comcube montage pneumatex
TRANSCRIPT
ComCubeMontage | Betrieb | 0705
Montage | Exploitation | 0705
Assembly | Operation | 0705
Montage | Werking | 0705
02
de
fr
en
nl
Ppneumatex.com ComCube 0705
General information Assembly and operating personnel must have the appropriate skills and training. The present assembly instructions, in particular the safety notes onpage 23, must be followed in all cases during assembly and operation.
Mühlerainstrasse 26CH-4414 Füllinsdorf
Phone +41 61 906 26 26Fax +41 61 906 26 27 [email protected]
www.pneumatex.com
03
de
fr
en
nl
Ppneumatex.com ComCube 0705
Table of contents
• Example of analogue outputs• Examples of digital outputs• Follow the accompanying instructions
for DCA isolating amplifiers.• Keyboard and Display | Operating
indications | menu | check Outputs | info | Programmable Outputs | Factory Settings
• Requirements | Mains supply• Connections | Analogue outputs• Software updates | 230 V | SELV | RS 485-1
• Switching on | Outputs calculation• Switching on | BrainCube configuration |
Initial start-up Welcome
• auto | standby | menu | check• Indications, acknowledgement |
Message list | Correcting faults• No inspection requirement• ComCube to be placed off circuit
Table of contents
Scope of deliveryFactory fittingWall-mounting
OperationAssembly | Function DCA | DCDAssembly | Function DCAAssembly | Function DCDConfiguration DCA
Configuration DCD
AssemblyElectrical connection DCA | DCDElectrical connection DCAElectrical connection DCDTerminal plan DCD
Start-up (IBN)Requirements DCA | DCDComCube DCAComCube DCD
OperationBasic principles DCA | DCDOperating modes DCDMessages DCD
Inspection | Disassembly DCA | DCD
Safety
Technical data
CE conformity
Customer service
03
0404
0505
06 – 1011
11 – 14
15151617
1818
18 | 19
202021
22
23
24
26
27
04
de
fr
en
nl
Ppneumatex.com ComCube 0705
ComCube DCA TI
ComCube DCD TI
ComCube DCA
ComCube DCD
The scope of delivery is indicated on the delivery note and may include other products in addition to ComCube. Intermediate storage is required in a dry roomprotected from frost. Various ComCube communication mo du les are available.
Scope of delivery
Factory-fitted in Transfero TI
Analogue communication module,fully wired on mounting rail in PowerCube panel.
Digital communication module,all inputs and outputs fully wired to terminal strips in the PowerCube panel.
Wall mounting
Analogue communication module for BrainCube controls, fixing elements for optimal cable management.
• ComCube DCA is fastened to the wall using the mounting plates. 4 screws and wall plugs are provided.
• Set the wall plugs in the wall corresponding to the positions of the holes in the mounting plates, hold ComCube DCA, and fasten with the screws.
Digital communication module for BrainCube controls, fixing elements for optimal cable management.
• ComCube DCD is fastened horizontally to the wall using the mounting plate (3).
• Fix 2 screws into the wall corresponding to the positions of the mounting slots.
• Mount the ComCube DCD and fasten with screws.
Legend1 ComCube1.2 Mains plug2 Fixing elements for customer cables3 Base plate4 Documents map
– Assembly | Operating instructions– Isolating amplifier SINEAX TV 808-12 operating instructions
(for ComCube DCA only)
1
1
2
34
4
1.2
1.2
05
de
fr
en
nl
Ppneumatex.com ComCube 0705
ComCube DCA PIS pressure and LIS content frequently have to be sent in simple form to the buil -ding management system. The ComCube DCA | DCA TI provides 2 galvanically iso-lated 4-20 mA analogue outputs.
ComCube DCA is connected between the BrainCube and the LIS and PIS sensors.The 2 outputs are connected to the building management system.
ComCube is a communication module that extends the BrainCube control functiona-lity, as applied in Compresso, Transfero, Pleno and Vento. There are two types: digitalComCube DCD and analogue ComCube DCA. The two can also be used in combi-nation.
Operation Assembly | Function
ComCube DCA
Compresso |Transfero
Final equipment | Building management system
PIS
LIS
06
de
fr
en
nl
Ppneumatex.com ComCube 0705
ComCube DCD
Parallel connection ofComCube DCD
and the BrainCube should consist of up to
4 BrainCube controls and 250 ComCube DCDcommunication mo du les.
The total length of the RS 485 data link should be no more than 300 m.
ComCube DCD | DCD TI is an 11-language communication module. It has 6 di gital IP inputs for registering and displaying external volt-free signals and 9 volt-free, indi-vidually configurable digital OP outputs. All outputs are individually reversible fromNO (normally open) to NC (normally closed). The graphical 8-line display and theencoder with Scroll and Select functions make it simple to operate.
ComCube DCD has two main applications:
• Up to 6 programmable external IP inputs and up to 9 OP outputs. For example,external signals can be set for temperatures as commands on the DCD outputs.For individual solutions, please contact our professional advisers.
