Committee(s) Dated: Planning and Transportation for decision Resource Allocation Sub Committee for information 30 April 2019 2 May 2019 Subject: Local Implementation Plan (LIP) Delivery Plan 2019/20 to 2021/22 Public Report of: Director of the Built Environment For Decision Report author: Samantha Tharme Department of the Built Environment Summary This report covers the provision of Transport for London funding to the City of London Corporation. It seeks approval for the formal adoption of the City Corporations Local Implementation Plan (LIP) Delivery Plan for 2019/20 to 2021/22 (Appendix 1). The LIP Delivery Plan and City of London Transport Strategy form the City Corporation’s third LIP. The LIP is a statutory document that sets out how the City Corporation will deliver the Mayor of London’s Transport Strategy. It must be adopted and submitted to TfL to enable the receipt of TfL funding over the next three years. The draft LIP Delivery Plan was approved by this committee in November 2018. Consultation on the LIP Delivery Plan ran alongside the Transport Strategy consultation. All comments received from TfL (Appendix 2) have been addressed in the final document. No other comments on the draft Delivery Plan were received. Recommendation Members are asked to: Approve the LIP Delivery Plan 2019/20 2021/22. Main Report Background 1. Under Section 159 of the Greater London Authority Act 1999, TfL is empowered to provide grants to London boroughs and the City for the provision of safe, efficient and economically viable transportation facilities and (or) services to, from or within Greater London.

Upload: others

Post on 01-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

Committee(s) Dated:

Planning and Transportation – for decision Resource Allocation Sub Committee – for information

30 April 2019 2 May 2019

Subject: Local Implementation Plan (LIP) Delivery Plan 2019/20 to 2021/22

Public

Report of: Director of the Built Environment

For Decision

Report author: Samantha Tharme – Department of the Built Environment

Summary This report covers the provision of Transport for London funding to the City of London Corporation. It seeks approval for the formal adoption of the City Corporation’s Local Implementation Plan (LIP) Delivery Plan for 2019/20 to 2021/22 (Appendix 1). The LIP Delivery Plan and City of London Transport Strategy form the City Corporation’s third LIP. The LIP is a statutory document that sets out how the City Corporation will deliver the Mayor of London’s Transport Strategy. It must be adopted and submitted to TfL to enable the receipt of TfL funding over the next three years. The draft LIP Delivery Plan was approved by this committee in November 2018. Consultation on the LIP Delivery Plan ran alongside the Transport Strategy consultation. All comments received from TfL (Appendix 2) have been addressed in the final document. No other comments on the draft Delivery Plan were received.

Recommendation Members are asked to:

• Approve the LIP Delivery Plan 2019/20 – 2021/22.

Main Report

Background 1. Under Section 159 of the Greater London Authority Act 1999, TfL is empowered to

provide grants to London boroughs and the City for the provision of safe, efficient and economically viable transportation facilities and (or) services to, from or within Greater London.

Page 2: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

2. The City of London Corporation’s Local Implementation Plan (LIP) is a statutory document that sets out how the City Corporation will support the delivery of the Mayor’s Transport Strategy (MTS). It must be adopted and submitted to TfL to enable the receipt of TfL funding over the next LIP 3-year period. The City of London Transport Strategy and LIP Delivery Plan will act as the City Corporation’s LIP.

3. There is good alignment between the Transport Strategy and the MTS, which seeks to improve London’s streets to make them healthy, inclusive and safe, provide a good public transport experience and support the delivery of homes and jobs.

LIP Delivery Plan 4. The LIP Delivery Plan 2019/20 to 2021/22 is attached in Appendix 1. This follows

a template provided by TfL and details the projects that will be funded in full or in part by TfL over the next three years.

5. The draft LIP Delivery Plan was approved by this committee in November 2018. Consultation the draft LIP Delivery Plan ran alongside the Transport Strategy consultation.

6. TfL provided minor comments on the draft LIP Delivery Plan. These have been

addressed in the final document and are summarised in Appendix 2. No other comments of the draft LIP Delivery Plan were received

7. The Delivery Plan has also been updated to reflect the City Corporation’s successful bid for £3.25 million of Liveable Neighbourhood funding to contribute to the cost of delivering transport and public realm improvements in the City Cluster.

8. Each year the City Corporation is required to separately submit an annual spending

submission. The Annual Spending Submission for 2020.21 will be submitted to this Committee and Resource Allocation Sub Committee at the appropriate time (usually autumn).

Corporate & Strategic Implications 9. The use of TfL grants will support the delivery of the City of London Corporate Plan,

and in particular the ‘People are safe and feel safe’ and ‘We are digitally and physically well connected and responsive’ priorities. The projects are also aligned with the draft Transport Strategy and the Department of Built Environment Business Plan.

Conclusion

10. The City Corporation’s LIP will consist of the City of London Transport Strategy and LIP Delivery Plan for 2019/20 to 2021/22. Subject to approval, both documents will be submitted to TfL to enable the receipt of funding over the next three years

Page 3: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

Background papers

• Draft LIP Delivery Plan 2019/20 to 2021/22 (Planning & Transportation Committee, 20 November 2018)

Appendices

• Appendix 1: Local Implementation Plan (LIP) Delivery Plan 2019/20 to 2021/22

• Appendix 2: TfL comments on draft LIP Delivery Plan

Samantha Tharme

Department of the Built Environment

T: 020 7332 3160

E: [email protected]

Page 4: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

Appendix 1: City of London Local Implementation Plan 2019/20 to 2021/22

Page 5: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

1

City of London Corporation

Local Implementation Plan Delivery Plan

2019/20 – 2021/22

April 2019

Page 6: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

2

Contents

Contents 2

Introduction 3

1. Policy Context. 5

2. City of London Transport Strategy delivery of MTS Outcomes. 8

3. Linkages between Delivery Plan and Mayor’s Transport Strategy outcomes 11

4. Three-year programme for TfL funding 14

* Provisional requests 18

Supporting commentary for the three-year programme 19

5. Proposed funding strategy – 3-year programme 24

6. Delivery Plan Medium to Long-term Programme 26

7. TfL Business Plan 32

8. Risks to the delivery of the three-year programme 34

9. Monitoring the delivery of the outcomes of the Mayor’s Transport Strategy 38

Page 7: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

3

Introduction

The City of London Transport Strategy sets the 25-year framework for future investment in, and management of, the Square Mile’s streets and for improvements to transport connections.

