Detailed Design drawings, the Contractor shall produce the proposed working drawings. The working drawings shall include Detailed Design drawings, which may be supplemented by drawings further developed in accordance with the working drawings such as site sketches, bar bending schedules, bar reference drawings, additional construction details, equipment installation details, finishes material list with accompanying specification and the like. All such drawings shall comply with the requirements of the detailed design submittal and design criteria
Will the employer supply detailed working drawings, good for construction drawings for the building including specifications for the scheme drawings attached?
Except tender drawings, no other drawings will be supplied by the employer
Tender condition prevails
16. 1. Is the tender drawings provided with the documents final? If no, is it provided as a guideline drawing to have the base for redesigning the same?
2. Is design changes allowed?
Tender drawings provided are only indicative which were developed after having discussions with existing stall owners.
EPC contractor may redesign/Develop the same & get it approved by the Engineer / Employer.
The new layout has to satisfy the requirement of
Cochin Smart Mission Limited (CSML)
Page 13 of 32
stall owners.
17. Article 10
10.1.1
EPC Agreement
Page 45
Appoint a Chief Designer (the "Chief Designer") who will head the Contractor's design unit and shall be responsible for surveys, investigations, collection of data, and preparation of preliminary and detailed designs & shop drawings and their approval and during execution.
We can see only few drawings with the tender. No façade drawing is given. Is that to be designed by the Chief designer appointed by Contractor.
Indicative elevation drawings are attached as addendum.
Refer Addendum II
18. The second floor drawing for commercial space is missing in tender drawings.
Second floor drawing are attached as addendum
Refer Addendum II.
19. 2.2.1.1 Schedules
Page 20
In the basement of total floor space 4309 sq. m. is designed to accommodate 97 cars. 260 sq. m space is allocated exclusively for bike parking. Major driveways of width 6 m and access driveways of 3.5 m width are provided. Entry ramp to the basement form ground level is provided at a slope of 1:10. Height of the basement floor is 3 m.
Can the carriage way width of Major drive way be changed to 7m in order to facilitate smooth 2 way traffic?
No change.
20. 3.2 Schedules
Page 20
Construction of temporary sheds for rehabilitation of existing stalls during construction period is a sub- component of the construction project. The sheds are to be demolished once the shops are resettled back to new
1. As another tender is uploaded for the rehabilitation of market, is it necessary to construct temporary sheds in EPC contractor’s scope?
2. It was confirmed by CSML that rehabilitation of the existing market to nearby area is not included in the
Refer Serial No.1 of CORRIGENDUM II
Cochin Smart Mission Limited (CSML)
Page 14 of 32
market complex. scope of the project
21. 33.1.1 Schedules
Page 751
All construction/demolition waste will be stored within the site itself. Metal mesh screen or GI screens will be provided so that the waste does not get scattered
Bidders enquired about provision of site for disposal of C&D waste.
Refer Serial No. 2. Of CORRIGENDUM II
22. 2.2.1.1 20 Major driveways of width 6 m and access driveways of 3.5 m width are provided.
Road width for car parking can it be increased (current width is only 3.5m) which in turn might reduce the number of Parking
No
23. TENDER DRAWINGS
Number of shops in each floor can it be changed?
No
24. TENDER DRAWINGS
Main passage width can it be increased which will affect the general arrangement provided by you.
No
25. TENDER DRAWINGS
Page 6
Truck parking area needs to be identified or clarified
Truck loading and unloading bays have been demarcated as per KMBR rules. Please Refer Ground Floor drawing.
26. 1.17.16 127, 602 Can the exterior elevation i.e. GBC be changed to louvers
No
27. 11.7 EPC agreement
Monthly Progress Report CSML need to confirm how the progress Contractor has to issue RFI (Request for Inspection),
Cochin Smart Mission Limited (CSML)
Page 15 of 32
76 is going to be recorded daily, weekly, monthly & quarterly progress reports including video recording as described in article no 11, clause no 11.16 of EPC agreement.
Contractor shall have to submit the progress as mentioned in SCHEDULE S - PROJECT MANAGEMENT REQUIREMENTS.
28. 19.3, 19.4 EPC agreement 110
Stage Payment Statement for Works
The Contractor shall submit a statement (the “Stage Payment Statement”),in 3 copies, by the 7th (seventh) day after completion of payment stage to the Employer’s Engineer in the form set forth in Schedule-O, showing the amount calculated in accordance with Clause 19.3 to which the Contractor considers itself entitled for completed stage(s) of the Works. The Stage Payment Statement shall be accompanied with complete computation and details relevant to the progress of works, progress report and any other supporting documents. The Contractor shall not submit
CSML need to confirm the payment methodology whether it is monthly or payment stage wise only
Refer Sl no. 8 CORRIGENDUM II.
Cochin Smart Mission Limited (CSML)
Page 16 of 32
any claim for payment for incomplete stages of work. In the event that there is no claim for the Stage Payment in accordance with the provisions of this Clause 19.4, the Contractor shall submit a ‘Nil” claim to the Employer’s Engineer. The billing cycle shall be minimum of one month.
29. Weightage for designing is not considered, please state the methodology for payment of the same
It is part of total payment. No separate payment shall be made for designing.
30. 19.1.2 EPC agreement 108
The Contract Price includes all duties, taxes, royalty, GST, labour cess, Flood cess and fees that may be levied in accordance with the laws and regulations in force as on the Base Date on the Contractor's equipment, Plant, Materials and supplies acquired for the purpose of this Agreement and on the services performed under this Agreement. Nothing in this Agreement shall relieve the Contractor from its responsibility to pay any tax including any tax that may be levied in India on profits made by it in respect of this Agreement. All payments under this Agreement shall be made in Indian Rupees.
CSML need to confirm whether Flood CESS is included or not
Flood Cess is not applicable.
Refer Sl. No. 5 CORRIGENDUM II
Cochin Smart Mission Limited (CSML)
Page 17 of 32
Firm / agency are hereby once again reminded that, offer / proposal shall be submitted keeping in mind the clarifications & addendum issued
Cochin Smart Mission Limited
31. Waste Management is said to be 100 m away from the market, Require more clarity
Secondary collection point is within 100 m from market area.
32. We request CSML to provide the BOQ Specification with or without Quantity/Rate to provide a better quote
Indicative items are attached in ADDENDUM III.
33. Can the AUTOCAD drawings be shared with the bidders?
The bidders may contact CSML office for receiving the AUTOCAD Tender drawings.
34. Are the designs as per Latest KMBR? The plans approved by the Corporation are as per previous KMBR. The bidder may bid as per the detailed scope of work, technical requirements specified in the RFP. Any deviations in the RFP requirements with respect to latest KMBR rules etc. will be dealt separately by CSML during the execution of the project.
Cochin Smart Mission Limited (CSML)
Page 18 of 32
CORRIGENDUM-II
For
Detailed Design, Construction, Testing & Commissioning of Redevelopment of Ernakulam Market, Ernakulam, Kerala on EPC Basis Under Smart City Mission
Tender ID: 2020_KMRL_339243_1 RFP: CSML/E&E/MAR/RFP/001, Dated : 28/01/2020
Sl.No.
RFP Page No. /
Reference
Clause No./ Reference
Earlier Clause(s)
Additional Clause(s)
1
Schedules
Page 20
3.2 Construction of temporary sheds for rehabilitation of existing stalls during construction period is a sub- component of the construction project. The sheds are to be demolished once the shops are resettled back to new market complex.
-DELETED-
2
Schedules
Page 751
33.1.1 All construction/demolition waste will be stored within the site itself. Metal mesh screen or GI screens will be provided so that the waste does not get scattered
All construction/demolition waste will be stored within the site itself. Metal mesh screen or GI screens will be provided so that the waste does not get scattered. Non reusable waste will be transported to Brahmapuram municipal solid waste management plant.
3
Schedules
Page 144 para 3
Clause 14.4 in case of failure of KSEB supply. Adequate capacity of UPS system shall be provided for lifts, fire alarm system, emergency lighting etc.
in case of failure of KSEB supply. Adequate capacity of UPS system shall be provided for fire alarm system, emergency lighting etc.
4
Request for Qualification cum
2.2.2 (ii) “Similar Works” shall mean - Large Commercial Buildings, Large Institutional buildings, Large Infrastructure Projects excluding road, sewage, canal works" with any reputed organization/department including external &
“Similar Works” shall mean - Large Commercial Buildings, Large Institutional buildings, Multi storeyed Residential buildings, Large Infrastructure Projects excluding road, sewage, canal works" with any reputed organization/department
Cochin Smart Mission Limited (CSML)
Page 19 of 32
Sl.No.
RFP Page No. /
Reference
Clause No./ Reference
Earlier Clause(s)
Additional Clause(s)
Proposal
Page 21
internal services in last 7 (Seven) years.
including external & internal services in last 7 (Seven) years.
5
EPC agreement 108
19.1.2 The Contract Price includes all duties, taxes, royalty, GST, labour cess, Flood cess and fees that may be levied in accordance with the laws and regulations in force as on the Base Date on the Contractor's equipment, Plant, Materials and supplies acquired for the purpose of this Agreement and on the services performed under this Agreement. Nothing in this Agreement shall relieve the Contractor from its responsibility to pay any tax including any tax that may be levied in India on profits made by it in respect of this Agreement. All payments under this Agreement shall be made in Indian Rupees.
The Contract Price includes all duties, taxes, royalty, GST, labour cess, and fees that may be levied in accordance with the laws and regulations in force as on the Base Date on the Contractor's equipment, Plant, Materials and supplies acquired for the purpose of this Agreement and on the services performed under this Agreement. Nothing in this Agreement shall relieve the Contractor from its responsibility to pay any tax including any tax that may be levied in India on profits made by it in respect of this Agreement. All payments under this Agreement shall be made in Indian Rupees.
