committee for transportation mobility...
TRANSCRIPT
COMMITTEE FOR TRANSPORTATION MOBILITY & ACCESSIBILITY
Thursday, January 17, 2019
10:00 AM
VTA Conference Room B-106
3331 North First Street
San Jose, CA
AGENDA
COMMITTEE MISSION
The VTA Committee for Transportation Mobility and Accessibility provides guidance and perspective
to the Board of Directors on VTA transit and transportation accessibility matters to help ensure
complete access to all users in Santa Clara County, doing so by facilitating dialogue with,
representing and advocating the needs of the disabled and senior communities.
CALL TO ORDER
1. ROLL CALL
2. INTRODUCTION OF AUDIENCE MEMBERS
3. ORDERS OF THE DAY
4. PUBLIC PRESENTATIONS
This portion of the agenda is reserved for persons desiring to address the Committee on
any matter not on the agenda, within the Committee’s jurisdiction. Speakers are limited
to 2 minutes. The law does not permit Committee action or extended discussion on any
item not on the agenda except under special circumstances. If Committee action is
requested, the matter can be placed on a subsequent agenda. All statements that require a
response will be referred to staff for reply in writing.
5. Receive the Committee Staff Report. (Verbal Report)
MV Transportation Corrective Action Follow-up (Siedentopf) (Verbal Report)
October 8, 2018 Service Change Impact to Paratransit (Vogel) (Verbal Report)
Santa Clara Valley Transportation Authority
Committee for Transportation Mobility & Accessibility January 17, 2019
Page 2
2016 Measure B update (Verbal Report)
CONSENT AGENDA
6. ACTION ITEM - Approve the Regular Meeting Minutes of November 8, 2018.
7. INFORMATION ITEM - Receive the FY2019 First Quarter Transit Operations
Performance Report.
8. INFORMATION ITEM - Receive a report on the January 14, 2019 service changes.
9. INFORMATION ITEM - Receive the Chief Operating Officer's Report.
REGULAR AGENDA
10. ACTION ITEM - Conduct voting to determine the Committee's chairperson, first vice
chairperson and second vice chairperson for 2019.
11. ACTION ITEM - Recommend that the VTA Board of Directors approve draft framework
of the proposed 2016 Measure B Innovative Transit Service Models Competitive Grant
Program.
12. DISCUSSION ITEM - Review and discuss the updated Paratransit Privacy Policy.
13. INFORMATION ITEM - Receive information on the new Proterra electric buses.
(Verbal Report)
REPORTS
14. Receive the Citizens Advisory Committee/Citizens Watchdog Committee Report.
(Verbal Report)
15. Receive the Chairperson's Report. (Verbal Report)
OTHER
16. INFORMATION ITEM - Receive workplan update.
17. ANNOUNCEMENTS
18. ADJOURN
Santa Clara Valley Transportation Authority
Committee for Transportation Mobility & Accessibility January 17, 2019
Page 3
In accordance with the Americans with Disabilities Act (ADA) and Title VI of the Civil Rights
Act of 1964, VTA will make reasonable arrangements to ensure meaningful access to its
meetings for persons who have disabilities and for persons with limited English proficiency who
need translation and interpretation services. Individuals requiring ADA accommodations should
notify the Board Secretary’s Office at least 48-hours prior to the meeting. Individuals requiring
language assistance should notify the Board Secretary’s Office at least 72-hours prior to the
meeting. The Board Secretary may be contacted at (408) 321-5680 or
[email protected] or (408) 321-2330 (TTY only). VTA’s home page is www.vta.org
or visit us on www.facebook.com/scvta. (408) 321-2300: 中文 / Español / 日本語 /
Çѱ¹¾î / tiếng Việt / Tagalog.
All reports for items on the open meeting agenda are available for review in the Board
Secretary’s Office, 3331 North First Street, San Jose, California, (408) 321-5680, the Monday,
Tuesday, and Wednesday prior to the meeting. This information is available on VTA’s website
at http://www.vta.org and also at the meeting.
Committee for Transportation Mobility & Accessibility
Thursday, November 8, 2018
MINUTES
CALL TO ORDER
The Regular Meeting of the Committee for Transportation Mobility and Accessibility
(CTMA) was called to order at 10:00 a.m. by First Vice Chairperson Morrow in
Conference Room B-106, Santa Clara Valley Transportation Authority (VTA), 3331
North First Street, San Jose, California.
1. ROLL CALL
Attendee Name Title Status
Kathy Bonilla Member Present
Sara Court Member Present
Jeffery Darling Member Absent
Rowan Fairgrove Member Absent
Christine Fitzgerald Chairperson Absent
Cheryl Hewitt Member Absent
Melba Holliday Member Present
Jeffery Jokinen Member Absent
Tricia Kokes Second Vice Chairperson Present
John Macon Alternate Member N/A
Lupe Medrano Member Present
Laura Michels Member Absent
Alexandra Morris Member Present
Aaron Morrow First Vice Chairperson Present
Dilip Shah Member Present
Chaitanya Vaidya Member Absent
Lori Williamson Member Absent
* Alternates do not serve unless participating as a Member.
A quorum was present.
2. INTRODUCTION OF AUDIENCE MEMBERS
David Siedentopf, General Manager, MV Transportation; Holly Perez, Public
Information Officer; Inez Evans, Chief Operations Officer; Aiko Cuenco, Transportation
Planner III; Jason Kim, Senior Transportation Planner; Melissa Cerezo, Senior
Transportation Planner; Malahat Owrang, Transportation Planner III; Suet Nguyen,
6
Committee for Transportation Mobility & Accessibility Minutes Page 2 of 7 November 8, 2018
Senior Management Analyst; , Lauren Rosiles, Management Analyst; and Leslie Garcia,
Office Specialist II.
3. ORDERS OF THE DAY
First Vice Chairperson Morrow noted that part of Agenda Item #5., MV Transportation
Corrective Action report would be heard following Agenda Item #13., North First Street
Light Rail Improvements.
M/S/C (Holliday/Bonilla) to approve the Orders of the Day.
RESULT: APPROVED [UNANIMOUS] – Orders of the Day MOVER: Melba Holliday, Member
SECONDER: Kathy Bonilla, Member
AYES: Bonilla, Court, Holliday, Kokes, Medrano Morris, Morrow, Shah
NOES: None
ABSENT: Darling, Fairgrove, Hewitt, Jokinen, Michels, Fitzgerald, Vaidya,
Williamson
4. PUBLIC PRESENTATIONS
First Vice Chairperson Morrow reported about an incident on bus route 81 where he was
denied boarding due to the operator being unable to secure his wheelchair.
Member Bonilla requested clarification on VTA's policy regarding service animals.
VTA staff noted they would provide to Member Bonilla at a future date, information
about VTA’s service animals.
First Chairperson Morrow requested a Member submit in writing to VTA staff, concerns
about receiving inconsistent scheduling times from customer service representatives.
5. Committee Staff Report
Aaron Vogel, Regional Transportation Services Manager and Staff Liaison, provided a
report, highlighting the following: 1) summary of actions the VTA Board of Directors
(Board) took at their November 1, 2018, meeting; 2) update on the Silicon Valley
Express Lanes Program Toll Ordinance; 3) the Next Generation of Clipper; 4) EZFare
mobile app; and 5) announced the Ad Hoc Financial Stability Committee will meet on
November 16, 2018.
Mr. Vogel introduced Suet Nguyen, Senior Management Analyst, who provided a brief
overview of the Mobility Assistance Program (MAP), highlighting: 1) program goals;
2) unmet transportation needs; and 3) implementation plan.
NOTE: M/S/C MEANS MOTION SECONDED AND CARRIED AND, UNLESS OTHERWISE INDICATED, THE
MOTION PASSED UNANIMOUSLY.
6
Committee for Transportation Mobility & Accessibility Minutes Page 3 of 7 November 8, 2018
CONSENT AGENDA
6. Regular Meeting Minutes of September 13, 2018
M/S/C (Kokes/Medrano) to approve the Regular Meeting Minutes of
September 13, 2018.
7. Transit Operations Performance Report - Annual- FY2018
M/S/C (Kokes/Medrano) to receive the FY2018 Annual Transit Operations
Performance Report.
8. Chief Operating Officer's Report
M/S/C (Kokes/Medrano) to receive the Chief Operating Officer's Report.
RESULT: APPROVED [UNANIMOUS] – Consent Agenda Items #6-8 MOVER: Tricia Kokes, Second Vice Chairperson
SECONDER: Lupe Medrano, Member
AYES: Bonilla, Court, Holliday, Kokes, Medrano Morris, Morrow, Shah
NOES: None
ABSENT: Darling, Fairgrove, Hewitt, Jokinen, Michels, Fitzgerald, Vaidya,
Williamson
REGULAR AGENDA
9. Election Process for 2019 Advisory Committee Leadership: Appoint Nomination
Subcommittee
Elaine Baltao, Board Secretary, provided an overview of the 2019 Advisory Committee
Leadership Election Process.
On order of First Vice Chairperson Morrow and there being no objection, Members
Morrow and Kokes were appointed to the Nomination Subcommittee to identify
Committee members interested in serving as the chairperson or vice chairperson for
2019.
10. Station Access Policy
Aiko Cuenco, Transportation Planner III, provided an overview of the staff report and
provided a presentation entitled “Station Access Policy,” highlighting: 1) Policy
Consistency; 2) Access Policies and Practices; 3) Station Access Policy; 4) Guiding
Principles; 5) Station Access Hierarchy; and 6) Next Steps.
Members of the Committee discussed the following: 1) the removal of shelters and
benches along bus route 23; 2) Americans with Disabilities Act (ADA); and
3) commended staff for streamlining the approach with other policies.
6
Committee for Transportation Mobility & Accessibility Minutes Page 4 of 7 November 8, 2018
VTA staff noted they would provide follow-up regarding removals of any benches and
shelters along bus route 23.
M/S/C (Medrano/Holliday) to recommend that the VTA Board of Directors adopt a
Station Access Policy for VTA.
RESULT: APPROVED [UNANIMOUS] – Regular Agenda #10 MOVER: Lupe Medrano, Member
SECONDER: Melba Holliday, Member
AYES: Bonilla, Court, Holliday, Kokes, Medrano Morris, Morrow, Shah
NOES: None
ABSENT: Darling, Fairgrove, Fitzgerald, Hewitt, Jokinen, Michels, Vaidya,
Williamson
11. VTA Land Use and Development Review Policy
Melissa Cerezo, Senior Transportation Planner, provided an overview of the staff report
and provided a presentation entitled “Land Use and Development Review Policy,”
highlighting: 1) Policy consistency; 2) Why are we creating this; 3) Policy Outreach;
4) Principles; 5) Strategies to Fulfill Principles; 6) Policy Tools; and 7) Next Steps.
Members of the Committee made the following comments: 1) key corridors being
impacted by the policy; and 2) noted the importance of trust and would like to see
cohesiveness across the various jurisdictions.
M/S/C (Bonilla/Holliday) to recommend that the VTA Board of Directors approve the
VTA Land Use and Development Review Policy.
RESULT: APPROVED [UNANIMOUS] – Regular Agenda #11 MOVER: Kathy Bonilla, Member
SECONDER: Melba Holliday, Member
AYES: Bonilla, Court, Holliday, Kokes, Medrano Morris, Morrow, Shah
NOES: None
ABSENT: Darling, Fairgrove, Fitzgerald, Hewitt, Jokinen, Michels, Vaidya,
Williamson
12. Proposed Design Guidance for Bike Lanes and Cycle Tracks at Bus Stops
Malahat Owrang, Transportation Planner III, provided an overview of the staff report.
Members of the Committee and staff had a robust discussion about the following: 1) bike
lanes in downtown San Jose; 2) any city ordinances or fines in place for bicyclists using
sidewalks; 3) concerns about raised platforms; 4) the use of at-grade crossings versus
raised platforms; and 5) individuals who have problems with inclines.
6
Committee for Transportation Mobility & Accessibility Minutes Page 5 of 7 November 8, 2018
Ms. Owrang reported that ADA guidelines were considered and the proposed design is a
guide for local agencies.
A Member of the Committee requested a joint meeting between CTMA members and
Bicycle & Pedestrian Advisory Committee Members to provide design feedback, noting
the need to collaborate with the bicyclist community to find common ground.