• OP outputs of a DCD. This avoids the need for expensive software for the inter -face (Examples 1-7). If more than 9 outputs are required, more than one DCDs(up to 250!) can be connected to one BrainCube.– Individual assignment of BrainCube and ComCube messages on the OP outputs.– Individual switching of the OP outputs of the connected BrainCube control depen-
ding on PIS pressure and/or LIS content.– Status indication (on/off) of ComCube IP inputs and OP outputs.– Indication of pressure and content, and switching of the pumps and valves of the
connected BrainCube control.– Monitoring of the connected BrainCube control type.
Installed between the RS 485 of the BrainCube and the building managementsystem (Examples 1-6) or the final equipment for remote monitoring of the BrainCubecontrols (Example 7). There are many other possible applications, which cannot allbe described here.
Operation Assembly | Function
07
de
fr
en
nl
Ppneumatex.com ComCube 0705
Example 1 Visualisation and building management systemComCube DCD No.1: RS 485 signals on 9 outputs to represent water level, forexample Min., 20%, 30%, 40%, 50%, 60%, 70%, 80%, Max.ComCube DCD No.2: RS 485 signals on 9 outputs, for example representingmin./standard/max. water level, min./standard/max. pressure, compressor on, spillvalve open, water make-up on.
It is advisable to install ComCube DCD No. 2 directly in the building managementsystem, as this will greatly reduce the amount of wiring required for the 9 outputs.
Operation Assembly | Function
RS 485cable
RS 485 cable
BrainCube
ComCube DCDNo.2
ComCube DCDNo.1
Final equipment |Building manage-
ment systemCompresso |Transfero
Ligh
ting
colu
mn
08
de
fr
en
nl
Ppneumatex.com ComCube 0705
Example 2
Example 3
Connecting a system to the building management systemDirect wiring of the volt-free OP outputs of the ComCube DCD to the buildingmanagement system. If the 1 or 2 volt-free outputs of the BrainCube are not enough,then 9 more outputs can be made available through the ComCube DCD.
Connecting several systems in different buildings to the building management systemIt is advisable to connect them through the ComCube DCD over separate RS 485data links.
Operation Assembly | Function
RS 485cable
ComCube DCDBrainCube Cabling with OP outputs
Final equipment |Building manage-
ment system
Compresso |Transfero
RS 485 cable
RS 485 cable
RS 485 cable
Final equipment | Building management system
Compresso
BrainCube
BrainCube
BrainCubeTransfero Vento
ComCubeDCD
Link-up information* B
Link-up information*
* Information on the main menu of ComCube DCD | DCD TI � page 12
B
B
B
09
de
fr
en
nl
Ppneumatex.com ComCube 0705
Operation Assembly | Function
Example 4
Example 5
Connecting several systems in one building to the building management systemIt is advisable to connect them over an RS 485 data link. In any case, each systemcan be assigned to a specific ComCube DCD.
Master-slave parallel operation + several ComCube DCDsThe master and each slave are assigned to one ComCube DCD. This arrangementallows the maximum required monitoring of the entire system with a minimum amountof cabling. It is also the ideal arrangement for master-slave parallel operation.
RS 485 cable
ComCubeDCD
Final equipment | Building management system
Compresso
BrainCube
Transfero
Vento
BrainCube BrainCube
RS 485 cableMaster
BrainCube BrainCube BrainCube
ComCubeDCD
Slave Slave
Final equipment | Building management system
Link-up information* B B B
Link-up information* M S S
* Information on the main menu of ComCube DCD | DCD TI � page 12
10
de
fr
en
nl
Ppneumatex.com ComCube 0705
Operation Assembly | Function
Example 6
Example 7
Master-slave parallel operation + one ComCube DCDThe ComCube DCD is assigned to the master. The volt-free outputs on the slaveBrainCube controls are connected directly to the building management system. Thisarrangement is useful in «parallel operation» and provides optimum monitoring atminimum cost.
Remote monitoring with one ComCube DCDA ComCube DCD can, of course, also be used as a terminal for the remote monito-ring of one or more BrainCubes. The graphical display can display any desired data.
RS 485 cableMaster
BrainCube
ComCubeDCD
Slave Slave
Final equipment | Building management system
RS 485 cable
Compresso
TransferoVento
ComCube DCD
BrainCube
BrainCube
BrainCube
Link-up information* M
Link-up information* B
B
B
S S
* Information on the main menu of ComCube DCD | DCD TI � page 12
11
de
fr
en
nl
Ppneumatex.com ComCube 0705
Operation Programmable
ComCube DCA
ComCube DCD
Change betweenoperating displays using scroll.
To use and operate the integrated isolating amplifier, read the «Isolating amplifierSINEAX TV 808-12 operating instructions».
Keyboard and display
Operating displays
push – confirm, open
scroll – select, modify,Change view
escapeBack,Key lockPress key lock for 5 s until « » appears. Press again for 5 s to release the key lock.
Illuminated displayLight goes off 60 safter last operatoraction. Activated bythe scroll or other key.
autoAutomatic operation
menuMain menustandbyDisplay only
checkFunction check
Message row 1ComCube + equipment type
Message row 2Operating mode,Most recent message
Information rowInputs, Outputs, BrainCube No.