6
Schedules
Page 38
Architectural specifications
General
The Contractor shall provide a performance guarantee to provide for expenses, to cover the risk and cost of rectification of defect, noticed during guarantee period. Guarantee period to start from the date of completion of the project. Such performance guarantees shall be provided for anti-termite treatment, waterproofing works and all other works as specified in the tender. The price quoted by the bidder shall be deemed to include the cost of all such performance guarantees.
The Contractor shall provide a performance guarantee to provide for expenses, to cover the risk and cost of rectification of defect, noticed during guarantee period. Guarantee period to start from the date of completion of the project.
The Contractor shall furnish separate guarantees to the Employer in respect of Water Proofing and Anti-termite treatment jobs before releasing the original Performance Security Deposit for the complete project under article 7 of EPC agreement.
The Contractor shall deposit with Employer a Bank Guarantee for the amount equal to 10% of the estimated value of waterproofing / anti termite
Cochin Smart Mission Limited (CSML)
Page 20 of 32
Sl.No.
RFP Page No. /
Reference
Clause No./ Reference
Earlier Clause(s)
Additional Clause(s)
works executed for a period of 10 years from the date of completion of work to guarantee the works against defective materials and workmanship. Bank Guarantee shall be kept valid till the 90 days beyond expiry of the Guarantee period.
The price quoted by the bidder shall be deemed to include the cost of all such performance guarantees.
7
RFQ cum RFP
Page 40
3.5.2(B).2 At least one Commercial Complex with total floor area of 16,000 sq.m. in similar projects.
At least one Commercial/Residential Complex with total floor area of 15,000 sq.m. in similar projects.
8
EPC Agreement
Page 110
19.3 Procedure for estimating the payment for the Works 19.3.1 The Employer shall not make interim payments to the Contractor before completion of a stage. 19.3.2 The Contractor shall base its claim for interim payment for the stages completed till the end of the previous month for which the payment is claimed, valued in accordance with Clause 19.3.1, supported with necessary particulars and documents in accordance with this Agreement.
Procedure for estimating the payment for the Works 19.3.1 The Employer shall make interim payments to the Contractor on completion of 20% of any stage. Contractor can claim payment for one or more such stages where the work is completed minimum of 20% subject to minimum billing of Rs 2.5 Cr. per month.
19.3.2 The Contractor shall base its claim for interim payment for the part stages (minimum 20% of any stage) completed till the end of the previous month for which the payment is claimed, valued in accordance with Clause 19.3.1, supported with necessary particulars and documents in accordance with this Agreement.
Cochin Smart Mission Limited (CSML)
Page 21 of 32
ADDENDUM-II
For
Detailed Design, Construction, Testing & Commissioning of Redevelopment of Ernakulam Market, Ernakulam, Kerala on EPC Basis Under Smart City Mission
Tender ID: 2020_KMRL_339243_1 RFP: CSML/E&E/MAR/RFP/001, Dated : 28/01/2020
Sl.No.
RFP Page No. /
Reference
Clause No./
Reference
Earlier Clause(s)
Additional Clause(s)
1
Part 2 Volume
1.3
Tender drawings
New Drawing Insert after DRG NO: CSML/M12/EE/EMR/AR-003
Please refer Annexure 1 of this addendum.
GOODS LIFT
PASSENGER
LIFT
SERVICE DUCT
3175x2000
3175x2500
Open Space
GOODS LIFT
PASSENGER
LIFT
3000x2500
3000x2000
MALE TOI.
FEMALE TOI.
SECOND FLOOR PLAN
AA
TLT (PH)
D2
D2
D2
D2
D2
D2
D2
D3D3D3D3D3D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D3 D3 D3 D3 D3D3
+9.70 M LVL
+9.70 M LVL
+9.70 M LVL
+9.70 M LVL
+9.70 M LVL
UP
LA
ND
IN
G -1300 m
m
TR
EA
D -300 m
m
RIS
E -148.15 m
m
LANDING -1450 mm
TREAD -300 mm
RISE -148.15 mm
UP
LA
ND
IN
G -1375 m
m
TR
EA
D -300 m
m
RIS
E -148.15 m
m
UP
UP
LANDING -1375 mm
TREAD -300 mm
RISE -148.15 mm
6
4
6
1
9806
6
0
0
0
8075
5521
5571
5114
6505
6505
6844
7553
11408
5
7
0
0
service room
Service
room
D2
5700x2650
1550x1200
1550x1200
1550x1200
1550x1200
1550x1200
1550x1200
1400x1200
1400x1200
1400x1200
1400x1200
1400x1200
1400x1200
2100x1200 1600x1200 1600x1200 1600x1200 1600x1200 1600x1200
1600
1965x1500
4865x4325
WASH
8100x2625
4865x2300
URINAL
1650x1200
1650x1200
1650x1200
1650x1200
1650x1200
1650x2430
6600x1900
WASH
6600x1900
WASH
3275x2850
4360x1495
27438
33419
4306
3
8
5
3
3
8
3
6
4
1
0
2
51
15
1
38
28
6
47147
26007
23651
21064
1
9
5
4
9
3
1
2
3
7
1
7
1
7
0
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS
MENTIONED OTHERWISE.
2. ONLY WRITTEN DIMENSION ARE TO BE FOLLOWED
3. THIS DRAWING IS TO BE READ ALONG WITH ALL
REFERENCED OR MENTIONED DRAWINGS.
4. NECESSARY CLARIFICATIONS MIGHT BE OBTAINED
FROM CSML.
5. DISCREPANCY IF ANY SHOULD BE BROUGHT
TO THE NOTICE OF CSML OFFICE IMMEDIATELY.
NREVISION
R1
IPE Global & HaskoningDHV Consulting Pvt. Ltd.5th Floor, Revenue Tower,Park Avenue, Kochi-682011, Kerala,India
CLIENT : COCHIN SMART MISSION LIMITED9th Floor, Revenue Tower,Park Avenue, Kochi-682011, Kerala,India
PMC TEAM :
PROJECT NAME :
TITLE:
DRG NO:
Drawn BY Design BY Checked BY
SIGNATORYARCHITECT:
SIGNATORYCLIENT :
SCALE : DATE :
SECOND FLOOR PLAN
ERNAKULAM MARKET REDEVELOPMENT
1:400CSML/M12/EE/EMR/AR-004
UNNI ANAND ABHISHEK
31-10-2019
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS
MENTIONED OTHERWISE.
2. ONLY WRITTEN DIMENSION ARE TO BE FOLLOWED
3. THIS DRAWING IS TO BE READ ALONG WITH ALL
REFERENCED OR MENTIONED DRAWINGS.
4. NECESSARY CLARIFICATIONS MIGHT BE OBTAINED
FROM CSML.
5. DISCREPANCY IF ANY SHOULD BE BROUGHT
TO THE NOTICE OF CSML OFFICE IMMEDIATELY.
NREVISION
R0
IPE Global & HaskoningDHV Consulting Pvt. Ltd.5th Floor, Revenue Tower,Park Avenue, Kochi-682011, Kerala,India
CLIENT : COCHIN SMART MISSION LIMITED9th Floor, Revenue Tower,Park Avenue, Kochi-682011, Kerala,India
PMC TEAM :
PROJECT NAME :
TITLE:
DRG NO:
Drawn BY Design BY Checked BY
SIGNATORYARCHITECT:
SIGNATORYCLIENT :
SCALE : DATE :
CONCEPT DRAWING
ELEVATION
ERNAKULAM MARKET REDEVELOPMENT
1:300CSML/M12/EE/EMR/AR-101
UNNI ANAND ABHISHEK
31-10-2019
SECTION A - A
RAMP UP
BASIN ROAD SIDE ELEVATION-1
±0.00 METER LVL
GROUND LEVEL
+0.40 METER LVL
GROUND FLOOR
+9.70 METER LVL
SECOND FLOOR LEVEL
+13.70 METER LVL
TERRACE LEVEL
+5.70 METER LVL
FIRST FLOOR LEVEL
+14.6 METER LVL
PARAPET LEVEL
±0.00 METER LVL
GROUND LEVEL
+0.40 METER LVL
GROUND FLOOR
+9.70 METER LVL
SECOND FLOOR LEVEL
+13.70 METER LVL
TERRACE LEVEL
+5.70 METER LVL
FIRST FLOOR LEVEL
+14.6 METER LVL
PARAPET LEVEL
MARKET ROAD SIDE ELEVATION-2
5250
4000
4000
450
13700
900
3000
2100
16700
5250
4000
4000
450
13700
900
3000
2100
16700
+16.7 METER LVL
MUMTY LEVEL
+16.7 METER LVL
MUMTY LEVEL
Cochin Smart Mission Limited (CSML)
Page 24 of 32
ADDENDUM-III
For
Detailed Design, Construction, Testing & Commissioning of Redevelopment of Ernakulam Market, Ernakulam, Kerala on EPC Basis Under Smart City Mission
Tender ID: 2020_KMRL_339243_1 RFP: CSML/E&E/MAR/RFP/001, Dated : 28/01/2020
The indicative items that may be referred to for preparation of estimate is mentioned below. These items are not all inclusive and will vary for different designs. This list may be for reference purpose only. 1 Foundation 1) od192834/2019_2020 Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-30 with cement content 400kg/m3of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using DMC by tripod and mechanical winch machine all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap). 500 mm dia piles 2) 5.35 Add for using extra cement in the items of design mix over and above the specified cement content therein 3) 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more 4) 20.6.2.1 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile above 50 tonne and upto 100 tonne capacity-Initial test 5) 20.6.2.2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile above 50 tonne and upto 100 tonne capacity- Routine test 6) 20.8.2 Lateral load testing of single pile in accordance with IS Code of practice IS : 2911 ( Part IV) for determining safe allowable lateral load on pile: Above 50 tonne and upto 100 tonne capacity pile. 7) od192365/2019_2020 Chipping and removing R.C.C. pile of diameter 500 mm manually / by mechanical means including disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge. 8) 20.9 Integrity testing of pile using Low Strain / Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge. Note:- The inclusion of the above item in the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. 2 Sub structure 1) 60.65 Providing Z steel sheet pile of size 400x185x7.5/8.5 driving down vertically in lines and levels interlocking with adjacent piles with suitable pile driving unit and all accessories including all labour hire charges etc. complete and as per the directions of departmental officers at site. 2) od193935/2019_2020 : Providing and maintaining well point dewatering system to maintain dry condition
Cochin Smart Mission Limited (CSML)
Page 25 of 32
0.50m below pile cap PCC level of basement. The system shall be designed to maintain the basement area dry for construction foundation and retaining walls till above natural water table and shall be provided with adequate number of well points connected to a vacuum dewater pump/pumps though header pipe systems. The outflow from pump shall be dispersed to an approved water source with a silt trap in between. Adequate number of spare dewatering pump shall be available as stand-by. The well point system shall be installed behind the shoring system. The rate shall include the cost for well points, coarse sand, fuel for pumps, pump operator and necessary labours, transportation, loading and unloading, removal of well points etc. complete 3) 60.2.2 Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay of staff etc complete 4) 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil 5) 2.26.1 Extra for every additional lift 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil 6) 15.60 Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved 7) 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 8) 4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns 9) od192366/2019_2020 5.33.1.+5.34.1 Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 400 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately. All work upto plinth level 10) 5.35 Add for using extra cement in the items of design mix over and above the specified cement content therein 11) 5.9.1 Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete 12) 5.9.3 Centering and shuttering including strutting, etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform 13) 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more 3 Super structure 1) 50.6.2.2 Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete 2) 50.6.2.3 Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete 3) od192362/2019_2020 5.33.2.+5.34.1 Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding
Cochin Smart Mission Limited (CSML)
Page 26 of 32
the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately. All work above plinth level 4) 5.35 Add for using extra cement in the items of design mix over and above the specified cement content therein 5) 5.9.3 Centering and shuttering including strutting, etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform 6) 5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more 4 Flooring 1) 8.12 Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvillinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-charge. a. Flamed finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent. 2) 11.41.3 Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 800x 800 mm 3) 11.36 Providing and fixing I st quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer -in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. 4) 11.37 Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete. 5) 8.2.2.1 Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite of any colour and shade. Area of slab upto 0.50 sqm 5 Finishing 1) 13.1.1 12 mm cement plaster of mix: 1:4 ( 1 cement : 4 fine sand) 2) 13.16.1 6 mm cement plaster of mix: 1:3 ( 1 cement : 3 fine sand) 3) 13.9.2 Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement. 20 mm cement plaster 4) 13.43.1 Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: Water thinnable cement primer 5) 13.60.1 Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade: Two or more coats on new work
