![Page 1: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/1.jpg)
March 19, 2020
![Page 2: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/2.jpg)
Albert V. Shelby, III
Director of Program Delivery
March 19, 2020
2
![Page 3: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/3.jpg)
35, 16%
11, 5%
15, 7%
130, 60%
27, 12% GDOT & Local Lets
Bridges
Roads
Enhancements
Maintenance
Safety
Total = 218 As of March 4, 2020Source Bidding Administration3
![Page 4: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/4.jpg)
$149,430,170, 27%
$40,690,200, 8%
$17,431,876, 3%
$216,858,834, 40%
$121,897,057, 22%
GDOT & Local Lets
Roads
Safety
Enhancements
Maintenance
Bridges
Total = $674,004,767As of March 4, 2020Source Bidding Administration4
![Page 5: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/5.jpg)
Summary Presented to GDOT Board
(Includes Adjustments)Low Bid
(Awarded to Contractor)
Low Bid w/Adjustments(Total Project Obligation)
GDOT Let (Project Count)
23 23 23
GDOT Let (Dollars)
$132,665,369 $127,696,631 $130,555,231
As of March 4, 2020Source Bidding Administration
*Low Bid Award Amount includes the Deferred and Awarded projects. Does not include Engineering and Inspection, Utilities, Liquid AC, Incentives, LMIG and Rejected projects.
Local Let 0 NA NA
5
![Page 6: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/6.jpg)
April 2020 Letting
6
![Page 7: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/7.jpg)
Project ID Description Primary CountyPrimary Work
TypeCongressional
DistrictProject Let By
Project Sponsor
M005897 SR 25 FROM BRYAN COUNTY LINE TO I-516 ChathamResurface &
Maintenance001 DOT GDOT
M005898 SR 30 FROM EFFINGHAM COUNTY LINE TO W OF SR 21 ChathamResurface &
Maintenance001 DOT GDOT
M005919SR 21 FROM N OF CS 590/SMITH AVE TO CS 661/HENDLEY
ROADChatham
Resurface & Maintenance
001 DOT GDOT
0015920 SR 22 SPUR @ I-185 MuscogeeOperational
Improvement002 DOT GDOT
0016416 CR 351/BROCK ROAD @ REEDY CREEK Crisp Bridges 002 DOT GDOT
M006015I-75 FROM SR 155 TO 0.02 MI S OF CR 2993/WALT STEVENS
ROADHenry Pavement Markings 003, 013 DOT GDOT
0012875CS 5156/CHAMBLEE DUNWOODY RD FROM COTILLION DR
TO PEELER RDDeKalb Bicycle/Ped. Facility 006 LOC Dunwoody
0014160ROGERS BRIDGE @ CHATTAHOOCHEE RIVER - PEDESTRIAN
BRIDGEGwinnett Bridges 006, 007 LOC Duluth
0016072PEACHTREE IND BLVD FROM S OF ROGERS BRIDGE RD TO
GRAND VISTAGwinnett
Resurface & Maintenance
007 LOC Gwinnett County
0016415 CR 481/FUNSTON SALE CITY ROAD @ BRIDGE CREEK Colquitt Bridges 008 DOT GDOT
M004853 SR 112 FROM SR 87/BLECKLEY TO SR 19/WILKINSON BleckleyResurface &
Maintenance008 DOT GDOT
7
![Page 8: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/8.jpg)
Project ID Description Primary CountyPrimary Work
TypeCongressional
DistrictProject Let By
Project Sponsor
M005834SR 105 FROM 0.02 MI W OF SR 184/FRANKLIN TO SR
15/BANKSBanks
Pavement Preservation
009 DOT GDOT
M006087 SR 53 @ MULBERRY RIVER - BRIDGE REHABILITATION Barrow Bridges 009, 010 DOT GDOT
0008430 SR 316/US 29 @ SR 11 Barrow Interchange 010 DOT GDOT
M005802 SR 120 FROM CS 1621/WHITLOCK AVE TO SR 3/US 41 CobbResurface &
Maintenance011 DOT GDOT
M005943 SR 5/SR 120 ALT FROM SR 120 TO SR 3/US 41 CobbResurface &
Maintenance011 DOT GDOT
0006049SR 360 FROM NEW MACLAND ROAD/COBB TO SR
120/PAULDINGCobb Widening 011, 013, 014 DOT GDOT
0015806 CR 432/SPRING CREEK ROAD @ SPRING CREEK Bulloch Bridges 012 DOT GDOT
522220-SR 4/US 1 FROM S OF SR 147 TO S OF GEORGE HILL ROAD -
TIAToombs Widening 012 DOT GDOT
0012833 SR 3/US 19 @ SR 138 ClaytonOperational
Improvement013 DOT GDOT
M005963 I-285 @ SR 14 SPUR - BRIDGE REHABILITATION Fulton Bridges 013 DOT GDOT
0008314 SR 136 FROM SR 136 CONN TO SR 515 Pickens Realignment 014 DOT GDOT
8
![Page 9: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/9.jpg)
