Columbia University’s Advanced Concept Data Center Pilot Project

April 30, 2010

22

Agenda11:30am Data Center Tour

12:00pm Welcome and Opening Remarks Bryan P. Berry, NYSERDA

Project Review Alan Crosswell, Chief Technologist, CUIT

Richard Hall, Project Manager, CUIT

1:00pm Installation Summary of Monitoring and Measurement Tools Ian Katz, Manager, CUIT Data Center

1:45pm Measurement Plan and Initial Results Raj Bose and Peter Crosta, Research Computing Services, CUIT

2:45pm Closing CommentsAlan Crosswell, Chief Technologist, CUIT

Victoria Hamilton, Research Initiatives Coordinator

3:00pm Meeting Adjourned

Welcome and Opening Remarks

Bryan P. Berry, NYSERDA

3

Faculty House

• Recently renovated Faculty House has been awarded the prestigious Leadership in Energy and Environmental Design (LEED) Gold Certification by the United States Green Building Council.

• http://www.environment.columbia.edu/blog/facultyhouseawardedleedgold

First LEED Gold Certified building on Morningside campus. The first McKim, Mead & White building in the country to be given this

designation. 

• To learn about Columbia University’s other “green initatives” please visit Columbia University’s Environmental Stewardship webpage

• http://www.environment.columbia.edu/initiatives

4

Advanced Concepts Data Center Pilot Project - ReviewAlan Crosswell, Assoc VP and Chief Technologist, CUIT

The opportunities• Data centers consume 3% of all electricity in New York State (1.5%

nationally as of 2007). That’s 4.5 billion kWh annually.

• Use of IT systems especially for research high performance computing (HPC) is growing.

• We need space for academic purposes such as wet labs, especially in our constrained urban location.

• Columbia’s commitment to Mayor Bloomberg’s PlaNYC 30% carbon footprint reduction by 2017.

• NYS Gov. Paterson’s 15x15 15% electrical demand reduction by 2015 goal.

• National Save Energy Now 25% energy intensity reduction in 10 yrs.

6

Green data center best practices

1. Measure and validate– You can’t manage what you don’t measure.

2. Power and cooling infrastructure efficiency– Best Practices for Datacom Facility Energy Efficiency. ASHRAE

(ISBN 978-1-933742-27-4)

3. IT equipment efficiency– Moore’s Law performance improvements– Energy Star/EPEAT– Server consolidation and virtualization– BIOS, OS and Application tuning

7

Measuring infrastructure efficiency

• The most common measure is Power Use Effectiveness (PUE) or its reciprocal, Data Center Infrastructure Efficiency (DcIE).

[Total Datacenter Electrical Load]

PUE =

[Datacenter IT Equip. Electrical Load]

• PUE only measures efficiency of the electrical and cooling infrastructure.

• Chasing a good PUE can lead to bizarre results since heavily-loaded facilities usually use their cooling systems more efficiently.

8

LBNL Average PUE for 12 Data Centers

Power Use Effectiveness (PUE) =2.17

9

Making the server slice bigger, the pie smaller and green.• Reduce the PUE ratio by improving electrical & mechanical

efficiency.– Google claims a PUE of 1.2

• Consolidate data centers (server rooms)– Claimed more efficient when larger (prove it!)– Free up valuable space for wet labs, offices, classrooms.

• Reduce the overall IT load through– Server efficiency (newer, more efficient hardware)– Server consolidation & sharing

• Virtualization• Shared research clusters

• Move servers to a zero-carbon data center

10

Data center electrical best practices

• 95% efficient 480V room UPS– Basement UPS room vs. wasting 40% of rack space– Flywheels or batteries?

• 480V distribution to PDUs at ends of rack rows– Transformed to 208/120V at PDU– Reduces copper needed, transmission losses

• 208V power to servers vs. 120V– More efficient (how much?)