Cochin Smart Mission Limited (CSML)
Page 27 of 32
6) 13.47.1 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) 7) 13.62.1 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture . 6 Woodwork and PVC work 1) 9.121 Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross- section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness. The laminated shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2 mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame. 2) 9.122.1 Providing and fixing to existing door frames. 30 mm thick Glas Fibre Reinforced Plastic (FRP) panelled door shutter of required colour and approved brand and manufacture, made with fire - retardant grade unsaturated polyester resin, moulded to 3 mm thick FRP laminate for forming hollow rails and styles, with wooden frame and suitable blocks of seasoned wood inside at required places for fixing of fittings, cast monolithically with 5 mm thick FRP laminate for panels conforming to IS : 14856, including fixing to frames. 3) 9.147B.1 543 SUB HEAD : 9 - WOOD & PVC WORK 9.147B Providing and fixing factory made uPVC white colour fixed glazed windows/ ventilators comprising of uPVC multi-chambered frame and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), , uPVC extruded glazing beads of appropriate dimension, EPDM gasket, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes and silicon sealant shall be paid separately).<br> Note: For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable. Fixed window / ventilator made of (small series) frame 47 x 50 mm & mullion 47 x 68 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area upto 0.75 sqm.) 4) 10.6.1 Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.25 mm M.S. laths with 1.25 mm thick top cover 7 Structural steel work 1) 10.28 Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) 2) 9.48.2 Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings/ wooden frames with rawl plugs screws etc
Cochin Smart Mission Limited (CSML)
Page 28 of 32
3) 10.2 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. 8 Water proofing 1) 22.5 Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. 2) 22.23.1 Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in- charge. The product performance shall carry guarantee for 10 years against any leakage. For vertical surface two coats @0.70 kg per sqm 9 Water supply and sanitary 1) 8.5 Extra for providing opening or required size & shape for wash basin/kitchen sink in kitchen platform, vanity counter and similar location in marble/granite/ stone work, including necessary holes for pillar taps etc. including moulding, rubbing and polishing of cut edges etc. complete. 2) 8.10.1 Providing and fixing stone slab with table rubbed, edges rounded and polished, of size 75x50 cm deep and 1.8 cm thick, fixed in urinal partitions by cutting a chase of appropriate width with chase cutter and embedding the stone in the chase with epoxy grout or with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 6 mm nominal size) as per direction of Engineer-in Charge and finished smooth. White Agaria Marble Stone 3) 17.3.1 Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required W.C. pan with ISI marked white solid plastic seat and lid 4) 17.5.1 Providing and fixing white vitreous china flat back half stall urinal of size 580x380x350 mm with white PVC automatic flushing cistern, with fittings, standard size C.P. brass flush pipe, spreaders with unions and clamps (all in C.P. brass) with waste fitting as per IS : 2556, C.I. trap with outlet grating and other couplings in C.P. brass, including painting of fittings and cutting and making good the walls and floors wherever required: Single half stall urinal with 5 litre PVC. automatic flushing cistern 5) 17.7.7 Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Flat back wash basin size 450x300 mm with single 15 mm C.P. brass pillar tap 6) 50.17.1.5 Supplying and fixing CP Health Faucet superior quality ( Jagur or equvalent make ) including cost of materials and labour charges etc complete as per the direction of site Engineer-in-charge.
Cochin Smart Mission Limited (CSML)
Page 29 of 32
7) 18.17.2 Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 32 mm nominal bore 8) 18.17.3 Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 40 mm nominal bore 9) 18.51.1 Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms. 15 mm nominal bore 10) 50.18.8.6.2 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 50 mm pipe 6 kgf/cm2 11) 50.18.8.2.2 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 20 mm pipe 10 Kgf/ cm2 12) 50.18.8.4.1 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 32 mm pipe 10Kgf/cm2 13) 50.18.8.3.2 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 25 mm pipe 10kgf /cm2 14) 50.18.8.4.2 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 32 mm pipe 6Kgf/cm2 15) 50.18.8.5.2 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 40 mm pipe 6Kgf/cm2 16) 50.18.7.4.1 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 32 mm dia 10Kgf/cm2- Internal work - Exposed on wall 17) 50.18.8.7.2 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc 63 mm pipe 4 kgf/ cm2 18) 50.18.9.7.2 Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.63 mm dia 4 Kgf/cm2 19) 50.18.8.8.1 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 75 mm pipe 6 Kgf/cm2 20) 50.18.8.9.1 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chased and making good the wall etc. 110 mm pipe 6kgf/cm2 21) 50.18.9.10.1 Providing and fixing PVC pipes includings jointing of pipes with one step pvc solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer in Charge. 150 mm dia 6 Kgf/cm2 22) 50.18.9.21.7 Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 75 mm dia Vent cowl 23) 50.18.9.22.8 Providing and fixing PVC moulded fittings /accessories for Rigid PVC pipes, including jointing with PVC solvent cement -110 mm dia Vent cowl 24) 18.32.1 Constructing masonry chamber 30x30x50 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for stop cock, with C.I. surface box 100x100x75 mm (inside) with
Cochin Smart Mission Limited (CSML)
Page 30 of 32
hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2 coarse sand: 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design: With common burnt clay F.P.S (non modular) bricks of class designation 7.5 25) 18.33.1 Constructing masonry chamber 60x60x75 cm inside, in brick work in cement mortar 1:4 (1 cement:4 coarse sand) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep (inside) with chained lid and RCC top slab 1:2:4 mix ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5 fine sand: 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 ( 1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design: With common burnt clay F.P.S (non modular) bricks of class designation 7.5 10 Roofing 1) 50.12.2.2 Providing & fixing Poly carbonate multi wall plain sheet 4 mm thick as approved by the Engineer in charge and should be supplied in a single length of 12 M or as decide by the Engineer in charge. The sheets shall be fixed using self drilling/ self tapping screw of size (5.5x55mm) with EPDM seal complete upto any pitch in horizontal / vertical / curved surfaces, but excluding the cost of purlins, rafters, trusses and including cutting to size and shapes where ever required. 11 Yard and landscaping 1) 50.2.25.1 Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge 2) 2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. 3) 16.78.1 Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge. With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30 4) od196230/2019_2020 Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete. 12 Compound wall 1) 5.1.3 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size 2) 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) 3) 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
Cochin Smart Mission Limited (CSML)
Page 31 of 32
4) 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more 5) 5.9.1 Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete 6) 50.6.1.2 Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete. 7) 13.1.1 12 mm cement plaster of mix: 1:4 ( 1 cement : 4 fine sand) 8) 13.47.1 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) 13 Water tank 1) od192357/2019_2020 Supplying and errecting in position Ferrocement water storage tank made from superior quality ferrocement work with 50 mm min wall thickness and ribbings as required etc complete 14 Electrical, pumps, fire, lift 15 STP 16 LINER 1) 12.22 Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. 17 Drain 1) 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil 2) 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) 3) 5.1.3 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 4) 5.9.2 Centering and shuttering including strutting, etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. 5) 5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more 6) 2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. 18 Architectural works with GRC panels
Cochin Smart Mission Limited (CSML)
Page 32 of 32
ADDENDUM-IV
For
Detailed Design, Construction, Testing & Commissioning of Redevelopment of Ernakulam Market, Ernakulam, Kerala on EPC Basis Under Smart City Mission
Tender ID: 2020_KMRL_339243_1 RFP: CSML/E&E/MAR/RFP/001, Dated : 28/01/2020
REPORT ON SOIL INVESTIGATION FOR THE PROPOSED MARKET
DEVELOPING PROJECT AT MARKET ROAD, ERNAKULAM
REPORT ON SOIL INVESTIGATION FOR THE PROPOSED MARKET DEVELOPING PROJECT AT MARKET ROAD,
ERNAKULAM
CLIENT
IPE GLOBAL LTD
GEOTECHNICAL CONSULTANTS:
M/s ENGINEERS DIAGNOSTIC CENTRE PVT LTD 41/1210, VADAKUMTHALA BUILDING,
PULLEPADDY, COCHIN-682018
PHONE: 0484 2371643 JOB NO: EDC/19-20/SEPTEMBER/GI/026-2
REPORT ON SOIL INVESTIGATION FOR THE PROPOSED MARKET DEVELOPING PROJECT AT MARKET ROAD,
ERNAKULAM
Principal Consultant Prof.Dr.Babu T. Jose
Consultant Er. Binex Kunjumon
CONTENTS
1.0 INTRODUCTION................................................................................................................................1
2.0 SCOPE OF WORK...............................................................................................................................1
3.0 FIELD EXPLORATION AND LABORATORY TESTING…......................................................2
3.1FIELD EXPLORATION AND METHODOLOGY................................................................2
3.2 ANALYSIS OF VARIOUS LABORATORY TESTS.............................................................2
3.3 DETAILS OF BOREHOLES…………………………………………………………………3
4.0 FINDINGS……………………………………….................................................................................4
4.1 FIELD OBSERVATIONS.........................................................................................................4
5.0 DESIGN CONSIDERATIONS FOR FOUNDATION SYSTEM................................................5
6.0 SUMMARY & RECOMMENDATIONS………………………………………………………….9
6.1 RECOMMENDATIONS………………………………………………………….................9
7.0 REFERENCES.................................................................................................................................... 11
ANNEXURE
1. BORELOG
2. N VALUE CURVE
3. LAB RESULT
CLIENT: IPE GLOBAL LTD
1
1. INTRODUCTION
Kochi Smart City Mission is planning to construct a B+G+3 storied building for the proposed Market Developing Project at Market Road, Ernakulam. The work of geotechnical investigation for the proposed project was entrusted to M/s Engineers Diagnostic Centre (P) Ltd, Cochin. The field works for the geotechnical investigation were carried out from 22nd of September to 6th of October 2019 and boring was done up to a maximum depth of 55.00m.