A subcommittee composed of First Vice Chairperson Morrow, Members Kokes and
Medrano was formed.
On order of First Vice Chairperson Morrow, and there being no objection, the
Committee received a report on VTA's draft design guidelines for accommodating bike
lanes and cycle tracks at bus stops.
13. North First Street Light Rail Improvements
Jason Kim, Senior Transportation Planner, provided an overview of the staff report and
provided a presentation entitled “North First Street Light Rail Improvements,”
highlighting: 1) Speeding up Light Rail; 2) VTA Strategic Plan; 3) Light Rail Maximum
Speeds; 4) Light Rail Actual Speeds; 5) Light Rail Operating Inefficiency Increasing;
6) Light Rail Operating Delays System wide; 7) North First Street and Delays; 8) Light
Rail Enhancement project; 9) Improving Signal Priority; 10) Adaptive Pedestrian
Detection; and 11) First and Tasman.
A Member of the Committee requested status of a referral from the September 2018
CTMA meeting regarding a request for a presentation about safety and the benefits of
using FLIR cameras; and further requested follow-up about a list of operational FLIR
cameras in the City of San Jose.
On order of First Vice Chairperson Morrow, and there being no objection, the
Committee received an update on the North First Street Light Rail Improvements.
The Agenda was taken Out of Order.
5. Committee Staff Report (continued)
MV Transportation Corrective Action
David Siedentopf, MV General Manager, provided a report on the following:
1) update on the service improvement plan; 2) overview of on-time compliance
efforts and recent performance improvement trends; 3) overview of call center
response time; and 4) customer service and management focus.
Mr. Vogel reported that VTA took action in response to CTMA’s feedback last
September. VTA’s goal is to have an open dialogue with the Committee; and
periodic improvement updates will be given to the Committee.
6
Committee for Transportation Mobility & Accessibility Minutes Page 6 of 7 November 8, 2018
Members of the Committee and staff engaged in discussion about the following:
1) changes to the service area in Fremont, resulting in increased fares; 2) the
various analysis VTA completed on service area changes and the impacts it would
have; 3) routing concerns; 4) tools used for tracking ridership; 5) improving
communication; and 6) batching process.
First Vice Chairperson Morrow would like the following brought back to the
Committee in January 2018: 1) improvements on the batching process; 2) the data
software used to track on-time performance and any improvements made; 3) plans
on improving training and communication with the disability community; and
4) the analysis VTA completed around service area changes and its impacts.
Member Kokes left the meeting at 11:57 a.m. and a Committee of the Whole was
declared.
REPORTS
14. Citizens Advisory Committee/Citizens Watchdog Committee Report
First Vice Chairperson Morrow reported CAC requested a presentation on the MV
Transportation paratransit corrective action plan.
15. Chairperson's Report
First Vice Chairperson Morrow reported about a conference call with Chairperson
Fitzgerald and VTA staff about emergency disaster plans for Santa Clara County and
how paratransit is utilized during an emergency disaster.
Mr. Vogel noted VTA hired a consultant to help develop the plan and will continue to
provide Committee updates.
OTHER
16. Committee Work Plan
Mr. Vogel informed the Committee on items scheduled for the January meeting.
First Vice Chairperson Morrow discussed a possible workshop in the future to discuss
paratransit data being used publicly for better transparency with the VTA Access
Paratransit Program.
On order of First Vice Chairperson Morrow, and there being no objection, the
Committee reviewed the Committee Work Plan.
17. ANNOUNCEMENTS
There were no Announcements.
6
Committee for Transportation Mobility & Accessibility Minutes Page 7 of 7 November 8, 2018
18. ADJOURNMENT
On order of First Vice Chairperson Morrow and there being no objection, the
Committee meeting was adjourned at 12:04 p.m.
Respectfully submitted,
Theadora Abraham, Board Assistant
VTA Office of the Board Secretary
6
Date: November 1, 2018
Current Meeting: January 17, 2019
Board Meeting: n/a
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transportation Mobility & Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Chief Operating Officer, Inez Evans
SUBJECT: Transit Operations Performance Report - Q1 FY 2019
FOR INFORMATION ONLY
BACKGROUND:
The FY2019 First Quarter Transit Operations Performance Report presents the first fiscal
quarter's year-to-date (July 2018-September 2018) key performance information for VTA
Operations. This report is routinely produced after each quarter and at the end of the fiscal year.
DISCUSSION:
Ridership (page 6 of the report)
Bus ridership for the first quarter of FY2019 (July 2018- September 2018) totaled 6.8 million, a
decrease of 4.0% compared to the same period in FY2018 (July2017-September 2017). Average
weekday ridership was 88,671, down 3.3 % compared to the same period in FY2018.
Light rail recorded 2.2 million boardings during the first quarter of FY2019, an increase of 0.4%
compared to the same period of the prior fiscal year. Average weekday ridership was 28,739, up
2.2% compared to the first quarter of FY2018.
Overall, the 9.0 million system ridership (bus and rail) was down 2.9%. Average weekday
ridership decreased 2.0%, from 119,819 in the first quarter of FY2018 to 117,410 in this fiscal
year’s first quarter.
Special Event Service: A total of fifteen stadium events occurred in the first quarter of FY2019
- nine at Avaya Stadium and six at Levi’s Stadium. Events at Levi’s Stadium were two pre-
season 49ers football games, one regular 49ers game, and two international soccer matches. A
total of 60,052 riders took VTA to Levi’s stadium during the six major events, averaging 10,009
per event.
7
Page 2 of 3
Levis Stadium events
Year Month Riders Events Average per event
2018 July 8,144 1 8,144
2018 August 30,808 3 10,269
2018 September 21,100 2 10,550
Totals 60,052 6 10,009
Key Performance Indicators (page 5 of the report)
Service reliability performance for the system (both bus and light rail) in the first quarter of
FY2019 was 99.66%, which exceeded the established goal. Bus on-time performance was
86.6%, slightly higher than the same period last year (86.1%). Light rail on-time performance
was 84.2% in the first quarter of FY2019, slightly lower than last year’s 84.7%.
Bus recorded 12,585 miles between major mechanical schedule losses in the first quarter of
FY2019, 2.8% higher than the same period last year and exceeded the established goal of 8,000
miles. Light rail recorded 57,981 miles between major mechanical schedule losses, 76.7% higher
than last year and exceeded the goal of 25,000 miles.
Absenteeism goals were not met except for Light Rail Maintenance and Way, Power & Signal
personnel.
Paratransit (page 21 of the report)
Through the first three months of FY 2019, the total Paratransit ridership was 131,731, down
2.8% compared to the same period last year. The fiscal year to date net operating cost for ADA
Paratransit services for FY2019 was $5,358,449, an 11.47% decrease from the same period last
year. The net operating cost per Paratransit passenger trip (including eligibility costs) for the first
quarter of FY2019 was $40.51, an 11.47% decrease from the $45.76 reported for the same period
last year. Five of the 13 performance indicators were met.
Contract Performance Indicators for Q1 2019
Performance Indicators Goal FY19 Actual YTD Met
Goal
Passengers Per Hour [PPH] >=2.0 1.5 No
On-Time Performance [OTP] >=
92.0%
89.07% No
Net Cost per Passenger <=$38.0
0
$40.51 No
OTP First Pick-Up >=95% 96.93% Yes
OTP be there By Time >=90.0
%
87.86% No
Excessively Late Trips <=0.10
%
0.94% No
Missed Trips 0 199 No
Call Center Telephone Hold Times (Minutes) <=1:30 1:46 No
Abandoned Telephone Calls <=3% <=3% 6.27% No
Complaints per 1,000 Passenger Trips <=1 <=1 0.98 Yes
7
Page 3 of 3
Preventable Accidents (Per 100,000 Revenue
Miles)
<=0.75 0.46 Yes
Preventable Maintenance Inspections On-Time 100% 100% Yes
ADA Eligibility Certification within 21 Days 100% 100% Yes
Inter-Agency Partners and Contracted Services (page 6 of the report)
VTA’s Inter-agency partners and contracted services recorded ridership decreases, with the
exception of Caltrain, ACE and ACE shuttles:
Dumbarton Express ridership was 67,052, down 1.1%.
Highway 17 Express ridership was 66,524, down 4.2%.
Monterey-San Jose Express ridership was 5,045, down 11.4 %.
ACE ridership was 380,448, up 10.4%.
Caltrain ridership was 4,955,705, up 2.3%.
CE shuttle ridership was 113,884, up 7.9%.
Paratransit ridership was 131,731, down 2.8%.
Prepared By: Lalitha Konanur
Memo No. 6764
7
Transit Operations Performance Report FY2019 First Quarter Report (July 01, 2018-September 30, 2018)
7.a
7.a
Transit Operations Performance Report
First Quarter FY 2019 Report (July 1, 2018 – September 30, 2018)
7.a
Santa Clara Valley Transportation AuthorityFY2018 First Quarter Transit Operations Performance Report(July 01, 2018 - Sept. 30, 2018)
TABLE OF CONTENTS page
Executive SummarySummary of Performance 1Event Highlights 3
Key Performance Indicators 5
Ridership Summary 6
Route details 7
Route PerformanceBoardings Per Revenue Hour 8Average Peak Load (Express) 12Route Productivity 13
Paratransit Operating Statistics 21
Glossary
Prepared by: Operations Analysis, Reporting & Systems
7.a
Executive Summary
7.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY FY2019 First Quarter Transit Operations Performance Report (July 1, 2018 –September 30, 2018) SUMMARY OF PERFORMANCE
Ridership (page 6 of the report)
Bus ridership for the first quarter of FY2019 (July 2018- September 2018) totaled 6.8 million, a decrease of 4.0% compared to the same period in FY2018 (July2017-September 2017). Average weekday ridership was 88,671, down 3.3 % compared to the same period in FY2018.
Light rail recorded 2.2 million boardings during the first quarter of FY2019, an increase of 0.4% compared to the same period of the prior fiscal year. Average weekday ridership was 28,739, up 2.2% compared to the first quarter of FY2018.
Overall, the 9.0 million system ridership (bus and rail) was down 2.9%. Average weekday ridership decreased 2.0%, from 119,819 in the first quarter of FY2018 to 117,410 in this fiscal year’s first quarter.
Special Event Service: A total of fifteen stadium events occurred in the first quarter of FY2019 - nine at the Avaya Stadium and six at the Levi’s Stadium. Events at Levi’s Stadium were two pre-season 49ers football games, one regular 49ers games, and two international soccer matches. A total of 60,052 riders took VTA to the Levi’s stadium during the six major events, averaging 10,009 per event.
Levis Stadium events Year Month Riders Events Average per event2018 July 8,144 1 8,144 2018 August 30,808 3 10,269 2018 September 21,100 2 10,550 Totals 60,052 6 10,009
Key Performance Indicators (page 5 of the report)
Service reliability performance for the system (both bus and light rail) in the first quarter of FY2019 was 99.66%, which exceeded the established goal. Bus on-time performance was 86.6%, slightly higher than the same period last year (86.1%). Light rail on-time performance was 84.2% in the first quarter of FY2019, slightly lower than last year’s 84.7%.
Bus recorded 12,585 miles between major mechanical schedule losses in the first quarter of FY2019, 2.8% higher than the same period last year and exceeded the established goal of 8,000 miles. Light rail recorded 57,981 miles between major mechanical schedule losses, 76.7% higher than last year and exceeded the goal of 25,000 miles.
1
7.a
Absenteeism goals were not met except for Light Rail Maintenance and Way, Power & Signal personnel.
Paratransit (page 21 of the report)
Through the first three months of FY 2019, the total Paratransit ridership was 131,731 down 2.8% compared to the same period last year. The fiscal year to date net operating cost for ADA Paratransit services for FY2019 was $5,358,449, an 11.47% decrease from the same period last year. The net operating cost per Paratransit passenger trip (including eligibility costs) for the first quarter of FY2019 was $40.51, an 11.47% decrease from the $45.76 reported for the same period last year. Five of the 13 performance indicators were met.