• Variable Frequency Drives for cooling fans and pumps– Motor power consumption increases as the cube of the speed.

• Generator backup

11

Data center mechanical best practices

• Air flow – reduce mixing, increase delta-T– Hot/cold or double hot aisle separation– 24-36” under floor plenum– Plug up leaks in floor and in racks (blanking panels)– Duct CRAC returns to an overhead plenum if possible– Perform CFD modeling

• Alternative cooling technique: In-row or in-rack cooling– Reduces or eliminates hot/cold air mixing– More efficient transfer of heat (how much?)– Supports much higher power density– Water-cooled servers are making a comeback

12

Measuring IT systems efficiency

• A complementary measure to PUE is the amount of useful work being performed by the IT equipment. What should the metric be?

• MIPS per KwH? • kilobits per MWh (an early NSFNet node benchmark:-)• SPECpower benchmark

13

• Highly recommended reading

• Surveys 261 higher ed institutions

• Cites Columbia’s environmental sustainability efforts and NYSERDA’s role

14

Our NYSERDA project• New York State Energy Research & Development Authority is a public benefit

corporation funded by NYS electric utility customers. http://www.nyserda.org

• Columbia competed for and was awarded an “Advanced Concepts Datacenter demonstration project”. 18 months starting April 2009

• ~ $1.2M ($447K Direct costs from NYSERDA)

• Goals:

Learn about and test some industry best practices in a “real world” datacenter Measure and verify claimed energy efficiency improvements. Share lessons learned with our peers.

15

1616

External Visiting Committee

• Laurie Kerr, Senior Policy Advisor for Energy and Green Buildings, NYC Mayor’s Office of Long-Term Planning and Sustainability

• Vace Kundakci, Assistant Vice President for Information Technology and Chief Information Officer, City College of New York/City University of New York

• Timothy Lance, President and Board Chair, New York State Education and Research Network (NYSERNet)

• Marilyn McMillan, Associate Provost and Chief Information Technology Officer, New York University

Role: The External Visiting Committee is charged with maintaining skepticism about our plans and our

accomplishments from the perspective of external institutions. To the extent we demonstrate feasibility and potential impact, they will serve as powerful ambassadors to other institutions.

1717

Internal Advisory Group• Wilmouth A. Elmes, Associate Vice President of Engineering/Technical Services, Manhattanville

Development Project

• Doug McKean, Director, Capital Project Management

• Arthur M. Langer, School of Engineering and Applied Science, Senior Director of the Center for Technology, Innovation, and Community Engagement and Faculty & Assoc Director, Executive Masters of Science in Technology Management at the School of Continuing Education

• Nilda Mesa, Assistant Vice President, Environmental Stewardship

• Scott W. Norum, Chief Administrative Officer for Arts and Sciences and Vice President, Office of the Vice President for Arts and Sciences

• Leonard Peters, School of Business, Associate Dean and Chief Information Officer – Information Technology

Role: The Internal Advisory Group serves two primary functions. Not only do we anticipate they will

prove a valuable sounding board for the execution of the pilot (implementation guidance/expert judgment), but we expect them to pose the hard questions about issues surrounding scale-up (feedback).

17

1818

Research Faculty User Group

• Liam Paninski, Associate Professor, Dept. of Statistics

• Kathryn V. Johnston, Associate Professor, Dept. of Astronomy

• Mary Putman, Clare Boothe Luce Associate Professor of Astronomy

• Greg L. Bryan, Assistant Professor, Dept. of Astronomy

Role: Responsible for vetting the results of the combined HPC cluster for the Department of Astronomy

and the Department of Statistics

18

1919

Working Group• Co-Principal Investigators

Alan Crosswell, Associate Vice President and Chief Technologist, CUIT Victoria Hamilton, Director of the Office for Research Initiatives (ORI)