Bridges
Roads
Enhancements
Maintenance
Safety
9
![Page 10: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/10.jpg)
Resurfacing Project in Chatham CountyCongressional District 1
Begin
End
10
![Page 11: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/11.jpg)
Bridge Replacement Project in Crisp CountyCongressional District 2
Begin
End
11
![Page 12: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/12.jpg)
Bridge Replacement Project in Crisp CountyCongressional District 2 (Continued)
12
![Page 13: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/13.jpg)
Pedestrian Bridge Project in Gwinnett and Fulton CountiesCongressional Districts 6 and 7
Begin
End
13
![Page 14: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/14.jpg)
Pedestrian Bridge Project in Gwinnett and Fulton CountiesCongressional Districts 6 and 7 (Continued)
14
![Page 15: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/15.jpg)
Pedestrian Bridge Project in Gwinnett and Fulton CountiesCongressional Districts 6 and 7 (Continued)
15
![Page 16: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/16.jpg)
Bridge Replacement Project in Colquitt CountyCongressional District 8
Begin
End
16
![Page 17: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/17.jpg)
Bridge Replacement Project in Colquitt CountyCongressional District 8 (Continued)
17
![Page 18: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/18.jpg)
Resurfacing Project in Cobb CountyCongressional District 11
Begin
End
18
![Page 19: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/19.jpg)
Widening Project in Cobb and Paulding CountiesCongressional District 11, 13 and 14
Begin
End
19
![Page 20: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/20.jpg)
Widening Project in Appling and Toombs CountiesCongressional District 12
Begin
End20
![Page 21: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/21.jpg)
Roundabout and Realignment Project in Pickens CountyCongressional District 14
Begin
End
21
![Page 22: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/22.jpg)
April 2020 Letting
Albert V. Shelby, III
Director of Program Delivery
March 19, 2020
22
![Page 23: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/23.jpg)
Project ID DescriptionPrimary County
Primary Work TypeCongressional
DistrictProject Let
ByTIA Region
0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia
0016236CR 228/HARVEY VICKERS ROAD FROM SR 135 TO SR 31/US 441 -
TIACoffee Minor Widen & Resurf 012 DOT Southern Georgia
0016239WRAY RD FROM AMBROSE CITY LIMITS TO IRWIN COUNTY LINE -
TIACoffee Minor Widen & Resurf 012 DOT Southern Georgia
0016243 WARREN CARTER RD/HILLCREST RD FROM SR 32 TO SR 206 - TIA Coffee Minor Widen & Resurf 012 DOT Southern Georgia
0016252 CS 650/N LIBERTY STREET FM SR 32 TO NICHOLLS CITY LIMITS-TIA Coffee Minor Widen & Resurf 012 DOT Southern Georgia
23
![Page 24: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/24.jpg)
Pierce County / Congressional District 1
Patterson
24
![Page 25: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/25.jpg)
Coffee County / Congressional District 12
Douglas
Douglas Municipal Gene Chambers Airport
End Project
Begin Project
25
![Page 26: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/26.jpg)
Coffee County / Congressional District 12
Begin Project
End Project
Ambrose
26
![Page 27: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/27.jpg)
Coffee County / Congressional District 12
Begin Project
End Project
27
![Page 28: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/28.jpg)
Coffee County / Congressional District 12
Begin Project
End Project
Nicholls
28
![Page 29: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/29.jpg)
15; 56%
2; 8%
2; 7%
6; 22%
2; 7%
Total = 27
Maintenance
Safety
Enhancements
Bridges
Roads
