ISS INTERNATIONAL SpA COMMISSIONING & START UP SERVICES Il presente documento è proprietà della ISS International SpA e non può essere, totalmente o parzialmente, direttamente o indirettamente, trasferito, riprodotto, copiato, rivelato o usato, senza l’autorizzazione della ISS International SpA. The present document is property of ISS International SpA and shall not be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or used, without the authorization of ISS International SpA. Commissioning & Start up Commissioning & Start up CLIENT PERIOD DESCRIPTION Name Logo COUNTRY Year Duration Plant / Unit Services Saipem Spa UAE 2010 3 months Shah Gas Development Project. Development of sour gas reserves Precommissioning & Commissioning HSE Procedures Implementation Foster Wheeler SpA Italy 2010 6 months Thessaloniki, Greece Commissioning Services AHMADIAH Contracting & Trading Co. Kuwait 2010 8 months Mina Abdulla WWT Mina Al Hamadi WWT Shuaiba WWT (Pre) Commissioning & Start-Up Supervision Services AHMADIAH Contracting & Trading Co. Kuwait 2010 8 months Mina Abdulla WWT Mina Al Hamadi WWT Shuaiba WWT Commissioning and Start-Up manuals. Saipem Spa Algeria 2009/2010 12 months Gas Treatment Plant Commissioning & Start up up manual Saipem SpA Pakistan 2009 18 months Engro Site, UREA production, Pakistan Commissioning Services CEMIT Srl / ENI E&P Italy 2010 8 months Oil & Gas Treatment Plant (Pre) Commsissioning Procedures Tozzi Sud Italy 2010 12 months LERs Fiend Ravenna Commissioning Supervision Procedures Technip KTI Colombia 2010 2 months SRU for Ecopetrol Hydrogen Unit Refinery in Barrancabermeja Commissioning Supervision Services

Upload: nguyennga

Post on 15-Mar-2018

225 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Commissioning & Start up - ISS International INTERNATIONAL SpA COMMISSIONING & START UP SERVICES l A l A. l A t • l S pA. Commissioning & Start up CLIENT PERIOD DESCRIPTION Name

ISS INTERNATIONAL SpA COMMISSIONING & START UP SERVICES

Il pr

esen

te d

ocum

ento

è p

ropr

ietà

del

la IS

S In

tern

atio

nal S

pA e

non

può

ess

ere,

tota

lmen

te o

par

zial

men

te, d

iretta

men

te o

indi

retta

men

te, t

rasf

erito

, rip

rodo

tto, c

opia

to, r

ivel

ato

o us

ato,

sen

za l’

auto

rizza

zion

e de

lla IS

S In

tern

atio

nal S

pA.

The

pres

ent d

ocum

ent i

s pr

oper

ty o

f IS

S In

tern

atio

nal S

pA a

nd s

hall

not b

e to

tally

or p

artia

lly, d

irect

ly o

r ind

irect

ly, t

rans

ferr

ed, r

epro

duce

d, c

opie

d, d

iscl

osed

or u

sed,

with

out t

he a

utho

rizat

ion

of IS

S In

tern

atio

nal S

pA.

Commissioning & Start upCommissioning & Start up CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Saipem Spa

UAE 2010 3 months

Shah Gas Development Project. Development of sour gas reserves

• Precommissioning & Commissioning HSE Procedures Implementation

Foster Wheeler SpA

Italy 2010 6 months Thessaloniki, Greece • Commissioning Services

AHMADIAH Contracting & Trading Co.

Kuwait 2010 8 months Mina Abdulla WWT Mina Al Hamadi WWT Shuaiba WWT

• (Pre) Commissioning & Start-Up Supervision Services

AHMADIAH Contracting & Trading Co.

Kuwait 2010 8 months Mina Abdulla WWT Mina Al Hamadi WWT Shuaiba WWT

• Commissioning and Start-Up manuals.

