![Page 1: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/1.jpg)
Combined Sewer OverflowLong Term Control Plan
January 29, 2020
Citywide/Open Waters LTCP
Recommended Plan Public Meeting
![Page 2: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/2.jpg)
2
Agenda
Topic Speaker
1 Welcome and Introduction Mikelle Adgate
2 Investments and Spending Priorities Angela Licata
2 Overview of Baseline Conditions Pinar Balci
3 Overview of Recommended Plan Keith Mahoney
4 City-wide Integrated Floatables Program Pinar Balci
6 Next Steps Mikelle Adgate
![Page 3: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/3.jpg)
3
Welcome and Introduction
Mikelle Adgate DEP
![Page 4: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/4.jpg)
4
What is a Combined Sewer Overflow (CSO)?
NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary and storm flows.
65% to 90% of combined sanitary and storm flow is captured at wastewater resource recovery facilities (WRRFs).
When the sewer system is at full capacity, a diluted mixture of rainwater and sewage may be released into local waterways. This is called a combined sewer overflow (CSO).
DownSpout
Catch Basin
Stormy Weather Conditions
CombinedSewer Outfall
SewerRegulator
City Sewer Main
Building SewerConnection
DownSpout
Catch Basin
CombinedSewer Outfall
Sewer Regulator
Dry Weather Conditions
City Sewer Main
Building SewerConnection
![Page 5: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/5.jpg)
5
What is a LTCP and CSO Consent Order?
Long Term Control Plan (LTCP)
identifies appropriate CSO controls to achieve applicable water quality standards
consistent with the Federal CSO Policy and Clean Water Act
CSO Consent Order
an agreement between NYC and DEC that settles past legal disputes without prolonged litigation
DEC requires DEP to develop LTCPs and mitigate CSOs
![Page 6: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/6.jpg)
6
LTCP Milestone Status
ID LTCP Approved?
Alley Creek
Westchester Creek
Hutchinson River
Flushing Creek
Bronx River
Gowanus Canal
Coney Island Creek
Flushing Bay
Newtown Creek Jamaica Bay andTributaries(1) Under DEC review
Citywide/Open Waters(2) LTCP in developmentDue to DEC March 2020
1
3
4
5
6
8
7
9
10
11
(1) Jamaica Bay includes Thurston Basin, Bergen Basin, Hendrix Basin, Fresh Creek, Spring Creek, Paerdegat Basin and Jamaica Bay
(2) Citywide/Open Waters LTCP includes East River, Lower Long Island Sound, Hudson River, Harlem River, Lower and Upper New York Bay, Arthur Kill and Kill Van Kull
2
![Page 7: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/7.jpg)
7
Citywide/Open Waters LTCP
• Waterbody-specific CSO evaluation of Open Waters: • Harlem River
• Hudson River
• East River/Long Island Sound
• Upper and Lower New York Bay
• Arthur Kill and Kill Van Kull
• Citywide/Open Waters LTCP will be submitted to DEC in March 2020
![Page 8: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/8.jpg)
8
Citywide/Open Waters LTCP Public Meetings
Kickoff Meetings: Harlem River/Hudson River:
January 31, 2018
Kill van Kull, Arthur Kill, New York Bay: March 27, 2018
East River/Long Island Sound Meeting: May 10, 2018
Update Meeting: April 16, 2019
Retained Alternatives Meetings: Tibbetts Brook Meeting: October 2, 2019
Retained Alternatives Meeting: October 15, 2019
Staten Island Meeting: November 6, 2019
![Page 9: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/9.jpg)
9
Investments and Spending Priorities
Angela LicataDEP
![Page 10: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/10.jpg)
10
DEP Investments and CSO Reduction
$-
$10
$20
$30
$40
$50
$60
0
20
40
60
80
100
120
1980 1990 2000 2010 2020 2030 2040 2050
Cum
ulat
ive
Cos
t (B
illio
ns)
Ann
ual C
SO V
olum
e (B
GY)
Annual CSO Volume (BGY)
Cumulative Cost (Billions)
Actual Estimated
![Page 11: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/11.jpg)
11
Water Quality Improvements
Fecal Coliform Bacteria0-100 100-200 >2,000201-2,000Scale (# col/100 mL)
Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC in June 2019 with an effective date of Nov 1, 2019. Applies to following NYC waters evaluated under this OW LTCP – Long Island Sound, Upper New York Bay and portion of Lower New York Bay. Attainment with Enterococci WQS discussed later in presentation.