• Richard Hall, Project Manager• Anthony Cirillo, AVP Systems and Operations• Peter Miner, Senior Director, Systems Engineering• Ian Katz. Data Center Facilities Manager• Melissa Metz, Director of Systems Engineering • Fran Ovios, Director of Systems Engineering • Stew Feuerstein, Director and Chief Architect • Joseph Rini, Director of Network Engineering • Megan Andersen, Research Systems Administrator • Ed McArthur, CU Facilities Project Manager• Raj Bose, Manager, Research Computing Services• Don Lanini, Senior Systems Engineer

Role: Day-to-day responsibility for planning, executing and measuring required by the proposal. The

Columbia University in-house team will perform much of the work.

19

CU Data Center Improvement Program

• Begun with an assessment and recommendation performed by Bruns-Pak, Inc. in 2009 ($50K).

• CUF Operations HVAC study by Horizon Engineering.

• Generator overload mitigation study by Rowland Engineering ($32K).

• JB&B, Gensler & Structuretone developed a master plan ($152K) based on the Bruns-Pak work which was used to develop:

– DOE ARRA grant application for HVAC improvements (not awarded).– NIH ARRA grant application for electrical improvements (awarded

4/15/10 $10M Core Research Computing Facility). – Will be used for future funding opportunities– Informing portions of the NYSERDA project (chilled racks).

20

Advanced Concepts Data Center Pilot Project - Scope Review

Richard Hall, Project Manager, CUIT

21

22

Scope of Work Review

No. Milestone Description

1 Project Approval

2 Inventory Servers

3 Instrument Power

4 Instrument Cooling

5 Develop Datacenter Profile

6 Implement 9 Racks

7 Replace 30 Servers

8 Compare Clusters

9 Implement Server Power Management

10 Increase Chilled Water Set Point 5-degrees

12 Project Review

13 Project close

2323

Scope of Work – DetailTo achieve the overall project objectives, CUIT has broken down the project into major tasks.

• Inventory (task 2) – COMPLETE– Create detailed physical inventory of existing in-scope server

• Instrument server power consumption (task 3) – COMPLETE– Install network monitored power monitors for each server– Perform data collection at 5-min intervals

• Instrument server input air temperature and overall DC chilled water (task 4) - COMPLETE– Install server input ambient air temperature for each server – Install BTU metering on data center supply and return lines – Perform data collection at 5-min intervals

• Establish overall Data Center profile (task 5) - September 2010– Utilize equipment load results to establish baselines– Develop PUE ratio for entire data center & inventoried servers

• Implement 9 racks of high power density in-row cooling (task 6) – September 2010– Install 9 server racks outfitted for high power density– Provide in-row cooling subsystem for 9 server racks

23

2424

Scope of Work Detail Cont’d• Replace 30 “old” servers and measure efficiency improvement (task 7) – September 2010

– Consolidate the replacement servers into high density racks and re-implement the same IT services

– Take measurements of before-and-after power consumption – Document expected and actual efficiency improvement

• Compare old and new research clusters (task 8) – COMPLETE– Benchmark applications on new Astronomy/Statistics HPC cluster

• Implement server power management (task 9) - September 2010– Install server BIOS/high level power management feature upgrades to servers (identified in

task 2)

• Increase chilled water set point and measure (task 10) - May 2010– Document measured before-and-after energy consumption

• Communicate results (task 11) – On-going

– Share results with key stakeholders

24

Installation Summary of Monitoring and Measurement Tools

Ian Katz, Data Center Facilities Manager, CUIT

25

Progress so far…

• Installed power meters throughout Data Center– Established overall data center power usage ~ 290kW

• Installed metered PDU’s and plugged in inventoried hosts– Ready for Idle benchmarking and service group power measurements

• Installed chilled water flow meters– Established overall data center heat load ~ 120tons

• Estimated CU Data Center PUE (Power Use Effectiveness)

• Other Data Center Improvements

26

Selected Metering Products• Power Panel Metering

– WattNode Meter– Babel Buster SPX (ModBus to SNMP translator)