The scope of work for this investigation included performing site reconnaissance, drilling and sampling of three boreholes, conducting geotechnical field and laboratory testing, and preparing this report. The primary purpose of these activities was to collect subsurface information at the site for subsequent preparation of geotechnical recommendations for the design of foundations for the proposed project.
The results of various tests conducted to determine the physical and engineering properties of soil samples collected from the bore holes are also appended in this report.
2. SCOPE OF WORK
Scope of work for the geotechnical investigations consists of:
a) Drilling bore hole at three locations at the site. b) Conducting standard penetration tests (SPT) in the bore holes at regular intervals and collection of samples. c) Conducting laboratory tests on samples collected for geotechnical properties of soil. d) Submitting a geotechnical report providing foundation design and recommendation for the proposed project.
CLIENT: IPE GLOBAL LTD
2
3. FIELD EXPLORATION AND LABORATORY TESTING 3.1 FIELD EXPLORATION AND METHODOLOGY
Boring was done in accordance with the provisions of IS 1892-1979, using rotary calyx rig technique which is mechanically operated. Boreholes were drilled through the sandy and clayey layers and were terminated at 55.00m, 54.00m and 55.00m in areas of BH2, BH3 and BH4 respectively.
During drilling through the soil layers, sodium bentonite slurry was circulated in order to prevent the sides from caving. Standard penetration tests (SPT), were taken at various depth using standard split spoon sampler, the sets being driven by 63.5Kg hammer as per IS 2131-1981 giving a free fall of 750mm. The number of blows required to penetrate the first 15cm is for seating and is not considered for assessing strength characteristics. The summation of the number of second and third sets of 15cm each are termed as SPT value
bore holes. Soil samples were collected in plastic bags for visual inspection and classification of strata from all the layers as recorded in log sheets of bore holes.
3.2 ANALYSIS OF VARIOUS LABORATORY TESTS
Disturbed samples (SPT Samples) obtained from specified sampler were tested for the following index properties as well as strength properties to classify the strata to various soil group as per IS soil classification IS: 1498-1970 and IS: 2720.
3.2.1 Moisture Content {IS: 2720 (Part II) - 1973}
The natural moisture content of all the soil samples brought from the site was determined as prescribed in IS: 2720. For many soils, the water content will be an extremely important index used for establishing the relationship between the way a soil behaves and its properties. The consistency of a fine-grained soil largely depends on its water content. The water content is also used in expressing the phase relationships of air, water, and solids in a given volume of soil.
CLIENT: IPE GLOBAL LTD
3
3.2.2 Grain Size Distribution {IS: 2720 (Part IV) - 1985}
Both sieve analysis and Hydrometer analysis were conducted on different samples and the findings are tabulated. Since particle diameters typically span many orders of magnitude for natural sediments, in order to conveniently describe wide ranging data sets, the base to logarithmic (phi) scale was used to represent grain size information for sediment distribution. A tabular classification of grain sizes in terms of units and other commonly used measurement scales is included for purposes of comparison.
3.2.3 Specific Gravity {IS: 2720 (Part III)- 1980}
The specific gravity of soil particles was determined by using pycnometer or density bottle. Specific gravity is the ratio of the mass of unit volume of soil at a stated temperature to the mass of the same volume of gas-free distilled water at the same stated temperature. The specific gravity of a soil is used in the phase relationship of air, water, and solids in a given volume of the soil.
3.3 Details of Boreholes
The salient features of the one borehole are summarized in table 3.3.1
Borehole No.
Starting Date
Ending Date
Termination Depth
Ground Water Level
BH2 22.09.2019 27.09.2019 55.00m 0.50m BH3 29.09.2019 03.10.2019 54.00m 0.65m BH4 03.10.2019 06.10.2019 55.00m 0.70m
CLIENT: IPE GLOBAL LTD
4
4. FINDINGS
4.1FIELD OBSERVATIONS
BOREHOLE NO: 2(55.00m)
In BH-2, the top 0.50m comprise of fill. From 0.50m to 4.20m very soft silty clay having S.P.T value of 1 was noted. Below this medium stiff to stiff silty clay (grey) having S.P.T value of 4 to 12 was noted extending up to depth of 21.40m. This was followed by medium dense to dense lateritic silty sand with lateritic gravel (brownish/ reddish brown) having S.P.T value of 22 to 38 extending up to depth of 27.40m. From 27.40m to 30.00m very stiff silty clay (dark grey) having S.P.T value of 22 was noted. Below this hard sandy silty clay (grey) having S.P.T value of 30 to 34 was noted extending up to depth of 38.30m. This was followed by very dense silty sand (light grey) having S.P.T value greater than 50 to 67 extending up to depth of 50.20m. From 50.20m to 55.00m very dense sand (grey) having S.P.T value greater than 50 was noted and the borehole BH2 was terminated at 55.00m. Water table was noted at a depth of 0.50m from ground level in the borehole during the time of investigation.
BOREHOLE NO: 3 (54.00m)
In BH-3, the top 0.70m comprise of fill. From 0.70m to 2.30m very loose sand (grey)having S.P.T value of 1 was noted. Below this very loose silty sand (grey) having S.P.T value of 2 was noted extending up to depth of 3.60m. This was followed by very soft silty clay (grey) having S.P.T value of 1 to 2 extending up to depth of 6.70m. From 6.70m to 10.00m very loose silty sand (grey) having S.P.T value of 2 to 3 was noted. Below this medium stiff to stiff silty clay (grey) having S.P.T value of 5 to 9 was noted extending up to depth of 16.60m. This was followed by medium stiff to stiff silty clay (grey) having S.P.T value of 8 extending up to depth of 23.20m. From 23.20m to 26.30m very stiff lateritic sandy silty clay (brownish) having S.P.T value of 16 was noted. Below this medium dense silty sand (grey) having S.P.T value of 14 was noted extending up to depth of 28.50m.This was followed by very dense silty sand (dark grey) having S.P.T value greater than 100 extending up to depth of 30.30m.From 30.30m to 33.90m medium dense silty clayey sand (dark grey) having S.P.T value of 17 was noted. Below this decayed wood (black) having S.P.T value of 66 to greater than 100 was noted extending up to depth of 40.40m.This was followed by very dense silty sand (dark grey) having S.P.T value greater than 100 extending up to
CLIENT: IPE GLOBAL LTD
5
depth of 47.60m.From 47.60m to 52.50m very dense sand (whitish) having S.P.T value greater than 100 was noted. Below this very dense silty sand (grey) having S.P.T value greater than 100 was noted extending up to depth of termination of borehole BH3 at 54.00m. Water table was noted at a depth of 0.65m from ground level in the borehole during the time of investigation.