12
de
fr
en
nl
Ppneumatex.com ComCube 0705
Operation Programmable
Switch outputs manually� on, � off
Set outputs� pages 13 | 14
Set inputs:� NO (normally open)
� NC (normally closed)
menu —Selected applications
Main menu MSBXCheck outputsParametersInfo
2.2 70bar Back %
Link-up information* Master-slave parallel operation** Individual operation, for example Vento
BrainCube 1, in this case: M = Master*BrainCube 2, in this case: S = Slave*BrainCube 3, in this case: B = stand alone**BrainCube 4, in this case: X = not connected
LIS contentmax. content 100%min. content 0%
PIS pressuremax. PSV pressuremin. P0 pressure
Check outputsOutput OP1 �
Output OP9 �
...
InfoType ComCube DCDVersion V1.01View messages
Select the BrainCube with whichcommuni cations are to be set up.
DE, EN, FR, NL, IT, CZ, PL, SE, ES, FI, DKParametersLanguage selectionDate 12.05.2007Time 15:38BrainCube 1
Output OP1 �Output OP2 �
Output OP9 �
Input IP1 �Input IP2 �
Input IP6 �
Factory settingContrast 120
...
...
Load factory settings.All individual settings will be overwritten!
The last 20 ComCube messages.
ComCube DCD
13
de
fr
en
nl
Ppneumatex.com ComCube 0705
Operation Programmable
Switching points for pressure are inactive, if PIS on = off,switching points for content are inactive, if LIS on = off,
Note: It is not useful to switch an output according to content or pressure.
Programmable outputs, for example output OP1
Output OP1Inputs �Pumps/valves �Switch-points BrainC �Messages BrainCube �Messages ComCube �Invers �
1) Assign IP inputs of ComCube DCD to the output.2) Assign BrainCube pumps/compressors and valves individually.
If the corresponding unit switches, the output closes.3) Assign BrainCube message individually. Multiple assignments are possible.4) Assign ComCube DCD messages individually. Multiple assignments are possible.5) Switch output to inverse: � NO (normally open) | � NC (normally closed).
1)
2)
3)
4)
5)
Set switching points, for example output OP1
OP1 Switch-points BrainCPIS on offPIS off 2.0 barLIS on 10%LIS off 20%
Switching points for pressure are inactive.Output closes if content > 90 % and opens if< 80 %. This arrangement can be used, forexample, to actuate a valve in order to preventoverfilling (separate water meter and locking isrecommended for when maximum quantity isexceeded).
OP1 Switch-points BrainCPIS on offPIS off 0.0 barLIS on 90%LIS off 80%
Switching points for pressure are inactive.Output closes if content > 30 % and opens if< 29 %. This output could be coupled with anindicator lamp. If other outputs are program-med for other levels, a lighting column canthen be easily set up to display the different -vessel contents (�page 7, example 1).
Example A:
Example B: OP1 Switch-points BrainCPIS on offPIS off 0.0 barLIS on 30%LIS off 29%
Mode of operationIf PIS | LIS on is lower than PIS | LIS off , the output is switched on if the value fallsbelow PIS | LIS on, and switches off if the value goes above PIS | LIS off.If PIS | LIS on is higher than PIS | LIS off , the output is switched on if the value goesabove PIS | LIS on, and switches off if the value falls below PIS | LIS off.
ComCube DCD
� This output is not assigned,� Assignment of this output,
Note: Multiple assign ments are not useful (except invers = �)
14
de
fr
en
nl
Ppneumatex.com ComCube 0705
Operation Programmable
Factory settings menu - Parameters
Parameters Factory setting
Language selection EnglishDate 00.00.2000Time 00:00BrainCube off
Output OP1 Messages BrainCube � M01 Min pressure PIS �Output OP2 Messages BrainCube � M02 Max pressure PIS �Output OP3 Messages BrainCube � M03 Min contents LIS �Output OP4 Messages BrainCube � M04 Max contents LIS �Output OP5 Messages BrainCube � M11 Runtime FIQ �
M12 Leakages FIQ �M13 NS leaky FIQ �M14 Max quantity FIQ �M15 Water meter FIQ �
Output OP6 Switch-points BrainC � LIS on: 70 %LIS off: 69 %
Output OP7 Switch-points BrainC � LIS on: 50 %LIS off: 49 %
Output OP8 Switch-points BrainC � LIS on: 30 %LIS off: 29 %
Output OP9 Switch-points BrainC � LIS on: 10 %LIS off: 9 %
Input IP1Input IP2 All inputs NO �
(normally open)Input IP6
...
ComCube DCD
15
de
fr
en
nl
Ppneumatex.com ComCube 0705
Assembly Electrical connection
ComCube DCA
The electrical connection work should be performed by a skilled person in accor-dance with local regulations. Please also follow the BrainCube control Assembly IOperation instructions. Shut down the ComCube before starting work.
