Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program Presentation to: ITS America CVFM Presented by: Jeff Secrist Federal Motor Carrier Safety Administration August 30, 2005

Upload: rachel-fitzgerald

Post on 04-Jan-2016

149 views

Category:

Documents


0 download

DESCRIPTION

Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program. Presentation to: ITS America CVFM Presented by: Jeff Secrist Federal Motor Carrier Safety Administration August 30, 2005. Agenda. CVO Opportunities for VII FMCSA VII-Related Activities to Date - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program

Commercial Vehicle OperationsVehicle Infrastructure Integration (VII) Program

Presentation to:

ITS America CVFM

Presented by:

Jeff SecristFederal Motor Carrier Safety Administration

August 30, 2005

Page 2: Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program

22

Agenda

CVO Opportunities for VII

FMCSA VII-Related Activities to Date

Future FMCSA Involvement

Page 3: Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program

33

CVO Opportunities for VII

VII Working Group has identified a numberof “high priority” use cases

Three of these use cases are directly related to commercial vehicle operations: e-screening e-inspections In-vehicle safety advisories)

Page 4: Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program

44

CVO Opportunities for VII (continued) CVO also could participate in other VII

activities: Cooperative safety systems Probe vehicles Telematics Mobility management

Page 5: Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program

55

FMCSA VII-Related Activities to Date

FMCSA currently participates in the VII Working Group

FMCSA’s Office of Research and Analysis’s Technology Division has/is actively participating in several VII-related projects Wireless safety inspections Geo-fencing/hazardous material security Advanced electronic screening concepts In-vehicle safety advisories

Page 6: Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program

66

FMCSA VII Activities to Date (continued)

FMCSA also is investigating a series of projects that could be integrated with VII: SmartPark Roadside Testbed

Page 7: Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program

77

FMCSA’s VII Strategy FMCSA is considering the role that it will

play in the VII program

FMCSA will pursue one of three strategies: Wait and See Moderated Aggressive

Page 8: Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program

88

FMCSA’s VII Strategy (continued)

Factors affecting FMCSA decision will include: Relationship of VII to FMCSA’s core mission of safety Relationship of VII to FMCSA’s strategic goals Ability of VII projects to leverage existing (e.g.,

roadside screening sites) and planned (e.g., 5.9 GHz DSRC) CVISN program investment

Consistency of VII with ITS/CVO Guiding Principles, including those related to data privacy and interoperability

Page 9: Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program

99

CVO VII Next Steps FMCSA’s next steps will include:

Evaluate the ability of VII capabilities to support FMCSA’s safety mission and strategic goals

Identify linkages between VII capabilities and other FMCSA research and technologies projects

Coordinate commercial vehicle stakeholder input to the VII Working Group

Page 10: Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program

1010

CVO VII Next Steps (continued) Depending on the strategy selected other

steps may include: Refine VII capabilities based on stakeholder input Explore policy issues related to VII deployment; Develop business case for VII capabilities to

encourage industry adoption; and

Page 11: Commercial Vehicle Operations Vehicle Infrastructure Integration (VII) Program

1111

For more information: USDOT Joint Program Office

Bill Jones, (202) 366-2128 http://www.its.dot.gov

Click on “major initiatives”

Jeff Secrist [email protected] (202) 385-2367

TTY Access: (800) 877-8339