BOREHOLE NO: 4(55.00m)
In BH-4, the top 0.70m comprise of fill. From 0.70m to 2.50m loose silty sand (brownish) having S.P.T value of 7 was noted. Below this loose clayey silty sand (grey) having S.P.T value of 6 was noted extending up to depth of 3.70m. This was followed by very soft to soft sandy silty clay (grey) having S.P.T value of 1 to 3 extending up to depth of 21.80m. From 21.80m to 23.40m very stiff silty clay with shell dust (grey) having S.P.T value of 18 was noted. Below this loose silty sand (grey) having S.P.T value of 6 was noted extending up to depth of 27.20m. This was followed by medium dense lateritic silty sand (brownish) having S.P.T value of 16 to 18 extending up to depth of 33.00m. From 33.00m to 36.40m dense sand (grey) having S.P.T value of 32 was noted. Below this very dense sand (grey) having S.P.T value greater than 100 was noted extending up to depth of 40.30m.This was followed by decayed wood (black) having S.P.T value greater than 100 extending up to depth of 48.70m. From 48.70m to 55.00m very dense sand (whitish/ grey) having S.P.T value greater than 100 was noted and the borehole BH4was terminated at 55.00m. Water table was noted at a depth of 0.70m from ground level in the borehole during the time of investigation.
5. DESIGN CONSIDERATIONS FOR FOUNDATION SYSTEM
Recommendations are based on the assumption that the soil profiles obtained in the boreholes taken are indicative of the entire area of the project. Any deviation in soil profile other than that observed in the boreholes tested should immediately be referred to the consultant and proper modification should be implemented.
From the study of the borehole, it was noted that the 0.50m to 0.70m comprise of fill. Shallow foundation if adopted in the top fill will undergo differential settlements due to non-homogeneous nature of the fill. Below this very soft silty clay was noted extending
CLIENT: IPE GLOBAL LTD
6
up to depth of 4.50m in areas of BH2.In areas of BH3 and BH4, below the fill very loose to losse silty sand was noted extending up to a depth of 3.60 to 3.70m.
For the B+G+3 storied building, bored cast in situ D.M.C. piles with adequate penetration into dense to very dense sand strata at 42.00m depth in areas of BH2,BH3 and 50.00m in areas of BH4 may be provided. Suitable precaution has to be adopted in order to prevent the sides from caving while boring through loose sand layer.
Load test are essential for accurate determination of pile capacity.
Typical Calculations of safe bearing capacity of borehole BH3 are given below.
As per IS-2911, Part 1, Sec II, the ultimate load carrying capacity (Q u) for pile resting on granular soil is given by
Qu = + K Pdi tan As
Where
Ap = Cross Sectional area of pile toe m2
D = Pile diameter in m
= Effective unit weight of soil at pile toe kgf/cm3
Pd = Effective overburden pressure at pile toe in kgf/cm 2
= Bearing capacity factors based on angle of internal friction at pile toe
K = Coefficient of earth pressure
Pdi = Effective overburden pressure for the layer kgf/cm2
= Angle of wall friction between pile and soil
As = Surface Area of pile shaft, m2
The depth of pile is likely to be about 42.00m in the area of BH3. The load capacity of pile will be the summation of the friction developed from the very loose to loose sand/medium dense sand, soft clay/stiff/very stiff sandy clay strata and hard sandy clay strata.
Shear parameters and frictional capacity of pile in the area of BH3 is
CLIENT: IPE GLOBAL LTD
7
Soil Strata BH3 zT
(m) zB
(m) H
(m) Description and Classification SPT N
(kN/m3)c
(kPa) cu
(kPa) ufrictional capacity
0.7 4.6 3.9 Very loose sand 1 17 28 - - 5.23 4.6 7.2 2.6 Very soft clay 2 15 - - 10 - 2.60 7.2 10 2.8 Very loose sand 2 17 - 28 - - 10.15 10 24 14 Medium stiff clay 7 16 - - 40 - 52.75 24 26.8 2.8 Very stiff clay 16 18.5 - - 107 - 16.93
26.8 28.2 1.4 Medium dense sand 14 17 - 31 - - 5.99 28.2 31.4 3.2 Very dense sand 100 20 - 40 - - 18.41 31.4 34.8 3.4 Medium dense sand 17 17 - 32 - - 15.09 34.8 40.5 5.7 Decayed wood 83 16 - - - - 0.00 40.5 42 1.5 Very dense sand 100 20 40 8.63
Table 1: Shear parameters and frictional capacity of 600mm dia in area of BH3
Hence the safe capacity of pile based on soil strength criteria works out to be
Qsafe =((Rub + Ruf(1) + Ruf(2)+ Ruf(3)+ Ruf(4)+ Ruf(5) + Ruf(6)+ Ruf(7)+ Ruf(8)+ Ruf(9)+Ruf(10)+)/ 2.5)
= ((181.3+5.23+2.60+10.15+52.75+16.93+5.99+18.41+15.09+0+8.63)) /2.5)
=126.83Tonnes, Say 125 Tonnes
The Uplift capacity of pile based on soil strength criteria works out to be
Qsafe = (Ruf(1) + (Ruf(2)+ Ruf(3)+ Ruf(4)+ Ruf(5) + Ruf(6)+Ruf(7)+Ruf(8) + Ruf(9)+Ruf(10)) / 3)
=((5.23+2.60+10.15+52.75+16.93+5.99+18.41+15.09+0+8.63)) / 3) `
= 45.263Tonnes
0.6 x 0.6 x 42 x 1.5 = 17.803 Tonnes
Uplift capacity of pile = 45.263+17.803= 63.056, Say 60 Tonnes
Hence the safe uplift capacity of the pile of 600mm dia can be taken as 60 Tonnes.
CLIENT: IPE GLOBAL LTD
8
Capacity from Structural Strength Criteria:
Considering grade of Concrete to be used = M35
Permissible stress in direct compression = 9N/mm2
Considering concreting is to be done underwater, take only 75% of the capacities
Hence permissible stress in direct compression = 6.75N/mm 2
Qsafe of pile of 600mm dia from structural strength criteria
= (3.14/4) x 0.6 x 0.6 x 675 = 190.755Tonnes
Hence the safe carrying capacity of the pile in the very dense sand strata will be governed by the soil strength criteria and the safe capacity of 600mm dia pile can be taken as 125Tonnes. 6. SUMMARY & RECOMMENDATIONS:
Recommendations are based on the assumption that the soil profile found in the borehole tested is indicative of the surrounding plot area. Any deviation in soil profile other than that observed in the borehole tested in that area should immediately be referred to the consultant and proper modification should be implemented.
6.1 RECOMMENDATIONS
From the study of the borehole, it was noted that the 0.50m to 0.70m comprise of fill. Shallow foundation if adopted in the top fill will undergo differential settlements due to non-homogeneous nature of the fill. Below this very soft silty clay was noted extending up to depth of 4.50m in areas of BH2. In areas of BH3 and BH4, below the fill very loose to losse silty sand was noted extending up to a depth of 3.60 to 3.70m.
CLIENT: IPE GLOBAL LTD
9
For the B+G+3 storied building, bored cast in situ D.M.C. piles with adequate penetration into dense to very dense sand strata at 42.00m depth in areas of BH2,BH3 and 50.00m in areas of BH4 may be provided. Suitable precaution has to be adopted in order to prevent the sides from caving while boring through loose sand layer.
Load tests are essential for accurate determination of pile capacity
Safe vertical load carrying capacity of D.M.C. piles end bearing terminating in to very dense sand may roughly be assessed as
Pile Diameter (cm) Axial Capacity (Tonnes) Uplift Capacity (Tonnes)
50 80 45
60 125 60
70 180 80
80 250 95
For design consideration the horizontal load carrying capacity can be taken as 5% of
the axial capacity. Routine pile load tests shall be conducted on all piles for verification of pile
capacities recommended. The foundation execution is recommended under strict technical supervision.
For ENGINEERS DIAGNOSTIC CENTRE (P)LTD.,
Dr. BABU T JOSE (B.E.M.Tech,Ph.D, FIGS) GEOTECHNICAL CONSULTANT
CLIENT: IPE GLOBAL LTD
10
7. REFERENCES 1) Foundation Analysis And Design,J.EBowels,Mcgraw Hill Publication
2) Soil Mechanics And Foundation Engineering,K.RArora,Standard Publishers Distributors,Fourth Edition,1997
3) Soil Mechanics In Engineering Practice, 2ndEdition,Terzaghi K and Peck R.B, John Willey And Sons,1967.
4) IS:6403-1981,Code Of Practice For Determinationof Bearing Capacity Of Shallow Foundation.
5) Foundation Manual,N.V Nayak,1996.
6) Foundation Design And Construction,M.JTomlinson,Viewpoint Publishers.
7) IS12070-1987, Code of Practice for Design of Shallow Foundation on Rock.
8) IS 2911 (PART1/SECTION 2)-1979, Codeof Practice for Design and Construction of Pile Foundation.
9) Pile Design,Poulos& Davis.
