    Code of Construction PracticePart B: Site Specific RequirementsChambers Wharf - Revised 3 February 2014

    Doc Ref: APP104.19

    Folder1803 February 2014

    Thames Tideway TunnelThames Water Utilities Limited

    Application for Development ConsentApplication Reference Number: WWO10001

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    2/14

    DCO-DT-000-ZZZZZ-071902 I February 2014

    Code of Construction PracticePart B: Site-specific

    requirements

    Chambers Wharf

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    3/14

    Code of Construction Practice Part B

    This page left intentionally blank

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    4/14

    Code of Construction Practice Part B i

    Thames Tideway Tunnel

    Code of Construction Practice Part B

    Chambers Wharf

    List of contents

    Page number

    1 Introduction ...................................................................................................... 12 General requirements ...................................................................................... 23 Communications and community/stakeholder liaison ................................. 24 Site operation ................................................................................................... 25 Public access, highway and river transport .................................................. 46 Noise and vibration .......................................................................................... 57 Air quality.......................................................................................................... 78 Water resources ............................................................................................... 79 Land quality ...................................................................................................... 710 Waste management and resource use ........................................................... 711 Ecology (aquatic and terrestrial) .................................................................... 812 Historic environment ....................................................................................... 813 Other ................................................................................................................. 8

    List of figures

    Page number

    Figure 1.1 Chambers Wharf: Site context and location plan ....................................... 2

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    5/14

    Code of Construction Practice Part B ii

    This page left intentionally blank

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    6/14

    Chambers Wharf

    Code of Construction Part B 1

    1 Introduction

    1.1.1 All works described in this document are to be managed and performed tomeet the health and safety vision of Zero Incidents, Zero Harm, Zero

    Compromisefor the Thames Tideway Tunnel project (the project).

    1.1.2 The Code of Construction Practice (CoCP)comprises two parts:

    a. Part A: General requirements. These measures are applicableproject wide.

    b. Part B: Site-specific requirements. These are site-specific measureswhere deviations from the general requirements are indicated inPart A.

    1.1.3 This document forms the CoCPPart B for the project works at theChambers Wharf site and sets out detailed site-specific measures

    including working hours, site set-up and servicing arrangements, takinginto account environmental matters and consultations with the LondonBorough of Southwark and other stakeholders.

    1.1.4 For ease of reference, this document sets out site-specific issues anddeviations from Part A; therefore where no site-specific measures arespecified, reference should be made to Part A.

    1.1.5 A plan of the location of the site is shown inFigure 1.1 overleaf.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    7/14

    Chambers Wharf

    Code of Construction Part B 2

    Figure 1.1 Chambers Wharf: Site context and location plan

    Note: For detailed limits of land to be acquired or used, refer to the drawings in the Book of Plans.

    2 General requirements

    2.1.1 As per the CoCPPart A.

    3 Communications and community/stakeholderliaison

    3.1.1 The employer shall convene a community liaison working group inaccordance with Schedule 4 of the Section 106 deed with the London

    Borough of Southwark.

    4 Site operation

    Topic Site-specific requirement

    Working hours The following working hours shall apply to this site:

    a. standard

    b. extended

    c. continuous during construction of the maintunnel.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    8/14

    Chambers Wharf

    Code of Construction Part B 3

    Topic Site-specific requirement

    When other types of working hours (CoCPPart A,Table 4.1) are required, these shall be subject toconsent from the local authority under Section 61 ofthe Control of Pollution Act 1974.

    Except where any surface structures are deemed tobe at risk and for essential activities to ensuresafety of the works (eg, pump maintenance andtunnel boring machine inspections), the contractorshall incorporate within the construction programmea one-week site shut down during both the Easterand Christmas periods.

    Site layout The contractor shall use best endeavours toposition required offices and storage containers or

    structures in the site layout to serve as noisebarriers, having regard to effects on daylight andsunlight. Specifically, the contractor shall considerpositioning three-storey offices or equivalent on thesouthwestern corner by Chambers Street or thewestern boundary of the site to act as noise barriersas this area of the site is closest to St MichaelsRoman Catholic School and Axis Court.

    The site layout, hoarding and noise barriers in thewest of the site shall be designed (where practical)to minimise potential adverse sunlight/daylight

    impacts on the lower floors of Axis Court.

    The contractor shall refer to the Building ResearchEstablishment Guidance Site Layout Planning forDaylight and Sunlight: A Guide to Good Practiceand carry out an assessment of the impact of lossof sunlight/daylight at properties adjacent to the sitewhen developing the site layout.

    The contractor shall ensure that noise-generatingactivities are located as far away from sensitivereceptors as is practicable.