• Server Level Metering– Raritan PDU

• Chilled Water Metering– Flexim – Fluxus ADM 7407

27

Power Meter Installation

• Installed WattNodes in 20 Power Panels• 17 Panels in Data Center• 3 Main Feeder Panels in Mechanical room

– ATS 2 & 3 - HVAC Load– ATS 4 - IT Load

28

• 290kW IT load read from PP1,2,3,4,5,6,16,26,27

• 120kW HVAC load read from ATS 2 & 3

Chilled Water Meter Installation• Flexim meters installed in Mechanical Room• Sensors installed to measure flow rate and

temperature• Result is Heat Flow Rate in tons• HF (tons) = Vol Flow (gpm) * ∆T / 24

29

• Sensors installed in 3 locations– Liebert CRACs 1 – 6

– AC 1 & 2– Dry Coolers

• Meters tied into same Modbus network as Wattnodes

Server Level Metering• Meter many different hardware types with Raritan PDU’s

– Sun: NetraT1, V100, V210, V240, 280R, V880, T2000– HP: DL360G4p, DL360G5p, DL380G5

• 28 servers Identified to:– Establish Active/Idle Benchmark– Investigate service usage comparisons

• Blade chassis (HP c7000) and blade servers (HP BL460c) metered with built in tools.

30

Mechanical Room: 100 Level

Data Center: 200 Level

Campus Level

server rackRaritan Power Distribution Units (PDUs)

and Uninterruptible Power Supplies (UPSs)

Wattnode meters

chilled water pipes

Main IT power feed (ATS4)

power panel

CRAC unit

Flexim meters

CU Data Center PUE Pie Chart

32

Servers246.547%

HVAC fans & pumps & compressors

11422%

HVAC chilled water12023%

Lighting5

1%

UPS overhead43.58%

Power Use Effectiveness – 2.15

More Data Center Improvements

• Overhead Cable Trays– Will allow us to clean up under the

raised floor

• New Data Center Layout– Hot Aisle / Cold Aisle Format

• *Future* -- Duct CRAC units & use ceiling as plenum – To return hot air from hot aisles to

CRACs

33

Measurement Plan and Initial Results

Raj Bose and Peter Crosta, Research Computing Services, CUIT

34

Overview: Tasks 7, 8, 9

• Task 7: Comparing power consumption of old and new(er) hardware

• Task 8: High performance computing (HPC) cluster power consumption comparison

• Task 9: Power management and tuning

35

Task 7: Out with the old, in with the new

• If we replace old servers with new servers, how will power consumption change?

IBM 7090 in University Computer Center, 1966

Microsoft’s Chicago data center, 2009

36

Task 7: Power measurement plan

• Inventory servers

• Determine comparison groups

• Two-tiered power measurement approach

1) pre/post migration comparison

2) SPECpower benchmark

37

Task 7: Pre/post migration comparisons

• Power consumption of same IT services on different hardware

MigrationTime

Old server New server

Service: E-mailHardware: oldTime: 1 weekEnergy: 68 kWh

Service: E-mailHardware: newTime: 1 weekEnergy: ?? kWh

E.g.

38

Task 7: SPECpower benchmark

• Industry standard benchmark to evaluate performance and power

• Addresses the performance of server side Java

• Finds maximum ssj_ops (server side Java operations per second)

• With simultaneous power measurement, allows calculation of ssj_ops / watt (performance per watt)

39

Task 7: SPECpower results – HP DL360G4p• On some systems, power consumption decreases as load decreases.

40

Task 7: SPECpower results – HP DL360G4p

41

Task 7: SPECpower results – Sun Sunfire V880• On other systems, constant power consumption regardless of load.