Contract Performance Indicators for Q1 2019
Performance Indicators Goal FY19 Actual
YTD Met Goal
Passengers Per Hour [PPH] >=2.0 1.5 No On-Time Performance [OTP] >= 92.0% 89.07% No Net Cost per Passenger <=$38.00 $40.51 No OTP First Pick-Up >=95% 96.93% Yes OTP be there By Time >=90.0% 87.86% No Excessively Late Trips <=0.10% 0.94% No Missed Trips 0 199 No Call Center Telephone Hold Times (Minutes) <=1:30 1:46 No Abandoned Telephone Calls <=3% <=3% 6.27% No Complaints per 1,000 Passenger Trips <=1 <=1 0.98 Yes Preventable Accidents (Per 100,000 Revenue Miles) <=0.75 0.46 Yes Preventable Maintenance Inspections On-Time 100% 100% Yes ADA Eligibility Certification within 21 Days 100% 100% Yes
Inter-Agency Partners and Contracted Services (page 6 of the report)
VTA’s Inter-agency partners and contracted services recorded ridership decreases, with the exception of Caltrain, ACE and ACE shuttles:
Dumbarton Express ridership was 67,052, down 1.1%. Highway 17 Express ridership was 66,524, down 4.2%. Monterey-San Jose Express ridership was 5,045, down 11.4 %. ACE ridership was 380,448, up 10.4%. Caltrain ridership was 4,955,705, up 2.3%. CE shuttle ridership was 113,884, up 7.9%. Paratransit ridership was 131,731, down 2.8%.
2
7.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY EVENT HIGHLIGHTS FY 2019 First Quarter Transit Operations Performance Report (July 1, 2018 to September 30, 2018) This section shows events that can affect normal service operations and system ridership. Ridership historically follows employment trends in the Valley, for example. Weather, public events, strikes, traffic, construction, new service, area gasoline prices, and other changes to our operating environment also affect system ridership and service conditions.
July 2, 2018 – Service Changes
July 4, 2018 – Major fireworks show at Discovery Meadow in downtown San Jose. Two other major fireworks shows – one at California’s Great America Theme Park in Santa Clara, and another at Lake Almaden Park in San Jose July 11, 2018 - Harry Styles Concert at SAP July 12, 2018 – Music in the Park July 22, 2018 – Levi’s Stadium: SJ Earthquakes Vs. Manchester United July 22, 2018 - Line 251 Permanently moved to Warm Springs BART July 25, 2018 - Earthquakes vs. Seattle Sounders at Ayaya Stadium July 28 and 29, 2018 – Gilroy Garlic Festival July 2018 – Unleaded fuel averaged $3.69 a gallon
August 4, 2018 – Levi’s Stadium: AC Milan vs. F.C. Barcelona August 9, 2018 – Levi’s Stadium: SF 49ers vs. Dallas Cowboys (Pre-Season) August 10, 2018 - San Jose Jazz Summer Fest 2018 August 18, 2018 - Earthquakes vs. Toronto FC at Avaya Stadium August 20, 2018 – Schools starts to reopens
August 24, 2018 - Music in the Park (Series)
August 24, 2018 – Spare the Air day
August 25, 2018 - Earthquakes vs. Vancouver at Avaya Stadium
August 30, 2018 – Levi’s Stadium: SF 49ers vs. Los Angeles Chargers (Pre-Season)
3
7.a
August 2018 – Unleaded fuel averaged 3.64 a gallon
September 4, 2018 - U.S. Women’s National Team vs. Chile at Avaya Stadium September 8, 2018 - Game of Thrones Live Concert Experience at SAP Center September 12, 2018 – Foo Fighters Concert at SAP Center September 16, 2018 – Levi’s Stadium: SF 49ers vs. Detroit Lions September 18, 2018 - Sharks vs. Anaheim (Pre-Season) at SAP Center September 23, 2018 - Viva Calle at San Jose September 27, 2018 – Sharks vs. Calgary Flames SAP Center September 29, 2018 – Levi’s Stadium: Jay-Z & Beyoncé Concert September 2018 – Unleaded fuel averaged 3.67 a gallon
4
7.a
Key Performance
Indicators
7.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITYKEY PERFORMANCE INDICATORSFY2019 First Quarter Transit Operations Performance Report(July 01, 2018 - Sept. 30, 2018)
FY 2016Annual
FY 2017Annual
FY 2018Annual
FY 2019 Q1Met Goal? FY 2019 Goals
SYSTEM (Bus & Light Rail)Total Boarding Riders (in millions) 42.92 38.19 36.56 9.01 No 10.16>= Average Weekday Boarding Riders 137,317 124,002 118,631 117,410 No 131,927>= Boardings per Revenue Hour 29.7 25.5 24.3 23.6 No 24.7>= Percent of Scheduled Service Operated 99.64% 99.65% 99.68% 99.66% YES 99.55%>=
Miles Between Major Mechanical Schedule Loss1 10,655 11,303 12,458 13,709 YES 9,243>= Miles Between Chargeable Accidents 168,454 112,974 112,718 197,800 YES 113,071>= Passenger Concerns per 100,000 Boardings 21.0 21.7 18.5 16.8 No 10.6<=
BUS OPERATIONSTotal Boarding Riders (in millions) 32.20 29.06 28.05 6.80 No 7.60>= Average Weekday Boarding Riders 104,009 94,740 91,270 88,671 No 99,070>= Boardings per Revenue Hour 24.7 21.4 20.6 19.8 No 20.7>= Percent of Scheduled Service Operated 99.60% 99.62% 99.66% 99.63% YES 99.50%>=
Miles Between Major Mechanical Schedule Loss1 10,011 10,579 11,768 12,585 YES 8,032>= Miles Between Chargeable Accidents 153,146 102,623 103,607 183,652 YES 100,388>= On-time Performance 85.8% 86.3% 86.4% 86.6% No 92.5%>= Operator Personal Time-off 7.6% 8.3% 10.5% 10.7% No 10.0%<= Maintenance Personal Time-off 5.5% 6.9% 7.0% 9.5% No 8.0%<= Passenger Concerns per 100,000 Boardings 22.4 23.9 20.0 18.6 No 11.8<=
LIGHT RAIL OPERATIONSTotal Boarding Riders (in millions) 10.72 9.13 8.51 2.20 No 2.56>= Average Weekday Boarding Riders 33,308 29,262 27,361 28,739 No 32,857>= Boardings per Revenue Hour 76.6 65.5 59.4 59.7 YES 57.4>= Percent of Scheduled Service Operated 99.97% 99.96% 99.96% 99.98% YES 99.90%>=
Miles Between Major Mechanical Schedule Loss1 23,528 26,707 25,173 57,981 YES 31,071>=
Miles Between Chargeable Accidents2 1,117,584 747,792 448,004 579,805 YES 579,805>= On-time Performance 77.5% 84.3% 84.7% 84.2% No 95.0%>= Operator Personal Time-off 7.7% 8.4% 9.8% 10.6% No 10.0%<= Maintenance Personal Time-off 4.1% 4.9% 4.4% 5.3% YES 8.0%<= Way, Power, & Signal Personal Time-off 8.7% 8.5% 4.1% 5.0% YES 8.0%<= Passenger Concerns per 100,000 Boardings 16.8 14.7 13.7 10.9 No 2.8<= Fare Evasion Rate 2.8% 2.1% 2.4% 2.5% YES 5.0%<=
PARATRANSIT Passengers per Revenue Hour³ 2.20 1.70 1.60 1.55 No 2.00>= Net Cost per Passenger $30.24 $39.34 $36.37 $40.51 No $38.00<= Ontime Performance 90.9% 91.9% 87.7% 89.1% No 92.0%>=
OTP First Pick-Up3 97.0% 96.9% YES 95.0%>=
OTP Be There By Time3 88.3% 87.9% No 90.0%>=
Excessively Late Trips 3 1.05% 0.94% No 0.01%<=
Missed Trips 3 745 199 No 0<= Complaints per 1,000 passenger Trips 0.68 100.0% 1.03 0.98 YES 1.0<= Calls Response Time (minutes)³ 0:58 0:03 1:55 1:46 No 1:30<= Abandoned Telephone Calls 3 1.40 1.03 10.1% 6.3% No 3.0%<= ADA Eligibility Certification within 21 Days 100.0% 1.00 100.0% 100.0% YES 100.0%= Preventative Maintenance Inspections Ontime 100.0% 1.00 100.0% 100.0% YES 100.0%= Preventable Accidents (per 100,000 Revenue Miles)3
0.68 0.46 YES 0.75<= j p g pNote: Ridership goals were developed using budget projections.1 Mechanical failure that prevents the vehicle from completing a scheduled service due to limited vehicle movement or safety concerns.2 Goal is no more than one chargeable accident in a year.3 New ADA Paratransit Performance Indicators for Paratransit effective FY 2018
5
7.a
Ridership Summary
7.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITYRIDERSHIP SUMMARY(Directly Operated, Inter-Agency Partners, and Contracted Services)FY2019 First Quarter Transit Operations Performance Report
(July 01, 2018 - Sept. 30, 2018)
FY2019 FY2018 % Change
Directly Operated ServicesBus 6,804,820 7,085,148 -4.0% Average Weekday Riders 88,671 91,687 -3.3%
Light Rail 2,202,141 2,192,785 0.4% Average Weekday Riders 28,739 28,132 2.2%
Total Directly Operated Services 9,006,961 9,277,933 -2.9% Average Weekday Riders 117,410 119,819 -2.0%
Inter-Agency Partners
Dumbarton Express 67,052 69,447 -3.4% Average Weekday Riders 1,064 1,076 -1.1%
Highway 17 Express 66,524 69,447 -4.2% Average Weekday Riders 810 854 -5.2%
Monterey-San Jose Express 5,045 5,697 -11.4% Average Weekday Riders 43 49 -12.2%
Altamont Commuter Express (ACE) 380,448 344,613 10.4% Average Weekday Riders 5,470 5,397 1.4%
Caltrain 4,955,705 4,845,297 2.3% Average Weekday Riders 64,226 62,106 3.4%
Caltrain Shuttles (in Santa Clara County) 426,641 465,152 -8.3% Average Weekday Riders 6,666 7,268 -8.3%
Contracted ServicesParatransit* 131,731 135,705 -2.9% Average Weekday Riders 1,801 1,844 -2.3%
ACE Shuttles 113,884 105,523 7.9% Average Weekday Riders 1,801 1,844 -2.3%
Total Contracted / Inter-Agency 3,001,741 2,951,550 1.7%
Combined Total Ridership (in Santa Clara County) 1 12,008,702 12,229,483 -1.8%1 These figures are based on estimated ridership in the VTA service area for Caltrain, ACE, Highway 17 Express, Dumbarton Express, and Monterey-San Jose Express. Paratransit, Light Rail Shuttles, ACE Shuttles, and Caltrain Santa Clara County Shuttles are operated wholly within the service area, therefore, 100% of the ridership is included.*Data through Fenruary 2018
6
7.a
Route Destination Route Destination
10Santa Clara Transit Ctr.-San Jose International Airport-Metro/Airport LRT Station
70 Capitol LRT Station-Great Mall/Main Transit Ctr.
12San Jose Civic Ctr.-Eastridge Transit Ctr. via San Jose Flea Market
71Eastridge Transit Ctr.-Great Mall/Main Transit Ctr. via White Rd.
13Almaden Expwy. & McKean-Ohlone/Chynoweth LRT Station
72 Senter & Monterey-Downtown San Jose
14Gilroy Transit Ctr. to St. Louise Hospital via Camino Arroyo
73 Snell/Capitol-Downtown San Jose
16 Morgan Hill Civic Ctr. to Burnett Ave. 77 Eastridge Tran Ctr-Great Mall/Main Trans Ctr via King Rd
17 Gilroy Transit Ctr. to St. Louise Hospital via Murray Ave. 81 Moffett Field/Ames Ctr.-San Jose State University
18 Gilroy Transit Ctr. to Gavilan College 82 Westgate-Downtown San Jose19 Gilroy Transit Ctr. to Wren & Mantelli 88 Palo Alto Veteran's Hospital-Middlefield & Colorado
22Palo Alto Transit Ctr.-Eastridge Transit Ctr. via El Camino
88 L and 88MPalo Alto Veteran's Hospital-Middlefield & Colorado (Scholl day only)
23DeAnza College-Alum Rock Transit Ctr. via Stevens Creek
89California Ave. Caltrain Station-Palo Alto Veteran's Hospital
25DeAnza College-Alum Rock Transit Ctr. via Valley Medical Ctr.