Annexure
Borelog
GEOTECHNICAL INVESTIGATION WORK FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKETROAD, ERNAKULAM
ENGINEERS DIAGNOSTICCENTRE (P) LTD
Client :
Bore Hole No :
Type of Boring :
Termination Depth :
Boring Started :
Boring Completed :
Ground Water Table:
Location :
Remarks
SPT
" N
"
Test Depth
DEP
TH in
m
THIC
KN
ESS
OF
STR
ATA BLOWS/15cm
15cm 15cm 15cmDEP
TH
PRO
FILE
DESCRIPTION OF STRATA
BH 2
ROTARY
55.00 m MARKET ROAD
27.09.2019
IPE GLOBAL LTD 22.09.2019
0.50m
3.50
UDS SLIPPED
4.20
0.50
9.50 9.50-9.95 4 4 5 9
1 0 1 1 2.00 2.50- 2.95
5.00 5.00- 5.45 1 1 4 5
8.00 8.00- 8.45 2 2 3 5
UDS COLLECTED
11.00 11.00-11.45 2 2 4 6
12.50 12.50-12.95 3 4 3 7
14.00 14.00-14.45 4 4 5 9
15.50 15.00-15.95 4 5 7 12
17.00 2 2 3 5
20.00 20.00-20.45 3 2 2 4
22.00 22.00-22.45 9 11 13 24
0.50
21.40
3.70
17.20
6.50
17.00-17.45
18.50 218.50-18.95
Concrete filling
Very soft silty CLAY
Medium stiff to stiff silty CLAY (grey)
GEOTECHNICAL INVESTIGATION WORK FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKETROAD, ERNAKULAM
ENGINEERS DIAGNOSTICCENTRE (P) LTD
Client :
Bore Hole No :
Type of Boring :
Termination Depth :
Boring Started :
Boring Completed :
Ground Water Table:
Location :
Remarks
SPT
" N
"
Test Depth
DEP
TH in
m
THIC
KN
ESS
OF
STR
ATA BLOWS/15cm
15cm 15cm 15cmDEP
TH
PRO
FILE
DESCRIPTION OF STRATA
BH 2
ROTARY
55.00 m MARKET ROAD
27.09.2019
IPE GLOBAL LTD 22.09.2019
0.50m
26.00
33.00 33.00-33.45 11 15 19 34
8 10 12 22 24.00 24.00- 24.45
28.00 28.00- 28.45 7 10 12 22
30.00 30.00- 30.45
36.00 36.00-36.45
19 28 39 67
43.00 43.00-43.45 20 30 35 65
26.00- 26.45 12 17 21 38
12 13 17 30
39.00 39.00-39.45
27.40
38.30
Medium dense to dense lateritic silty sandwith lateritic gravel (brownish/ reddish brown)
6.00
2.60
8.30
11.90
SPT REBOUNDED
Very stiff silty CLAY (dark grey))
Hard sandy silty clay(grey)
Very dense silty SAND (light grey)
30.00
THE BOREHOLE WAS TERMINATED AT 55.00m DEPTH
GEOTECHNICAL INVESTIGATION WORK FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKETROAD, ERNAKULAM
ENGINEERS DIAGNOSTICCENTRE (P) LTD
Client :
Bore Hole No :
Type of Boring :
Termination Depth :
Boring Started :
Boring Completed :
Ground Water Table:
Location :
Remarks
SPT
" N
"
Test Depth
DEP
TH in
m
THIC
KN
ESS
OF
STR
ATA BLOWS/15cm
15cm 15cm 15cmDEP
TH
PRO
FILE
DESCRIPTION OF STRATA
BH 2
ROTARY
55.00 m MARKET ROAD
27.09.2019
IPE GLOBAL LTD 22.09.2019
0.50m
55.00 55.00-55.45
50/13cm penetration >100 47.00 47.00- 47.45
51.00 51.00-51.45
Balance = 32cm
50/10cm penetration >100 Balance = 40cm
50/10cm penetration >100 Balance = 35cm55.00
50.20
4.80Very dense SAND (light grey)
Very dense silty SAND (light grey)
GEOTECHNICAL INVESTIGATION WORK FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKETROAD, ERNAKULAM
ENGINEERS DIAGNOSTICCENTRE (P) LTD
Client :
Bore Hole No :
Type of Boring :
Termination Depth :
Boring Started :
Boring Completed :
Ground Water Table:
Location :
Remarks
SPT
" N
"
Test Depth
DEP
TH in
m
THIC
KN
ESS
OF
STR
ATA BLOWS/15cm
15cm 15cm 15cmDEP
TH
PRO
FILE
DESCRIPTION OF STRATA
BH 3
ROTARY
54.00 m MARKET ROAD
03.10.2019
IPE GLOBAL LTD 29.09.2019
0.65m
3.60
0.70
Very loose SAND(grey)
1.50
FILL 0.70
16.60
10.00
6.70
Very soft silty CLAY(grey)
Very loose silty SAND (grey)
Medium stiff to stiff silty CLAY (grey)
Medium stiff to stiff silty CLAY (grey)
1.30
3.10
3.30
6.60
6.60
1.50- 1.95 1 0 1 1
3.00 3.00- 3.45 1 1 1 2
4.50 4.50- 4.95 0 1 1
6.00 6.00- 6.45 1 1 2
1
1
7.50 7.50- 7.95 1 1 2 1
9.00 9.50- 9.45 1 2 3 1
10.50 10.50- 10.95 3 4 7 3
12.00 12.00- 12.45 3 2 5 2
13.50 13.50- 13.95 3 3 6 3
15.50 15.50- 15.95 4 5 9 4
17.00 17.00- 17.45 3 5 8 4
19.00 19.00- 19.95 4 4 8 3
21.00 21.00- 21.45 4 4 8 4
Very loose silty SAND (grey)
1.60
2.30
ENGINEERS DIAGNOSTICCENTRE (P) LTD
Client :
Bore Hole No :
Type of Boring :
Termination Depth :
Boring Started :
Boring Completed :
Ground Water Table:
Location :
Remarks
SPT
" N
"
Test Depth
DEP
TH in
m
THIC
KN
ESS
OF
STR
ATA BLOWS/15cm
15cm 15cm 15cmDEP
TH
PRO
FILE
DESCRIPTION OF STRATA
BH 3
ROTARY
54.00 m MARKET ROAD
03.10.2019
IPE GLOBAL LTD 29.09.2019
0.65m
27.00
32.00 32.00-32.45 8 8 9 17
6 7 9 16 25.00 25.00- 25.45
29.00 29.00- 29.45 29 48 50/ 10Cm >100
35.00 35.00-35.45
16 18 48 66
27.00- 27.45 6 7 7 14
20 40 50 /13 cm >100
38.00 38.00-38.45
23.20
30.30
40.40
26.30
33.90
Very stiff lateritic sandy silty CLAY (brownish)
Medium dense silty SAND (grey)
Very dense silty SAND (dark grey)
Decayed wood (black)
Very dense silty SAND (dark grey)
3.10
2.20
3.60
6.50
7.20
12 16 50/ 12cm >100 41.00 41.00-41.45
2.00
28.50
Medium dense silty clayey SAND (dark grey)
GEOTECHNICAL INVESTIGATION WORK FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKETROAD, ERNAKULAM
Medium stiff to stiff silty CLAY (grey)
THE BOREHOLE WAS TERMINATED AT 54.00m DEPTH
ENGINEERS DIAGNOSTICCENTRE (P) LTD
Client :
Termination Depth :
Bore Hole No :
Type of Boring : Ground Water Table:
Remarks
Boring Started :
Boring Completed :
Location :
SPT
" N
"
Test Depth
DEP
TH in
m
THIC
KN
ESS
OF
STR
ATA BLOWS/15cm
15cm 15cm 15cmDEP
TH
PRO
FILE
DESCRIPTION OF STRATA
BH 3
ROTARY
MARKET ROAD
IPE GLOBAL LTD
50.00 50.00-50.45
50/13cm>100 45.00 45.00- 45.45
>100 50/10cm 4.90
47.60
54.00
Very dense SAND (whitish)
40 15
48
54.00 54.00-54.45 50/35cm >100
1.50
52.50
Very dense silty SAND (grey)
GEOTECHNICAL INVESTIGATION WORK FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKETROAD, ERNAKULAM
54.00 m
03.10.2019
29.09.2019
0.65m
Very dense silty SAND (dark grey)
GEOTECHNICAL INVESTIGATION WORK FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKETROAD, ERNAKULAM
ENGINEERS DIAGNOSTICCENTRE (P) LTD
Client :
Bore Hole No :
Type of Boring :
Termination Depth :
Boring Started :
Boring Completed :
Ground Water Table:
Location :
Remarks
SPT
" N
"
Test Depth
DEP
TH in
m
THIC
KN
ESS
OF
STR
ATA BLOWS/15cm
15cm 15cm 15cmDEP
TH
PRO
FILE
DESCRIPTION OF STRATA
BH 4
ROTARY
55.00 m MARKET ROAD
06.10.2019
IPE GLOBAL LTD 05.10.2019
0.70m
3.70
0.70
Loose silty SAND (brownish)
1.50
FILL 0.70
Very soft to soft sandy silty CLAY (grey)
1.20
18.1
1.50- 1.95 2 4 3 7
3.00 3.00- 3.45 2 3 3 6
4.50 4.50- 4.95 1 2 3
6.00 6.00- 6.45 1 2 3
1
1
8.00 8.00- 8.45 0 1 1 1
10.00 10.00- 10.45 1 1 2 1
12.00 12.00- 12.45 0 1 1 1
