Page 1: committed to quality, cost & deliverycilegonfab.co.id/img/compro2015.pdf · 2015-09-15 · demand of steel structure for industrial, handling heavy equipment (crane), boiler component

BOILER PRESSURE PART, PIPING, HRSG, STEEL STRUCTURE & HEAVY EQUIPMENTJl. Raya Bojonegara - Salira, Argawana

Pulo Ampel, Serang - Banten 42454 Indonesiawww.cilegonfab.co.id

PT. CILEGON FABRICATORS

PT. CILEGON FABRICATORS

committed to quality,cost & delivery

Page 2: committed to quality, cost & deliverycilegonfab.co.id/img/compro2015.pdf · 2015-09-15 · demand of steel structure for industrial, handling heavy equipment (crane), boiler component

CONTENTS

committed to quality,cost & delivery

forewordCOMPANY introductionvalues & trustPRODUCTFACILITIEScertificatION

010305071113

Page 3: committed to quality, cost & deliverycilegonfab.co.id/img/compro2015.pdf · 2015-09-15 · demand of steel structure for industrial, handling heavy equipment (crane), boiler component

FOREWORD

company profile PT. CILEGON FABRICATORS

We are PT.Cilegon Fabricators was established in March 1984 it by JEL Singa-pore and PT. Tri Usaha Bakti and has grown into reputable steel fabricators to supply products to customers in all over the world.

Management system has been applied in our company to make sure that all fabrication processes can be conducted to satisfy our customer international common standard.

Year 2009, IHI Corporation. Japan take over all local company share, together with IHI Corp. PT.Cilegon Fabricators has been expanded its business to cover demand of steel structure for industrial, handling heavy equipment (crane), boiler component and piping works.

With total area 25 hectares, shop facility and have private jetty, we are sure that we can serve you best quality products, competitive price and intime delivery.

Very Trully yours,

President Director

01 company profile PT. CILEGON FABRICATORS02

Page 4: committed to quality, cost & deliverycilegonfab.co.id/img/compro2015.pdf · 2015-09-15 · demand of steel structure for industrial, handling heavy equipment (crane), boiler component

COMPANY INTRODUCTION COMPANY HISTORY

company profile PT. CILEGON FABRICATORS

PT. Cilegon Fabricators located at heavy industries area in Cilegon, Banten Province, approximate 100 km western of Jakarta, continues to exit Jakarta Merak high-way to Gate Cilegon Timur.

With total area 250,000 m2, with engineering capability support by X-Steel (TEKLA) and CAD which compatible used. 50,000 m2 total under roof fabrica-tion shop, open yard for full assembled of Heavy product and 300 m skid rail for load-out of heavy product, cover storage components.

Private seaport (jetty) and bounded area to make convenience for receiving raw material and shipping out of bulky products direct from PT. Cilegon Fabrica-tors Jetty.

Capital

Share Holder : US $ 34,4 Million

IHI Corporation, Japan : 88,76 %

Jurong Engineering Limited, Singapore : 11,24 %

03 company profile PT. CILEGON FABRICATORS04

1984

1985

1994

1995

1996

1998

2002

2003

2004

2007

2009

2011

2012

2013

:

:

:

:

:

:

:

:

:

:

:

:

:

:

Founded

Start fabrication of steel structure

Certi�ed ISO 9002

Start fabrication of packaged boiler

Start fabrication of heavy equipment

Investment by IHI Logistic Division (share 10.48%)

Investment by IHI Power Plant Division

(share 29.9% / 34.9% incl. preferred stock)

Certi�ed ISO 9001 : 2008 & certi�ed ASME S. U, PP stamp

Start fabrication of boiler pressure parts

Established 3D network for engineering

IHI become 100% share holder of PT.CF

(IHI took over all local shares of PTCF)

Certi�ed OHSAS 18001 : 2007 & SMK3

(Indonesian Government Certi�cation for Safety)

Start fabrication of HRSG pressure parts shop,

New investment by IHI in 2011

Start fabrication of new boiler pressure parts shop,

New investment by IHI in 2012

Page 5: committed to quality, cost & deliverycilegonfab.co.id/img/compro2015.pdf · 2015-09-15 · demand of steel structure for industrial, handling heavy equipment (crane), boiler component

We continuously developed and applied our values that strongly support our mission.

Our values are :

company profile PT. CILEGON FABRICATORS05 company profile PT. CILEGON FABRICATORS06

VALUES

Integritytransparencyteamwork

creativitywinning spiritexcellence

When it comes to business it’s all about trust. Trust that your cooperations won’t fail and that you can count in your partner. PT. Cilegon Fabricators and IHI Corporation as new share holders will be increasing our facilities, technical capability and always improving technologies.As market requirement our factory could manufacture

With capability of 26,000 ton / year, at present condition and with our experi-ences we have grown into a reputable steel fabricators. We make it sure that PT. Cilegon Fabricators can serve you with best quality products, so don’t hesitate to meet your partnership to be trust on future project.