1985
1992
1999
2018
![Page 12: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/12.jpg)
12
Population, Water Demand, and Rates
• Water demand has declined more than 40% since 1990
• Population increased by more than one million people
• Rates have more than doubled (adjusted for inflation) since 2000 to meet the increasing cost of service
![Page 13: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/13.jpg)
13
DEP Capital Commitments
DEP’s $20B 10-Year Capital Plan
Liner for Del Aqueduct Bypass Tunnel
Storm Sewer, Southeast Queens
![Page 14: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/14.jpg)
14
Balancing Investments
Protecting public health
Supporting economic growth
Affordable & sustainable rates and customer
assistance programs
Climate actions & energy recovery
Environmental justice
Ecosystem restoration & species protection
Improving drinking water quality & receiving water
protection
Addressing aging infrastructure
![Page 15: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/15.jpg)
15
LTCP Program Commitments and Benefits
![Page 16: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/16.jpg)
16
?Questions
![Page 17: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/17.jpg)
17
Overview of Baseline Conditions
Pinar Balci, PhD DEP
![Page 18: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/18.jpg)
18
Citywide/Open Waters LTCP Baseline Conditions
Grey Infrastructure Projects
• WWFP Projects
• Tributary LTCPs
Green Infrastructure Projects
• Right-of-way Green Infrastructure
• Public Property Retrofits
• Private Property Incentives
• Stormwater Rules
• Demand Management
• Tibbetts Brook Daylighting
![Page 19: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/19.jpg)
19
Green Infrastructure Program Snapshot
• Installed over 4,500 assets
• Over 7,000 GI assets going into construction in 2019-2021
Source: DEP Green Infrastructure Program Map (publicly accessible)
LEGEND
Final Design
In Construction
Constructed
![Page 20: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/20.jpg)
20
ROW Contract Areas in East River/Open Waters
• 435 AssetsConstructed and In-Construction
• 181 MGY of Stormwater Managed
• 144 Equivalent Greened Acres
![Page 21: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/21.jpg)
21
ROW – Infiltration Basins
![Page 22: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/22.jpg)
22
ROW Cloudburst Swales & SW Greenstreets
![Page 23: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/23.jpg)
23
ROW Rain Gardens
![Page 24: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/24.jpg)
24
ROW Porous Concrete
![Page 25: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/25.jpg)
25
ROW Large-Scale ProjectsExisting
Concept
![Page 26: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/26.jpg)
26
Public Property Retrofits
Public HousingHope Gardens, Brooklyn
Public SchoolsWinthrop Campus, Brooklyn
Key Partnerships:• NYC Housing Authority• NYC Parks• NYC Department of Education• DDC Public Buildings Portfolio
(Library, Fire, Police, Other) Public ParksAstoria Heights Playground, Queens
![Page 27: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/27.jpg)
27
Public Property - TPL Partnership
![Page 28: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/28.jpg)
28
Green Infrastructure Grant Program• More than $13M committed to date to
32 projects
• New green roof incentive schedule released in 2018 – up to $30/SF
• Shifting focus to green roof retrofits
Private Property Implementation Update
Private Property Retrofit Program• $53M RFP released Nov 2018
• Program administrator selected in June 2019
• 200 Greened Acres in 5 years starting in 2020
• Properties > 50,000 SF
Unified Stormwater Rule • Legislation introduced January 23rd,
2020
• Expands MS4 Requirements into CSO Areas
• New Rule currently being drafted
• Rule will update stormwater quantity and flow rates (superseding 2012 Performance Standard)
• Reduces construction/post-construction program threshold and adds requirements for infiltration
• Result will be a Citywide Stormwater Management Program
![Page 29: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/29.jpg)
29
Demand Management Projects
Central Park Jackie Onassis Reservoir Recirculation Project 0.83 MGD of potable water savings CSO reduction of about 4 MG/yr to the
East River
Prospect Park Valve Replacement Project 0.80 MGD of potable water savings CSO reduction of about 12 MG/yr to
New York Bay
![Page 30: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/30.jpg)
30