Saipem Spa

Algeria 2009/2010 12 months Gas Treatment Plant • Commissioning & Start up up manual

Saipem SpA

Pakistan 2009 18 months Engro Site, UREA production, Pakistan • Commissioning Services

CEMIT Srl / ENI E&P

Italy 2010 8 months Oil & Gas Treatment Plant • (Pre) Commsissioning Procedures

Tozzi Sud Italy 2010 12 months LERs Fiend Ravenna • Commissioning Supervision Procedures

Technip KTI

Colombia 2010 2 months

SRU for Ecopetrol Hydrogen Unit Refinery in Barrancabermeja

• Commissioning Supervision Services

Page 2: Commissioning & Start up - ISS International INTERNATIONAL SpA COMMISSIONING & START UP SERVICES l A l A. l A t • l S pA. Commissioning & Start up CLIENT PERIOD DESCRIPTION Name

ISS INTERNATIONAL SpA COMMISSIONING & START UP SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Technip KTI

India 2010 2 months SUR for IOCL Refinery in Haldia, India

• Commissioning Supervision Services

Technip SpA

Egypt 2010 4 months Hydrogen Plant, Alexandria

• Precommissioning Supervision Activities

Saipem SpA

Italy 2010 7 months Treatment Gas Central “Fiume Trieste” / Cupello

• E&I Commissioning / Start-Up Activities

Technip KTI SpA

China 2010 2 months Acetic Acid Cracking furnace for Chemtex

• Commissioning Supervision Services

Edison SpA

Greece 2009/2010 6 months Combined Cycle Power Plant

• Commissioning and Start Procedure

Edison SpA

Greece 2009/2010 12 months Combined Cycle Power Plant • Commissioning Activities on site

Qcon

Qatar 2009/2010 10 months VOC Plant • Commissioning Activities on Site

Saipem Spa

Italy 2009/2010 5 months Pipe Line – Mantova/Bergantino

• E&I Commissioning / Start up Activities

Saipem Spa

Italy 2009 2 months Gas Compression Central

• E&I Commissioning / Start up Activities

Saipem Spa

Italy 2009/2010 6 months Pipe Line –Enna/Messina • Commissioning / Start up

Page 3: Commissioning & Start up - ISS International INTERNATIONAL SpA COMMISSIONING & START UP SERVICES l A l A. l A t • l S pA. Commissioning & Start up CLIENT PERIOD DESCRIPTION Name

ISS INTERNATIONAL SpA COMMISSIONING & START UP SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Technip KTI SpA

Sweden 2009/2010 8 months Hydrogen Plant • Commissioning on Site

Technip KTI SpA

India 2009 9 months Refinery Plant • Commissioning on Site

Tractbel /Suez Group

Greece 2009 10 months Power Plant – Thisvi • Precommissioning / Commissioning Servicies

Saipem Spa

Italy 2008 8 months Pumping station – Pipe Line – Cavalzere/Minerbio

• Commissioning / Start up

Saipem Spa

Italy 2008 10 months Pipe line – LNG Ferrara • Commissioning / Start up

Tractbel /Suez Group

Italy 2007 10 months Power Plant – Napoli Levante

• Precommissioning / Commissioning Servicies

Guascor SpA

Italy 2007 10 months Recovery Oil Plant - Gela • Precommissioning / Commissioning /Start up

Tractbel /Suez Group

Italy 2007 7months Power Plant – Rosignano • Commissioning Servicies

Bentini SpA

Algeria 2006 6 months Compression Station - Orano • Utility Commissioning

Technip KTI SpA

Egypt 2006 8 months Compression Station – El Harish • Precommissioning on Site

Page 4: Commissioning & Start up - ISS International INTERNATIONAL SpA COMMISSIONING & START UP SERVICES l A l A. l A t • l S pA. Commissioning & Start up CLIENT PERIOD DESCRIPTION Name

ISS INTERNATIONAL SpA COMMISSIONING & START UP SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Bentini SpA

Libya 2006 6 months Compression Station – Mellitah • Utility Commissioning

Tractbel /Suez Group

Italy 2006 6 months Power Plant – Vado Ligure • Commissioning Servicies

Technip KTI SpA

Croatia 2006 10 months Hydrogen Plant - Rjeka • Precommissioning on Site

Snamprogetti Ltd

Nigeria 2005/2006 16 months LNG – Bonny Island

• Precommissioning/Commissioning on Site

Snamprogetti

Libya 2005 6 months Gas Platform – Mellitah • Automation Commissioning on Site

Snamprogetti

Iran 2005 6 months Gas Platform – Mellitah

• Precommissioning/Commissioning on Site

Snamprogetti

Iran 2005 6 months Gas Platform – Mellitah • Commissioning on Site