The Transport Strategy along with this Local Implementation Plan Delivery Plan make up the City of London Corporation’s Local Implementation Plan (LIP). The LIP is a statutory document (prepared under Section 145 of the GLA Act) that sets out how the City Corporation will support the delivery of the Mayors Transport Strategy (MTS).

The Transport Strategy and LIP Delivery Plan were developed to meet the needs of the City’s traveling public and align the City Corporation’s projects and programmes with the policy framework of the MTS. In accordance with Transport for London guidance the LIP Delivery Plan includes details of how projects will contribute to meeting the MTS priorities and further details of the projects that will be funded through the TfL’s grant funding to the City Corporation.

The City of London Transport Strategy sets out in more detail the rational and context for the City’s transport outcomes and each of the related proposals to deliver them INSERT LINK. The final Transport Strategy was adopted by the Court of Common Council XX. The LIP Delivery Plan was adopted by the Planning and Transportation Committee on XX.

An Integrated Impact Assessment is submitted as a separate document INSERT LINK. (Requirement 5).

Page 8: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

4

Consultation and democratic process to adoption.

The democratic process for formal adoption of the LIP is set out below:

Draft Transport Strategy approved for consultation

Planning and Transportation Committee 30 October 2018

Draft LIP Delivery Plan approved for consultation

Planning and Transportation Committee 30 November 2018

LIP Delivery Plan adoption

Planning and Transportation Committee XX

Transport Strategy adoption Planning and Transportation Committee XX

Policy and Resources XX

Court of Common Council XX

The draft LIP Delivery Plan was published alongside the Transport Strategy for consultation from December 2018 to January 2019. This included sending notice of the consultation to neighbouring boroughs, the City of London Police, the Environment Agency and the City of London Access Group. Natural England were consulted via the IIA process.

Details of responses to the draft Transport Strategy are set out in the Phase Three Engagement Report INSERT LINK. Only TfL responded to the draft LIP Delivery Plan consultation, suggested changes have been incorporated.

Page 9: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

5

1. Policy Context.

Regional policy

There are a number of regional policy documents, in addition to the Mayor’s Transport Strategy, that have been considered in

preparing the City Corporation’s LIP:

• The Mayor of London River Action Plan (2013): This plan outlines a number of specific measures to be taken by TfL to

help boost the number of river trips in line with achieving the Mayor’s target of 12 million passenger journeys a year by 2020.

The City of London Transport Strategy sets out proposals to optimise use of the River (see proposals 38 and 48).

• A City for all Londoners (2016): This report sets out the Mayor’s strategic vision for London. The document does not

include specific policies but gives an indication of the priorities of the Mayor. The overarching Healthy Streets Approach to

managing the street network is a key part of the Mayor’s vision and is fully embraced in the City of London Transport

Strategy.

• Environment Strategy (2018): This plan addresses all matters affecting the quality of London’s Environment. Those

relevant to transport are also embedded in the Mayor’s Transport Strategy. The proposals in the City of London Transport

Strategy include measures to address air pollution and noise resulting from transport (proposals 29 to 37).

• Housing Strategy (2018): The Local Plan will meet the London Plan housing target of 146 new homes per year, as well as

seeking 35% affordable housing on site. New homes will continue to be guided to sites in or near existing residential areas

and we will seek to protect residential amenity. The connectivity proposals in the City of London Transport Strategy

(proposals 47 to 51) seek to enable travel to work by sustainable modes.

Page 10: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

6

City of London policy

The following is a list of the relevant City of London Policy and documents that the LIP is guided by and support.

• City of London Local Plan 2015 and Draft Local Plan 2036

• City of London Air Quality Strategy 2015 -2020 and Draft 2019 – 2024

• City of London Noise Strategy 2016 – 2026

• City of London Road Danger Reduction and Active Travel Plan

• The Thames Strategy Supplementary Planning Document

• City of London Public Realm Supplementary Planning Document

• Freight and Servicing Supplementary Planning Document

The City of London Corporate Plan outcomes are grouped under three themes as below, and the Transport Strategy proposals support these as follows:

It will help the City contribute to a flourishing society by:

• Making streets safer and reducing the number of traffic related deaths and serious injuries.

• Enabling people to walk and cycle and reducing the negative health impacts of transport.

• Ensuring streets are accessible to all and provide an attractive space for the City’s diverse community to come together.

A thriving economy will be supported by:

• Enabling the City to continue to grow and accommodating the associated increase in demand for our limited street space.

• Improving the quality of streets and transport connections to help attract talent and investment.

• Helping create a smarter City, that supports and enables innovative transport technology and other mobility solutions.

The Strategy will help shape outstanding environments by:

• Advocating for improved local, national and international transport connections.

• Reducing motor traffic levels to enable space to be reallocated to walking, cycling, greenery and public spaces.

• Improving air quality and reducing noise from motor traffic.