    The contractor shall consult the local authorityduring the development of the site layout.

    Site security/hoardingrequirements

    The hoarding shall be planted and incorporatesuitable art work on public-facing sections, asdefined in CoCPPart A para. 4.3.4a and c.

    The hoarding height shall be 3.6m around this site.A 5m high hoarding/noise barrier shall be erectedon the eastern edge of the site.

    Hoarding panels shall be composed of reconstitutedsheet material or similar, comply with noise

    attenuation requirements and weigh at least 7kg/m.

    The external appearance of the hoarding shall be

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    9/14

    Chambers Wharf

    Code of Construction Part B 4

    Topic Site-specific requirement

    approval by the local authority.

    River works As per the CoCPPart A.

    Other items The contractor shall produce a site-specific lighting

    management plan. The lighting scheme shallminimise impacts on terrestrial and aquatic ecologyand include the use of low level directional lighting,where possible, while providing safe workingconditions. In order to ensure off-site impacts of thelighting are minimised, the plan shall be submittedfor approval of the London Borough of Southwark.

    On completion of the works the site shall be left in asafe condition, with secure hoardings, a levelground surface and no open stockpiles.

    5 Public access, highway and river transport

    Topic Site-specific requirement

    Site access and gates The security barrier shall be positioned to enable astandard rigid tipper vehicle to sit wholly off the roadwhile awaiting barrier operation.

    The site gates shall be solid panels and remainclosed (except when vehicles are passing through)to mitigate noise and other impacts.

    Traffic management All vehicles shall enter/exit the site from JamaicaRoad (A200) via Bevington Street/Chambers Street.

    The site access shall operate as right turn in, leftturn out.

    During term time, no lorry movements to or from thesite shall be scheduled to take place between 08:30and 09:15 and 15:00 and 15:45 to avoid arrival anddeparture times at Riverside Primary School. Thecontractor shall provide traffic marshals to prevent

    site lorries entering Bevington Street at these times.Parking along Chambers Street from the siteentrance to Bevington Street and sections ofparking on Bevington Street at the junction withChambers Street shall be suspended.

    A new pedestrian refuge on Bevington Streetapproximately 20m southwest of the BevingtonStreet/Chambers Street junction shall be providedto enable safe crossing.

    Signage shall be provided to inform pedestrians andcyclists of safe routes and the presence ofconstruction vehicles.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    10/14

    Chambers Wharf

    Code of Construction Part B 5

    Topic Site-specific requirement

    The contractor shall consider pedestrian and cyclediversion route to reduce the number of conflictpoints with site construction traffic.

    Event restrictions Event restrictions shall be confirmed in consultationwith the local authority and Transport for London.

    River transport Barges shall not be loaded/unloaded or move ontoor off the barge at night (22:00 to 08:00) inaccordance with the Transport Strategy(andsubject to the derogation process detailed therein).

    Chambers Wharf shall not be used as atranshipment site for materials from other worksites.

    6 Noise and vibrationTopic Site-specific requirement

    Control measures

    The noise and vibration controlmeasures shall be detailed(and may be modified oradded to) in Section 61consent applications to thelocal authority.

    Except for the anchor piles, the contractor shallconstruct the cofferdam using push piling unlessthis is determined to be impossible. The anchorpiles will be installed as far away from the closestresidential receptors, including Luna House and8-14 Fountain Green Square, as practicable.

    The construction area around the main tunnel shaft

    shall be covered by a noise enclosure during themain tunnel construction and secondary liningworks.

    Noise enclosure openings shall face away fromsensitive noise receptors where practicable; atnight, the openings shall only be used whereessential and kept closed when not in use.

    The slurry treatment plant shall be screened by afour-sided enclosure with a roof, clad with suitablenoise attenuation material.

    Noise enclosures shall be provided around thetemporary concrete batching plant, grout plant andconveyors used to load barges.

    Night time activities within the materialstorage/handling area shall be screened by aroofed, three-sided noise enclosure. The openingshall not face sensitive receptors, where

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    11/14

    Chambers Wharf

    Code of Construction Part B 6

    Topic Site-specific requirement

    practicable.

    All cladding and roofing of noise enclosures shallincorporate suitable noise attenuation material with

    a minimum sound reduction value of 20dB Rw

    1

    .All static plant shall be screened or enclosed.

    Movement of vehicles onsite shall be restrictedoutside standard hours.

    The vessel loading area shall be positioned to limitnoise impacts on riverside properties to the eastand west of the site.