101 Camden & Hwy 85-Palo Alto
26Sunnyvale/Lockheed Martin Transit Ctr.-Eastridge Transit Ctr.
102 South San Jose-Palo Alto
27 Good Samaritan Hospital-Kaiser San Jose 103 Eastridge Transit Ctr.-Palo Alto31 Evergreen Valley College-Eastridge Transit Ctr. 104 Penitencia Creek Transit Ctr.-Palo Alto32 San Antonio Shopping Ctr.-Santa Clara Transit Ctr. 120 Fremont BART-Lockheed Martin/Moffett Park-Shoreline34 San Antonio Shopping Ctr.-Downtown Mountain View 121 Gilroy Transit Ctr.-Lockheed Martin/Moffett Park35 Downtown Mountain View-Stanford Shopping Ctr. 122 South San Jose-Lockheed Martin/Moffett Park37 West Valley College-Capitol LRT Station 140 Fremont BART-Mission College & Montague Expwy.
39 The Villages-Eastridge Transit Ctr. 168 Gilroy Transit Ctr.-San Jose Diridon Transit Ctr.
40Weekday/Sat-Foothill College-La Avenida & Shoreline Sun-San Antonio & Lyell-La Avenida & Shoreline
180 Great Mall/Main Transit Ctr/Aborn&White-Fremont BART
42Weekday-Kaiser San Jose-Evergreen Valley College Sat-Santa Teresa LRT-Monterey & Senter
181San Jose Diridon Transit Ctr.-Fremont BART via Great Mall/Main Transit Ctr. late evenings & weekends
45 Alum Rock Transit Ctr.-Penitencia Creek Transit Ctr. 182 Palo Alto-IBM/Bailey Ave.
46 Great Mall/Main Transit Ctr.-Milpitas High School 185 Gilroy Transit Ctr.-Mountain View47 Great Mall/Main Transit Ctr.-McCarthy Ranch 200 Tasman & Baypointe-Mountain View Station
48Los Gatos Civic Ctr.-Winchester Transit Ctr. via Winchester Blvd.
201 DASH SJ Diridon Stn-Downtown SJ LRT Stations
49Los Gatos Civic Ctr.-Winchester Transit Ctr. via Los Gatos Blvd.
52 Foothill College-Downtown Mountain View 251 Fremont BART-Levi's Stadium (Event Service Only)
53 West Valley College-Sunnyvale Transit Ctr.
54 De Anza College-Sunnyvale/Lockheed Martin Trans Ctr.
55 De Anza College-Great America 304 South San Jose-Sunnyvale Transit Ctr. via Arques
55XFremont High School-Lakewood Village (School Days Only)
321Great Mall/Main Transit Ctr.-Lockheed Martin/Moffett Park
57 West Valley College-Great America via Quito Rd. 323 De Anza College-Downtown San Jose
58 West Valley College-Alviso via Fruitvale 328 Almaden Expy/Via Valiente-Lockheed Martin/Moffett Pk60 Winchester Transit Ctr.-Great America 330 Almaden Expy. & Via Valiente-Tasman Drive
61 Good Samaritan Hospital-Sierra & Piedmont via Bascom 522 Palo Alto Transit Ctr.-Eastridge Transit Ctr.
62 Good Samaritan Hospital-Sierra & Piedmont via Union LRT Line 902 - Mountain View-Winchester
63 Almaden Expy & Camden-San Jose State University Line 901 - Alum Rock-Santa Teresa
64Almaden LRT Station-McKee & White via Downtown San Jose
Line 900 - Ohlone/Chynoweth-Almaden
65 Kooser & Blossom Hill-13th & Hedding 970Highway 17 Express - Santa Cruz & Scotts Valley-San Jose Diridon Transit Ctr.
66Kaiser San Jose-Milpitas/Dixon Rd. via Downtown San Jose
971 Dumbarton Express - Union City BART-Palo Alto
68 Gilroy Transit Ctr.-San Jose Diridon Transit Ctr. 972 Monterey-San Jose Express (MST55)
Route Listing
Master destination list for the timeguides, frequency chart, web site & timeguide effective date list.
7
7.a
Route Performance
7.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY
Weekday Boardings per revenue hourFY2019 First Quarter Transit Operations Performance Report
22.1
13.2
22.9
25.5
23.3
21.6
22.9
20.4
25.3
23.4
16.4
18.0
18.4
19.4
22.5
23.2
25.5
28.2
522
323
77
73
72
71
70
68
66
64
62
61
60
55
26
25
23
22
CoreStandard: 21.8 boardings
per rvenue hour
19.3
21.4
14.6
14.8
12.8
19.0
21.0
23.0
10.5
26.6
14.6
13.3
18.0
14.5
18.7
89
82
81
63
58
57
54
53
52
46
40
35
31
27
10
Local Standard: 17.6 boardings
per revene hour
29.1
9.1
14.8
13.2
9.0
13.1
12.7
12.9
18.4
12.6
9.1
14.9
13.1
13.1
8.8
15.6
9.0
10.6
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0
201
200
88
65
49
48
45
42
39
37
34
32
19
18
17
16
14
13
Community BusStandard: 15.0 boardings
per revenue hour
25.9ACEShuttles
Note: ACE shuttles are not considered in the calculation of the Community Bus standard, which is VTA-based only.
87.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY
Weekday Boardings per revenue hourFY2019 First Quarter Transit Operations Performance Report
56.9
74.8
43.0
0 10 20 30 40 50 60 70 80
ExpressStandard: is 60% Maximum
Load Factor
Light RailStandard: 58.2
boardingsper revenue train hour
* Line 900 is the Ohlone/Chynoweth – Almaden line * Line 901 is the Alum Rock - Santa Teresa Line * Line 902 is the Mountain View - Winchester Line.
11.2
8.9
11.3
13.8
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0
LimitedStandard 15.0 Boarding Per
Revenue Hour
97.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY
Saturday Boardings per revenue hourFY2019 First Quarter Transit Operations Performance Report
44.9
43.3
33.5
0 10 20 30 40 50 60 70 80 90 100
902*
901*
900*Light Rail
Standard: 40.6 boardingsper revenue train hour
13.2
7.9
10.8
14.5
14.9
13.0
11.3
8.7
12.7
11.3
13.6
16.0
20.1
82
81
63
57
54
47
46
40
35
31
27
12
10
4.9
8.8
7.7
6.2
9.9
12.0
11.9
4.9
9.7
0 10 20 30 40 50 60
200
49
48
42
39
32
19
17
14
Local Standard: 15.0 boardings
per revenue hour
Community BusStandard: 15.0 boardings
per revenue hour
* Line 900 is the Ohlone/Chynoweth – Almaden line * Line 901 is the Alum Rock - Santa Teresa Line * Line 902 is the Mountain View - Winchester Line.
16.4
8.1
20.2
16.5
14.3
18.7
19.3
18.2
19.9
16.2
15.7
14.2
15.0
11.7
16.6
21.5
20.0
22.3
522
323
77
73
72
71
70
68
66
64
62
61
60
55
26
25
23
22
CoreStandard: 16.9 boardings
per revenue hour
107.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY
Sunday Boardings per revenue hourFY2019 First Quarter Transit Operations Performance Report
45.2
43.9
34.5
0 10 20 30 40 50 60 70 80
902*
901*
900*
Light RailStandard 41.2 boardings
per revenue train hour
16.4
9.7
21.1
19.6
18.6
24.1
20.2
17.3
21.0
16.3
14.0
12.7
14.8
14.2
17.2
24.3
21.2
22.9
522
323
77
73
72
71
70
68
66
64
62
61
60
55
26
25
23
22
CoreStandard: 18.1 boardings
per revenue hour
16.0
10.3
13.7
13.8
20.9
11.3
14.5
10.3
15.1
19.4
20.2
82
63
57
54
47
40
35
31
27
12
10
Local Standard: 15.0 boardings
per revenue hour
6.6
8.4
6.8
21.2
12.7
6.0
9.0
0 5 10 15 20 25 30 35 40 45 50
200
49
48
39
19
17
14
Community BusStandard: 15.0 boardings
per revenue hour
* Line 900 is the Ohlone/Chynoweth – Almaden line * Line 901 is the Alum Rock - Santa Teresa Line * Line 902 is the Mountain View - Winchester Line
117.a
Saturday / Sunday
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY
Express Routes Average Peak Load
FY2019 First Quarter Transit Operations Performance Report
Weekday
29.7%
50.5%
44.5%
36.8%
27.6%
35.5%
35.5%
19.7%
36.3%
17.4%
37.6%
37.6%
17.1%
26.2%
33.6%
10.8%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
101
102
103
104
120
121
122
140
168
180
181
182
185
DB
Hwy 17
MST 55
ExpressStandard: 60% Peak Load
Note: HWY 17, MST and DB are not considered in the calculation of the standard which isVTA- based only.