• Ensuring streets are well maintained and resilient to natural and man-made threats

Page 11: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

7

Integrated Impact Assessment

The City of London commissioned LUC to undertake separate Integrated Impact Assessments (IIA) of its Transport Strategy and LIP Delivery Plan. Both documents can be found on our website INSERT LINK

IIA brings together Sustainability Appraisal (SA) incorporating Strategic Environmental Assessment (SEA), Equality Impact Assessment (EqIA) and Health Impact Assessment (HIA) into a single assessment process. It is designed to ensure that the plan preparation process maximises the contribution that a plan makes to sustainable development and minimises any potential adverse impacts. SEA is also a statutory assessment process, required under the SEA Directive, transposed in the UK by the SEA Regulations (Statutory Instrument 2004, No 1633). The SEA Regulations require the formal assessment of plans and programmes which are likely to have significant effects on the environment and which set the framework for future consent of projects requiring Environmental Impact Assessment (EIA).

LIP Delivery Plan IIA - outcomes and recommendations

The IIA has identified the potential for significant positive effects for all the projects contained with the Delivery Strategy apart from Legible London and principal road renewal. No significant negative effects have been identified as a result of the projects in the Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive effects on the baseline in relation to achievement of all the IIA objectives apart from education and heritage, for which negligible effects are anticipated (although there is some uncertainty with regard to heritage). These positive effects are, for the majority of IIA objectives expected to be enhanced when the Delivery Plan is considered in combination with the Transport Strategy and the draft London Plan.

One recommendation for an addition to the Delivery Plan has been included (EV charging infrastructure impact on the built environment). No other changes were recommended as a result of the IIA process.

Page 12: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

8

2. City of London Transport Strategy delivery of MTS Outcomes.

The City of London Corporation’s Transport Strategy and LIP Delivery Plan were developed to meet the needs of the City’s traveling public and align the City’s projects and programmes with the policy framework of the MTS, including the overarching mode share aim and each of the nine outcomes. The City of London Transport Strategy sets out in more detail the rational and context for the City’s transport outcomes and each of the related proposals to deliver them. The Strategy is available our website INSERT LINK. An overview of the context in relationship to the Mayor’s Transport Strategy is given in this section.

The overarching MTS outcome of Changing the Transport Mix, aiming for 80% of trips by public transport, on foot or cycle, is

already exceeded in the Square Mile. The City does however appreciate its role in delivering a quality end of journey environment

and enabling those trips passing through the City by these modes to be more efficient and pleasant. Additionally, the shift of freight

to alternative modes and consolidation is still required. All of the City’s Transport Strategy Outcomes play a role in delivering

against this overarching objective.

The City’s Transport Strategy outcomes which are relevant and support each of the 9 MTS outcomes is set out below.

Outcome 1: London’s streets will be healthy and more Londoners will travel actively by:

• Making the Square Mile’s streets great places to walk and spend time by prioritising the needs of people on foot and; and by

enabling more people to choose to cycle by making conditions safer and more pleasant.

• Making the Square Mile more accessible and championing step-free access for all stations in the City

• Minimising the impacts of streetworks and other disruption on users of the City’s streets

Outcome 2: London’s streets will be safe and secure by

• Eliminating death and serious injuries from our streets through speed reduction, improved safety of vehicles and safer

behaviours;

• Making the Square Mile’s streets great places to walk, prioritising the needs of people on foot; and enabling more to choose

to cycle by making conditions safer

Page 13: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

9

• Maximising the opportunities presented by new transport technologies while avoiding negative impacts and unintended

consequences

Outcome 3: London’s streets will be used more efficiently and have less traffic on them by

• Making the most efficient use of street space, reducing motor traffic and in particular the number of delivery and servicing

vehicles

• Prioritising the needs of people on foot and enabling more to choose to cycle

• Maximising the opportunities presented by new transport technologies while avoiding negative impacts and unintended

consequences

Outcome 4: London’s streets will be clean and green by

• Improving air quality and reduce noise by encouraging and enabling the transition to zero emission capable vehicles

• Making the Square Mile’s streets great places to walk and spend time by delivering world-class public realm

Outcome 5: The public transport network will meet the needs of a growing London by:

• Working with TfL, national government and transport providers to improve local, national and international transport

connections to the Square Mile

• Maximising the opportunities presented by new transport technologies

Outcome 6: Public transport will be safe, affordable and accessible to all

• Making the Square Mile more accessible, championing step-free access for all stations in the City

Outcome 7: Journeys by public transport will be pleasant, fast and reliable

• Making the most efficient use of street space, reducing motor traffic and in particular the number of delivery and servicing

vehicles

Page 14: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

10

• Minimising the impacts of streetworks and other disruption

• Maximising the opportunities presented by new transport technologies

Outcome 8: Active, efficient and sustainable travel will be the best option in new developments

City Planning Policy, supported by the Transport Strategy, requires developments to support and improve sustainable travel

to new and redeveloped sites and make financial contribution to improvements to the transport network including for those

walking and cycling, supporting MTS Outcome 8.

Outcome 9: Transport Investment will unlock the delivery of new homes and jobs

In a wider context improving transport connections externally to the City does also support MTS Outcome 9.