42

Task 7: Summary

• Designed plan to measure old and new server power consumption in multiple ways

– Energy consumed while running the same IT services – Performance per watt of power used

• Pre-migration measurement period is complete; awaiting migrations and follow-up measurements

• Benchmarking has begun and nears completion

43

Task 8: Cluster comparison

• Can a new, larger research cluster be more energy efficient than an older, smaller research cluster?

HotfootBeehive

44

Task 8: The clusters

Beehive• Built in 2005• 16 cores• 8 servers• Dual-core 2.2 GHz AMD Operton• 2 to 8 GB RAM• 10 TB SATA storage• OpenPBS scheduler

• Theoretical Peak GFlops: 61.6 • IDLE POWER IN WATTS: 2.7 kW

Hotfoot• Built in 2009• 256 cores• 16 high-density blades (2 servers each)• Dual quad-core 2.66 GHz Intel Xenon• 16 GB RAM• 30 TB SATA storage• Condor scheduler

• Theoretical Peak GFLops: 1361.9• IDLE POWER IN WATTS: 4.1 kW

45

Task 8: Comparison plan

• Power use in active idle state– Beehive = 2.7 kW– Hotfoot = 4.1 kW

• Energy consumption at load– Counting to one billion– Summing primes from 2 to 2 million (MPI)– Summing primes from 2 to 15 million (MPI)

46

Task 8: Energy use while running jobs

New cluster uses less energy to run research jobs than old cluster.

47

Job Cluster RuntimeTime

Difference EnergyEnergy

Difference

Beehive 3.33 minutes 0.15 kWhHotfoot 2.87 minutes 0.46 minutes 0.20 kWh 133%

Beehive 13.02 minutes 0.61 kWhHotfoot 4.93 minutes 8.09 minutes 0.35 kWh 57%

Beehive 8.92 hours 24.2 kWhHotfoot 3.87 hours 5.05 hours 16.3 kWh 67%

Hotfoot 15.85 minutes 8.66 hours 1.3 kWh 5%

Count to one billion on 1 core

Sum primes between 2 and 2 million on 14 cores

Sum primes between 2 and 15 million on 14 cores

Sum primes between 2 and 15 million on 256 cores

Task 8: Summary

• Older cluster consumes less power and uses less energy at baseline

• Advantages of newer cluster are evident as utilization increases

48

Task 9: Power tuning

• Implement server-, BIOS-, OS-level power tuning and power management

• Re-run benchmarks and service group comparisons to collect additional power usage data

49

Summary of Tasks 7, 8, and 9

• Task 7: In progress

• Task 8: Completed – newer cluster proves to use less energy than older cluster for research intensive work

• Task 9: In progress

50

Closing Comments

Alan Crosswell, Associate VP and Chief Technologist, CUIT

Victoria Hamilton, Director of Research Initiatives, Office of the Executive Vice President for Research (OEVPR)

51

Project Communications

• Conference presentations, publications, etc.– Workshop planned for January(?) timeframe– proposal submitted: 2010 Educause Annual Meeting (October)– 05/03/10 participation in NSF Workshop on Sustainable HPC– 04/15/10 cited in ECAR Green IT study– 03/03/10 participation in Datacenter Dynamics panel– 10/20/09 presentation at AITP-LI meeting– 10/06/09 presentation at Internet2 Member Meeting– 03/04/09 participated in CANARIE Green IT workshop– cited in The Greening of IT (ISBN 978-0-13-715083-0)

• Project blog: http://blogs.cuit.columbia.edu/greendc

• Email: [email protected]

52

Thank You, NYSERDAThis work is supported in part by the New York State Energy Research and Development Authority (NYSERDA agreement number 11145).  NYSERDA has not reviewed the information contained herein, and the opinions expressed do not necessarily reflect those of NYSERDA or the State of New York.

53

• Facilities, Data Center, Operations

• Statics and Astronomy

• NetDev, NetProj, NFS

• UNIX, WISE

• RCS, PM Office

Thanks to many groups around Columbia and within CUIT