Saturday, 36.1%
Sunday, 29.2%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
181
181
127.a
Boardings per Revenue Hour by Time Period(July 01, 2018 - Sept. 30, 2018)
Core Routes
WEEKDAYROUTE PEAK MIDDAY OFF PEAK TOTAL
22 28.5 30.3 24.7 28.2
23 25.3 27.8 19.4 25.5 Weekday Service Periods25 23.5 23.1 20.9 23.2 Peak 5:00 AM to 9:00 AM &26 23.2 23.5 15.3 22.5 2:30 PM to 6:30 PM55 19.4 21.4 13.5 19.4 Midday 9:00 AM to 2:30 PM60 17.7 20.9 14.7 18.4 Off Peak 6:30 PM to 5:00 AM61 17.8 19.9 10.6 18.0
62 16.0 18.3 11.1 16.4
64 23.8 24.9 13.7 23.4
66 24.2 28.3 20.8 25.3
68 19.8 22.3 17.7 20.4
70 21.9 24.7 17.8 22.9
71 19.7 28.2 18.6 21.6
72 25.4 22.4 14.2 23.3
73 25.3 28.6 14.4 25.5
77 21.2 25.7 19.5 22.9
323 13.6 13.2 10.8 13.2 Legend:522 23.5 20.7 20.4 22.1 Below standard
Standard 21.7 23.6 16.6 21.8 No Service
13
7.a
Boardings per Revenue Hour by Time Period(July 01, 2018 - Sept. 30, 2018)
Core Routes
SATURDAYROUTE AM BASE Evening Late Night TOTAL
22 28.0 25.4 23.6 25.3 25.723 23.4 24.0 19.7 21.4 23.1 Saturday Service Periods25 24.3 23.4 19.5 16.4 23.0 AM 12:00 AM to 9:00 AM26 21.4 17.6 19.9 0.0 18.5 Base 9:00 AM to 6:00 PM55 13.9 13.1 13.6 0.0 13.2 Evening 6:00 PM to 10:00 PM60 17.8 16.0 15.3 0.0 16.1 Late night 10:00 PM to 12:00 AM61 15.7 16.4 11.8 0.0 15.562 14.8 14.6 12.3 0.0 14.364 16.8 17.9 15.1 11.3 17.366 23.8 21.8 21.5 14.0 21.968 24.9 18.1 21.1 17.3 19.470 25.4 21.4 21.8 11.6 21.971 30.1 21.1 18.3 0.0 21.572 17.0 21.2 13.0 7.4 18.573 17.7 23.0 13.2 8.9 20.077 22.7 23.0 18.0 0.0 22.5
323 10.5 10.5 8.7 0.0 10.3522 17.6 18.2 16.5 17.0 17.8
Standard 20.3 19.3 16.8 15.1 18.9
SUNDAYROUTE AM BASE Evening Late Night TOTAL
22 26.5 22.0 22.4 21.2 22.9 Sunday Service Periods23 22.1 20.8 23.1 15.7 21.2 AM 12:00 AM to 9:00 AM25 24.1 25.7 18.5 16.7 24.3 Base 9:00 AM to 6:00 PM26 19.0 17.4 12.0 0.0 17.2 Evening 6:00 PM to 10:00 PM55 14.7 13.8 16.1 0.0 14.2 Late night 10:00 PM to 12:00 AM60 16.0 14.5 15.6 0.0 14.8
61 13.5 12.9 9.9 0.0 12.7
62 17.2 13.6 12.3 0.0 14.0
64 18.4 16.5 13.6 0.0 16.3
66 24.0 19.5 26.0 0.0 21.0
68 20.7 16.3 20.6 14.2 17.3
70 24.9 19.8 17.8 14.0 20.2
71 31.0 22.7 25.3 0.0 24.1
72 19.8 19.5 14.4 31.0 18.6
73 18.1 19.5 22.1 14.5 19.6
77 24.9 21.2 13.5 0.0 21.1323 0.0 9.7 13.4 0.0 9.7 Legend:522 19.1 14.5 25.5 0.0 16.4 Below standard
Standard 20.8 17.8 17.9 18.2 18.1 No Service
14
7.a
Boardings per Revenue Hour by Time Period(July 01, 2018 - Sept. 30, 2018)
Local Routes
WEEKDAYROUTE PEAK MIDDAY OFF PEAK TOTAL
10 19.3 19.7 16.1 18.7
27 13.6 17.0 9.5 14.5 Weekday Service Periods
31 17.8 21.1 8.1 18.0 Peak 5:00 AM to 9:00 AM &
35 13.8 13.0 12.4 13.3 2:30 PM to 6:30 PM
40 14.6 15.7 8.0 14.6 Midday 9:00 AM to 2:30 PM
46 26.0 28.7 16.9 26.6 Off Peak 6:30 PM to 5:00 AM
47 18.4 22.0 14.3 19.2
52 9.4 12.9 4.9 10.5
53 24.9 20.2 0.0 23.0
54 24.4 18.2 17.3 21.0
57 18.0 21.3 15.2 19.0
58 14.3 8.7 15.2 12.8
63 15.2 15.0 11.3 14.8
81 15.0 14.1 10.9 14.6
82 22.8 21.2 14.0 21.4 Legend:
89 21.3 14.7 0.0 19.3 Below standard
Standard 18.1 17.7 15.0 17.6 No Service
15
7.a
Boardings per Revenue Hour by Time Period(July 01, 2018 - Sept. 30, 2018)
Local Routes
SATURDAYROUTE AM BASE Evening Late Night TOTAL
10 11.5 22.5 24.0 10.8 20.112 0.0 16.1 13.3 0.0 16.0 Saturday Service Periods27 4.4 17.9 10.1 0.0 13.6
31 7.5 12.6 17.6 0.0 11.3 AM 12:00 AM to 9:00 AM
35 8.2 13.4 13.1 0.0 12.7 Base 9:00 AM to 6:00 PM
40 8.0 8.8 10.8 0.0 8.7 Evening 6:00 PM to 10:00 PM
46 0.0 11.1 0.0 0.0 11.3 Late night 10:00 PM to 12:00 AM
47 9.1 13.3 15.6 0.0 13.0
54 10.9 15.3 18.8 0.0 14.9
57 12.3 14.2 18.5 0.0 14.5
63 7.9 11.8 12.0 0.0 10.8
81 0.0 7.9 0.0 0.0 7.9
82 8.5 13.8 19.2 0.0 13.2
Standard 15.0 15.0 15.7 15.0 15.0
SUNDAYROUTE AM BASE Evening Late Night TOTAL
10 10.3 24.4 20.3 16.0 20.212 0.0 19.5 8.3 0.0 18.527 0.0 15.0 0.0 0.0 11.8 Sunday Service Periods
31 0.0 10.5 0.0 0.0 9.7 AM 12:00 AM to 9:00 AM
35 16.3 14.5 12.9 0.0 12.3 Base 9:00 AM to 6:00 PM
40 10.3 11.5 9.2 0.0 9.4 Evening 6:00 PM to 10:00 PM
47 40.5 20.6 15.2 0.0 16.3 Late night 10:00 PM to 12:00 AM
54 10.8 14.0 14.0 0.0 13.1
57 14.7 13.4 16.7 0.0 12.9
63 12.0 10.1 0.0 0.0 9.7 Legend:
82 12.4 16.5 16.7 0.0 13.3 Below standard
Standard 15.9 15.5 15.0 16.0 15.0 No Service
16
7.a
Boardings per Revenue Hour by Time Period(July 01, 2018 - Sept. 30, 2018)
Community Bus
WEEKDAYROUTE PEAK MIDDAY OFF PEAK TOTAL
13 10.7 11.2 2.8 10.6 Weekday Service Periods14 8.0 9.6 0.0 9.0 Peak 5:00 AM to 9:00 AM &16 16.3 7.1 0.0 15.6 2:30 PM to 6:30 PM17 7.5 9.4 0.0 8.8 Midday 9:00 AM to 2:30 PM18 13.0 13.5 3.0 13.1 Off Peak 6:30 PM to 5:00 AM19 10.9 17.1 8.5 13.1
32 16.6 13.1 13.9 14.9
34 9.8 9.0 0.0 9.1
37 12.7 13.9 4.4 12.6
39 15.3 26.6 20.0 18.4
42 12.8 13.1 12.8 12.9
45 12.9 11.8 23.0 12.7
48 14.1 12.2 5.5 13.1
49 8.7 10.2 3.6 9.0
65 12.1 15.0 10.2 13.2
88 18.4 10.8 0.0 14.8
200 0.0 0.0 9.1 9.1
201 33.1 22.8 25.1 29.1
Standard 15.0 15.0 15.0 15.0
17
7.a
Boardings per Revenue Hour by Time Period(July 01, 2018 - Sept. 30, 2018)
Community Bus
SATURDAYROUTE AM BASE Evening Late Night TOTAL Saturday Service Periods
14 0.0 9.6 0.0 0.0 9.7 AM 12:00 AM to 9:00 AM17 0.0 4.9 0.0 0.0 4.9 Base 9:00 AM to 6:00 PM19 14.7 11.7 0.0 0.0 11.9 Evening 6:00 PM to 10:00 PM32 9.5 12.5 0.0 0.0 12.0 Late night 10:00 PM to 12:00 AM39 4.4 11.6 16.3 0.0 9.9
42 1.8 7.1 0.0 0.0 6.2
48 6.1 7.9 8.3 0.0 7.7
49 9.9 9.0 4.5 0.0 8.8
200 0.0 0.0 0.0 4.9 4.9
Standard 15.0 15.0 15.0 15.0 15.0
SUNDAYROUTE AM BASE Evening Late Night TOTAL Sunday Service Periods
14 36.0 8.9 0.0 0.0 9.0 AM 12:00 AM to 9:00 AM17 0.0 6.0 0.0 0.0 6.0 Base 9:00 AM to 6:00 PM19 8.7 12.9 0.0 0.0 12.7 Evening 6:00 PM to 10:00 PM39 0.0 21.5 0.0 0.0 21.2 Late night 10:00 PM to 12:00 AM48 0.0 6.9 0.0 0.0 6.8
49 0.0 8.5 0.0 0.0 8.4 Legend:
200 0.0 0.0 0.0 6.6 6.6 Below standardStandard 15.0 15.0 15.0 15.0 No Service
18
7.a
Boardings per Revenue Hour by Time Period(July 01, 2018 - Sept. 30, 2018)
Limited Stop Routes
WEEKDAY Weekday Service PeriodsROUTE PEAK Peak 5:00 AM to 9:00 AM &
304 13.8 2:30 PM to 6:30 PM321 11.3328 8.9 Legend:330 11.2 Below standard
Standard 15.0 No Service
19
7.a
Boardings per Revenue Hour by Time Period(July 01, 2018 - Sept. 30, 2018)
Light Rail
WEEKDAYROUTE PEAK MIDDAY OFF PEAK TOTAL Weekday Service Periods
900* 48.7 45.0 30.8 43.0 Peak 5:00 AM to 9:00 AM &901* 88.7 73.4 46.9 74.8 2:30 PM to 6:30 PM902* 69.6 45.0 43.5 56.9 Midday 9:00 AM to 2:30 PM
Standard 69.0 54.5 40.4 58.2 Off Peak 6:30 PM to 5:00 AM
SATURDAYROUTE AM BASE Evening Late Night TOTAL Saturday Service Periods
900* 19.2 37.7 28.5 0.0 33.5 AM 12:00 AM to 9:00 AM901* 29.2 48.2 48.1 37.2 43.3 Base 9:00 AM to 6:00 PM902* 28.7 51.0 47.9 44.7 44.9 Evening 6:00 PM to 10:00 PM
Standard 25.7 45.6 41.5 41.0 40.6 Late night 10:00 PM to 12:00 AM
SUNDAYROUTE AM BASE Evening Late Night TOTAL Sunday Service Periods
900* 26.1 37.7 29.1 0.0 34.5 AM 12:00 AM to 9:00 AM901* 30.7 50.7 42.3 26.6 43.9 Base 9:00 AM to 6:00 PM902* 30.9 57.7 33.6 23.4 45.2 Evening 6:00 PM to 10:00 PM
Standard 29.2 48.7 35.0 25.0 41.2 Late night 10:00 PM to 12:00 AM
* Line 900 is the Ohlone/Chynoweth – Almaden line. Legend:
* Line 901 is the Alum Rock to Santa Teresa Line. Below standard
* Line 902 is the Mountain View to Winchester Line. No Service
20
7.a
Paratransit Operating
Statistics
7.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITYPARATRANSIT OPERATING STATISTICSFY2019 First Quarter Transit Operations Performance Report
(July 01, 2018 - Sept. 30, 2018)
FY2019Q1
FY2018Q1 Percent Change
RIDERSHIP Clients 117,842 119,623 -1.5% Attendants 12,543 13,705 -8.5% Companions 1,346 2,146 -37.3%
Total 131,731 135,474 -2.8% Avg. Weekday Trips 1,801 1,857 -3.0% Avg. Weekday Client Trips 1,812.95 1,648 10.0% Active Clients 4,942 4,830 2.3% Avg. Trips per Client 23.8 24.8 -3.7% PREMIUM SERVICES Same Day Trips 280 1,266 -77.9% Second Vehicles 79 266 -70.3% Open Returns 31 33 -6.1% Service Area Surcharge Trips 846 832 1.7% Subscription Trips 47,280 32,874 43.8%
Total 48,516 35,271 37.6% LEVEL OF SERVICE Revenue Miles 1,445,649 1,320,752 9.5% Revenue Hours 85,088 78,868 7.9% Maximum Vehicles Operated (non-Taxi) 154 137 12.4% Total Vehicles Available (non-Taxi) 204 224 -8.9% ELIGIBILITY Total Data Cards Received 2,259 1,886 19.8% New Applicants Certified 753 777 -3.1% New Applicants Denied 77 63 22.2% Clients Recertified 559 829 -32.6% Clients Denied Recertification 9 25 -64.0% Total Eligibility Assessments 1,621 1,713 -5.4% Denial Rate 5.3% 5.1% 3.3% EXPENSES AND REVENUESEXPENSES Contracted Fixed Costs 317,723$ 363,000$ -12.5% Contracted Variable Costs 276,207$ 172,582$ 60.0% Contracted Eligibility Certification Costs 841,188$ 675,363$ 24.6% Contracted Supplemental Trip Costs ** 3,058,410$ 4,154,083$ -26.4% Contracted Fare Processing * 504,923$ 609,465$ -17.2% VTA Administration & Oversight - Labor Costs * 48,927$ -$ NA Fleet Maintenance and Fuel ** 587,764$ 678,510$ -13% Hardware, Software, Utilities, phone and data services ** 131,235$ 22,812$ 475% ADA-Facilities, Maintenance & Utilities ** 92,131$ 60,431$ 52%
Total Operating Costs $5,858,508 $6,736,245 -13.0%REVENUES $467,866 $506,472 -7.6% Client Fare $32,193 $27,596 16.7% Other Fare $0 $534,068 -100.0%
Non-VTA Broker Revenue $500,059 $1,068,135 -53.2%
Total Revenue $500,059 $1,068,135 -53.2%Net Expenses 5,358,449$ 5,668,110$ -5.5%
Fare Recovery Rate 8.5% 15.9% -46.2% COST PER PASSENGER TRIP (excludes capital expenses) Total Reported Costs $44.47 $49.72 -10.6% Fare Revenue $3.96 $3.96 0.0%
Net Cost $40.51 $45.76 -11.5%
PERFORMANCE Passengers / Revenue Hour 1.5 1.9 -18.5% Passenger Miles / Passenger Trip 12.7 10.1 26.1% On-Time Performance 89.1% 88.0% 1.2%*New expense included in total paratransit costs** New Paratransit Cost Structure previously accounted for in Fixed and Variable Costs. Key Cost Elements Broken Out Separately.