RequirementsPull out mains plug (1.2) and, for ComCube DCD, switch off any external voltages onoutputs OP1-OP9.Mains power requirements:• Connection voltage U : 230 V, 50 Hz• Connected load PA : 0.1 kW• Electrical protection provided by customer : 10 A, FI protection switch,
follow the regulations applicable at the location• If installed in residential buildings, we recommend fitting a commercially available
mains filter in the junction box.
Mains power supply through mains plug (1.2)• Pull out the mains plug (1.2) and unscrew.• Connect PE, N, L to the corresponding terminals and screw the mains plug
back together.• Connect the mains plug (1.2) only at the initial start-up.
After cabling is completeWhen cabling is complete, close off all unused screw connections on the housing backpanel with suitable plugs, in order to ensure Protection Class IP 54.
ConnectionsExample connections are shown in the following terminal plan:
Example: BrainCube terminal plan with ComCube DCA
Analogue outputsTo connect and operate the integrated isolating amplifier, please read the accom-panying «Isolating amplifier SINEAX TV 808-12 operating instructions».For the building management system, PIS pressure and LIS content can be madeavailable in the form of galvanically isolated 4-20 mA signals through the ComCubeDCA. The existing PIS BrainCube and LIS BrainCube cable connections must beremoved and rewired to the ComCube DCA. The total length of the PIS/LISBrainCube and/or PIS/LIS ComCube DCA cable connections should be no morethan 4 m. A twisted pair shielded cable should be used (for example, Belden Type9501). With the DCA TI, the above cabling is no longer required (� Transfero TIAssembly | Operation).
! Do not connect ComCube to the heating emergency off switch!
!
1.2
E
E E
E
Terminal boxOpen cover:loosen the 4 screws (E),pull cover forward.Close cover:place cover and fastenwith 4 screws (E).
PIS
Mainsplug
1.2.1
21
Pressure sensor
GN
D
+ OUT +IN
PIS sensor
IN +
LIS sensor
BrainCube
21
Content sensor
GN
D
+ OUT
LIS
ComCube DCA
10
2IN
10
5IN
10
2+
GN
D
10
5+
GN
D
10
1+
10
1IN
GN
D
max.4,0 m
max.4,0 m
max.4,0 m
max.4,0 m
10
4+
10
4IN
GN
D
L N PE
Network supply
3x 1,0 mm2 (L+N+PE)
230 V AV / 50 Hz
0,6 m
1Aff
10
3+
10
3IN
GN
D
10
6+
10
6IN
GN
D
Analogue output
PIS/4-20 mA
Analogue output
LIS/4-20 mA
min. 2x 0,5 mm shielded
TecBox
*
* Line protection max.10 AT
16
de
fr
en
nl
Ppneumatex.com ComCube 0705
ComCube DCD
Assembly Electrical connection
Connections• � Terminal plan page 17• The connections for the digital IP inputs, digital OP outputs and the RS 485
interface are made on the terminal rail of the PowerCube PC1 panel (� Transfero TI Assembly | Operation)
On the rear panelB: Run the software updates using the special adapter.This is to be done by Pneumatex Customer Service only!
Terminal box SELV - Cover 1• Digital inputs IP1-IP6• RS 485 interface
Open cover 1:1.Open cover 2.2.Loosen the 4 torx screws (C).3 Carefully pull the cover 1 forward a few
centimetres, until the ribbon cable plugs for the display and keyboard become accessible.
4.Snap the fastener for the «20 Display» and «14 Keyboard» plugs outwards.
5.Carefully pull cover 1 forward and remove.
Terminal box 230 V – Cover 2• Digital outputs OP1-OP9
Open cover 2:Loosen the 2 torx screws (D),carefully pull the cover forward and remove.
RS 485-1 interfaceTo operate the ComCube DCD | DCD TI with up to four BrainCubes. The total lengthof the data link should be no more than 300 m. A twisted pair shielded cable shouldbe used (for example, Belden Type 9501). The RS 485-1 jumper (� terminal planpage 17) in the final equipment on the data link must be set to «on», and the jumperon intermediate equipment to «off».
Example: Parallel connection with 2 BrainCube controls and 2 ComCube DCDcommunication modules
Close cover 2:Cover 1 must be closed.Push cover 2 into the guiding slots in the housing and fasten with the screws (D).
Close cover 1:1. Insert the plugs of the ribbon cables for the
display and keyboard in the «20 Display» and «14 Keyboard» slots and snap the fasteners in.