Page 15: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

11

3. Linkages between Delivery Plan and Mayor’s Transport Strategy outcomes

Linkages between LIP projects and programmes and the Mayor’s Transport Strategy outcomes

Project / Programme

MT

S m

od

e

sh

are

MTS outcomes

Imp

rovin

g a

ctive,

eff

icie

nt and

susta

inable

mo

de

share

No 1

: A

ctive

No 2

: S

afe

No 3

: E

ffic

ient

No 4

: C

lean &

Gre

en

No 5

: C

onnecte

d

No 6

: A

ccessib

le

public

tra

nsport

No 7

: Q

ualit

y

public

tra

nsport

Nos 8

& 9

:

Susta

inable

Gro

wth

/Unlo

ckin

g

Programme name

Barbican & Golden Lane Zero Emission Zones

City Cluster Zero Emission Zone

Streets Accessibility Standard

Page 16: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

12

City-wide 15mph – scheme development &

implementation

Healthy Streets minor schemes: pedestrian priority,

accessibility, cycling and road danger reduction

Legible London City-wide roll out

Puddle Dock Pedestrian safety and route severance

scheme

Riverside Walkway – Globe View section

Mansion House Station walking and public realm

improvements

100 Minories public realm enhancements

City Cycle Network Phase 1 minor schemes

Road Danger Reduction campaigns, behaviour

change and community engagement

Page 17: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

13

Kerbside uses review

Lunchtime Streets

City Cluster scheme implementation – junction

improvements and Healthy Streets improvements and

pedestrian priority, walking streets (£3m total bid into

22/23)

Principal road renewal

Implementation of bus priority in Heathy Streets minor

schemes; and TfL bus priority schemes

City Cycle Network Phase one, including: CS1 – CS6

Holborn Circus to Bishopsgate via Bank

EV charge points – GULCS/Rapids programme

Page 18: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

14

4. Three-year programme for TfL funding

This table summarises the projects that will be funded in part or in their entirety by TfL funding in the period 2019/20 – 2021/22.

Funding in 2022/21 and 2021/22 is indicative and dependent on TfL’s business planning process.

TfL FUNDING 2019/20 TO 2021/22 Allocated

2019/20 £k

Indicative

2020/21 £k

Indicative

2021/22 £k

LOCAL TRANSPORT INITIATIVES

City Cluster and Barbican & Golden Lane Zero Emission Zones 50 50 50

Streets Accessibility Standard 50

City-wide 15mph – scheme development 50

City-wide 15mph – education and enforcement 50

Sub-total 100 100 100

Page 19: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

15

TfL FUNDING 2019/20 TO 2021/22 Allocated

2019/20 £k

Indicative

2020/21 £k

Indicative

2021/22 £k

CORRIDOR, NEIGHBOURHOODS & SUPPORTING MEASURES

Healthy Streets minor schemes: pedestrian priority, accessibility,

cycling and road danger reduction 100 100 350

Legible London City-wide roll out 215 290

Puddle Dock Pedestrian safety and route severance scheme 185 200

Riverside Walkway – Globe View section 100

Mansion House Station walking and public realm improvements 40 60

100 Minories public realm enhancements 100

City Cycle Network – Phase 1 minor schemes 280

City-wide 15mph – implementation 100

Page 20: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

16

TfL FUNDING 2019/20 TO 2021/22 Allocated

2019/20 £k

Indicative

2020/21 £k

Indicative

2021/22 £k

Road Danger Reduction campaigns, behaviour change and

community engagement 90 90 90

Kerbside uses review 110

Lunchtime Streets 40 60 80

Sub-total (including Local Initiatives) 980k 1,000 1,000

Page 21: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

17

DISCRETIONARY FUNDING

City Cluster scheme implementation – junction improvements

and Healthy Streets improvements and pedestrian priority,

walking streets (£3.25m to 22/23)

100 1,150 1,000

Principal road renewal 102 105 104

Bridge strengthening tbc tbc Tbc

Sub-total 202 1,255 1,104

TfL FUNDING 2019/20 TO 2021/22 Allocated

2019/20 £k

Indicative

2020/21 £k

Indicative

2021/22 £k

STRATEGIC FUNDING

Bus Priority

Implementation of bus priority in Heathy Streets minor schemes;

and TfL bus priority schemes 50 25 25

Page 22: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

18

London cycle grid (Quietways programme)

City Cycle Network Phase one, including: CS1 – CS6 Holborn

Circus to Bishopsgate via Bank 800 850

Mayor’s Air Quality Fund

City Cluster and Barbican & Golden Lane Zero Emission Zones* 50 50 50

Other

EV charge points* 50 50 75

Sub-total 950 975 150

All TfL funding 2,132 3,230 2,254

* Provisional requests

Page 23: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

19

Supporting commentary for the three-year programme

In accordance with Transport for London guidance the Delivery Plan summarises how each project will contribute to meeting the MTS priorities and further details of projects that will be funded thorough the TfL’s grant funding to the City Corporation.

LOCAL TRANSPORT INITIATIVES

City Cluster and Barbican & Golden Lane Zero Emission Zones: The City has set air quality improvement as a high priority and

aims to bring in higher standards by 2022 in the City Cluster which has the highest concentration of people working, and therefore

on the street at many times of day. The second area, Barbican and Golden Lane Estate has a high concentration of residents and

will see more daytime visitors using the streets with the development of the Culture Mile. The current air quality monitoring and

projections of air quality after the introduction of the ULEZ in 2019 show that further interventions are required to bring pollution

down and work to the international health-based standards, as recommended in the MTS.

Streets Accessibility Standard: Through working with residents, workers and access groups we will define an accessibility

standard that goes above and beyond existing accessibility requirements. This ensures that people of all abilities who use our

streets have an environment where they can travel comfortably and confidently. This project supports the delivery of MTS proposal

1, reviewing removal of street furniture, improving pavements, introducing more raised tables and seating and provision for non-

standard cycles.

City-wide 15mph speed limit: The City would like to introduce a 15mph limit across all streets. Evidence shows that the severity

of accidents is significantly reduced at slower speeds. The project includes implementation of the scheme, accompanied by

education and enforcement which should help deliver against the Vision Zero aim.