BOILER PRESSURE PARTS, PIPING , HRSG, STEEL STRUCTURE & HEAVY EQUIPMENT

trust

Page 6: committed to quality, cost & deliverycilegonfab.co.id/img/compro2015.pdf · 2015-09-15 · demand of steel structure for industrial, handling heavy equipment (crane), boiler component

1. boiler presure parts and pipinGboiler presure parts and pipinG1.

2.

3.

company profile PT. CILEGON FABRICATORS07

PRODUCT

CAPABILITY

5,000 Ton per year

FACILITIES

Under Roof Workshop

21,600 m2 could cover all activities for

fabrication of boiler pressure part.

Common Device

Membrane Panel Welding 24+8,

Welding Manipulator, 4” Pipe Bender, 4” NC

Pipe Bender, 8 Electrode Panel Welder, 4

Electrode Gantry Welder, Equipment for

Surface Preparation using for Tube, Pipe,

and PWHT Furnace size 14m x 6m x 4m

steel structure and heavy equipment

HRSG ( Heat recovery steam generator )

MEMBRANE WELDING 24+8 BOROSCOPE VISUAL INSPECTION

BENDING PANELDELIVERY PRODUCT

MACHINING PROCESS

WELDING PROCESS

company profile PT. CILEGON FABRICATORS08

Page 7: committed to quality, cost & deliverycilegonfab.co.id/img/compro2015.pdf · 2015-09-15 · demand of steel structure for industrial, handling heavy equipment (crane), boiler component

3. steel structure and heavy equipmentCAPABILITY

18,000 Ton per year (existing ave.) and

further expansion become 20,000 ton.

FACILITIES

Under Roof Workshop

19,827 m2 could cover all activities for

fabrication of boiler pressure part.

Common Device

CNC Cutting Machine, NC Sawing, Drilling

Machine, Bending & Rolling Machine,

Horizontal Boring & Milling Machine, Ringer

Crane Cap 150 ton shop for erection at

year, private jetty (width : 50m x

depth : 7m).

2. HRSG ( Heat recovery steam generator )CAPABILITY

3,000 Ton per year (existing ave.) and further

expansion become 4,000 ton.

FACILITIES

Under Roof Workshop

8,100 m2 could cover all activities for fabri-

cation of boiler pressure part.

Common Device

2 Unit Finning Machine,

2 Unit Bending Tube 3”,

1 Unit Bending Tube 4”, Assembled Area, and

Hydro test Area.

company profile PT. CILEGON FABRICATORS09 company profile PT. CILEGON FABRICATORS10

FINNING TUBE MACHINE

MODULARIZATION PROCESS

ASSEMBLING AREA

HARP ASSEMBLY

HARP HYDRO TEST

DELIVERY PRODUCT HRSG

CUTTING PROCESS ASSEMBLING PROCESS

WELDING

DELIVERY

MAGNETIC TEST

TRIAL ASSEMBLY PROCESS

Page 8: committed to quality, cost & deliverycilegonfab.co.id/img/compro2015.pdf · 2015-09-15 · demand of steel structure for industrial, handling heavy equipment (crane), boiler component

CHAMBER BLASTINGENGINEERING FACILITY (TEKLA MODEL)

24 + 8 MEMBRANE PANEL MACHINE AUTOMATIC DRILLING MACHINE

PAINTING INSPECTION CLINIC OPEN 24 HOURS

PAINTING FACILITY UT/RT INSPECTION

MOSQUE PRIVATE JETTY

MAGNETIC PARTICAL TEST CNC CUTTING MACHINE

FACILITIES

Page 9: committed to quality, cost & deliverycilegonfab.co.id/img/compro2015.pdf · 2015-09-15 · demand of steel structure for industrial, handling heavy equipment (crane), boiler component

CERTIFICATION

company profile PT. CILEGON FABRICATORS13

OSHAS 18001 : 2007

SMK 3

ISO 9001 : 2008

ASME STAMP

Page 10: committed to quality, cost & deliverycilegonfab.co.id/img/compro2015.pdf · 2015-09-15 · demand of steel structure for industrial, handling heavy equipment (crane), boiler component

OUR EXPERIENCE ON WORLDWIDE

STEEL STRUCTURE & HEAVY EQUIPMENT BOILER PRESSURE PART HRSG

MOROCCO

CHILE

GERMANY

USA

ALGERIA

CAMEROON

SAUDIARABIA

YEMEN

KUWAIT

SRILANKA

AUSTRALIA

CHINA JAPANSOUTHKOREA

TAIWAN

PHILIPINESTHAILAND

MYANMAR

VIETNAM

MALAYSIA

CAMBODIA

SINGAPORE

INDONESIA