GDOT & Local Lets
Number of ProjectsApril 2020 Letting
29
![Page 30: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/30.jpg)
Dollar Amount of ProjectsApril 2020 Letting
$26,725,995; 13% $17,536,214; 8%
$11,327,485; 5%
$101,518,330; 48%
$55,819,079; 26%
Total = $212,927,104
Maintenance
Safety
OtherEnhancements
Bridges
Roads
GDOT & Local Lets
30
![Page 31: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/31.jpg)
31
![Page 32: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/32.jpg)
Russell R. McMurry
Commissioner
March 19, 2020
![Page 33: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/33.jpg)
Project ID Description Primary County Primary Work TypeCongressional
DistrictAction
0017187 SR 120 FROM NORTH POINT PKWY TO KIMBALL BRIDGE ROAD Fulton Widening 006Addition to the
Program
0017188 SR 23/SR 73 DRAINAGE IMPROVEMENTS IN GLENNVILLE TattnallDrainage
Improvements012
Addition to the Program
33
![Page 34: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/34.jpg)
Project ID Description Primary County Primary Work TypeCongressional
DistrictAction
0015422CR 96/CULPEPPER ROAD @ ALAPAHOOCHEE RIVER & @
OVERFLOWEchols Bridges 001
Addition to the Program
0017237 SR 208 @ SCOTT CREEK Talbot Bridges 002Addition to the
Program
0017221 SR 247 @ ECHECONNEE CREEK & OVERFLOW @ 3 LOCS Bibb Bridges 002, 008Addition to the
Program
0016575 CR 55/MCINTOSH TRAIL @ KEG CREEK Coweta Bridges 003Deletion from the
Program
0017222 SR 113 @ ALLEN CREEK & @ BETHEL CREEK Carroll Bridges 003Addition to the
Program
0017238 SR 36 @ JERRY REEVES CREEK Upson Bridges 003Addition to the
Program
0017225 SR 30/US 280 @ HOG #635221H Dodge Bridges 008Addition to the
Program
34
![Page 35: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/35.jpg)
Project ID Description Primary County Primary Work TypeCongressional
DistrictAction
0017226 SR 87 @ LITTLE BRANCH CYPRESS RIVER @ 2 LOCS Dodge Bridges 008Addition to the
Program
0017230 SR 11/SR 22/US 129 SB & NB @ ROCK CREEK Jones Bridges 008Addition to the
Program
0017231 SR 11/SR 22/US 129 @ SAND CREEK Jones Bridges 008Addition to the
Program
0017232 I-20 EB & WB @ OCONEE RIVER & @ OCONEE RIVER OVERFLOW Greene Bridges 010Addition to the
Program
0017239 SR 10/US 78 @ ALCOVY RIVER Walton Bridges 010Addition to the
Program
0017220 SR 61 @ PINE LOG CREEK & @ SUGAR HILL CREEK Bartow Bridges 011Addition to the
Program
0017227 SR 192 @ BIG LONG CREEK & @ BIG LONG CREEK TRIBUTARY Emanuel Bridges 012Addition to the
Program
35
![Page 36: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/36.jpg)
Project ID Description Primary County Primary Work TypeCongressional
DistrictAction
0017236 SR 21BU/SR 73 @ ORC #620102E IN SYLVANIA Screven Bridges 012Addition to the
Program
0017223 SR 114 @ CHATTOOGA RIVER TRIBUTARY Chattooga Bridges 014Addition to the
Program
0017224 SR 114 @ MOSTELLER CREEK Chattooga Bridges 014Addition to the
Program
0017228 SR 61 @ CSX #350284W Gordon Bridges 014Addition to the
Program
0017233 SR 2 @ CONASAUGA RIVER & @ CONASAUGA RIVER OVERFLOW Murray Bridges 014Addition to the
Program
0017234 SR 255 @ PINHOOK CREEK Murray Bridges 014Addition to the
Program
0017235 SR 255 @ SUMAC CREEK Murray Bridges 014Addition to the
Program
36
![Page 37: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/37.jpg)
March 19, 2020
![Page 38: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/38.jpg)
1925
2019
❑Transportation Fund Collections
❑Employment Data
❑Professional Services Procurement update
❑Projects Open to Traffic
38
![Page 39: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/39.jpg)
1925
2019
39
![Page 40: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/40.jpg)
![Page 41: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/41.jpg)
41
![Page 42: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/42.jpg)