14.00 14.00- 14.45 1 1 2 1
16.00 16.00- 16.45 1 2 3 1
18.00 18.00- 18.45 1 1 2 2
20.00 20.00- 20.45 1 2 3 1
Loose clayey silty SAND (grey)
1.80
2.50
ENGINEERS DIAGNOSTICCENTRE (P) LTD
Client :
Bore Hole No :
Type of Boring :
Termination Depth :
Boring Started :
Boring Completed :
Ground Water Table:
Location :
Remarks
SPT
" N
"
Test Depth
DEP
TH in
m
THIC
KN
ESS
OF
STR
ATA BLOWS/15cm
15cm 15cm 15cmDEP
TH
PRO
FILE
DESCRIPTION OF STRATA
BH 4
ROTARY
55.00 m MARKET ROAD
06.10.2019
IPE GLOBAL LTD 05.10.2019
0.70m
3 2 3 5 22.00 22.00- 22.45 21.80
33.00
40.30
23.40
36.40
Very stiff silty CLAY with shell dust(grey)
Loose silty SAND (grey)
Decayed wood (black)
Dense SAND (grey)
Very dense SAND (whitish)
1.60
3.80
5.80
3.40
8.40
27.20
6 8 10 18 24.00 24.00- 24.45
3 3 3 6 26.00 26.00- 26.45
7 9 9 18 28.00 28.00- 28.45
6 8 7 16 30.00 30.00- 30.45
10 13 19 32 34.00 34.00- 34.45
24 29 50/15 cm >100 38.00 38.00- 38.45
50/32cm >100 42.00 42.00- 42.45
3.90
GEOTECHNICAL INVESTIGATION WORK FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKETROAD, ERNAKULAM
Very soft to soft sandy silty CLAY (grey)
Medium dense lateritic silty SAND (brownish)
THE BOREHOLE WAS TERMINATED AT 55.00m DEPTH
ENGINEERS DIAGNOSTICCENTRE (P) LTD
Client :
Termination Depth :
Bore Hole No :
Type of Boring : Ground Water Table:
Remarks
Boring Started :
Boring Completed :
Location :
SPT
" N
"
Test Depth
DEP
TH in
m
THIC
KN
ESS
OF
STR
ATA BLOWS/15cm
15cm 15cm 15cmDEP
TH
PRO
FILE
DESCRIPTION OF STRATA
BH 4
ROTARY
55.00 m MARKET ROAD
IPE GLOBAL LTD
50.00 50.00-50.45
50/32cm >100 46.00 46.00- 46.45
>100 50/27cm
48.70
55.00
48
46
55.00 55.00-55.45 50/35cm>100
6.30Very dense SAND (whitish)
8.40
GEOTECHNICAL INVESTIGATION WORK FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKETROAD, ERNAKULAM
06.10.2019
05.10.2019
0.70m
Decayed wood (black)
N value Curve
Bore Hole No : 03 Boring Started :29.09.2019Type of Boring : Rotary Boring Completed :03.10.2019Termination Depth : 54.00m Ground water table : 0.65m
PROJECT : GEOTECHNICAL INVESTIGATION FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKET ROAD, ERNAKULAM
ENGINEERS DIAGNOSTIC
CENTRE (P) LTD
BORE HOLE TERMINATED AT 54.00MFIG. 2
0.0
1.5
3.0
4.5
6.0
7.5
9.0
10.5
12.0
13.5
15.0
16.5
18.0
19.5
21.0
22.5
24.0
25.5
27.0
28.5
30.0
31.5
33.0
34.5
36.0
37.5
39.0
40.5
42.0
43.5
45.0
46.5
48.0
49.5
51.0
52.5
54.0
55.5
0 10 20 30 40 50 60 70 80 90 100
DEPT
H(M
)
N- VALUE(BLOWS)GRAPHICAL REPRESENTATION OF N VALUE
17
>10014
16
8
8
2
1
8
6
9
3
5
7
2
2
1
66
>100
>100
>100
>100
>100
Bore Hole No : 02 Boring Started :22.09.2019Type of Boring : Rotary Boring Completed :27.09.2019Termination Depth : 55.00m Ground water table : 0.50m
ENGINEERS DIAGNOSTIC
CENTRE (P) LTD
BORE HOLE TERMINATED AT 55.00MFIG. 1
PROJECT : GEOTECHNICAL INVESTIGATION FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKET ROAD, ERNAKULAM
0.0
1.5
3.0
4.5
6.0
7.5
9.0
10.5
12.0
13.5
15.0
16.5
18.0
19.5
21.0
22.5
24.0
25.5
27.0
28.5
30.0
31.5
33.0
34.5
36.0
37.5
39.0
40.5
42.0
43.5
45.0
46.5
48.0
49.5
51.0
52.5
54.0
55.5
0 10 20 30 40 50 60 70 80 90 100
DEPT
H(M
)
N- VALUE(BLOWS)GRAPHICAL REPRESENTATION OF N VALUE
34
30
22
38
24
12
5
1
22
5
4
5
9
7
6
9
5
67
65
>100
>100
>100
Bore Hole No : 04 Boring Started :05.10.2019Type of Boring : Rotary Boring Completed :06.10.2019Termination Depth : 55.00m Ground water table : 0.70m
PROJECT : GEOTECHNICAL INVESTIGATION FOR THE PROPOSED B+G+3 STOREYED BUILDING AT MARKET ROAD, ERNAKULAM
ENGINEERS DIAGNOSTIC
CENTRE (P) LTD
BORE HOLE TERMINATED AT 55.00MFIG. 3
0.0
1.5
3.0
4.5
6.0
7.5
9.0
10.5
12.0
13.5
15.0
16.5
18.0
19.5
21.0
22.5
24.0
25.5
27.0
28.5
30.0
31.5
33.0
34.5
36.0
37.5
39.0
40.5
42.0
43.5
45.0
46.5
48.0
49.5
51.0
52.5
54.0
55.5
0 10 20 30 40 50 60 70 80 90 100
DEPT
H(M
)
N- VALUE(BLOWS)GRAPHICAL REPRESENTATION OF N VALUE
16
18
18
6
2
6
7
3
5
2
3
3
1
2
3
1
32
>100
>100
>100
>100
>100
Lab Result
NOTE: SAMPLES SUPPLIED BY CLIENT
DEPTH IN METRE: 55.00m SHEAR PARAMETERS
N DEPTH SAMPLE SOIL DESCRIPTION TEST
VALUE (M) TYPE WET DRY METHOD
1 2.00 SPT-1 Grey soft silty clay CH 0 8 43 49 52 130 44 86 2.54
3.50 UDS-1 Slipped
5 5.00 SPT-2 Grey silty clay CH 0 12 41 47 114 134 46 88 2.54
6.50 UDS-2 Grey silty clay
5 8.00 SPT-3 Grey silty clay CH 0 10 42 48 119 126 43 83 2.54
9 9.50 SPT-4 Grey silty clay
6 11.00 SPT-5 Grey silty clay
7 12.50 SPT-6 Grey silty clay CH 0 2 47 51 111 122 41 81 2.54
9 14.00 SPT-7 Grey silty clay
12 15.50 SPT-8 Grey silty clay
5 17.00 SPT-9 Grey silty clay CH 0 8 43 49 117 120 40 80 2.54
5 18.50 SPT-10 Grey silty clay
4 20.00 SPT-11 Grey silty clay CH 0 11 42 47 104 116 39 77 2.54
LAB DONE BY: ENGINEER IN CHARGE: APPROVED BY:
ALEXANDER K J Er. AISWARYA RAJEEV BINEX KUNJUMON (M.TECH),(GEO TECHNICAL)
SPE
CIF
IC
GR
AV
ITY
PLC
kg/cm2
I.S CLASIFICATION
PICLAY%
ATTERBERGS LIMIT(%)GRAIN SIZE ANALYSIS
GRAVEL% LLSILT
%SAND
%N M
CØ
DEGREE
FSI %
UNIT WEIGHT (gm/cc)
ENGINEERS DIAGNOSTIC CENTRE (P) LTD41/1210, VADAKUMTHALA BUILDING,
PULLEPADDY, COCHIN-682018 PHONE: 0484 2371643
DATE OF BORING: 22.09.2019-27.09.2019
PROPOSED B+G+3 STORIED BUILDING AT ERNAKULAM MARKET
BORE HOLE NO: 2 (SHEET 1 OF 2)
JOB NO:EDC/920/GI/026DATE:12.10.2019
TYPE OF BORING: ROTARY DRILLING 150mm DIAWATER LEVEL: 0.50m
CLIENT: IPE GLOBAL LTDPROJECT:
NOTE: SAMPLES SUPPLIED BY CLIENT
DEPTH IN METRE: 55.00m SHEAR PARAMETERS
N DEPTH SAMPLE SOIL DESCRIPTION TEST
VALUE (M) TYPE WET DRY METHOD
24 22.00 SPT-12 Brownish lateritic silty sand with gravel SM 10 52 25 13 20 2.62
22 24.00 SPT-13 Brownish lateritic silty sand with gravel SM 10 40 30 20 20 2.60
38 26.00 SPT-14 Reddish brown lateritic silty sand with gravel SM 15 44 25 16 19 2.61
22 28.00 SPT-15 Dark grey medium stiff silty clay CH 0 32 30 38 52 72 28 44 2.58
30.00 SPT-16 S P T Rebounded
34 33.00 SPT-17 Grey sandy silty clay CH 0 38 28 34 48 2.58
30 36.00 SPT-18 Grey sandy silty clay
67 39.00 SPT-19 Light grey silty fine sand SM 0 78 16 6 26 2.63
65 43.00 SPT-20 Light grey silty fine sand SM 0 76 16 8 21 2.63
>50 47.00 SPT-21 Light grey silty fine sand SM 0 80 16 4 18 2.64
>50 51.00 SPT-22 Sample slipped
>50 55.00 SPT-23 Grey coarse sand SM, 0 83 15 2 17 2.64
LAB DONE BY: ENGINEER IN CHARGE: APPROVED BY:
ALEXANDER K J Er. AISWARYA RAJEEV