Tibbetts Brook Baseline Project
CSO Reduction Cost EstimateCost per CSO
Volume Reduction
228 MGY $63 Million $0.28/gal
• Reroutes flow from Van Cortlandt Lake, away from Broadway Sewer• Daylighted stream along former CSX right-of-way, discharging directly to Harlem River• Reducing CSO flows from WI-056• No siphon needed• Open Channel flow up to 31 cfs
Open Channel Cross Section
Daylighting Tibbett’s Brook Base Flow plus additional storm flow, with Van Cortlandt Lake Improvements
![Page 31: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/31.jpg)
31
Tibbetts Brook Baseline Project
![Page 32: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/32.jpg)
32
Proposed Improvements at Van Cortlandt Lake
• Increase storage through downstream overflow weir modification and construction of a new weir
• Lake restoration through creation of an additional 0.85 acre of wetlands
Overflow Weir Structure
Entrance to Collection System
![Page 33: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/33.jpg)
33
Proposed Improvements at Van Cortlandt Lake
Sports Fields
Major Deegan Expwy
Van Cortlandt Lake
Modification of Existing Weir
New Weir Structure
Van Cortlandt Golf Course
![Page 34: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/34.jpg)
34
?Questions
![Page 35: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/35.jpg)
35
Overview of Recommended Plan
Keith Mahoney, PE DEP
![Page 36: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/36.jpg)
36
WQS Attainment Chart
(1) Fecal Coliform attainment is assessed on an annual basis.
(2) Enterococci attainment is assessed for the recreational season (May 1st – Oct 31st) for SB coastal waters.
(3) There are additional loadings other than NYC CSO discharges that prevent full attainment with WQS.
![Page 37: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/37.jpg)
37
Key Take-Aways for Alternatives Analysis
*Based on only on outfalls and WRRFs associated with citywide open waters and the 2008 JFK Typical Year rainfall.
5%
95%
Over $9B in investments have been made or committed as part of the CSO Program to date
50% 75% 100%
% Volume Capture for2008 JFK Typical Year Rainfall
Annu
al C
SO V
olum
e
Annual CSO volume is small percentage of total volume treated at WRRFs
CSO volume to be captured increases significantly with increasing level of control
Baseline water quality shows high levels of attainment with applicable WQS
Paerdegat Basin CSO Facility
![Page 38: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/38.jpg)
38
Overview of Alternatives AnalysisApproach:• Toolbox defines technologies to be assessed
• Range of levels of CSO control evaluated per EPA CSO Policy
• Multiple iterations of screening steps to identify alternatives to be retained for cost/benefit evaluations presented in LTCP
• Screening considers:o Hydraulic/operational feasibilityo CSO reductiono Costo Siting availabilityo Impact on attainment of Water Quality Standards
• Screening process resulted in focus on system optimization alternatives and tunnel storage
Retained Alternatives from the 10/15/19 Meeting can be found online at
www.nyc.gov/dep/ltcp
![Page 39: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/39.jpg)
39
System Optimization Analysis Summary
• Evaluation was driven by system hydraulics and optimizing flow delivery
• Selection of alternatives limited by constraints on increasing water levels in the sewers
• Analysis demonstrated that the existing system is currently being operated as designed to maximize hydraulic flow delivery while also protecting the WRRFs
Targeted 100 monitored BMP regulators and prioritized CSO reduction from outfalls adjacent to public access locations
![Page 40: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/40.jpg)
40
Summary of Optimization Evaluations
Waterbody Alt. DescriptionCSO
Volume Reduction(1)
Est.Probable Bid Cost
CostEffective
No Add’lCSO to Tribs
Harlem River
HAR-1• Optimization of regulators associated with Outfalls NR-007,
008, 009, 010, 017
• Relocate and upsize portion of Main Interceptor16 MGY $35M
HAR-2• Optimization of regulators associated with Outfalls NR-008
and NR-010
• Relocate and upsize portion of Main Interceptor15 MGY $31M
Hudson River HUD-1 • Optimization of regulators associated with HUD-2 Outfalls
plus NR-022, 023, 026, 027, 031, 032, 035 9 MGY $19M
East River
ER-1 • Optimization of regulator associated with Outfall HP-025 30 MGY $16M ER-2 • Optimization of regulators associated with Outfalls HP-016,
018, 019, 025 30 MGY $24M ER-3 • Optimization of regulators associated with Outfalls TI-003,