2. Push the cover into the guiding slots in the housing and fasten with the screws (C).
C C
C C
DD
B
ONOFF ONOFF ONOFF ONOFF
A B B`A`
SH
IELDA B
A B B`A` A B B`A` A B B`A`
SH
IELDA B
SH
IELDBA
SH
IELDA B
SH
IELDBA
SH
IELDA B
Jumper ON Jumper OFF Jumper OFF Jumper ON
A
B A
B A
B A
B A
B A
B
RS 485-1
BrainCube 1 ComCube 1
RS 485-1 RS 485-1
BrainCube 2
RS 485-1
ComCube 2
17
de
fr
en
nl
Ppneumatex.com ComCube 0705
Assembly Terminal plan
12
12
ININ
IP2
IP3
IP4
ININ
IN
IP5
IP6
Mai
nspl
ug 1.2
MA
INS
L1N
14K
eybo
ard
20D
ispl
ay
ON
OF
FO
NO
FF
IP1
IN
2 1 Dia
gnos
tics
plug
RS
485-
1
AB
B`
A`
OP
8O
P9
L
N
PE
Terminalbox230V
NO
C
NC
Out
put8
C
NO Out
putg
9
SHIELD
Inte
rfac
eR
S48
5-1
A
B
SHIELD
B`
A`
Net
wor
ksu
pply
3x
1,0
mm
2(L
+N+P
E)
230
VA
V/5
0H
z
low
erco
ver
TerminalboxSELV
OP
7
NO
C
Out
put7
Dig
ital
OP
outp
uts
Allo
catio
nac
c.to
men
u*P
aram
eter
*
OP
6
NO
C
Out
put6
OP
5
NO
C
Out
put5
OP
4
NO
C
Out
put4
OP
3
NO
C
Out
put3
OP
2
NO
C
Out
put2
OP
1
NO
C
Out
put1
1)m
ax.1
0A
TLi
nepr
otec
tion
2)m
ax.2
AT
Line
prot
ectio
n
2)
2
1
1
1
2
2
1
2
1
2
2
1
Dig
itali
nput
sIP
(not
conn
ectv
olta
ge)
1)
Inp
ut
1In
pu
t2
Inp
ut
3
Jum
per
RS
485-
1
Dig
itali
nput
sIP
(not
conn
ectv
olta
ge)
Inp
ut
4In
pu
t5
Inp
ut
6
18
de
fr
en
nl
Ppneumatex.com ComCube 0705
ComCube DCA
ComCube DCD
Requirements• The services described in the «Assembly» section have been completed.• The electrical power supply is available.• The BrainCube control is switched on.
BrainCube with ComCube DCA | DCA TISwitching on: For ComCube DCA, connect the mains plug (1.2), or for ComCube DCATI, switch on the main switch on the Transfero TI,.if all requirements for start-up are ful-filled, all settings have been made, and the ComCube DCA is to go into operation. Noother steps are required for start-up.
Output calculations: For the building management system, PIS pressure and LIS con-tent can be made available as galvanically isolated 4-20 mA signals through ComCubeDCA | DCA TI (� Elec trical connection page 15). Parameter settings must not be madeon the BrainCube. The PIS and LIS 4-20 mA signals are calculated by the customer.
Sensors used Measurement range OutputPIS pressureCompresso CPV -1 – 10 bar → 4-20 mACompresso C 10 | 20 0 – 10 bar → 4-20 mATransfero T_ 4 | 6 | 8 | 10 0 – 10 bar → 4-20 mATransfero TI 100.2 | 61.2 | 91.2 | 62.2 | 82.2 | 53.2 | 93.2 0 – 10 bar → 4-20 mATransfero TI 120.2 | 150.2 | 111.2 | 141.2 | 112.2 | 152.2 | 113.2 | 143.2 0 – 16 bar → 4-20 mATransfero TI 190.2 | 230.2 | 181.2 | 241.2 | 152.2 | 192.2 | 173.2 0 – 25 bar → 4-20 mAPleno PI 6.1 | PI 6.2 | PI 9.1 0 – 10 bar → 4-20 mAVento (all types) -1 – 10 bar → 4-20 mALIS contentExpansion vessels up to 1,000 litre 0 – 500 kg → 4-20 mAExpansion vessels from 1,000 to 5,000 litres 0 – 2,000 kg → 4-20 mAExpansion vessels from 5,000 to 20,000 litres 0 – 8,000 kg → 4-20 mA
The LIS signal at 0% and 100% can be determined in the following ways :• Read off the mA values stored in the BrainCube for 0% or 100% (service level per-
formed by Pneumatex Customer Service only, at a cost),• Measure the mA signals when the primary vessel is empty (0%) and when full (100%),• Measure the mA signal with the primary vessel empty (0%), calculate the mA signal
for 100% according to the size of the primary vessel, and assuming that weight is distributed equally between the three feet of the vessel (� 1 litre ≈ 0.33 kg/foot).
BrainCube with ComCube DCD | DCD TISwitching on: For ComCube DCD, connect the mains plug (1.2) , or for ComCubeDCD TI, switch on the main switch on the Transfero TI. ComCube DCD | DCD TI isready for start-up. BrainCube Software Version V2.00 or higher is required. If necessa-ry, have a software update performed by Pneumatex Customer Service (this service ispayable). At the initial start-up, it displays a «Welcome» message (if there is no opera-tor action for 4 min., it automatically changes to standby with display function only, thento the menu.
We recommend having the start-up carried out by the nearest Pneumatex Customer Service. This must be ordered separately, and will be at the price specified in the Zoomfor the country concerned. The scope of service is as described in this chapter.
Start-up
19
de
fr
en
nl
Ppneumatex.com ComCube 0705
scro
ll* If a BrainCube No. is already assigned, itno longer appears inthe selection list.