Page 24: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

20

CORRIDOR, NEIGHBOURHOODS & SUPPORTING MEASURES

Healthy Streets minor schemes: Schemes will be delivered which create Healthy Streets. Providing more space for walking and

cycling, better accessibility for all users and road danger reduction working towards Vision Zero. Small schemes will be identified

which meet this objective and are deliverable in the short term.

Legible London City-wide roll out: The City supports the programme of the ‘Legible London’ as developed by TfL to introduce

comprehensive signing across its area. Particularly as this compliments the City’s ambition to make the Square Mile a world class

walking city, making it more accessible and attractive to move around on foot.

Puddle Dock Pedestrian safety and route severance scheme: Priority pedestrian route improvement and scheme to address

severance and safety at Upper Thames Street, to access riverside.

Riverside Walkway – Globe View section: This section of the Riverside has been closed for many years as it is not a continuous

route. This means that the walkway is currently diverted onto the busy and polluted Thames Street. By completing and enhancing

this section of walkway and linking it to the adjacent development, the completion of the Thames Path will be enabled and a

continuous and accessible walkway along the Thames provided.

Mansion House Station environs: Proposals include improvements to key walking routes including routes to the station to include

widening footways and accessibility improvements along with public realm improvements focussed on Little Trinity Lane that will

deliver an enhanced green public space incorporating seating, lighting and noise and pollution mitigation measures.

100 Minories public realm enhancements: Proposals include the formation of a brand new green public space to replace under-

utilised carriageway space at Crescent, along with a new north-south walking route through the new development that will improve

routes to the station and accessibility improvements.

City Cycle Network – Phase 1 minor schemes: Minor scheme proposals will be developed which assist in providing better

connections identified as necessary to provide a relaxed, connected and safer City Cycle Network.

Page 25: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

21

Kerbside uses review: In order to manage the street space more efficiently and reduce traffic overall (particularly private motor

vehicle trips) we wish to undertake a detailed kerbside use review. This will look at all aspects of kerbside use, including loading

activity for freight, taxi circulation and stopping and other parking activity.

This review will enable us to identify the current inefficiencies, rationalise use, identify solutions to optimise the efficiency of

kerbside for essential traffic, provide more space and infrastructure for people walking and cycling, and deter private motor vehicle

trips. This will include using emerging technology for real time management of kerb space. This supports the Mayors objectives of

reducing traffic and more efficient use of road space.

Road Danger Reduction campaigns, behaviour change and community engagement: A series of campaigns, programmes

and events to influence the attitudes of road users. To achieve reductions in KSIs, and work towards the Mayor’s Vision Zero a

change of culture is required. Empathy towards other road users and understanding of their behaviours reduces conflict and

collisions. Attitudinal surveys will be taken annually to measure the impact over time. These will include: Be Brake Ready –

campaign to drivers and riders – include on street actions, multi-media campaign

The Active City Network (ACN) has been established with the aim of getting more people walking and cycling more safely.

Lunchtime Streets: ‘Lunchtime Streets’ pilots timed closures on a busy pedestrian environment during the lunchtime peak. St

Mary Axe is an example where there is a high density of pedestrians at lunch, together with complaints about traffic and a history of

injuries. This will be organised in summer 2019. The event will offer an opportunity to work with businesses in the area to improve

the public realm and trial retiming and reduction of the number of vehicles. Further events in other local streets will be organised,

with an objective of a rolling programme of at least three streets with this activity over the summer months by 2022

City Cluster Liveable Neighbourhood: The area defined as the City Cluster is where there is a high density of office space, with

further future growth, therefore attracting high volumes of people on foot. This expanding area needs to consider more efficient

ways of using street space to prioritise it for people walking and therefore better management of deliveries and reduction in freight

vehicles. The opportunity to close streets completely to vehicles at peak pedestrian times is likely and provision of better public

realm and green space to improve the environment is the ambition. This will match the Healthy Streets approach of the MTS.

Page 26: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

22

A zero emission zone is also included for this area to be introduced in 2022 to address air quality which is currently breaching

recommended levels based on both national and international health based standards for PM and NO2. This will assist in reaching

the more stringent standards for PM as set out in the MTS.

Work required in advance includes traffic modelling and detailed analysis of loading and servicing requirements to buildings, in

order to reduce and better manage vehicles in the area. Junction improvements will give greater priority and safety to people

walking. This approach helps deliver on the Vision Zero for accidents, more active travel, better accessibility and reduction in

traffic.

City Cluster scheme implementation will focus on junction improvements and Healthy Streets improvements – walking streets and

pedestrian priority (£3.25m total bid into 22/23). Further improvements for a comprehensive project will be undertaken with

developer contributions, subject to further approval by City Corporation committees.

Principal road renewal: Priorities for the next 3 year period have been identified for Newgate Street (Old Bailey to King Edward

Street); this was previously deferred from this year due to long-term utility works; Holborn Viaduct (Snow Hill to Shoe Lane Bridge);

previously deferred due to then unknown extent of waterproofing of viaduct sections; and London Wall (Westbound: Moorgate to

Wood Street), (Eastbound: Aldersgate Rotunda to Wood Street). These priorities are based on current life-cycle, current physical

conditions and forecasted conditions over the next three years. Quality of principal roads assists in providing a network for a good

quality pleasant public transport experience in line with the MTS outcome 7.

STRATEGIC FUNDING

Bus Priority: We will undertake feasibility works for existing schemes identified by TfL to mitigate the impact of the roads

modernisation plan on bus journey times. Furthermore, we will also identify opportunities to deliver bus priority to support use of

public transport with in our healthy streets minor schemes. This supports the bus priority programme (page 58, TfL Business Plan)

and MTS proposals 58 + 59.