022 102 MGY $4M ER-4 • Optimization of regulators associated with Outfalls TI-003,
022, 023 122 MGY $7M ER-5 • Bending Weir at Regulator TI-13, Outfall TI-023 42 MGY $3M
Alternatives excluded from the Recommended Plan:
![Page 41: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/41.jpg)
41
Summary of Optimization Evaluations
Waterbody Alt. DescriptionCSO
Volume Reduction(1)
Est.Probable Bid Cost
CostEffective
No Add’lCSO to Tribs
Hudson River HUD-2 • Optimization of regulators associated with Outfalls NR-038,
040, 046 7 MGY $3M
East River ER-6 • Bending weir at Regulator TI-13 (TI-023) plus regulator
optimization associated with TI-003 86 MGY $6M
New York Bay
NYB-1 • Optimization of regulators associated with CSOs RH-005, 014 15 MGY $6M
NYB-2• Gravity flow connection from Victory Boulevard combined
sewer directly to interceptor, bypassing Hannah Street PS, diverting dry and wet weather flow upstream of CSO PR-013
43 MGY $22M
NYB-3 • RTC gate for Regulator 9C, Outfall OH-015 90 MGY $5M
Alternatives included in the Recommended Plan:
![Page 42: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/42.jpg)
42
Recommended Plan Project: HUD-2
Hudson River WaterbodyAlternative HUD-2
10 MGYCSO reduction to Hudson River
3 MGY*CSO increase to Harlem River
7 MGYNet CSO volume reduction
$3MEstimated probable bid cost
28activation reductions
Optimization of regulators associated with Outfalls NR—038, 040, 046
Fecal attainment maintained
DO attainment maintained
*Tibbetts daylighting project will reduce CSOs to Harlem River by 228 MGY
Project Location
![Page 43: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/43.jpg)
43
Recommended Plan Project: ER-6
East River WaterbodyAlternative ER-6
Bending weir at outfall TI-023 plus optimization of the regulator associated with outfall TI-003
86 MGYCSO reduction to East River
$6MEstimated probable bid cost
34activation reductions
Fecal attainment maintained
Entero GM & STV attainment maintained
DO attainment maintained
Project Location
![Page 44: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/44.jpg)
44
Recommended Plan Project: NYB-1
New York BayAlternative NYB-1
Optimization of regulators associated with CSOs RH-005 and 014
15 MGYCSO reduction to Upper New York Bay
$6MEstimated probable bid cost
14activation reductions
Fecal attainment
Entero GM attainment
DO attainment
Entero STV attainment
Project Location
![Page 45: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/45.jpg)
45
Recommended Plan Project: NYB-2
New York BayAlternative NYB-2
Gravity flow connection from Victory Blvd combined sewer to interceptor, bypassing Hannah St PS Diverts dry and wet weather flow upstream of CSO PR-013
43 MGYCSO reduction to Upper New York Bay
$22MEstimated probable bid cost
50activation reductions
Fecal attainment
Entero GM attainment
DO attainment
Entero STV Attainment
Project Location
![Page 46: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/46.jpg)
46
Recommended Plan Project: NYB-3
New York BayAlternative NYB-3
Real time control gate at Regulator 9C, Outfall OH-015
90 MGYCSO reduction to Lower New York Bay
$5MEstimated probable bid cost
-3activation reductions
Fecal attainment
Entero GM attainment
DO attainment
Entero STV Attainment
Project Location
![Page 47: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/47.jpg)
47
Recommended Plan WQ Attainment
(1) Fecal Coliform attainment is assessed on an annual basis.
(2) Enterococci attainment is assessed for the recreational season (May 1st – Oct 31st) for SB coastal waters.
(3) There are additional loadings other than NYC CSO discharges that prevent full attainment with WQS.
![Page 48: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/48.jpg)
48
Overview of the Recommended Plan
![Page 49: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/49.jpg)
49
Overview of the Recommended Plan
(1) Based on 2008 JFK Typical Year Rainfall
(2) Projected CSO LTCP escalated costs includes design/DSDC escalated to mid-point of design and construction/CM escalated to mid-point of construction
![Page 50: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/50.jpg)
50
?Questions
![Page 51: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/51.jpg)
51
City-wide IntegratedFloatables Program
Pinar Balci, PhD DEP
![Page 52: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/52.jpg)
52
Public Education and OutreachAwareness Campaigns and Stewardships
Clean Streets = Clean Beaches
Don’t Trash Our WatersTalk Trash New York
Bring It.