For all routes that have a
heavy AM peak movement,
traffic volumes were down
approx. 20%-40% through the
rush hours
42
![Page 43: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/43.jpg)
State of Emergency Declaration
![Page 44: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/44.jpg)
44
![Page 45: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/45.jpg)
45
![Page 46: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/46.jpg)
46
![Page 47: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/47.jpg)
![Page 48: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/48.jpg)
48
![Page 49: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/49.jpg)
49
![Page 50: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/50.jpg)
March 19, 2020
50
![Page 51: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/51.jpg)
Program (motor
fuel)
Governor House Senate Conference
Capital
Construction
$823,634,375 $823,634,375 $823,634,375 $823,634,375
LMIG $191,169,996 $191,169,996 $191,169,996 $191,169,996
Payments to SRTA $44,415,757 $44,415,757 $44,415,757 $44,415,757
Program
(Fees/SGF)
Governor House* Senate Conference
Payments to SRTA $58,866,629 $58,866,629 $58,866,629 $58,866,629
Intermodal $19,862,509 $19,862,509 $21,362,509 $22,862,509
51
![Page 52: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/52.jpg)
Governor’s Rec. House Rec.
Total Funds: $211,439,539 $211,502,444
Department of Community Affairs
GRTA: ($330,466) ($330,466)
ATL: ($18,372,102) ($18,372,102)
Department of Public Safety
MCCD: ($15,872,849) $0
GDOT Budget: $176,864,122 $192,799,876
52
![Page 53: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/53.jpg)
$-
$200,000,000.00
$400,000,000.00
$600,000,000.00
$800,000,000.00
$1,000,000,000.00
$1,200,000,000.00
CapitalProjects
50%
GeneralOperations
10%
LMIG*10%
RoutineMaintenance
20%
Payments toSRTA4%
Intermodal1%
GeneralObligation
Debt5%
* LMIG is 10% excise
53
![Page 54: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/54.jpg)
Program Governor’s Rec. House Rec. Change
Capital Construction $871,947,664 $887,820,513 $15,872,849
Capital Maintenance $184,379,429 $182,996,077 ($1,383,352)
Construction Admin $101,192,556 $105,823,855 $4,631,299
Data Collections $2,951,687 $3,057,239 $105,552
Departmental Admin $69,999,177 $71,617,139 $1,617,962
LMIG $197,748,818 $197,748,818 -
Local Roads Admin $4,346,461 $4,346,461 -
Intermodal $20,362,509 $19,925,414 ($437,095)
Planning $2,487,098 $2,601,123 $114,025
Routine
Maintenance
$443,892,701 $448,074,510 $4,181,809
Traffic Management $50,062,611 $51,295,316 $1,232,705
Payments to SRTA $94,463,174 $84,463,174 ($10,000,000)54
![Page 55: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/55.jpg)
Governor’s
Rec.
House Rec.
$50,000,000 $50,000,000
1,551 Bridge Structures
• Poor Condition / Weight Restricted
• Critical Features / Structure Types
• Temporary Shoring
• Priority Routes / Freight Corridors
• Life-cycle cost for Replacement vs. Rehabilitation
55
![Page 56: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/56.jpg)
![Page 57: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/57.jpg)
• Session Calendar (HR 1473) and Suspension of Sessiono Established April 2nd as Sine Die
o Authorized Speaker & Lt. Gov to suspend session
o Session Suspended after Day 29
• Cross Over Day Updateo HB 106—Ride Share Excise Tax, Hotel/Motel & Heavy Vehicle Fee Revenue Dedication
o HB 1098 & HR 1300—GDOT Housekeeping & GDOT/GA DNR Property Transfers
o Other Key Legislation
• March 16th Special Session ratifying Governor’s Declaration of Public Health State of Emergency57
![Page 58: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/58.jpg)
![Page 59: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/59.jpg)
Patrick Allen, P.E.