Programme the BrainCube to operate with ComCube DCDOne or more ComCubes (up to 250) can be operated with up to 4 BrainCube controls.Besides the cabling work (� pages 15 | 16), the following parameter settings are requi-red on the BrainCube.• Open *ComCube* menu: press menu, then press esc + push at the same time.• Make the settings in the *ComCube* menu:
ComCubeBrainCube off Show selected BrainCube No.ComCube � push Enable BrainCube for ComCube operationBrainCube 1BrainCube 2 push Select an available BrainCube No.*BrainCube 3BrainCube 4Back push Exit the *ComCube* menu
«Welcome» at initial start-up of ComCube DCD | DCD TIYou can now make the desired settings and function tests on ComCube DCD | DCD TI.
Welcome • Set language, date and time;Standard languages: de, en, fr, nl, other languages on request.
Main menuCheck outputs • Check signal transfer to building management
system.
Parameters • Set BrainCube No. This setting is required in order to establish communications.
• Set IP inputs, OP outputs. If no settings are made, the ComCube DCD | DCD TI uses the factory settings. � page 14
Check the functional efficiency of the link-upCheck the link-up information on the ComCube DCD | DCD TI � page 12. The linksto all connected BrainCubes are displayed there.**
Select operating mode• standby : select this if ComCube DCD | DCD TI is not to go into operation yet.• auto: select this if all requirements for start-up are fulfilled, all settings
have been made, and ComCube DCD | DCD TI is to go into operation.After auto operation begins, note that: key lock can be activated if desired (� page 11).
Start-up is now complete. ComCube works automatically.
Start-up
}
** Example:BrainCube No. 1 is aTransfero. OtherBrainCube controls are not included in thisarrangement. The message BXXX appears. If XXXX appears or thedisplay switches betweenBXXX and XXXX, there isprobably a data link fault.In this case, check thedata link.
20
de
fr
en
nl
Ppneumatex.com ComCube 0705
ComCube DCD
Basic principles
ComCube is maintenance-free. Before working on the electrical components, theComCube should be shut down and placed off circuit. Pull out mains plug (1.2), orfor Transfero TI, switch off the main switch or the integrated ComCube DCD TI safe-ty cut-out.
Operating modes
For ComCube DCD | DCD TI, operating states and deviations from normal operationare indicated and can if necessary be signalled to the central monitoring station overthe digital OP outputs. In general, auto operating mode is distinguished from stand-by mode. To ensure safety at work, the ComCube DCD | DCD TI should be assumedto be in operation when in either mode.
autoAfter start-up is completed successfully, ComCube DCD | DCD TI remains in automode all year round. Before working on the connected BrainCube control, deactiva-te auto mode � standby.
standbyThis operating mode is particularly suitable for maintenance work.
Standby mode can be selected manually. When in standby mode, the OP outputs areno longer actuated. However, communications are still active with the connectedBrainCube controls.
menuAll the ComCube DCD | DCD TI functions can be selected, tested and modified fromthe main menu. Data link function can also be checked here (� page 19).
checkIn the check menu, outputs can be switched manually and signal transfer to the buil-ding management system can be tested.
Auto mode is deactivated in the check menu. Messages that occur during function tests are stored in the message list.
After work is completed in the check menu, auto mode must be activated again.
Operation Operating modes
21
de
fr
en
nl
Ppneumatex.com ComCube 0705
ComCube DCD View/acknowledge messages
Deviations from the parameter settings and parameters calculated by ComCubeDCD | DCD TI, but operating information is also shown as codes on the bottom lineof the display. If a current message is present, you can open the message list imme-diately by pressing push.
Use push to open the message list.
Use scroll to select messages.Use push to open the Help text, and acknowledge with push if prompted.
If it is not possible to establish full functionality, please contact Pneumatex CustomerService.
Operation Messages
The last 20 messages are displayed. The message list can also be openedfrom the menu - info.
push
scroll
22
de
fr
en
nl
Ppneumatex.com ComCube 0705
Inspection
ComCube communication modules are not subject to any particular inspectionrequirement.
Disassembly
Before disassembling, place the ComCube off circuit (� Electrical connectionpage 15).
Operation Inspection | Disassembly
23
de
fr
en
nl
Ppneumatex.com ComCube 0705
ApplicationComCube is a communication module for BrainCube controls (Transfero,Compresso, Vento, Pleno PI). Applications other than those described require prioragreement with Pneumatex. A declaration of conformity is included and certifiescompliance with EU Directives.
Follow the instructionsAssembly, operation, maintenance, and disassembly must be carried out as descri-bed in these instructions and in accordance with best practice. For the ComCubeDCD TI and DCA TI, the Transfero TI instructions should also be followed. If anythingis unclear, please contact the Pneumatex Customer Service.
StaffAssembly and operating staff must possess the appropriate skills and training.
Place of installationAccess to the place of installation must be restricted to trained and specialisedpersonnel. Electrical power connections must correspond to the requirements of theequipment.