Forgot your bag?
Trash It. Don’t Flush It.
Community Clean-ups
Adopt-a-Basket
![Page 53: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/53.jpg)
53
Public Education and Outreach
Catch Basin Marking
Environmental EducationSAFE Disposal Events
Special Waste Drop Off Sites
School Sustainability Coordinator Trainings
Education Programs and Trash Free Waters Challenge
BetterBin Competition
![Page 54: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/54.jpg)
54
Regulatory Measures
• Prohibitions and fines for littering and illegal dumping
• Requirements to for property owners to keep sidewalks, gutters, backyard areaways and alleys clean
• Styrofoam Ban- in effect on January 1, 2019
• Single-use plastic bags ban (NYS) with five cent fee for paper bag (NYC)- in effect on March 1, 2020
• Executive Order banning City Agencies from purchasing single-use plastic foodware
![Page 55: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/55.jpg)
55
Street Sweeping and Public Litter Baskets
Includes DSNY, BID, and DSNY approved but privately owned baskets
Litter Basket Inventory
![Page 56: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/56.jpg)
56
Citywide Integrated Floatables Program
(1) Source: NYC Stormwater Management Program, NYCDEP, August 2018
Skimmer Boats
![Page 57: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/57.jpg)
57
Public Engagement on Floatables
• Signature CampaignClean Streets = Clean Beaches was launched in the 1990s
• DEP is seeking to refresh messaging
• Conducted an online survey with over 200 New Yorkers
• Focus-group tested multiple campaigns
![Page 58: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/58.jpg)
58
?Questions
![Page 59: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/59.jpg)
59
Next StepsMikelle Adgate
DEP
![Page 60: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/60.jpg)
60
LTCP Summary
• LTCP Retained Alternatives Summary was released in October 2019
• LTCP Recommended Plan Summary is now available online at nyc.gov/dep/ltcp
• Table of Contents1. Introduction2. CSO Best Management Practices3. Grey Infrastructure Strategies4. Green Infrastructure Strategies 5. Summary of Submitted Tributary LTCPs6. Baseline Conditions for LTCP Models7. WQS Attainment and Alternatives Screening8. Waterbody Snapshots and Retained Alternatives9. The Recommended Plan10. Public Outreach11. Affordability and Financial Capability
Public Comments on the Recommended Plan are due to [email protected] by March 2nd, 2020
![Page 61: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/61.jpg)
61
2020
Citywide/Open Waters LTCP Public Outreach
DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR2018 2019
2018 Annual Public Meeting
StakeholderBriefing
LTCP Recommended Plan Public Meeting
Retained Alternatives Public Meeting (10/15)
Citywide/Open Waters LTCP Submittal to DEC
• Complete LTCP Report• Response to Public Comments
Harlem RiverBriefing (10/2)
LTCPAlternatives
Comments Due
LTCPRecommended Plan Comments Due
Stakeholder Briefing Comments Due
LTCP Retained Alternatives
SummaryLTCP Summary
Staten Island Briefing (11/6)
![Page 62: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/62.jpg)
62
Additional Information & Resources
Visit the DEP Website for more information: www.nyc.gov/dep/ltcp
• Monthly Updates on the Citywide LTCP
• Citywide LTCP Content: sampling information, baseline information etc.
• CSO Order including LTCP Goal Statement
• Links to Waterbody/Watershed Facility Plans
• Presentations, Meeting Materials and Meeting Summaries
• LTCP Brochure and Waterbody Fact Sheets
• All Submitted LTCP Reports and Other LTCP Updates
• NYC’s Green Infrastructure Reports and Grant Program
• Green Infrastructure Interactive Map of Projects
• NYC Waterbody Advisory Program
• Upcoming Meeting Announcements
![Page 64: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/64.jpg)
64
![Page 65: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/65.jpg)
65
![Page 66: Combined Sewer Overflow Long Term Control Plan · Scale(#col/100mL) 0-100 100-200 201-2,000 >2,000 Enterococci GM and STV WQS adopted for Class SA and coastal Class SB waters by DEC](https://reader034.vdocuments.net/reader034/viewer/2022042612/5f3d40f9bb47042b8712ecca/html5/thumbnails/66.jpg)
Selection of 2008 Rainfall as Typical Year
66