code compliant ultrasonic inspection · inspection results and feedback, right at the end of...
TRANSCRIPT
![Page 1: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/1.jpg)
NDT in Canada 2015
Code Compliant Ultrasonic Inspection
with Enhanced PoD on Stainless Steel Welds using Phased Array
Metalogic Inspection Services Inc.
7211 – 68th Ave., Edmonton
Alberta T6B 3T6
David Tompkins1, Steve LePointe1, Charles Moore1
Steve Whytock2, Bill Lee2
Bob Simmons1, Dr. Aziz U. Rehman1
PCL Industrial Management Inc.
5404 – 99th St., Edmonton
Alberta T6E 3P4
12
ND
T in C
anada 2015 Conference, June 15-17, 2015, E
dmonton, A
B (C
anada) - ww
w.ndt.net/app.N
DT
Canada2015
![Page 2: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/2.jpg)
NDT in Canada 2015
NDT in Canada 2015, June 15 – 17, Edm onton 2015
Code Compliant PAUT Inspection & Enhanced PoD for SS
Project Background
Inspection Challenges
Application & Inspection Configuration
Calibration, Inspection and Qualification
Field Application
Conclusions
Questions
![Page 3: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/3.jpg)
NDT in Canada 2015
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Project Background
Agrium Inc. – V A U L T
VAnscoy ULTimate Expance Project
In early 2013, Agrium requested PCL to explore the potential of PAUT in-Lieu
of Radiography for Stainless Steel Piping Weld Inspection
![Page 4: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/4.jpg)
NDT in Canada 2015
Agrium Inc. – V A U L T
VAnscoy ULTimate Expance Project
PCL recognizes Agrium’s Request
���� As being a UNIQUE application
���� Requiring Specialized Technical Knowledge
���� Need for Extensive background in Advanced UT
PCL reviewed & analyzed Agrium’s request with three potential NDT Service Providers, by taking into account their
���� Case History of Related Successful Projects
���� Equipment Resources, and
���� Number of Qualified Technicians
Selected Metalogic Inspection Services
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Project Background
![Page 5: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/5.jpg)
NDT in Canada 2015
The combination of coarse grain structure and anisotropy can significantly affect the propagation of ultrasonic waves, sometimes even to the extent that the ultrasonic waves are not able to penetrate the weld metal at all, or with great difficulty
Austenitic Welds Showing Course Grain Columnar Structure
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Inspection Challenges
![Page 6: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/6.jpg)
NDT in Canada 2015
The following challenges may be encountered with varying degrees of
difficulty, while ultrasonically examining an Austenitic Weld:
Beam Distortion & Skew
Attenuation and Scattering,
Unexpected Reflection and Mode Conversion occurs on
���� Fusion Lines, and
���� Columnar Grains Boundaries
These difficulties may lead to:
Undetected or Missed Flaws
False Calls, and
Unnecessary Repairs
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Inspection Challenges
![Page 7: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/7.jpg)
NDT in Canada 2015
The objective of this study is to:
Reduce Production impacts caused by Industrial Radiography,
Propose an Ultrasonic Configuration, which can
���� Provide full volumetric inspection coverage of weld zone
���� Be Consistent
���� Be Reliable & Repeatable
The Intent is to provide:
Inspection results and Feedback, right at the end of welding, as
compared to industrial radiography, where inspection is delayed till the
end of the shift/day, which can be cost-prohibitive
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Inspection Challenges
![Page 8: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/8.jpg)
NDT in Canada 2015
Transducer Selection for Austenitic Stainless Steel Weld Inspection
For a reliable inspection of Austenitic Stainless Steel, and to reduce
the problem of scattering, signal to noise ratio and interpretation
issues emanating from mode converted received signals, following
should be considered:
���� Use of compression mode for volumetric inspection
���� Use of Phased Array transducers for a highly directional
and focused ultrasonic beam
���� Use of Separate Transmit and Receive Sensors
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Application & Inspection Configuration
![Page 9: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/9.jpg)
NDT in Canada 2015
All requirements (discussed previously) can be met, if a Transmit
Receive Longitudinal Phased Array (TRL-PA) transducer is employed for Austenitic Weld Inspection
Appl icat ion and Inspe ct ion Configurat ion