21
7.a
Glossary
7.a
GLOSSARY
AVERAGE FARE PER BOARDING – This measure is calculated by dividing the total fare revenue (cash, passes, tokens, and Eco Pass) by total boarding riders. It measures the rider contribution towards the farebox recovery ratio. AVERAGE WEEKDAY BOARDINGS – The average number of persons who board the transit system on a day that normal weekday revenue service is provided. BOARDINGS PER REVENUE HOUR – This is a productivity measure comparing the number of boardings to the number of revenue hours operated. It measures service utilization per unit of service operated. The Revenue hours is the time when a vehicle is available to the general public to carry passengers. This will include layover but exclude deadheads. BRT (BUS RAPID TRANSIT) ROUTES – The BRT route is a multi-component transit improvement that includes preferential treatment at traffic signals to improve bus operating speed and on-time performance. It operates in mixed traffic and relies on priority for buses at traffic signals to provide much of its time advantage over conventional buses. COMMUNITY BUS ROUTES – Community Bus service is characterized by weekday frequencies of 30 minutes or more in both the peak and midday periods. Service span is 14 hours or less, usually 12 hours for weekdays. Community Bus services operate seven days per week or less. These routes are defined as neighborhood-based circulator and feeder routes that travel within a limited area. CORE ROUTES – Core network routes are defined as bus routes or shared corridors that feature weekday frequencies of 15 minutes or less during the peak and midday periods and/or service spans of 18 hours or more. Core routes operate seven days per week. They typically travel on long distance corridors, which connect major trip generators such as universities, regional shopping malls and high-density housing and employment sites. Multiple core routes will sometimes operate on the same corridor where demand warrants, providing additional service frequency and transfer opportunities. Core network corridors are typically large arterial streets and intersect with freeways and expressways. DEADHEAD: Time during movement of a transit vehicle without passengers aboard, typically from the operating division to the start of the route. EXPRESS & LIMITED SERVICE ROUTES – Express routes generally operate during peak periods and are primarily commuter oriented. Midday, evening, and weekend service may be offered on regional express lines. Express routes emphasize direct service, use freeways and expressways to reduce travel time, and make few stops. Limited Service routes are characterized by limited stops. LAYOVER: Break the driver or the vehicle is given at the end of a trip before it starts operating its reverse route, or if the route is circular, before beginning its next trip LIMITED STOP ROUTES – Limited-stop service generally operates during peak periods and is primarily commuter oriented. Midday, evening, and weekend service may be offered on limited-stop lines. Limited-stop routes use major arterials, freeways, and/or expressways; and make fewer stops than grid routes, but more stops than express routes.
7.a
LOCAL ROUTES – Local network routes are defined as bus routes or corridors that feature weekday frequencies of thirty minutes or more during the peak and midday periods and/or service spans less than 18 hours. Local Network routes operate seven days per week or less. They typically travel on medium distance corridors, serving minor trip generators such as schools, hospitals and medium-density housing and employment. They also provide feeder service to the core network or to rail stations and transit centers. MILES BETWEEN CHARGEABLE ACCIDENTS – Safety measure that captures the number of total scheduled miles traveled between each occurrence of a preventable accident. A preventable accident is defined as accidents in which the transit driver is normally deemed responsible or partly responsible for the occurrence of the accident. MILES BETWEEN MECHANICAL SERVICE LOSS – Service quality measure capturing the number of total scheduled miles traveled between each mechanical breakdown that result in a loss of service to the public. SPECIAL SERVICE ROUTES – Special services routes only operate on certain days of the week or on a seasonal basis to address a specific service need. NATIONAL TRANSIT DATABASE (NTD) – The Federal Transit Administration's (FTA's) primary national database for statistics on the transit industry. Recipients of FTA’s Urbanized Area Formula Program (Section 5307) grants are required by statute to submit data to the NTD. Each year, NTD performance data are used to apportion over $4 billion of FTA funds to transit agencies in urbanized areas (UZAs). Annual NTD reports are submitted to Congress summarizing transit service and safety data. The NTD is the system through which FTA collects uniform data needed by the Secretary of Transportation to administer department programs. The data consist of selected financial and operating data that describe public transportation characteristics. The legislative requirement for the NTD is found in Title 49 U.S.C. 5335(a). ON-TIME PERFORMANCE – A reliability measure capturing the percentage of transit vehicles departing or arriving at a location on time. On-time performance is measured only for specific locations called timepoints for which a schedule is published. A bus transit vehicle is considered “on time” if it departs a location within three minutes before and five minutes after its published scheduled time. A light rail transit vehicle is considered “on time” if it departs a location within one minute before and three minutes after its published scheduled time. At the last timepoint location of a trip, early arrival is considered on-time. PASSENGER CONCERNS PER 100,000 BOARDINGS – A customer service measure that captures the number of passenger complaints/concerns per 100,000 boardings. This measure reports the amount of customer complaints received on the service that is attributed to an operating division. PEAK LOAD (Express) - The Express bus standard is 60 percent of the seated vehicle loading capacity (38 seats). This singular standard is needed due to the special characteristics of Express Bus lines where seat turnover is low. PERCENT SCHEDULED SERVICE OPERATED – This service reliability measure indicates the percent of service hours completed based on published schedule. A service is considered not completed when scheduled service hours are lost due to equipment failure, missed or late pull-outs, accidents/incidents, or natural causes.
7.a
PERSONAL TIME OFF (PTO) – This is defined as time off for non-scheduled absences such as: sick, industrial injury, FMLA (Family Medical Leave Act.), excused/unexcused leave, union business, and suspensions. REVENUE HOURS: Time when a vehicle is available to the general public to carry passengers. This will include layover but exclude deadhead. STANDARD (Boardings per revenue Hour): This is the average boardings per Revenue Hour and applies to Community Bus, Local, Core, Limited and Light Rail and is based on the Service Design Guidelines. The minimum standard is 15 boardings per revenue hour. TOTAL BOARDINGS – The total number of boarding riders using VTA directly operated bus service and light rail service. Riders are counted each time they board a bus or light rail vehicle.
7.a
Date: January 3, 2019
Current Meeting: January 17, 2019
Board Meeting: January 10, 2019
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transportation Mobility & Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Director - Planning & Programming, Chris Augenstein
SUBJECT: Transit Service Changes - January 14, 2019
FOR INFORMATION ONLY
BACKGROUND:
VTA implements transit service changes quarterly in January, April, July, and October. Major
service changes are typically planned for implementation in July to coincide with each fiscal
year, while minor service changes are planned for each quarter. Major service changes must be
submitted to the VTA Board of Directors for review and approval. For Title VI compliance
purposes, all major service changes also require that VTA staff perform a Service Equity
Analysis.
The following modifications are considered “major” service changes as adopted by the VTA
Board of Directors:
Establishment of a new transit line or service.
Elimination of a transit line or service.
Route change that impacts 25 percent or more of a line’s route miles.
Span of service or frequency changes affecting 25 percent or more of a line’s revenue
vehicle hours.
Series of changes on a single route which are included in the annual transit service plan
and cumulatively meet any of the above criteria.
Proposed changes that are anticipated to be controversial with a particular community or
interested parties based on public feedback.
Systemwide change concurrently affecting five percent or more of the total system
revenue hours.
Service change proposals that do not meet the criteria for major service changes are handled at
the staff level and are still subject to an appropriate level of community review and comment.
8
Page 2 of 3
DISCUSSION:
In June 2017, the VTA Board of Directors approved the Next Network Transit Service Plan, for
implementation coincident with the introduction of BART service at Milpitas and San Jose /
Berryessa stations. In the interim, quarterly transit service changes, such as this one, focus on
adjustments to VTA's current service to improve schedules and connections.
The following service changes will take effect on Monday, January 14, 2019:
Major Service Changes
No major service changes.
Minor Service Changes
1. Light Rail 900 Purple Line, 901 Blue Line, and 902 Green Line: weekday and
weekend schedules will be revised to accommodate additional running time. Train delays
have increased steadily due to increased traffic congestion and pedestrian activity on
sections of First Street and Tasman Drive.
2. Morgan Hill: The timepoint at Main & Hale will be moved to Main & Monterey. Buses
will remain on Main Street and no longer pull into an off-street bus stop at Main & Hale.
This change will impact:
Route 16 Morgan Hill Civic Center - Burnett Avenue
Route 68 Gilroy Transit Center - San Jose Diridon Transit Center
3. Downtown San Jose: The timepoint at San Fernando & 1st will be moved to San
Fernando & 2nd. This change will impact:
Route 63 Almaden Expressway & Camden - San Jose State University
Route 64 Almaden Station - McKee & White
Route 65 Kooser & Blossom Hill - 13th & Hedding
Route 81 Moffett Field/Ames Center - San Jose State University
DASH Downtown Area Shuttle
4. Express 181 San Jose Diridon Transit Center - Warm Springs BART: One additional
weekday afternoon bus will be added to improve reliability and capacity. Weekday and
weekend schedule changes will be made in January in advance of a BART schedule
change that will take effect on February 11, 2019. There will be additional changes that
will take effect on February 11 when BART changes their evening frequency to every 24
minutes (currently every 20 minutes).
5. Many bus routes will have minor schedule changes to weekday, Saturday, and
Sunday service in order to improve running times, on-time performance, transfers, and
operator layovers.
6. Cost increases due to declining speeds. As transit speeds continue to decline due to
increased traffic congestion and pedestrian activity, additional transit vehicles must
8
Page 3 of 3
occasionally be added in order to maintain service frequency. Two transit vehicles will be
added this quarter:
One additional light rail train will be added to Route 902 Green Line on weekends
(necessary to maintain 30-minute service frequency). The additional train is
required because of increased delays to trains due to traffic congestion (trains
waiting at red lights) and pedestrian activity, particularly along Tasman Drive and
North First Street.
One additional Saturday bus will be added to the combination of Route 72 & 73
to maintain service frequency in light of declining speeds due to increased traffic
congestion and buses waiting at red lights.
Subsequent service change memos will also include a discussion (including fiscal impact)
of specific instances when buses or trains are added due to declining transit speeds. The
continued decline in transit speeds and resulting cost increases point to the critical need to
speed up transit, which is the subject of VTA’s recently-initiated Fast Transit program.
FISCAL IMPACT:
The estimated annual cost of the additional buses and trains added to compensate for declining
transit speeds due to increased traffic congestion and pedestrian activity is approximately
$185,000 per year. Appropriation for these expenditures is available in the Adopted FY19 VTA
Transit Fund Operating Budget.
STANDING COMMITTEE DISCUSSION/RECOMMENDATION:
This item was reviewed as part of the Safety, Security, and Transit Planning and Operations
(SSTPO) Committee’s consent agenda on December 21, 2018. The Committee recommended
placing this item on the Board’s consent agenda for January 10, 2019.
Prepared By: Jay Tyree
Memo No. 6620
8
Date: January 9, 2019
Current Meeting: January 17, 2019
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transportation Mobility & Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Chief Operating Officer, Inez Evans
SUBJECT: Chief Operating Officer's Report
FOR INFORMATION ONLY
BACKGROUND:
The Chief Operating Officer provides the Committee for Transportation Mobility and
Accessibility (CTMA) with an update at each meeting on items of relevance to the Committee.
DISCUSSION:
College Football Championship Game
Levi’s Stadium hosted the College Football Championship game on Monday, January 7, 2019.
There were several events in Downtown San Jose the week prior to the big game. Concerts were
scheduled on Friday, January 4th, Saturday, January 5th, and Sunday, January 6th at the Discovery
Meadow near the Children’s Discovery Center. VTA had been preparing for these week long
events a year in advance. VTA saw light ridership on Friday and no impact to ridership on
Saturday. The concert on Sunday was cancelled due to weather. VTA deployed 12
Ambassadors in Downtown San Jose each night of the concerts. On game day, VTA transported
13,830 passengers using 100% of the available Light Rail fleet. 52 Ambassadors were deployed
along the Light Rail corridor and around Levi’s Stadium to help customers navigate their way to
the game answering questions about fares, game time, schedules, etc. At the end of the game,
VTA successfully cleared the stadium in 50 minutes. We received numerous compliments on
our service throughout the week for the various events and the big game.
