Coiled Tubing emergencyProcedures

Page 2: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 2/46

Typical stack up

• Blind/shear

• Pipe• Slip

Stuffing box

• Quick connector

Page 3: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 3/46

Emergency BOP Operation

• Stop tubing, set SLIP rams, PIPE RAMS

• Stop pumping

• Cut coil with SHEARS

• Pull above blinds (stay in stuffing box !)

• Close blinds

• Kill well down coil & / or kill line

• Fish coil out of well

Page 4: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 4/46

BLINDS 

SHEARS 

PIPES 

SLIPS 

Page 5: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 5/46

CT Leak At Surface

• Clear area (esp. around reel & injector)

MINOR LEAK (pinhole)

• Pull slowly on to reel while displacing to

water (minimize reel pressure)

MAJOR LEAK (large or hazardous material)

• Set SLIP & PIPE rams then check set

• Cut pipe, pull up to close BLIND rams

• Purge reel , remove failure, fish CT in

BOPs

Page 6: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 6/46

CT Leak Below Surface

Loss of pump pressure or string weight• Hole or parted CT may come thru stuffing box

• Clear area and displace to water

Pull out at max. 20 ft/min, pumping slowly• Evaluate leak when exits stuffing box

MINOR 

• Pull on to reel carefully (may break)

MAJOR (or parted coil)

• Follow Emergency BOP sequence

Page 7: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 7/46

Stuffing Box Leak 

Stop coil and close SLIP & PIPE rams toisolate annulus. Set manual locks.

• Place injector in neutral & engage brake.

• Bleed off pressure above pipe rams.

• Bleed off stuffing box hydraulic pressure and

replace elements. Pressurize.

• Pressure test stuffing box through kill line

(avoid collapsing CT)• Equalize pressure across BOP rams and

release manual locks.

Open PIPE and SLIP rams.

Page 8: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 8/46

Surface Equipment Leaks

Rotating Joint

• Close reel isolation valve inside work reel.

Repair or replace joint and test.• Open isolation valve and resume operations

Page 9: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 9/46

Surface Equipment Leaks

Leak Below BOP

• Clear area & evaluate

• Ensure coil sufficiently off bottom so it will

fall BELOW the MASTER VALVE whencut.

• Close shear/seal rams to cut and drop coil.

• Pull up coil and close blind rams.

• Close swab valve & master valve.

• Repair leak, pressure test, plan fishing

operations.

Page 10: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 10/46

Coiled tubing injector head

• Inside tension

• Outside tension

• Load cells

Page 11: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 11/46

Page 12: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 12/46

Tubing Run Away (into well)

Coil is pulled into the well under its ownweight due to insufficient chain grip.

•Speed up injector to match the descendingcoil.

• Increase inside chain tension to increase

friction on coil.

• Increase stuffing box pressure to increase

friction on the coil.

Page 13: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 13/46

Tubing Run Away (into well)

• If run away is hydraulic (not traction) reduceinjector hydraulic pressure to zero to set injector

brake.

If close to TD, may let fall to bottom then repairequipment and recover coil. Some may be kinked.

LAST RESORT (if insufficient coil to reach TD)

• Apply all other measures to slow the coil then closethe SLIP rams to physically grab the coiled tubing.

• Both coil and rams may be damaged.

Page 14: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 14/46

Birdnesting 

Page 15: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 15/46

Tubing Run Away (out of well)

Upthrust due to wellbore pressure exceeds coil

weight and injector chain to coil friction.

• Speed up injector to match the coil speed.

• Increase inside chain tension to increase

friction on coil.

• Increase stuffing box pressure to increase

friction on the coil.

Page 16: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 16/46

Tubing Run Away (out of well)

• Increase reel pressure to keep up with coil

coming out of the well.

•Prepare to close master valve if coil comes outof stuffing box.

• If coil does not stop, close the SLIP rams. Both

coil and rams may be damaged.

Page 17: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 17/46

Tubing Pulls Out of Stuffing Box

If BHA is lost there is no external upset to tag

on the stuffing box brass inserts.

• Stop the injector to keep the coil in the chains.

• Close the blind rams to isolate the well.

Plan fishing operations for BHA.

Page 18: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 18/46

Tubing Collapse At Surface

Wellbore fluids escape from stuffing box as

strippers cannot seal around collapsed coil.

Collapsed pipe may not pull through the

stuffing box brass bushings.

Injector may not be able to grip deformed coil.