Transducer Selection for Austenitic SS Weld Inspection
![Page 10: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/10.jpg)
NDT in Canada 2015
Appl icat ion & Inspe ct ion Configurat ion
Codes and Standard Requirements
Method Application Standard Construction Acceptance Standard
![Page 11: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/11.jpg)
NDT in Canada 2015
Appl icat ion and Inspe ct ion Configurat ion
Configuration for Volumetric Inspection Coverage
![Page 12: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/12.jpg)
NDT in Canada 2015
Proposed Inspection Configuration is Employed
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Field Application
![Page 13: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/13.jpg)
NDT in Canada 2015
Cal ibration, Inspection & Qual i f ication
Calibration Inspection Samples
Reliable field inspection of Austenitic Stainless Steel Welds
require:
Calibration Samples representing field inspection
For a “Volumetric Inspection Coverage” and taking into account
the limitations discussed earlier, PCL fabricated three (3) Stainless Steel Welding samples:
Detailed Inspection Procedures
Performance Qualification of Techniques
![Page 14: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/14.jpg)
NDT in Canada 2015
Calibration Sample ‘a’
10 mm Nominal Wall with 30°Weld Bevel
Welding with GTAW using WPS # 8 – 8T1
Cal ibration, Inspection & Qual i f ication
Calibration Inspection Samples
![Page 15: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/15.jpg)
NDT in Canada 2015
Cal ibration, Inspection & Qual i f ication
Calibration Inspection Samples
Calibration Sample ‘b’
13 mm Nominal Wall with 30°Weld Bevel
Welding Root with GTAW & Fills with SMAW using WPS # 8 – 8TA1
![Page 16: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/16.jpg)
NDT in Canada 2015
Cal ibration, Inspection & Qual i f ication
Calibration Inspection Samples
Calibration Sample ‘c’
13 mm Nominal Wall with 30°Weld Bevel
Welding Root with GTAW & Fills with FCAW using WPS # 8 – 8MF4
![Page 17: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/17.jpg)
NDT in Canada 2015
Artificial reflectors are introduced and comprehensive inspection
procedure developed by trying the conventional techniques (i.e. SW) first and progressing to special ones should they prove inadequate
10% ID and OD EDM Notches are placed
In 13mm Nominal Wall Samples (‘b’ and ‘c’) an additional OD Notch
is placed by using a 3” cutting disk
All caps are “ground flush” at designated notch locations
Note:
���� The samples are ground flush to verify detectability
during this study
Cal ibration, Inspection & Qual i f ication
Calibration Inspection Samples
![Page 18: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/18.jpg)
NDT in Canada 2015
Inspection Results
Ultrasonic inspection, using PAUT-SW, TRL-PA & Creep Waves is
performed on welded samples. Inspection results presented in the
following slides are grouped in three different categories:
���� ID Surface Reflectors
���� OD Surface Reflectors
���� OD Surface Cap-Center Reflectors
Cal ibration, Inspection & Qual i f ication
Application Test Results
![Page 19: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/19.jpg)
NDT in Canada 2015
Phased Array Ultrasonic Testing using Shear Waves (PAUT – SW)
Appl icat ion Te st ing Re sults – Cal ibrat ion Re sults
ID Surface Reflectors
Near – Side Far – Side
Calibration Sample ‘a’
![Page 20: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/20.jpg)
NDT in Canada 2015
Phased Array Ultrasonic Testing using Shear Waves (PAUT – SW)
Inspection Re sults
ID Surface Reflectors
Near – Side Far – Side
Calibration Sample ‘b’
![Page 21: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/21.jpg)
NDT in Canada 2015
Phased Array Ultrasonic Testing using Shear Waves (PAUT – SW)
Inspection Re sults
ID Surface Reflectors
Near – Side Far – Side
Calibration Sample ‘c’
![Page 22: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/22.jpg)
NDT in Canada 2015
Transmit Receive Longitudinal Wave Phased Array (TRL – PA)
Inspection Re sults
ID Surface Reflectors
Near – Side Far – Side
Calibration Sample ‘a’
![Page 23: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/23.jpg)
NDT in Canada 2015
Inspection Re sults
ID Surface Reflectors
Transmit Receive Longitudinal Wave Phased Array (TRL – PA)
Near – Side Far – Side
Calibration Sample ‘b’
![Page 24: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/24.jpg)
NDT in Canada 2015
Inspection Re sults
ID Surface Reflectors
Transmit Receive Longitudinal Wave Phased Array (TRL – PA)
Near – Side Far – Side
Calibration Sample ‘c’
![Page 25: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/25.jpg)