Observing the parametersPlease refer to the type plate for technical specifications and details of manufacturer,year of construction, and serial number. The regulations must be observed to ensu-re temperature and pressure protection, so that the system does not exceed or fallbelow the maximum and minimum operating parameters respectively.
Electrical connectionElectrical wiring and connections must be carried out by a skilled professional inaccordance with current local regulations. The system must be shut down beforeworking on any of the electrical components.
Failure to follow these instructions, in particular the safety instructions, may cause loss of functionality, faults or even serious damage to the ComCube and theelectrically connected BrainCube, and may also result in physical injury. If there hasbeen a failure to comply with these instructions, the manufacturer can no longeraccept liability or claims under warranty.
Safety
!
!
!
!
!
!
24
de
fr
en
nl
Ppneumatex.com ComCube 0705
Terms
TU: 40 °C Max. admissible ambient temperature
PA/U/F: ..... kW / 230 V / 50 Hz Connected load/voltage/frequency/as indicated on type plate
IP : ..... EN 60529 protection class, as indicated on type plate
The data on the ComCube type plate and the data given below should be compa-red with the design and system parameters. There should be no inadmissible devia-tions. Full technical information is available in the Zoom (Print) and on the internetat www.pneumatex.com.
Technical data
26
de
fr
en
nl
Ppneumatex.com ComCube 0705
fr
en
nl
Hersteller: Pneumatex AG, Mühlerainstrasse 26, CH-4414 Füllinsdorferklärt hiermit, dass die Produkte
ComCube
mit den folgenden EG-Richtlinien, einschliesslich der letzten Änderungen sowie mit den entsprechendenRechtsakten zur Umsetzung der Richtlinien in nationales Recht übereinstimmen:
73/23/EWG Niederspannungsrichtlinie und89/336/EWG Richtlinie über die elektromagnetische Verträglichkeit (EMV),
und dass folgende harmonisierten Normen zur Anwendung gelangten:
ComCube DCA | DCA TI: EN 61010-1:1993, EN 50081-2:2993, EN 50082-2:1994, EN 60335-1:2002ComCube DCD | DCD TI: EN 61000-6-2:2001, EN 61000-3-2:2000, EN 61000-3-3:1995 + A 2001,
EN 55022:1998 + A1+ A2 2003, EN 60335-1:2002._________________________________________________________________________________________
Constructeur: Pneumatex AG, Mühlerainstrasse 26, CH-4414 Füllinsdorfdéclare par la présente que
ComCube
est conforme aux dispositions des directives CE sulvantes, y compris les dernières modifications, et à lalégislation nationale appliquant ces directives:
73/23/CEE Directive basse tension et89/336/CEE Directive compatibilité électromagnétique (CEM),
et que les normes harmonisées suivantes ont été appliquées:
ComCube DCA | DCA TI: EN 61010-1:1993, EN 50081-2:2993, EN 50082-2:1994, EN 60335-1:2002ComCube DCD | DCD TI: EN 61000-6-2:2001, EN 61000-3-2:2000, EN 61000-3-3:1995 + A 2001,
EN 55022:1998 + A1+ A2 2003, EN 60335-1:2002.__________________________________________________________________________________________
Manufacturer: Pneumatex AG, Mühlerainstrasse 26, CH-4414 Füllinsdorfherewith declares that the products
ComCube
are in conformity with the provisions of the following EC directives, including the latest amendments, andwith national legislation implementing these directives:
73/23/EEC Low voltage guideline and89/336/EEC Electromagnetic compatibility guideline,
and that the following harmonized standards have been applied:
ComCube DCA | DCA TI: EN 61010-1:1993, EN 50081-2:2993, EN 50082-2:1994, EN 60335-1:2002ComCube DCD | DCD TI: EN 61000-6-2:2001, EN 61000-3-2:2000, EN 61000-3-3:1995 + A 2001,
EN 55022:1998 + A1+ A2 2003, EN 60335-1:2002.__________________________________________________________________________________________
Fabrikant: Pneumatex AG, Mühlerainstrasse 26, CH-4414 Füllinsdorfverklaart hiermede dat
ComCube
voldoet aan de bepalingen van de volgende EG-richtlijnen, de laatste wijzigingen inbegrepen, en met denationale wetgeving die deze richtlijnen van toepassing stelt:
73/23/EWG Laagspanningsrichtlijn en89/336/EWG Richtlijn electromagnetische compatibiliteit (EMC),
en dat de volgende geharmoniseerde normen zijn toegepast:
ComCube DCA | DCA TI: EN 61010-1:1993, EN 50081-2:2993, EN 50082-2:1994, EN 60335-1:2002ComCube DCD | DCD TI: EN 61000-6-2:2001, EN 61000-3-2:2000, EN 61000-3-3:1995 + A 2001,
EN 55022:1998 + A1+ A2 2003, EN 60335-1:2002.