State Utilities Engineer
59
![Page 60: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/60.jpg)
60
![Page 61: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/61.jpg)
• Recap Last Discussion
• Recommended Revisions
• Board Rule 672-11
• Open Rules for Public Comment
61
![Page 62: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/62.jpg)
• STB Rule 672-11 Fee Structure
• Modernize
• Streamline
• Consolidate
• Connectivity Across Georgia
• Thousands of Miles
• Telecommunications and Other Utility infrastructure on GDOT Rights-of-Way
62
![Page 63: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/63.jpg)
672-11-.01 Definitions
672-11-.02 Long Distance and Trunk Communications Cables, Issuance of Permits
672-11-.03 Long Distance and Trunk Communications Cables; Permit Fee Schedule
672-11-.04 Alternate Procedure for Assessing Fees
63
![Page 64: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/64.jpg)
Redefine Trunk Communications and Long Distance Cable
• “Broadband” = High Speed internet Access
• Copper Lines
• Coaxial Cable
• Fiber optics
• Wireless•
Broadband Services: Wired or wireless service that consists of the capability to transmit data to and from end users and in combination with such service provides: (1) Access to the internet; (2) Computer processing, information storage, or protocol conversion; or (3) Any application or information content to be provided over or through broadband.
64
![Page 65: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/65.jpg)
GDOT Utilities Staff
Reviews
GDOT Interdepartmental
Reviews Permit Activation,
Inspection, and Installation Oversight
Permit Data Management
10-12K Permits/Year Reviewed – Average 5 day
approval period
Administrative Fee
Statewide Permit Program~11,000 reviewed annuallyOver 6,700 approved annually
5-day average turnaround
65
![Page 66: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/66.jpg)
Project Utility Coordination
Subsurface Utility Engineering (SUE)
Program
Routine Permit Review & Inspection
Electronic Utility Permit System Management
Utility Agreement and Invoice Management
Annual Fee
Active Utility Project Management• 1,700+ active projects• Provides 1 of 3 Certifications
• Required for funding on all GDOT Projects
• SUE Program • Utilization on ~70% of GDOT projects
• Utility-Contractor dispute resolution• Escalation, Mediation and Conflict
Resolution (Board Rule 672-19)
66
![Page 67: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/67.jpg)
Existing Utility Infrastructure
Utility Company Permit Volume
Utility Company Prior Invoices
Existing Facilities Fee
Direct Benefit: Access to public ROW -no easements to purchase
67
![Page 68: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/68.jpg)
Project Utility Coordination
Subsurface Utility Engineering (SUE)
Program
Routine Permit Review & Inspection
Electronic Utility Permit System Management
Utility Agreement and Invoice Management
Annual Fee
Existing Utility Infrastructure
Utility Company Permit Volume
Utility Company Prior Invoices
Existing Facilities Use Fee
GDOT Utilities Staff Reviews
GDOT Interdepartmental Reviews
Permit Activation, Inspection, and Installation
Oversight
Permit Data Management
10-12K Permits/Year Reviewed – Average 5 day
approval period
Administrative Fee
68
![Page 69: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/69.jpg)
$-
$5,000,000.00
$10,000,000.00
$15,000,000.00
$20,000,000.00
$25,000,000.00
2017 2018
Expense vs. Collections
OperatingCost
69
![Page 70: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/70.jpg)
Proposed Rule 672-11-.03 Permit Fee Schedule
Existing Facilities Fee (Recurring)
Calculated based on facilities
installed prior to Jan. 2021
($0 where no facilities exist in
ROW)
Administrative Fee (One Time) $1000/permit
Annual Fee (Recurring) $500/permit/year
70
![Page 71: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/71.jpg)
• Considers all telecommunications Facilities – technology agnostic
• Revised Fee Structure
• Existing Facilities Fee
• Administrative Fee
• Annual Occupancy Fee
• Open Rule 672-11
71
![Page 72: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/72.jpg)
72
![Page 73: Commissioner’s Report to the State Transportation Board Meeting... · 0016291 CITY OF PATTERSON RESURFACING - PHASE I - TIA Pierce Resurface & Maintenance 001 DOT Southern Georgia](https://reader033.vdocuments.net/reader033/viewer/2022042309/5ed6cac4777e4e4f012b27b8/html5/thumbnails/73.jpg)