NDT in Canada 2015
Phased Array Ultrasonic Testing using Shear Waves (PAUT – SW)
Inspection Re sults
OD Surface Reflectors
Near – Side Far – Side
Calibration Sample ‘a’
![Page 26: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/26.jpg)
NDT in Canada 2015
Phased Array Ultrasonic Testing using Shear Waves (PAUT – SW)
Inspection Re sults
OD Surface Reflectors
Near – Side Far – Side
Calibration Sample ‘b’
![Page 27: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/27.jpg)
NDT in Canada 2015
Phased Array Ultrasonic Testing using Shear Waves (PAUT – SW)
Inspection Re sults
OD Surface Reflectors
Near – Side Far – Side
Calibration Sample ‘c’
![Page 28: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/28.jpg)
NDT in Canada 2015
Phased Array Creep Wave Inspection Scans
Inspection Re sults
OD Surface Reflectors
Near – Side Far – Side
Calibration Sample ‘a’
![Page 29: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/29.jpg)
NDT in Canada 2015
Inspection Re sults
OD Surface Reflectors
Phased Array Creep Wave Inspection Scans
Near – Side Far – Side
Calibration Sample ‘b’
![Page 30: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/30.jpg)
NDT in Canada 2015
Inspection Re sults
OD Surface Reflectors
Phased Array Creep Wave Inspection Scans
Near – Side Far – Side
Calibration Sample ‘c’
![Page 31: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/31.jpg)
NDT in Canada 2015
Phased Array Ultrasonic Testing using Shear Waves (PAUT – SW)
Inspection Re sults
OD Surface Cap-Center Reflectors
90ᵒ Skew 270ᵒ Skew
Calibration Sample ‘b’
![Page 32: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/32.jpg)
NDT in Canada 2015
Phased Array Ultrasonic Testing using Shear Waves (PAUT – SW)
Inspection Re sults
OD Surface Cap-Center Reflectors
90ᵒ Skew 270ᵒ Skew
Calibration Sample ‘c’
![Page 33: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/33.jpg)
NDT in Canada 2015
Phased Array Creep Wave Inspection Scans
Inspection Re sults
OD Surface Cap-Center Reflectors
Sample ‘b’ Sample ‘c’
![Page 34: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/34.jpg)
NDT in Canada 2015
ID Surface Notches (or ID Surface Reflectors)
PAUT-SW setup is adequate to inspect Near-Side ID Notches with
acceptable Signal-to-Noise Ratio
Note:
���� Combined inspection configuration of PAUT-SW & TRL-PA is
adequate for providing an acceptable & Code Compliant Inspection coverage for ID Notches (or ID Surface Reflectors)
Far-Side ID Notches are also visible, but not with an acceptable
SNR, while employing PAUT-SW Setup. Their PoD is increased with
the use of TRL-PA setup, and detected with acceptable SNR
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Discussion on Inspection Results
![Page 35: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/35.jpg)
NDT in Canada 2015
OD Surface Notches (or OD Surface Reflectors)
PAUT-SW setup is adequate to inspect Near-Side OD Notches with
acceptable Signal-to-Noise Ratio (SNR)
Note:
���� Combined inspection configuration of PAUT-SW & Creep Wave is
adequate for providing an acceptable & Code Compliant Inspection coverage for OD Notches (or OD Surface Reflectors)
Far-Side OD Notches very difficult to inspect, and sometimes, they
are not even detectable with PAUT
With Creep-Wave setup, PoD for Far-Side OD Notches is increased
and they become visible with acceptable SNR
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Discussion on Inspection Results
![Page 36: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/36.jpg)
NDT in Canada 2015
OD Surface Cap-Center Notches (or OD Surface Reflectors)
PAUT-SW setup is good for detecting these reflectors in TIG
Welded Samples, as compared to ‘STT’ welded samples
Note:
���� Combined inspection configuration of PAUT-SW & Creep Wave is
adequate to provide an acceptable & Code Compliant Inspection coverage for OD Cap-Center Notches (or OD Surface Reflectors)
With Creep Wave setup, again the PoD is increased
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Discussion on Inspection Results
![Page 37: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/37.jpg)
NDT in Canada 2015
Procedure Demonstration and Qualification (PDQ)
PCL specified the minimum acceptable technician qualifications & experience Levels that would be required, including
���� Previous experience with PAUT of Stainless Steel Welds, and
���� An acceptable understanding of Data Acquisition Software with Data Auditing Expectations
Following the Application Testing & PoD results reviews
���� PCL conducted a Procedure Demonstration and Qualification (PDQ) with Metalogic’s resident Level-III Technician
Metalogic selected Level-II PAUT Technicians based on