    A 2.4m high noise barrier shall be erected on theedge of the cofferdam on the eastern and westernsides of the vessel loading area. The noise barrier

    on the cofferdam shall be constructed withtransparent acrylic sheet with a minimum thicknessof 6mm and to meet noise attenuationrequirements. Up to 1m from ground level, thebarrier shall be plywood and the section above shallbe transparent to minimise visual impacts.

    3.6m high acrylic sheet shall be considered on theriver walls to reduce the noise effects at 8-14Fountain Green Square. The location of the acrylicsheet falls outside the limits of land to be acquiredor used and is therefore subject to planning

    permission being granted and is not embedded inthe revised environmental assessment. The sheetwill be agreed and formalised through a triggeraction plan with 8-14 Fountain Green Square andplanning permission from the local authority. Theemployer shall use all reasonable endeavours toobtain planning permission.

    Baseline noise monitoring shall be carried out for aminimum of 12 months before commencingconstruction activities.

    In-road utility works in Chambers Street shall besurrounded by suitable portable noise barriers, eg,noise attenuating cladding may be fixed to anyportable steel open mesh fencing used.

    Material onsite shall be compacted using machinerythat generates the lowest practicable vibrationlevels that can achieve the required level ofcompaction. Specifically, large twin-drum vibratingrollers shall only be used where vibration levels canbe controlled to less than the impact criteria set out

    1See British Standard EN ISO 12354.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    12/14

    Chambers Wharf

    Code of Construction Part B 7

    Topic Site-specific requirement

    in the Environmental Statement, Vol 20: ChambersWharf, Tables 9.5.4 and 9.5.5.

    Other See the CoCPPart A for details regarding removal

    of the existing jetty decking piles. The contractorshall select a method that reduces potentialvibration in the river.

    7 Air quality

    Topic Site-specific requirement

    Vehicle and plant emissions As per the CoCPPart A.

    Dust emissions/control Baseline monitoring for PM10and NO2shall be

    carried out for a minimum of 12 months beforecommencing the works.

    Odour As per the CoCPPart A.

    Other N/A

    8 Water resources

    Topic Site-specific requirement

    Control of pollution:surface water/groundwater

    All hardstanding (as far as is reasonablypracticable) on non-foreshore sites shall incorporatepermeable surfacing (Sustainable DrainageSystem/flood risk alleviation).

    Control on abstraction As per the CoCPPart A.

    Ground treatment/dredging As per the CoCPPart A.

    Other N/A

    9 Land qualityTopic Site-specific requirement

    Site works The unexploded ordnance mitigation plan shall beprepared in consultation with the local authority.

    Site-specific issues/mitigation As per the CoCPPart A.

    10 Waste management and resource use

    Topic Site-specific requirement

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    13/14

    Chambers Wharf

    Code of Construction Part B 8

    Excavated material As per the CoCPPart A.

    Resource usage As per the CoCPPart A.

    Other N/A

    11 Ecology (aquatic and terrestrial)

    Topic Site-specific requirement

    Protection of habitats A membrane shall be installed between the riverbedand any temporary backfill material to preventcontamination of juvenile fish habitat and preservepotential archaeology.

    Areas of foreshore used for temporary works shallbe restored to a similar condition with similar

    materials as prior to the works.

    See CoCPPart A, Section 4.7, River works, fordetails regarding removal of piles.

    Protection of trees As per the CoCPPart A.

    Other N/A

    12 Historic environment

    Topic Site-specific requirementOther The site-specific heritage management plan shall

    include all heritage assets along the alignment ofthe main tunnel driven from this site, where notdirectly affected by other sites.

    13 Other

    Topic Site-specific requirement

    Other As per the CoCPPart A.

  • 8/13/2019 Code of Construction Practice Part B: Site Specific Requirements Chambers Wharf - Revised 3 February 2014

    14/14

    Copyright notice

    All rights reserved.

    Any plans, drawings, designs and materials (materials) submitted

    by Thames Water Utilities Limited (Thames Water) as part of this

    application for Development Consent to the Planning Inspectorate

    are protected by copyright. You may only use this material(including making copies of it) in order to (a) inspect those plans,

    drawings, designs and materials at a more convenient time or

    place; or (b) to facilitate the exercise of a right to participate in the

    pre-examination or examination stages of the application which

    is available under the Planning Act 2008 and related regulations.

    Use for any other purpose is prohibited and further copies must

    not be made without the prior written consent of Thames Water.

    Thames Water Utilities Limited

    Clearwater Court, Vastern Road, Reading RG1 8DB

    The Thames Water logo and Thames Tideway Tunnel logo

    are Thames Water Utilities Limited. All rights reserved.

    Copyright Thames Water Utilities Limited February 2014.