Page 19: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 19/46

Tubing Collapse At Surface

WELL CONTROL

• Run back in until stuffing box seals around

coil.

• Reduce wellhead pressure by flowing the

well or stop reverse circulation.

• If seal cannot be obtained with stuffingbox, close PIPE rams to reduce leak.

• Clear the area and kill the well.

Page 20: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 20/46

Tubing Collapse At Surface

(well killed)• Clamp coil above injector head.

• Bleed off stuffing box and open pipe rams.

• Back off inside chain tension and pull the tubing

through the injector with the rig or a crane.

• Re-clamp the coil above the injector and cut off the

coil in sections.

Repeat until good condition coil is pulled through theinjector.

• Set slip and pipe rams, energize stripper, and make

up a dual roll on connector to the coil on the reel.

Page 21: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 21/46

Cutting and recovering coil

Close slip ramsClose pipe ramsClose blind/shear rams

Page 22: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 22/46

Cutting and recovering coil

Raise the coil and kill the well

Page 23: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 23/46

Cutting and recovering coil

Open blind shear rams

Spear fish (difficult)or

Pull test

Open pipe and slip rams and POOH

Page 24: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 24/46

Cutting and recovering coil

Raise BOPs and coil

Set tubing clamp

Open pipe and slip rams

Page 25: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 25/46

Cutting and recovering coil

Lower BOPs to expose cut coil

Fit double end connector

Lower injector and make up

double end connector

Pull test

Remove clamp

Page 26: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 26/46

Cutting and recovering coil

Lower stack and make up

POOH

Page 27: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 27/46

Tubing Breaks On Surface

Coiled tubing breaks into two sections at surface.

• Stop the injector and set the SLIP rams.

• Stop pumping operations and clear the area.

• Secure the coil to the reel and attempt to spool slack 

back onto the reel.

• Remove the damaged section of pipe and reconnect thecoil with a dual roll-on connector.

• Release the slips and continue to pull out.

Page 28: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 28/46

Tubing Breaks On Surface

• If the remaining coil cannot be spooled onto thework reel and no spare reel is available, it will be

necessary to hang off the coil in the well until a

reel is available or the well is killed.

• Close SLIP and PIPE rams then cut the coil.

• Pull up and close the blind rams.

• Once spare reel capacity is available, fish coil

from BOPs (kill well if necessary for safety).

Page 29: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 29/46

CT Reel Drive Fails

• Stop the injector.• Ensure coil held by injector and close and lock 

SLIP and TUBING rams.

Apply reel brake if fitted.• Repair drive and inspect coil for damage.

• If damaged, follow Leak Procedures.

• If coil is good, run in as deep as necessary to fix

the wrap on the reel. Do Not Run Kinked

Tubing Into the Well !

• If spool cannot be fixed, follow cut and fish

procedures (Leak Procedures).

Page 30: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 30/46

Coiled Tubing Stuck In Hole

Three possible scenarios:1. The coiled tubing itself is stuck somewhere

between the BHA and the stuffing box.

2. The BHA is stuck.

3. Stuck in the stuffing box due to ballooned

coil or excess stuffing box pressure.

Coil is considered stuck if it cannot be pulled free

at the lesser of 80% of the weak link rating or 80%

of the minimum yield rating of the coiled tubing.

Page 31: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 31/46

Coiled Tubing Stuck In Hole

Three factors to consider:

1. Type of well: flowing oil or gas well,

water injection well.

2. Type of BHA on the coiled tubing.

3. Type of operation carried out when

stuck.

Page 32: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 32/46

Coiled Tubing Stuck In Hole

• Continue Pumping

• Determine stuck point and reason why.

• Pull to 80% of CT yield and hold for 10minutes.

• Observe the trend on the weight indicator

and measure the stretch in the tubing to

calculate freepoint:

Page 33: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 33/46

Free Point Calculation

L = S( As x E)

F x 12

L = length free (ft)

S = stretch (in)

As = metal X-section area (in)E = modulus of elasticity

(30,000,000 psi for steel)

F = pull force (lbs)

= hang weight - max pull weigh

Page 34: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 34/46

Stuck In Hole Options• Flow the well at maximum rates to remove any

debris trapping the coil downhole.

• Displace the coil to N2 to increase buoyancy.

• Underbalance the well if differentially stuck.

• Circulate acid down to remove any soluble

material holding the coil.

• Cool the well if coil is helically stuck in

corkscrewed production tubing.• Pump down the annulus to force obstruction

downhole.

• Release the BHA to be fished later.