���� PCL’s accepted qualification and experience requirements
On case-by-case basis, Metalogic Provided additional application training to selected Level-II Techs prior to PDQ testing
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Calibration, Inspection & Qualification
![Page 38: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/38.jpg)
NDT in Canada 2015
Procedure Demonstration & Qualification Kit
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Procedure Demonstration & Qualification (PDQ)
![Page 39: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/39.jpg)
NDT in Canada 2015
Progress of Welding Project & Inspection
Period for which the data is monitored and recorded
���� Dec. 2012 – May 2015
Total Number of Welds Performed
���� 6531 Welds
Total Number of Welds Inspected
���� Industrial Radiography (RT) 506
���� MetaPhaseTM (PAUT) 374
Total Number of Rejects with % Reject
���� Industrial Radiography (RT) 34 (6.72%)
���� MetaPhaseTM (PAUT) 41 (10.96%)
Code Com pliant PAUT Inspect ion & Enhanced PoD for Stainless Steel
Field Application
![Page 40: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/40.jpg)
NDT in Canada 2015
RT Inspection Results for Welding Program Duration
Fie ld Application
Comparison of Field Inspection Results
Welded
Inspected
Rejected
![Page 41: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/41.jpg)
NDT in Canada 2015
PAUT Inspection Results for Welding Program Duration
Fie ld Application
Comparison of Field Inspection Results
MetaPhaseTM
Field Trialed
(April 2013)
MetaPhaseTM Field
Application Started
(August 2013)
![Page 42: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/42.jpg)
NDT in Canada 2015
The accumulative reject rate of PAUT is higher than RT. Over the full duration of
the project (i.e. equivalent to x1.6)
Radiography 28/358 (i.e. 7.82%), whereas
From Aug. 2013, onward (Reject/Inspect)
MetaPhaseTM (PAUT) 41/373 (i.e. 10.99%)
Note the Inspection (MetaPhaseTM vs. RT) Ratio is
Fie ld Application
Comparison of Field Inspection Results
���� 373 to 358, i.e. 104.2%
![Page 43: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/43.jpg)
NDT in Canada 2015
Fie ld Application
Interaction with Welders
![Page 44: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/44.jpg)
NDT in Canada 2015
Fie ld Application
Comparison of Field Inspection Results
Radiography 2/71 (i.e. 2.82%), whereas
From Jun. 2014, onward (Reject/Inspect)
MetaPhaseTM (PAUT) 11/223 (i.e. 4.93%)
Note the Inspection (MetaPhaseTM vs. RT) Ratio is
���� 223 to 71, i.e. 314.08%
Radiography 1/5 (i.e. 20.00%), whereas
For Last 6-months (Reject/Inspect)
MetaPhaseTM (PAUT) 11/223 (i.e. 4.93%)
![Page 45: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/45.jpg)
NDT in Canada 2015
Ultrasonic Shear Wave Inspection, has limitations for Austenitic
Stainless Steel Weld Inspection
Conclusions
Use of PAUT-SW only, cannot provide the volumetric coverage for
Austenitic Stainless Steel Weld Inspection
Near-Side inspection of Full Fusion Boundary is possible and provide
users with acceptable SNR
TRL-PA Sensor, because of their ‘discussed’ advantages, can be used
to inspect the Weld Volume in the 1st Leg of Ultrasonic Soundpath.
NDT in Canada 2015, June 15 – 17, Edm onton 2015
Code Compliant PAUT Inspection & Enhanced PoD for SS
���� AND DUE TO LIMITATIONS ON CAP REMOVAL. THE 1st LEG WAS LIMITED TO ID SURFACE DETECTION
![Page 46: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/46.jpg)
NDT in Canada 2015
Remaining, “top weld volume” can now be inspected using creep waves
Conclusions
Proposed Inspection Configuration, using multiple UT Techniques, will provide
full inspection coverage in-line with code requirements (i.e. ASME B31.3)
Field Application
���� Proper application of “proposed configuration” is IMPORTANT
���� In the long run, if properly applied, will IMPROVE process and SAVE COSTS
The Impact of MetaPhaseTM (PAUT)
���� Increase in “Rate of Inspection” (i.e. ���� up to 314 %)
���� Decrease in “Rate of Reject” (i.e. ���� down to 4.93 %)
NDT in Canada 2015, June 15 – 17, Edm onton 2015
Code Compliant PAUT Inspection & Enhanced PoD for SS
Due to actual site application thicknesses, PAUT was the
primary technique
![Page 47: Code Compliant Ultrasonic Inspection · Inspection results and Feedback, right at the end of welding, as compared to industrial radiography, where inspection is delayed till the end](https://reader033.vdocuments.net/reader033/viewer/2022042809/5f956a051f98dd3d161dd1dd/html5/thumbnails/47.jpg)
NDT in Canada 2015
QUESTIONS ???
Code Compliant Ultrasonic Inspection
with Enhanced PoD on Stainless Steel Welds using Phased Array