London cycle grid (Quietways programme) - City Cycle Network Phase 1: Through assessment of requirements to provide a

relaxed, connected and safer City Cycle Network the two schemes for Holborn Circus to Bishopsgate via Bank, and King William

Street, Bank to Monument, also make the connections as identified by TfL London cycle grid. Thus, supporting the MTS outcomes

Page 27: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

23

for more active travel and enabling cycling from further outside the Square Mile, in line with the ambition to more sustainable mode

share across London.

Mayor’s Air Quality Fund - City Cluster and Barbican & Golden Lane Zero Emission Zones: Part funding of the Zero Emission

Zones is sought from the Mayor’s Air Quality Fund, schemes as explained above.

GULCS/Rapids programme – Electric vehicle charge points: EV charge points will be needed to support the two areas

proposed for Zero Emission Zones as proposed by the City for 2022, and the anticipated Central London Zero Emission Zone for

2025. The location of further charge points will be decided in conjunction with prioritisation for taxi and freight vehicles. Where

possible the design of charging points to be sensitive to the streetscape and public realm, although the priority for charge points is

to be off-street. Enabling infrastructure supports the MTS ambition for a zero carbon city and meeting air quality targets for NO2

and PM.

Page 28: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

24

5. Proposed funding strategy – 3-year programme

The potential funding sources for the Delivery Plan are set out below, including funding from TfL, contributions from the City’s own

funds, and funding from developer contributions (S106, S278 and CIL). Once the City Department of the Built Environment project

review is completed, additional projects will be included in the programme and therefore the total funding will be increased, with

those projects delivered through City and other funds.

Funding source 2019/20

£k

2020/21

£k

2021/22

£k

Total

£k

TfL funding

Corridors & Supporting Measures and Local Transport Initiatives 980 1,000 1,000 2,980

Discretionary funding 202 1,255 1,104 2,561

Strategic funding 950 975 150 2,075

Sub total 2,132 3,230 2,254 7,616

City funding

Parking revenue 1,000 444 1,444

Page 29: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

25

Funding source 2019/20

£k

2020/21

£k

2021/22

£k

Total

£k

Other sources of funding

S106 1,590 1,070 697 3,357

S278 610 380 800 1,790

CIL 0 100 300 400

Third party contributions 470 610 650 1,730

Total 5,802 5,834 4,701 16,337

Page 30: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

26

6. Delivery Plan Medium to Long-term Programme

The table below summarises the programmes that the City of London is anticipating delivering up to 2041. These programmes will

be subject to a detailed prioritisation process in line with the Transport Strategy, Local Plan and City of London Corporate Priorities.

For the final approved Transport Strategy Delivery Plan and Local Implementation Plan a more detailed programme of projects for

delivery up to 2021/22 will be provided which will be in addition to those under the TfL funded programme. All projects are subject

to City Corporation approval processes, including relevant Committee and Sub-Committee approval. The total cost includes

delivery beyond the current Plan period, funding sources are for all years of the project and may vary year-by-year.

Project Project description

Anticipated

completion

date

Funding

sources

Estimated

Total cost £k

Link to MTS outcomes

Sustainable

logistics centre

Co-location major suppliers in a single

warehouse, alongside consolidation,

waste collection and courier services.

First three years of funding are for

feasibility and scheme development.

Delivering two last mile logistics hubs in

underutilised City Corporation assets

2030

2025

CoL TBC

Outcome 3 & 4: By

reducing the amount of

deliveries by traditional

freight vehicles, the road

space will be used more

efficiently and there will

be an overall motor

traffic reduction, also

resulting in a reduction

Page 31: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

27

by 2022. A further three hubs will be

delivered by 2025

in vehicle related

emissions.

City Cycle Network

Phase 1

Including:

We will deliver the Bishopsgate to

Blackfriars (including improvements at

Mansion House junction) and CS1 to

Monument Junction sections by 2025.

2025

CoL

TfL

Developer

contributions

8,000

Outcome 1 & 2, Healthy

streets; and active

travel, Safe and Secure:

by providing a

comprehensive network

through the City streets

to complement the

Strategic Cycle network,

we aim to make cycling

more attractive thus

increasing the level of

active travel and reduce

road danger to cyclists

City Cycle Network

Phase 1

• Holborn Circus via Bank including connecting the City Cluster to Cycle Superhighway (CS) 2 and CS6

• CS3 to St Paul’s via the City Cluster and London Wall (in conjunction with planned network improvements at St Paul's Gyratory)

• Monument Junction to CS4 via London Bridge in partnership with TfL

2030

CoL

TfL

Developer

contributions

TBC

Outcome 1 & 2, Healthy

streets; and active

travel, Safe and Secure

Page 32: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

28

• CS2 to CS3 via Mansell Street (in partnership with TfL)

Core Cycle

Network – Phase 2

Delivery of remaining core cycle

network.

2035

CoL

TfL

Developer

contributions

TBC

Outcome 1 & 2, Healthy

streets; and active

travel, Safe and Secure

Bank Junction and

surrounding streets

Walking and public realm

improvements. 2025

CoL

Developer

contributions

17,000

Outcome 1, 2, 3 & 4

This scheme will deliver

against a number of

outcomes, providing

high quality public realm

following on from the

reduction in traffic

through the junction; air

quality improvements

have already been

delivered from phase

one of the scheme.