Christian MüllerQuality Manager
Konformität | Conformité | Conformity | Conformiteit
de
fr
en
nl
27
de
fr
en
nl
Ppneumatex.com ComCube 0705
Kundendienst | Service après-vente | Customer service | Servicedienst
de
fr
en
nl
de
fr
en
nl
PNEUMATEX AGCH-4414 FüllinsdorfTel. +41(0)61 906 26 26Tel. +41(0)61 906 26 00Fax +41(0)61 906 26 [email protected]
SWISSMECH EQUIPMENT PTY.LTD.Braeside, Victoria 3195Tel. (03) 9587 8870 | Fax (03) 9587 [email protected]
PNEUMATEX & CIE NV/SAB-2170 MerksemTel. (03) 640 33 80 | Fax (03) 640 33 [email protected]
ARMATEC A/SDK-2600 GlostrupTel. (046) 96 00 00| Fax (046) 96 00 [email protected]
PNEUMATEX GmbHD-55511 Bad KreuznachTel. 06 71/8 90 10-0 | Fax 06 71/8 90 [email protected]
TOUR & ANDERSSON OYFIN-01511 VantaaTel. +358 207 401616 | Fax +358 207 [email protected]
PNEUMATEX SAF-77290 Mitry-MoryTel. (01) 64 67 82 82 | Fax (01) 64 67 94 [email protected]
ENGINEERING APPLIANCES LIMITEDUK-TW16 7DX MiddlesexTel. (01932) 788 888 | Fax (01932) 761 [email protected]
PNEUMATEX SAI-22070 Montano Lucino (CO)Tel. +39 (0)31 47 1764 | Fax +39 (0)31 472 [email protected]
PS COMPANY LTD.J-Tokyo 151-0063Tel. (03) 3469 7111 | Fax (03) 5478 [email protected]
PNEUMATEX SAL-8399 WindhofTel. 262 615-1 | Fax 262 [email protected]
ENERGY PRODUCTS INTERNATIONALNZ-HamiltonTel. (07) 847 27 05 | Fax (07) 847 42 [email protected]
PNEUMATEX BVNL-5260 CA VughtTel. (073) 657 90 21 | Fax (073) 656 16 [email protected]
ARMATEC ASN-0508 Oslo 5Tel. 23 24 55 00 | Fax 23 24 55 [email protected]
SchweizSuisse
SwitzerlandZwitserland
AustralienAustralieAustraliaAustralië
BelgienBelgiqueBelgium
België
DänemarkDanemarkDenmark
Denemarken
DeutschlandAllemagneGermanyDuitsland
FinnlandFinlandeFinlandFinland
FrankreichFranceFrance
Frankrijk
GrossbritannienGrande-BetagneUnited KingdomGroot-Brittannië
ItalienItalieItalyItalië
JapanJaponJapanJapan
LuxemburgLuxembourgLuxembourgLuxemburg
NeuseelandNouvelle-Zélande
New ZealandNieuw-Zeeland
NiederlandePays-Bas
NetherlandsNederland
NorwegenNorvègeNorway
Noorwegen
PNEUMATEXRepräsentanz ÖsterreichA-3340 Waidhofen/YbbsTel. +43 7442 52251 | Fax +43 7442 [email protected]
RÖHRICH Ges.m.b.H.A-5020 SalzburgTel. (0662) 439541 | Fax (0662) [email protected]
Vorarlberg + TirolInhaus Handels GmbHA-6845 HohenemsTel. (05576) 77877 | Fax (05576) 77877 [email protected]
PNEUMATEX sp. z o.o.PL-60-479 PoznańTel. +48 (0)[email protected]
BOMBAS WILO-SALMSONP-4050-040 PortoTel. (022) 208 03 50 | Fax (022) 200 14 [email protected]
GRAU DIA, LDAP-1250-240 LisboaTel. +351 91 [email protected]
PRATCO S.R.L.RO-032265 BucureştiTel. +40 21/345 1725Fax +40 21/345 [email protected] | www.pratco.ro
DOSETIMPEX S.R.L.RO-300085 TimişoaraTel. +40 256/200 368Fax +40 256/437 [email protected]
MANOMETER TERMA LTD.RUS-105120 MoskauTel. | Fax +7 495 916 79 [email protected]
ARMATEC ABS-40091 GöteborgTel. (031) 89 01 00 | Fax (031) 45 36 [email protected]
AIRTREND Ltd. – GOBRID Ltd.11000 BeogradTel. +381 11 383 68 86Fax: +381 11 344 41 [email protected] | [email protected]
INDELCASA ING. DEL CALOR S/AE-48530 Ortuella-BizkaiaTel. (094) 413 2560 | Fax (094) 446 [email protected]
ÖsterreichAutriche
AustriaOostenrijk
PolenPolognePoland
Polen
PortugalPortugalPortugalPortugal
RumänienRoumanieRomania
Roemenië
RusslandRussieRussia
Rusland
SchwedenSuède
SwedenZweden
SerbienSerbieSerbia
Serviën
SpanienEspagne
SpainSpanje
Mühlerainstrasse 26CH-4414 Füllinsdorf
Tel.+41 61 906 26 26Fax+41 61 906 26 27 [email protected]
www.pneumatex.com
WD
MO
IN00
0307
05| swiss made | Pneumatex – Dynamic Watermanagement
Dynamic Watermanagement