Page 35: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 35/46

Stuck In Hole Issues

• DO NOT work the coil violently across the coil

with frequent reversals.

Log the number of cycles while trying to pullfree. Do not exceed fatigue limit !

• If coil cannot be freed, hang off the coil in the

SLIP rams and close the PIPE rams.

• Kill the well then cut at free point and fish the

coil.

Page 36: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 36/46

Chemical / Explosive Cutters

Determine free point and ENSURE well is dead.• Pull coil into tension so it is as straight as possible.

• Close SLIP and PIPE rams, increase stuffing box

and chain pressure, and set the reel brake.

• Monitor pressure across pipe rams for leak.

• Bleed off the coil and monitor pressure to ensure

downhole check valve and coil integrity.

• Build work platform above injector with scaffolding.

Page 37: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 37/46

Chemical / Explosive Cutters

• Lay down gooseneck and cut the coil 5 feet above

the injector. Secure remaining coil at the reel.

• Straighten the coil to run wireline inside.

• Connect 2 valves, pumping “T” and wirelinelubricator and BOP to the coil to run the cutters

inside.

• Run cutter and freepoint tool to the correct depth

and cut the coil.

• COILED TUBING IS NOW OPEN TO

WELLBORE !

Page 38: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 38/46

Chemical / Explosive Cutters

• With the well and coil killed, remove the

wireline equipment.

• Dress the end of the coil for a double roll-onconnector

• Open the BOP rams and pull the coil out of the

hole, spooling back on to the work reel.

• NOTE: chemical or explosive cuts may need to

be worked several times to part.

Page 39: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 39/46

Power Pack Failure

•If the hydraulic power unit fails, injector headmotor brakes will automatically be applied.

• If in doubt, close SLIP rams and manually lock.

• Close PIPE rams and manually lock.

• Chain reel incase reel brake fails.

• Maintain circulation if required to prevent coil from

becoming stuck in the hole.

• Repair or replace powerpack, ensure BOP

accumulators are fully charged.

• Equalize BOP pressures and open rams.

Page 40: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 40/46

Replacement Of Injector

• Close SLIP and PIPE rams, bleed off coil.

• Ensure slips are holding coil, check valves hold.

• Secure coil on either side of cut, clamp at injector.

• Cut coil above injector and secure to reel.

• Bleed off pressure above tubing rams.

• Back off inside chain tension.

• Break the union below the injector and walk up coil

with the crane, clamp coil above BOP.

Page 41: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 41/46

Replacement Of Injector

• Back off chain tension and walk new injector

down to safety clamp on BOP

Clamp above, remove clamp below.• Make up union and pressure up inside chain

tension.

• Pull test before opening SLIP rams.

• Reconnect coil to reel with double roll on.

Page 42: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 42/46

• If coil is run inside small ID tubing and BOP,

kink will be between stuffing box and chains.

• Coil run in large diameter completion will kink 

at a diameter change or at the largest ID.

Tubing Kinked

Page 43: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 43/46

Tubing Kinked - Surface

• Stop injector immediately.

• Close SLIP and PIPE rams and lock.

• Bleed off coil and ensure downhole check valves

holding.

• Cut coil at top of stuffing box to lift off injector.• Remove injector and dress coil for connector.

• Run fresh coil through stuffing box and connect

with inline connector (dual roll on).• Walk injector down to make up to BOP.

• Pull test connector then pull coil out of well.

Page 44: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 44/46

Tubing Kinked - Downhole

Rapid weight loss in large ID may lead to kinks.

• Increase in pump pressure due to kink restriction

• Decrease in pump pressure as BHA may be brokenoff 

• Loss of string weight due to parted coil

Increase in string weight due to drag from kink 

Page 45: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 45/46

Tubing Kinked - Downhole

Increase in pump pressure or string weight

• Stop pumping

• Pull out at 10 to 20 ft/min until kink tags stuffing

box• Attempt to close SLIP and PIPE rams

• If kink cannot be pulled above the BOP, run in

to good pipe then hang off and cut coil in BOP

• Kill well and fish coil (freepoint & cutters ?)

Page 46: Coiled Tubing Operations

7/16/2019 Coiled Tubing Operations

http://slidepdf.com/reader/full/coiled-tubing-operations 46/46

Tubing Kinked - Downhole

Decrease in pump pressure or loss of weight

- String parted down hole.

• Calculate remaining coil from weight• Stop pumping

• Pull out slowly until coil comes out of stuffing box

•Close blind rams then secure wellhead