9
Page 2 of 2
Overhead Lineworker (OHLW) Apprentice Graduation
On Thursday, November 29, 2018 all six of the enrolled apprentices in VTA’s first Overhead
Lineworker (OHLW) Apprenticeship Program were honored at a graduation ceremony at the
VTA River Oaks Auditorium. These six employees completed the 18 months, 2,000-hour
requirement and passed all of the performance requirements needed to become an Overhead
Lineworker. Also recognized were the mentors who guided the OHLW Apprentices through
their training.
Along with VTA Staff and ATU Management, speakers at the event included Gary Knight,
Apprenticeship Consultant for DAS, Leandra Martin, VP for the Office of Instruction at Mission
College, and Supervisor Cindy Chavez, who is also a VTA Board Member. Congratulations to
our first six OHLW graduates!
Prepared By: Maria Soto
Memo No. 6501
9
Date: January 10, 2019
Current Meeting: January 17, 2019
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transportation Mobility & Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Board Secretary, Elaine Baltao
SUBJECT: 2019 CTMA Leadership Election Process: Conduct Elections
Policy-Related Action: No Government Code Section 84308 Applies: No
ACTION ITEM
RECOMMENDATION:
Conduct voting to determine the Committee's chairperson, first vice chairperson and second vice
chairperson for 2019.
BACKGROUND:
The Committee for Transportation Mobility & Accessibility (CTMA) bylaws require that the
committee elect from its membership a chairperson, first vice chairperson and second vice
chairperson annually to serve as the committee leadership for the upcoming calendar year. The
bylaws also provide that these positions serve one-year terms and are eligible for election to
multiple terms. Only voting members, not ex-officio or alternate members, are eligible to serve
in these positions. The elections for the CTMA chairperson and vice chairperson positions are
conducted during the committee’s first meeting of the calendar year (usually January), if
practical.
The duties of the chairperson are to preside at all meetings of the committee and represent the
committee before the Board of Directors. The duty of the first vice chairperson is to perform the
duties of the chairperson when that individual is absent. The duty of the second vice chairperson
is to perform the duties of the chairperson when neither the chairperson nor first vice chairperson
is present. It is the responsibility of all advisory committee chairpersons and vice chairpersons to
participate in periodic coordination meetings between themselves and the VTA Board leadership.
In addition, all committee leadership positions are normally requested to attend a brief training
and orientation session on advisory committee meeting management prior to the commencement
of their terms.
10
Page 2 of 3
DISCUSSION:
The election process for chairperson and vice chairperson is comprised of three distinct steps:
1. Appointing the nomination subcommittee
2. Presentation of the nomination subcommittee’s report
3. Conducting elections to select the chairperson and vice chairperson.
Each of these steps is normally conducted during the committee meeting.
Appointing the Nomination Subcommittee
The chairperson requests volunteers to serve on the nomination subcommittee, which is typically
comprised of two or three members. If there are no volunteers or an insufficient number, it is the
chairperson’s prerogative to appoint committee members to serve on it. It is required that the
committee votes to approve the appointment of members to the nomination subcommittee. This
step normally takes place two meetings prior to conducting the elections.
The nomination subcommittee identifies members interested in serving as the chairperson or vice
chairpersons. This is done by soliciting nominations from members, either for themselves or
other members, and is done at a time other than during the committee meeting. Additionally, it
is the nomination subcommittee’s responsibility to determine that members who have been
nominated are willing to serve. The nomination subcommittee may also make a
recommendation on candidates for each position.
At its November 2018 meeting, the CTMA approved the appointment of members Aaron
Morrow and Tricia Kokes to serve on the nomination subcommittee.
Report from the Nomination Subcommittee
For most advisory committees, at the meeting immediately preceding the elections the
nomination subcommittee provides a verbal report to the committee identifying committee
members who have confirmed their willingness to serve. This establishes the initial list of
candidates for the elections to be held at the next meeting. The nomination subcommittee is
automatically discharged when its report is formally presented to the committee. No action is
required of the committee other than to receive the report.
Since the CTMA meets every other month and not in December, the practice is for the
nomination subcommittee to submit its report in writing. As such, the nomination
subcommittee’s report was emailed to CTMA members on January 10, 2019 in order to provide
the membership sufficient time to consider the candidates. This report indicated that the
following individuals had been nominated and had confirmed their willingness to serve:
Chairperson: Christine Fitzgerald and Aaron Morrow
First Vice Chairperson: Christine Fitzgerald and Aaron Morrow
Second Vice Chairperson: Tricia Kokes
10
Page 3 of 3
The nomination subcommittee’s report and its recommendation for each position, if any, will be
reiterated immediately prior to the elections being conducted.
Election of Chairperson and Vice Chairperson
These elections, which are held at the bylaw-specified meeting whenever possible, are conducted
for the chairperson and vice chairperson positions individually and in sequence. Immediately
preceding the vote, the report on individuals that have indicated willingness to serve in each
position will be given and the chairperson will verify that the named candidates still wish to be
considered for the position. The chairperson will next ask whether there are any nominations
from the floor, then close the nomination process to establish the final list of candidates for each
position. For instances of multiple candidates for the same position, the order of voting for each
candidate is alphabetically by last name.
The CTMA requires the affirmative vote of eight members to elect each leadership position. The
term of office for the 2019 CTMA committee leadership commences immediately following the
completed vote for each specific office.
ALTERNATIVES:
There are no alternatives since the Committee’s bylaws specify the election process
FISCAL IMPACT:
There is no fiscal impact.
Prepared by: Board Office
Memo No. 6803
10
Date: January 9, 2019
Current Meeting: January 17, 2019
Board Meeting: February 7, 2019
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transportation Mobility & Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Director - Planning & Programming, Chris Augenstein
SUBJECT: Draft 2016 Measure B Innovative Transit Service Models Competitive Grant
Program Framework
Policy-Related Action: No Government Code Section 84308 Applies: No
ACTION ITEM
RECOMMENDATION:
Recommend that the VTA Board of Directors approve draft framework of the proposed 2016
Measure B Innovative Transit Service Models Competitive Grant Program.
BACKGROUND:
On November 8, 2016, the voters of Santa Clara County approved by over a two-thirds vote
Measure B, a 30-year, ½ cent sales tax measure supporting transportation projects and services.
2016 Measure B includes $500 million (in 2017 dollars) for Transit Operations. The Transit
Operations Program Category is divided into the following four subcategories:
Enhance Core Frequent Network
Support new/innovative transit service models to address first/last mile connections.
Expand mobility services and affordable fare programs for seniors, disabled, students and
low income riders.
Improve amenities at bus stops to increase safety, security and access, as well as on-going
maintenance.
At their October 2017 meeting, the VTA Board of Directors approved the Transit Operations
Program Category Guidelines, which directed the Innovative Transit Service Models Program to
support goals to address first/last mile connections. Strategies to support this subcategory may
11
Page 2 of 4
include competitive grant programs to help fund services operated by local jurisdictions, utilize
excess paratransit capacity, and other programs that encourage investments in local service. The
Transit Operations Program Category Guidelines are included as Attachment A.
The VTA Board adopted allocation for the Innovative Transit Service Models subcategory is $3
million for FY18 & FY19. VTA staff are proposing to continue this level of funding in the FY20
& FY21 budget. If approved by the VTA Board in June as part of VTA's FY20 & FY21
budgets, this would provide a four-year total allocation of $6 million.
DISCUSSION:
In order to address the charge of the Board of Directors, VTA will develop a competitive
Innovative Transit Service Models Grant program - to support the goals of the Innovative Transit
Service subcategory. A draft framework for the proposed Innovative Transit Service Models
Grant Program was developed using the language of the 2016 Measure B Transit Operations
subcategory and proposes competitive grant funds, available to Member Agencies, for the
operation of innovative services that address first/last mile connections, as well as for capital
costs directly associated with those operations.
The draft framework was initially presented to the VTA Technical Advisory Capital
Improvement Program Working Group (CIPWG) in fall 2017 for discussion. The presentation
included a robust discussion on the elements of the framework and concluded with Member
Agencies discussing the types of projects or programs the grant could potentially fund.
The following elements of the framework will be the basis of the criteria of the competitive grant
program:
Innovative service/business model - The project includes an innovative aspect in project
delivery including, but not limited to, unique partnership and funding arrangements;
flexible models of transit service delivery; technical capabilities such as integrated
payment systems, incentives for traveler choices, mobile applications, on-demand
software, and/or real time transit data.
Provides first/last mile connections to existing frequent transit - The project improves
connections between major, frequent transit stations/stops and residential areas,
employment areas, or major activity centers.
Serves vulnerable/transit dependent populations - The project cost effectively ensures
equal access is provided for individuals with disabilities, low incomes, and the elderly.
The project is located in an area benefitting individuals belonging to one or more of these
vulnerable population groups.
Service is affordable - The project provides a level of subsidy to maintain affordability
for customers. The project also considers protections against “surge pricing,” a concept
made popular with ride hailing services that increases costs for customers to ride during
periods of high demand.
11
Page 3 of 4
Serves underserved market - The project provides new or supplementary transit service
to an area that has little or no frequent transit service. The project may also target new
markets currently not served such as specific commute patterns and/or early morning/late
night service.
Project readiness - The project has completed a feasibility study or similar analysis to
provide the basis for project implementation. Project funding has been identified and
local match funding has been secured. The project is supported in existing transportation
documents and/or policies. The project must be implemented within one (1) year of grant
award.
Level of local contribution - Project commits to more than 10% of total project costs
from non-2016 Measure B sources.
Cost effectiveness - The project demonstrates reasonableness in costs per trip in relation
to the subsidy provided. Project must include ridership projections for new transit
services.
While programs can target specific populations (e.g. school children, seniors, people with
disabilities, etc.), all programs must serve the general public.
Next Steps
With the development of the draft framework, staff is looking for the VTA Board of Directors’
approval on the direction of the draft Innovative Transit Service Models Grant Program. After
approval of the proposed grant program framework, staff will develop project scoring criteria,
based on the elements of the framework, and guidelines with consultation and input from the
Capital Improvement Program Working Group (CIPWG), advisory committees and other
stakeholders throughout spring 2019.
The draft Innovative Transit Service Models Grant Program will be brought back to the
appropriate committees in summer 2019 for review and input prior to final approval from the
VTA Board of Directors. A call for projects, anticipated in late summer/early fall 2019, will be
held after Program approval.
FISCAL IMPACT:
There is no fiscal impact to VTA associated with the approval of the draft framework of the
proposed 2016 Measure B Innovative Transit Service Models Competitive Grant Program as the
FY18 & FY19 allocation for this subcategory has already been approved. However, should the
Board of Directors choose not to approve the draft framework, development and distribution of
the competitive grant program will be delayed, pending a favorable outcome of the pending
lawsuit.
Prepared by: Jane Shinn
Memo No. 6128
11
Page 4 of 4
ATTACHMENTS:
MT6128_AttachmentA (PDF)
11
Page 1 of 3
Transit Operations Program Guidelines Definition from Resolution No. 2016.06.17 The revenue from this program category will provide additional funds specifically for bus operations to serve vulnerable, underserved, and transit dependent populations throughout the county. The goals of the program category are to increase ridership, improve efficiency, enhance mobility services for seniors and disabled, and improve affordability for the underserved and vulnerable constituencies in the county. As VTA considers modifications to bus operations and routes to improve ridership and efficiencies, these funds may also be utilized to maintain and expand service to the most underserved and vulnerable populations. The funds may be used to increase core bus route service frequencies, extending hours of operations to early morning, evenings and weekends to improve mobility, safe access and affordability to residents that rely on bus service for critical transportation mobility needs. Attachment D describes the list of Candidate Projects and Programs. Total Funding
$500 million in 2017 dollars. Distribution
VTA anticipates that allocations will be programmed based upon the total allocation for the Transit Operations Program contained in 2016 Measure B divided by the number of years in the measure.
Future allocations will vary depending upon the amount of sales tax revenue collected.
The Transit Operations Program Area funding will be allocated for the following four programs identified in 2016 Measure B Attachment D:
o Enhance Frequent Core Bus Network by increasing core bus route service frequencies, and expanding or adding additional evening, late night and weekend service.
o Expand mobility services and affordable fare programs for seniors, disabled, students and low‐income riders.
o Support new/innovative transit service models to address first/last mile connections and transit services for the transit dependent, vulnerable populations and paratransit users that is safe and accountable.
o Improve amenities at bus stops to increase safety, security and access with lighting and access improvements.