PL PIC
kg/cm2Ø
DEGREE
BINEX KUNJUMON (M.TECH),(GEO TECHNICAL)
TYPE OF BORING: ROTARY DRILLING 150mm DIA BORE HOLE NO: 2 (SHEET 2 OF 2) DATE OF BORING: 22.09.2019-27.09.2019WATER LEVEL: 0.50m
I.S CLASIFICATION
GRAIN SIZE ANALYSIS ATTERBERGS LIMIT(%) FSI %
SPE
CIF
IC
GR
AV
ITY UNIT WEIGHT
(gm/cc)GRAVEL%
SAND %
SILT%
CLAY%
N M C LL
ENGINEERS DIAGNOSTIC CENTRE (P) LTD41/1210, VADAKUMTHALA BUILDING,
PULLEPADDY, COCHIN-682018 PHONE: 0484 2371643
PROJECT: PROPOSED MULTILEVEL CAR PARKING AT ERNAKULAM MARKET CLIENT: IPE GLOBAL LTD
JOB NO:EDC/920/GI/026DATE:12.10.2019
NOTE: SAMPLES SUPPLIED BY CLIENT
DEPTH IN METRE: 54.00m SHEAR PARAMETERS
N DEPTH SAMPLE SOIL DESCRIPTION TEST
VALUE (M) TYPE WET DRY METHOD
1 1.50 SPT-1 Greyesh silty fine sand SM 0 84 14 2 21 2.64
2 3.00 SPT-2 Grey silty very fine sand SM 0 62 25 13 25 2.62
1 4.00 SPT-3 Sample sliped
2 6.00 SPT-4 Grey sandy silty clay CH 0 30 31 39 59 2.57
2 7.50 SPT-5 Grey silty sand SM 0 62 22 16 30 2.62
3 9.00 SPT-6 Grey silty sand SM
7 10.50 SPT-7 Grey sandy silty clay CH 0 24 35 41 75 112 42 70 2.56
5 12.00 SPT-8 Grey sandy silty clay CH
6 13.50 SPT-9 Grey sandy silty clay CH
9 15.00 SPT-10 Grey sandy silty clay CH
8 17.00 SPT-11 Grey silty clay CH 0 2 46 52 87 117 45 72 2.54
8 19.00 SPT-12 Grey silty clay CH
LAB DONE BY: ENGINEER IN CHARGE: APPROVED BY:
ALEXANDER K J Er. AISWARYA RAJEEV
UNIT WEIGHT (gm/cc)
ENGINEERS DIAGNOSTIC CENTRE (P) LTD41/1210, VADAKUMTHALA BUILDING,
PULLEPADDY, COCHIN-682018 PHONE: 0484 2371643
DATE OF BORING: 29.10.21019-.03.10.2019
PROPOSED B+G+3 STORIED BUILDING AT ERNAKULAM MARKET
BORE HOLE NO : 3 (SHEET 1 OF 2)
JOB NO:EDC/920/GI/026DATE:12.10.2019
TYPE OF BORING: ROTARY DRILLING 150mm DIAWATER LEVEL: 0.65m
CLIENT: IPE GLOBAL LTDPROJECT:
BINEX KUNJUMON (M.TECH),(GEO TECHNICAL)
SPE
CIF
IC
GR
AV
ITY
PLC
kg/cm2
I.S CLASIFICATION
PICLAY%
ATTERBERGS LIMIT(%)GRAIN SIZE ANALYSIS
GRAVEL% LLSILT
%SAND
%N M
CØ
DEGREE
FSI %
NOTE: SAMPLES SUPPLIED BY CLIENT
DEPTH IN METRE: 54.00m SHEAR PARAMETERS
N DEPTH SAMPLE SOIL DESCRIPTION TEST
VALUE (M) TYPE WET DRY METHOD
8 21.00 SPT-13 Grey silty clay
16 25.00 SPT-14 Brownish lateritic stiff sandy silty clay CH 0 16 39 45 18 143 45 98 2.56
14 27.00 SPT-15 Dark grey silty fine to medium sand SM 0 72 19 9 25 2.63
>100 29.00 SPT-16 Dark grey silty fine to medium sand SM
17 32.00 SPT-17 Dark grey silty clayey sand SM 0 58 17 25 46 71 29 42 2.61
>100 35.00 SPT-18 Black decayed wood OH
66 38.00 SPT-19 Black decayed wood OH
>100 41.00 SPT-20 Dark grey silty sand SM 0 76 16 8 26 2.63
>100 45.00 SPT-21 Sample slipped
>100 50.00 SPT-22 whitish fine to medium sand SM 0 82 15 3 17 2.64
>100 54.00 SPT-23 Grey silty coarse sand SM 0 59 24 17 14 2.61
LAB DONE BY: ENGINEER IN CHARGE: APPROVED BY:
ALEXANDER K J Er. AISWARYA RAJEEV
ENGINEERS DIAGNOSTIC CENTRE (P) LTD41/1210, VADAKUMTHALA BUILDING,
PULLEPADDY, COCHIN-682018 PHONE: 0484 2371643
PROJECT: PROPOSED B+G+3 STORIED BUILDING AT ERNAKULAM MARKET CLIENT: IPE GLOBAL LTD
JOB NO:EDC/920/GI/026DATE:12.10.2019
TYPE OF BORING: ROTARY DRILLING 150mm DIA BORE HOLE NO: 3 (SHEET 2 OF 2) DATE OF BORING: 29.10.21019-.03.10.2019WATER LEVEL: 0.65m
I.S CLASIFICATION
GRAIN SIZE ANALYSIS ATTERBERGS LIMIT(%) FSI %
SPE
CIF
IC
GR
AV
ITY UNIT WEIGHT
(gm/cc)GRAVEL%
SAND %
SILT%
CLAY%
N M C LL PL PI
C kg/cm2
Ø DEGREE
BINEX KUNJUMON (M.TECH),(GEO TECHNICAL)
NOTE: SAMPLES SUPPLIED BY CLIENT
DEPTH IN METRE: 55.00m SHEAR PARAMETERS
N DEPTH SAMPLE SOIL DESCRIPTION TEST
VALUE (M) TYPE WET DRY METHOD
7 1.50 SPT-1 Brownish silty fine sand SM 0 64 21 15 22 2.62
6 3.00 SPT-2 Grey clayey silty very fine sand SM 0 58 25 17 23 2.61
3 4.00 SPT-3 Grey sandy silty clay CH 0 18 36 46 49 102 37 65 2.57
3 6.00 SPT-4 Grey sandy silty clay CH
1 8.00 SPT-5 Grey soft sandy silty clay CH 0 21 36 43 100 2.56
2 10.00 SPT-6 Grey soft sandy silty clay CH
1 12.00 SPT-7 Grey soft sandy silty clay CH
2 14.00 SPT-8 Grey soft sandy silty clay CH 0 24 35 41 98 123 40 83 2.56
3 16.00 SPT-9 Grey soft sandy silty clay CH
2 18.00 SPT-10 Grey soft sandy silty clay CH 0 26 34 40 93 126 42 84 2.56
3 20.00 SPT-11 Grey soft sandy silty clay CH
5 22.00 SPT-12 Grey medium stiff sandy silty clay CH 0 20 36 44 62 2.56
LAB DONE BY: ENGINEER IN CHARGE: APPROVED BY:
ALEXANDER K J Er. AISWARYA RAJEEV
UNIT WEIGHT (gm/cc)
ENGINEERS DIAGNOSTIC CENTRE (P) LTD41/1210, VADAKUMTHALA BUILDING,
PULLEPADDY, COCHIN-682018 PHONE: 0484 2371643
DATE OF BORING: 05.10.21019-.06.10.2019
PROPOSED B+G+3 STORIED BUILDING AT ERNAKULAM MARKET
BORE HOLE NO : 4 (SHEET 1 OF 2)
JOB NO:EDC/920/GI/026DATE:12.10.2019
TYPE OF BORING: ROTARY DRILLING 150mm DIAWATER LEVEL: 0.70m
CLIENT: IPE GLOBAL LTDPROJECT:
BINEX KUNJUMON (M.TECH),(GEO TECHNICAL)
SPE
CIF
IC
GR
AV
ITY
PLC
kg/cm2
I.S CLASIFICATION
PICLAY%
ATTERBERGS LIMIT(%)GRAIN SIZE ANALYSIS
GRAVEL% LLSILT
%SAND
%N M
CØ
DEGREE
FSI %
NOTE: SAMPLES SUPPLIED BY CLIENT
DEPTH IN METRE: 55.00m SHEAR PARAMETERS
N DEPTH SAMPLE SOIL DESCRIPTION TEST
VALUE (M) TYPE WET DRY METHOD
18 24.00 SPT-13 Grey silty clay with shell dust CH 0 24 35 41 86 112 39 73 2.56
6 26.00 SPT-14 Grey silty fine sand SM 0 77 16 7 20 2.64
18 28.00 SPT-15 Brownish lateritic silty sand SM 0 50 28 22 18 2.60
16 30.00 SPT-16 Brownish lateritic stiff silty sand SM
32 34.00 SPT-17 Grey fine sand SM-MH 0 80 16 4 20 106 38 68 2.64
>100 38.00 SPT-18 Grey fine sand SM-MH
>100 42.00 SPT-19 Black decayed wood OH
>100 46.00 SPT-20 Black decayed wood OH
>100 50.00 SPT-21 Whitish silty fine sand SM 0 80 15 5 17 2.64
>100 55.00 SPT-22 Grey silty fine to medium sand SM 0 83 15 2 16 2.64
LAB DONE BY: ENGINEER IN CHARGE: APPROVED BY:
ALEXANDER K J Er. AISWARYA RAJEEV
ENGINEERS DIAGNOSTIC CENTRE (P) LTD41/1210, VADAKUMTHALA BUILDING,
PULLEPADDY, COCHIN-682018 PHONE: 0484 2371643
PROJECT: PROPOSED B+G+3 STORIED BUILDING AT ERNAKULAM MARKET CLIENT: IPE GLOBAL LTD
JOB NO:EDC/920/GI/026DATE:12.10.2019
TYPE OF BORING: ROTARY DRILLING 150mm DIA BORE HOLE NO: 4 (SHEET 2 OF 2) DATE OF BORING: 05.10.21019-.06.10.2019WATER LEVEL: 0.70m
I.S CLASIFICATION
GRAIN SIZE ANALYSIS ATTERBERGS LIMIT(%) FSI %
SPE
CIF
IC
GR
AV
ITY UNIT WEIGHT
(gm/cc)GRAVEL%
SAND %
SILT%
CLAY%
N M C LL PL PI
C kg/cm2
Ø DEGREE
BINEX KUNJUMON (M.TECH),(GEO TECHNICAL)