Page 33: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

29

Moorgate area

Walking improvements to junction and

surrounding public realm (in

conjunction with Crossrail) and to

streets connecting Moorgate Station,

Liverpool Street Station and the City

Cluster

2025

Developer

contributions

Crossrail

9,500

Outcome 1, 2 & 5

The scheme should

deliver more space for

people walking and

reduce road danger; it

also supports the

greater connectivity of

public transport across a

wider part of London,

supporting the increase

in people using

Moorgate Station as a

result of the Crossrail

programme

Culture Mile

Delivery of public realm improvements

to support Culture Mile;

and Beech Street public realm, traffic

management improvements

2026

CoL

Developer

contributions

20,000

Outcome 1, 2, 3, 4

Improvements include

the removal of traffic

and addressing air

quality in the area tied

with supporting

developments through

Smithfield and the new

Centre for Music.

Page 34: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

30

Museum of London

roundabout, St

Paul's gyratory

Removal of St Paul’s gyratory system

and Museum of London roundabout,

including measures to support the

delivery of the Centre for Music

2028 Developer

contributions 27,800

Outcome 1, 2, 3, 4

This scheme will deliver

more space and comfort

for people walking and

cycling; the severance

created by the gyratory

road system and

associated road danger

will be removed and the

area will be less

dominated by traffic.

City Cluster

Delivery of the City Cluster Area

Strategy and associated traffic

management and Healthy Streets

measures

2030

TfL

Developer

contributions

20,000 +

Outcome 1, 2, 3, 4

This scheme will provide

more space for people

walking and transform

the way deliveries are

made thus using the

space more efficiently,

reducing the total

number of motor

vehicles and reducing

vehicle related

emissions and pollution.

Page 35: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

31

Fleet Street and

Courts Area

Area improvement scheme for Fleet

Street between Chancery Lane and

Ludgate Circus

2025-2040

CoL

Developer

contributions

10,000

Outcome 1, 2, 3, 4

This will deliver a

reduction in air pollution

and the dominance of

traffic along Fleet Street.

Greater space for

people walking, a

healthy streets

approach, will deliver a

better environment for

active travel and more

efficient use of road

space.

Page 36: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

32

7. TfL Business Plan

In developing and preparing the Transport Strategy and Delivery Plan we have considered the Mayor’s aspiration to deliver

the major projects in TfL’s Business Plan and the milestones associated with these projects. The following TfL projects have

implications for the City of London. This will be reviewed with the new TfL business plan anticipated in December 2019.

Old Street roundabout

Whilst the physical extent of works on this scheme fall solely within the London Borough of Islington, there are potential

traffic implications to the City of London highway network. We are working with officers from Transport for London and the

London Borough of Islington to identify and resolve any issues which may occur.

Ultra-Low Emission Zone (ULEZ)

Delivery of ULEZ is an important step to improving air quality in the Square Mile and surrounding central London boroughs,

which the City Corporation supports. Supporting works such as signage on the City highway network will be delivered by

Transport for London.

Elizabeth Line

On completion, the Elizabeth Line will make a significant public transport provision improvement to the Square Mile with

access to the new line at Smithfield, Moorgate and Liverpool Street. To support the increased footfall at these sites, the City

of London are delivering improvements at these new ticket halls.

At Smithfield we are widening pavements, improving crossing points and resurfacing all carriageways and footways. At

Moorgate we will close the southern end of Moorfields to vehicles except for those servicing buildings and the area

immediately outside the station will be reinstated with high quality materials and artworks. Moorgate itself will benefit from

slower traffic and improved informal crossings.

Page 37: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

33

Liverpool Street will be pedestrianised in the area surrounding the station. This will be supported by wider footways and

improved crossings in Eldon Street, Blomfield Street and Old Broad Street. We will also develop options for improving the

eastern end of Liverpool Street and Old Broad Street north of London Wall to support the increased expected pedestrian

numbers in the area.

Bank Station Update

The Bank Station Upgrade will provide a significant capacity upgrade to Bank station at a platform level as well as new

escalators, a new entrance resulting in a 40% capacity uplift. This will provide much required increased connectivity and

accessibility improvements in the Square Mile.

To support the scheme, the City has closed Arthur Street and Nicholas Lane to traffic whilst works are undertaken and will

support in public realm and highways improvements at the new ticket hall.

Modernisation of the Circle, District, Hammersmith & City and Metropolitan Lines

The modernisation of the sub-surface lines will bring a welcome improvement in public transport capacity to and around the

City. We are undertaking no complementary works to support signalling and rolling stock upgrades.

Deep Tube Upgrade Programme

The Deep Tube Upgrade Programme will bring a welcome improvement in public transport capacity to and around the City.

We are undertaking no complementary works to support signalling and rolling stock upgrades.

DLR Rolling Stock

The new DLR rolling stock will bring a welcome improvement in public transport capacity to and around the City. We are

undertaking no complementary works to support rolling stock upgrades.

Page 38: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

34

8. Risks to the delivery of the three-year programme

The principal risks associated with delivery of the TfL funded programme of projects are summarised below together with

possible mitigation actions. Risk registers are being developed for all projects that will receive funding in 2019/20. The

principal project risks will be included in the final version of this Delivery Plan.

Risk Likelihood Potential mitigation measures Impact if not mitigated

Financial

There is a risk that funding

sources, both TfL and other

sources, become unavailable, are

reduced or are not available at the

time they are needed.