11.a
Page 2 of 3
The proposed allocations for the four categories are as follows:
2016 Measure B Transit Operations Program Area Area Funding Allocation (Proposed)
Frequent Core Bus Network 73%
Innovative Mobility Models & Programs 8%
Fare Programs 15%
Bus Stop Amenities 4%
Implementation For FY18 & FY19 Budget Allocation:
The Enhanced Frequent Core Bus Network will directly fund VTA’s core bus network of services increasing core bus route service frequencies, and expanding or adding evening, late night and weekend service.
The Fare Programs will fund the Transit Assistance Program (TAP) and reduced fares for youth.
The Innovative Transit Models Program will support goals to address first/last mile connections. Strategies may include competitive grant programs to help fund services operated by local jurisdictions, utilize excess paratransit capacity, and other programs that encourage investments in local service.
The Bus Stop Amenities Program will directly fund improvements at VTA’s bus stops. The bus stop improvements will be prioritized based on VTA’s Transit Passenger Environment Plan and ongoing maintenance needs.
Six to 12 months into the implementation of the Next Network, staff will have ridership data available to evaluate potential increases to the ridership hours where we see higher demand for service. To meet our commitment as expressed in 2016 Measure B and in collaboration with the public, VTA will make increased investments in service hours in the system focusing on those areas where we see the greatest demand by transit dependent populations. VTA will consider the potential for further reducing the fares for seniors and youth with a requested goal of free rides.
Criteria
Only projects and programs currently listed on 2016 Measure B Attachment D are eligible.
Requirements
For potential competitive grants for the Innovative Transit Models Program: o Reporting requirements will be detailed in agreements executed with VTA
for project funding.
11.a
Page 3 of 3
o All applications must include a delivery schedule. o Funds will be available on a reimbursement basis.
VTA Complete Streets reporting requirements will be required for all capital improvements projects.
All collateral material will be required to display a 2016 Measure B logo.
11.a
Date: January 10, 2019
Current Meeting: January 17, 2019
Board Meeting: n/a
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transportation Mobility & Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Chief Operating Officer, Inez Evans
SUBJECT: Paratransit Privacy Policy
FOR INFORMATION ONLY
BACKGROUND:
Santa Clara Valley Transportation Authority (VTA) provides a paratransit service to eligible
individuals with disabilities who cannot use conventional public transit service due to their
physical, visual or cognitive abilities. In order to provide this service, VTA may request that
individual paratransit riders voluntarily provide Paratransit Personal and Health Information
(“PPHI”). This Policy will serve as guidance to VTA for the use and handling of PPHI obtained
through VTA’s Paratransit Division.
DISCUSSION:
This Paratransit Privacy Policy has been updated by utilizing a specific, VTA-created term that
has been created to accurately capture the specific types of information that the Paratransit
Division collects. This updated Policy also clarifies how VTA uses that information to provide
effective paratransit service to our riders.
Please refer to Attachment A for the updated Paratransit Privacy Policy. The Committee for
Transportation Mobility & Accessibility received the draft Paratransit Privacy Policy at its
meeting on May 10, 2018 and had a detailed discussion regarding several elements of the policy.
The CTMA requested that the updated Paratransit Privacy Policy be brought back to the CTMA
for further discussion.
Prepared By: Suet Nguyen
Memo No. 6668
12
POLICY Document Number:
Paratransit Privacy Policy Version Number: 1
Date: MM/DD/YYYY
Original Date:
MM/DD/YYYY
Revision Date:
MM/DD/YYYY Page 1 of x
1. Purpose:
Santa Clara Valley Transportation Authority (VTA) provides a paratransit service to eligible
individuals with disabilities who cannot use conventional public transit service due to their
physical, visual or cognitive abilities. In order to provide this service, VTA may request that
individual paratransit riders and applicants voluntarily provide or allow VTA to access
Personally Identifiable Information (PII)Paratransit Personal and Health Information
(“PPHI”).1 This Policy will serve as guidance to VTA for the use and handling of PPHIPII.
2. Scope:
This Policy applies to VTA Board Members and employees, as well as any of VTA’s
consultants, contractors, and or agents.
1 Although there are many state and federal health and medical privacy laws that give individuals the right to keep
health information private, there is no statutory or regulatory definition that specifically addresses the type of
personal health information that is collected for paratransit purposes. Thus, the term “Paratransit Personal and
Health Information” is a specific term that VTA has created to accurately capture the specific type of information
that VTA’s Paratransit Division collects from its paratransit riders.
There are other, well-known data privacy terms that exist but, as set forth below, those terms are not appropriate
terms to adopt for use in the paratransit context.
There is a term called “Protected Health Information (PHI),” but that term is not appropriate in the paratransit
context because that is a specific term used for HIPAA purposes. VTA is not subject to HIPAA because it is not a
“covered entity” nor is it a “business associate” of a “covered entity.” A transit agency is subject to HIPAA only if
the transit agency meets HIPAA’s definition of a business associate (or is a subcontractor of a business associate
subject to HIPAA) under 45 C.F.R. § 164.504(e)(2) of the HIPAA regulations. As of this writing, VTA’s
Paratransit service is not operating as a “business associate” to a “HIPAA-covered entity.” Thus, classifying the
information that VTA collects in our Paratransit operations as “PHI” would not be an appropriate use of the term
“PHI.”
There is another term called “Personally Identifiable Information (PII)” that relates to privacy, but that term is a
consumer privacy law that pertains to data protection in the digital space (i.e., how companies collect, use, and sell
consumer data). As such, “PII” is not appropriate in the paratransit context.
Finally, under California Civil Code 1798.3, there is also the term “Personal Information” which is defined as “any
information that is maintained by an ‘agency’ that identifies or describes an individual, including, but not limited to,
his or her name, social security number, physical description, home address, home telephone number, education,
financial matters, and medical or employment history. It includes statements made by, or attributed to, the
individual.” However, per California Civil Code 1798.3 (b)(4), “agency” shall not include, a “local agency,” as that
term is defined in subdivision (a) of Section 6252 of the Government Code. Because VTA falls under the
definition of “local agency,” the definition of “Personal Information” (as that term is defined under California Civil
Code 1798.3) does not apply to VTA. Thus, using the term “Personal Information” is not appropriate in the
paratransit context either.
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Formatted: Font: Times New Roman, 10 pt, Font color:
Auto, Pattern: Clear
Formatted: Font: Times New Roman, 10 pt, Font color:
Auto, Pattern: Clear
Formatted: Font: Times New Roman, 10 pt, Font color:
Auto, Pattern: Clear
Formatted: Font: Times New Roman, 10 pt, Font color:
Auto, Pattern: Clear
Formatted: Font: Times New Roman
12.a
POLICY Document Number:
Paratransit Privacy Policy Version Number: 1
Date: MM/DD/YYYY
Original Date:
MM/DD/YYYY
Revision Date:
MM/DD/YYYY Page 2 of x
3. Responsibilities:
All VTA Board Members and employees, as well as any VTA consultants, contractors
and or agents are responsible for ensuring compliance with this Policy.
The Office of the General Counsel is responsible for responding to requests for PPHI PII
made under the California Public Records Act.
VTA Operations’ Chief Operating Officer and Regional Transportation Services Manager
are responsible for authorizing staff access to PPHI PII for business purposes. VTA limits
employee access to rider information to those who have a business reason to know this
information.
4. Policy:
VTA will only gather PPHI PII through lawful means, and will limit the collection of
PPHI PII to what is relevant and necessary to provide effective paratransit service.
VTA will only obtain PPHI PII that is voluntarily provided by the paratransit rider or
applicant, or that the paratransit rider or applicant has allowed VTA to access.
VTA will only use PPHI for PII for services requested , to provide information regarding
VTA services or for any other legitimate business need. For example, information
collected is used to:
o Process the rider’s application for paratransit service
o Process requests such as updates to address, emergency contact information, and
mobility devices
o Schedule service
o Keep the rider informed by issuing notifications of expiration of eligibility, ID
cards, and policy updates
VTA will not sell or rent PPHI PII to any third party.
VTA will only disclose PPHI PII as required by law or if VTA has a good-faith belief
that disclosure is necessary to (a) comply with a current judicial proceeding, a court order
or legal process served on VTA, or (b) protect or defend VTA’s rights, property and other
interests.
Formatted: Font: Bold, Italic
Formatted
Formatted: Font: Bold, Italic
Formatted: Font: Bold, Italic
Formatted: Font: Bold, Italic
Formatted: Bulleted + Level: 1 + Aligned at: 0.25" +
Indent at: 0.5"
Formatted: Font: Italic
12.a
POLICY Document Number:
Paratransit Privacy Policy Version Number: 1
Date: MM/DD/YYYY
Original Date:
MM/DD/YYYY
Revision Date:
MM/DD/YYYY Page 3 of x
VTA will store, manage, and maintain PPHI paper and electronic data as a critical record
and will manage and dispose of any PPHI record pursuant to VTA’s records management
policy. In the normal course of business, VTA will not directly store or retain customer
credit card information except in the customer’s secure account maintained by the credit
card processor. If in the process of providing customer support during a transaction,
customer credit card information was provided to VTA, VTA will not retain the credit
card information.
5. Definitions:
Personally Identifiable InformationParatransit Personal and Health Information
(PPHIPII): For purposes of this Policy, Paratransit Personal and Health Information PII
means an individual’s first name or first initial and last name in combination with any one or
more of the following data elements:
Home address
Phone Number.
Work Address
Social security number.
Driver’s license number or California identification number.Physical Description
Health/Account number or credit care or debit card number in combination with any
required security code, access code, or password that would permit access to an
individual’s financial account.
MMedical Iinformation (For example, this may include information provided to VTA to
determine eligibility as well as information from an outside source, such as a physician
regarding health history or treatment status.)
Eligibility Start Date.
Health insurance information.Origin and Destination Trip Information
Most-Frequented Destinations
Mobility Aid Information (e.g., oxygen tank, wheelchair)
Whether the rider has a service animal
Whether the rider has vision issues
Whether the rider travels with a personal care attendant
Whether the rider may be left alone
Whether a rider is able to climb steps and thus requires boarding assistance
PPHI PII also may include a user name or email address, in combination with a password or
security question and answer that would permit access to an online account.
6. Summary of Changes:
Formatted: Underline, Font color: Text 1
Formatted: Bulleted + Level: 1 + Aligned at: 0.25" +
Indent at: 0.5"
Formatted: Font: Bold
Formatted: Font: Not Bold
12.a
POLICY Document Number:
Paratransit Privacy Policy Version Number: 1
Date: MM/DD/YYYY
Original Date:
MM/DD/YYYY
Revision Date:
MM/DD/YYYY Page 4 of x
N/A
7. Approval Information:
Prepared by Reviewed by Approved by
Inez Evans
Chief Operating Officer
Susana IndaCaroline Kim
Staff Attorney IIAssistant Counsel
Nuria I. Fernández
General Manager/CEO
Date Approved:
12.a
Date: November 8, 2018
Current Meeting: January 17, 2019
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transportation Mobility & Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Chief Operating Officer, Inez Evans
SUBJECT: Workplan Update
FOR INFORMATION ONLY
BACKGROUND:
Attached is the Committee for Transportation Mobility and Accessibility Workplan Update.
Prepared By: Aaron Vogel
Memo No. 6309
16
Legend:
A = Action
I = Information
D = Discussion
Short Title Doc ID CTMA 1/17 BOD
2/7
BOD
3/7
CTMA
3/14
BOD
4/4
CTMA
5/9
BOD
6/6
2019 CTMA Leadership Election Process: Conduct Elections 6803 A
Draft Innovative Transit Service Models Competitive Grant Program 6128 A A
Paratransit Privacy Policy - Further Discussion 6668 D
CTMA Workplan Update 6309 I
Chief Operating Officer's Report 6501 I
CTMA Referral Response (Verbal Report) MV Corrective Action +
Service Changes Impacts
6853 I
Transit Operations Performance Report - Q1 FY 2019 6764 I
Transit Speed Policy 6841 A A
Transit Operations Performance Report - Q2 FY 2019 6765 I
Transit Service Changes - April 8, 2019 6739 I I
2019 New Transit Service Plan TBD I
Committee for Transportation Mobility & Accessibility Work Plan
16.a