  • 7/22/2019 Column Capacity Assessment

    1/5

    TEST COLUMN ID: C1

    No. of Floor = 6Slab thickness = 5 "

    Beam Size = 10 " x 18 "

    Column Size = 18 " x 18 "

    Area covered. = 20 ' x 15 ' = 300 sft

    Beam Length = 20 ' + 15 ' = 35 ft

    Column height = = 10 ft

    DEAD LOAD

    Self wt. of slab =

    Self wt. of Beam =

    Self wt. of Column =

    Floor Finish =

    Partition wall =

    Total DL(area load) =

    LIVE LOAD

    Service Live Load = (As per BNBC 93:2.3.3 table 6.2.3)

    = 6 ( 300 x 0.118 + 0.338 x 10 ) + 7 x 0.188 x 35 = 277.7 kip

    = 6 ( 300 x 0.080 ) = 144 kip

    = PDL+PLL =

    = 1.2PDL+1.6PLL =

    Ultimate capacity of Existing ColumnPu = 0.80( 0.85f'c(Ag Ast) + fy Ast)

    = 324 in2

    = 12.2 in2

    (16-25mm)

    = 60 ksi= 3.32 ksi

    = 0.65

    Pu = 0.80( 0.85f'c(Ag Ast) + fy Ast)

    = 837 kip

    Pu = 837 kip > kip "ok"564

    CAPACITY ASSESMENT OF TEST COLUMN

    COLUMN AREA ,Ag

    Area of Steel,As

    fyf'c

    TOTAL SERVICE LOAD, P

    TOTAL FACTORED LOAD, Pu

    421.7

    563.6

    kip

    kip

    0.08 ksf

    ksf0.118

    TOTAL DEAD LOAD,PDL

    TOTAL LIVE LOAD,PLL

    0.063

    0.188

    0.338

    0.030

    0.025

    ksf

    k/ft

    k/ft

    ksf

    ksf

  • 7/22/2019 Column Capacity Assessment

    2/5

    TEST COLUMN ID: C2

    No. of Floor = 6Slab thickness = 5 "

    Beam Size = 10 " x 21 "

    Column Size = 16 " x 16 "

    Area covered. = 10 ' x 20 ' = 200 sft

    Beam Length = 10 ' + 20 ' = 30 ft

    Column height = = 10 ft

    DEAD LOAD

    Self wt. of slab =

    Self wt. of Beam =

    Self wt. of Column =

    Floor Finish =

    Partition wall =Total DL(area load) =

    LIVE LOAD

    Service Live Load = (As per BNBC 93:2.3.3 table 6.2.3)

    = 6 ( 200 x 0.118 + 0.267 x 10 ) + 7 x 0.219 x 30 = 202.9 kip

    = 6 ( 200 x 0.080 ) = 96 kip

    = PDL+PLL =

    = 1.2PDL+1.6PLL =

    Ultimate capacity of Existing Column

    Pu = 0.80( 0.85f'c(Ag Ast) + fy Ast)

    = 256 in2

    = 3.88 in2

    (8-20mm)

    = 60 ksi

    = 3 ksi

    = 0.65

    Pu = 0.80( 0.85f'c(Ag Ast) + fy Ast)

    = 455 kip

    Pu = 455 kip > kip "ok"397

    fy

    f'c

    kip

    TOTAL FACTORED LOAD, Pu 397.1 kip

    COLUMN AREA ,Ag

    Area of Steel,As

    0.08 ksf

    TOTAL DEAD LOAD,PDL

    TOTAL LIVE LOAD,PLL

    TOTAL SERVICE LOAD, P 298.9

    0.030 ksf

    0.025 ksf0.118 ksf

    CAPACITY ASSESMENT OF TEST COLUMN

    0.063 ksf

    0.219 k/ft

    0.267 k/ft

  • 7/22/2019 Column Capacity Assessment

    3/5

    TEST COLUMN ID: C3

    No. of Floor = 6Slab thickness = 5 "

    Beam Size = 10 " x 20 "

    Column Size = 18 " x 18 "

    Area covered. = 16 ' x 20 ' = 320 sft

    Beam Length = 16 ' + 20 ' = 36 ft

    Column height = = 10 ft

    DEAD LOAD

    Self wt. of slab =

    Self wt. of Beam =

    Self wt. of Column =

    Floor Finish =

    Partition wall =Total DL(area load) =

    LIVE LOAD

    Service Live Load = (As per BNBC 93:2.3.3 table 6.2.3)

    = 6 ( 320 x 0.118 + 0.338 x 10 ) + 7 x 0.208 x 36 = 298.4 kip

    = 6 ( 320 x 0.080 ) = 153.6 kip

    = PDL+PLL =

    = 1.2PDL+1.6PLL =

    Ultimate capacity of Existing Column

    Pu = 0.80( 0.85f'c(Ag Ast) + fy Ast)

    = 324 in2

    = 4.85 in2

    (10-20mm)

    = 60 ksi

    = 2.93 ksi

    = 0.65

    Pu = 0.80( 0.85f'c(Ag Ast) + fy Ast)

    = 565 kip

    Pu = 565 kip < kip " not ok"604

    COLUMN AREA ,Ag

    Area of Steel,As

    fy

    f'c

    TOTAL SERVICE LOAD, P 452 kip

    TOTAL FACTORED LOAD, Pu 603.8 kip

    0.118 ksf

    0.08 ksf

    TOTAL DEAD LOAD,PDL

    TOTAL LIVE LOAD,PLL

    0.338 k/ft

    0.030 ksf

    0.025 ksf

    CAPACITY ASSESMENT OF TEST COLUMN

    0.063 ksf

    0.208 k/ft

  • 7/22/2019 Column Capacity Assessment

    4/5

    TEST COLUMN ID: C4

    No. of Floor = 6Slab thickness = 5 "

    Beam Size = 10 " x 21 "

    Column Size = 15 " x 15 "

    Area covered. = 16 ' x 16 ' = 256 sft

    Beam Length = 16 ' + 16 ' = 32 ft

    Column height = = 10 ft

    DEAD LOAD

    Self wt. of slab =

    Self wt. of Beam =

    Self wt. of Column =

    Floor Finish =

    Partition wall =Total DL(area load) =

    LIVE LOAD

    Service Live Load = (As per BNBC 93:2.3.3 table 6.2.3)

    = 6 ( 256 x 0.118 + 0.234 x 10 ) + 7 x 0.219 x 32 = 243.5 kip

    = 6 ( 256 x 0.080 ) = 122.9 kip

    = PDL+PLL =

    = 1.2PDL+1.6PLL =

    Ultimate capacity of Existing Column

    Pu = 0.80( 0.85f'c(Ag Ast) + fy Ast)

    = 225 in2

    = 4.8 in2

    (8-22mm)

    = 60 ksi

    = 3.32 ksi

    = 0.65

    Pu = 0.80( 0.85f'c(Ag Ast) + fy Ast)

    = 473 kip

    Pu = 473 kip < kip " not ok"

    COLUMN AREA ,Ag

    Area of Steel,As

    fy

    f'c

    489

    TOTAL DEAD LOAD,PDL

    TOTAL LIVE LOAD,PLL

    TOTAL SERVICE LOAD, P 366.4 kip

    TOTAL FACTORED LOAD, Pu 488.9 kip

    0.025 ksf0.118 ksf

    0.08 ksf

    0.219 k/ft

    0.234 k/ft

    0.030 ksf

    CAPACITY ASSESMENT OF TEST COLUMN

    0.063 ksf

  • 7/22/2019 Column Capacity Assessment

    5/5

    TEST COLUMN ID: C5

    No. of Floor = 6Slab thickness = 5 "

    Beam Size = 10 " x 16 "

    Column Size = 10 " x 15 "

    Area covered. = 14 ' x 15 ' = 210 sft

    Beam Length = 14 ' + 15 ' = 29 ft

    Column height = = 10 ft

    DEAD LOAD

    Self wt. of slab =

    Self wt. of Beam =

    Self wt. of Column =

    Floor Finish =

    Partition wall =Total DL(area load) =

    LIVE LOAD

    Service Live Load = (As per BNBC 93:2.3.3 table 6.2.3)

    = 6 ( 210 x 0.103 + 0.156 x 10 ) + 7 x 0.167 x 29 = 172.4 kip

    = 6 ( 210 x 0.080 ) = 100.8 kip

    = PDL+PLL =

    = 1.2PDL+1.6PLL =

    Ultimate capacity of Existing Column

    Pu = 0.80( 0.85f'c(Ag Ast) + fy Ast)

    = 150 in2

    = 4.85 in2

    (10-20mm)

    = 60 ksi

    = 2.92 ksi

    = 0.65

    Pu = 0.80( 0.85f'c(Ag Ast) + fy Ast)

    = 339 kip

    Pu = 339 kip < kip " not ok"

    COLUMN AREA ,Ag

    Area of Steel,As

    fy

    f'c

    368

    TOTAL DEAD LOAD,PDL

    TOTAL LIVE LOAD,PLL

    TOTAL SERVICE LOAD, P 273.2 kip

    TOTAL FACTORED LOAD, Pu 368.1 kip

    0.025 ksf0.103 ksf

    0.08 ksf

    0.167 k/ft

    0.156 k/ft

    0.015 ksf

    CAPACITY ASSESMENT OF TEST COLUMN

    0.063 ksf