L

Seek funding from other sources or

reprofile other projects to allow

funding to be reallocated

Change the project scope to react to

the unavailability or delay in funding to

allow the main elements of the project

to still be delivered

Projects may be delayed, closed

prematurely or removed from the

programme

Page 39: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

35

Risk Likelihood Potential mitigation measures Impact if not mitigated

Statutory / Legal

The two main statutory/legal risks

associated with the programme

are:

• Approval is not obtained

from TfL for the exercise of

the Highways Act or Traffic

Management Act Road

powers for affected streets

• Objections are made to

Traffic Order proposals

under the Road Traffic

Regulation Act

L

M

Ensure projects are aligned with the

MTS and engage TfL in the

development of projects

Thorough and early engagement and

consultation with all relevant

stakeholders and interested parties

Projects may be removed from the

programme

Projects may be delayed or

removed from the programme

Page 40: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

36

Risk Likelihood Potential mitigation measures Impact if not mitigated

Third Party

The main third-party risks are:

• Stakeholders and interested

parties are disengaged with

the programme

• There is a lack of alignment

with the City of London

aspirations and those of

neighbouring boroughs

M

M

Thorough engagement and

consultation with all relevant groups,

persons and bodies interested and/or

impacted by the programme

Close and collaborative working with

the boroughs of Tower Hamlets,

Hackney, Camden, Islington,

Westminster, Lambeth and

Southwark; including through the

Central London Sub-regional

Transport Partnership

There could be a lack of ownership

and support from the wider

community and/or objections made

to projects.

Projects could conflict with each

other resulting in projects being

delayed or becoming undeliverable

Page 41: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

37

Risk Likelihood Potential mitigation measures Impact if not mitigated

Public / Political

Elements of the programme could be

seen as unambitious or too radical by

members

L

Keeping members involved and

engaged early in the development of

projects and keep them up to date

and aware of the aspirations of the

Mayor of London, the Mayor’s

Transport Strategy and our

commitment to its delivery.

Projects do not receive approval

and are delayed or abandoned

Programme & Delivery

Changes in staffing could provide the

following programme and delivery

risks;

• An inadequate level of

resourcing

• A lack of required skills or

knowledge

M

M

Prepare a resourcing plan to manage

and allocate staff time and update

throughout the programme.

Identify where skills/knowledge are

limited in the resourcing plan and

provide training where appropriate.

Delay to the delivery or reduced

quality of projects and programme

Reduced quality of projects and

programme

Page 42: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

38

9. Monitoring the delivery of the outcomes of the Mayor’s Transport Strategy

In line with MTS aspirations we are aiming for an active and sustainable mode share target of 99 percent by 2040. This

would make the City one of the cleanest and healthiest central business districts in the world. We have also set targets

against key MTS outcome indicators, summarised in the table below.

The City Corporation will monitor and record delivery indicators and report to TfL annually using Proforma C.

Additionally, the City will report on the local indicators listed in our Transport Strategy. These indicators will be supported by

a City Streets Report published every two years which will provide indicator data updates and an analysis of traffic trends

based on our biennial vehicular and pedestrian counts.

Objective Metric City

target

Target

year Additional commentary

Overarching mode share aim – changing the transport mix

Londoners’ trips to be

on foot, by cycle or by

public transport

Active, efficient and sustainable (walking,

cycling and public transport) mode share

(by City/borough resident) based on

average daily trips. Base period 2013/14 -

2015/16.

97%

99%

2021

2041

The City is working to make the

City a great place for walking and

cycling through numerous

proposals and an emphasis on

prioritising pedestrians on our

streets.

Page 43: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

39

Objective Metric City

target

Target

year Additional commentary

Healthy Streets and healthy people

Outcome 1: London’s streets will be healthy and more Londoners will travel actively

Londoners to do at

least the 20 minutes

of active travel they

need to stay healthy

each day

Proportion of London residents doing at

least 2x10 minutes of active travel a day

(or a single block of 20 minutes or more).

70 2041

The City is enhancing its walking

and cycling networks alongside

making every street accessible to

all.

Londoners have

access to a safe and

pleasant cycle

network

Proportion of Londoners living within 400m

of the London-wide strategic cycle network. 100 2041

The planned extension to the City

cycling network alongside

additional TfL strategic cycle

schemes will ensure that nearly

every City property is within 400m

of an enhanced cycling link.

Page 44: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

40

Outcome 2: London's streets will be safe and secure

Deaths and serious

injuries from all road

collisions to be

eliminated from our

streets

Deaths and serious injuries (KSIs) from

road collisions, base year 2005/09 (for

2022 target) *

35 2022

The City will adopt a Safe

Systems approach to reducing

road danger to ensure that no

one is killed or seriously injured

on our streets in 2040.

Deaths and serious injuries (KSIs) from

road collisions base year 2010/14 (for 2030

target).

16 2030

The City will adopt a Safe

Systems approach to reducing

road danger to ensure that no

one is killed or seriously injured

on our streets in 2040. This date

(where the MTS date is 2041) is

aligned with the actions in the

Transport Strategy which are set

to deliver a reduction in KSIs.

The Metropolitan Police Service (MPS) introduced a new collision reporting system in November 2016 – the Case Overview

and Preparation Application (COPA). The City of London Police also moved to the Collision Reporting and Sharing

(CRASH) system in October 2015. This has had a number of impacts on the data that is available to Transport for London

(TfL) and the London Boroughs in the ACCSTATS database for collision investigation.

Under the new systems officers use an ‘injury-based assessment’ in line with DfT STATS 20 guidance and online self-

reporting is available. Both of these changes are expected to provide a better assessment of injury occurrence and severity

but have made data collected from November 2016 onwards difficult to compare with earlier data.

Page 45: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

41

TfL commissioned the Transport Research Laboratory (TRL) to undertake a back-casting exercise to enable pre-November

2016 data to be compared with post November 2016 data. These initial back cast estimates included the number of people

killed or seriously injured (KSI) for each borough between 2005 and 2017 and this data has been used to update borough

targets to align with those contained in the Mayor’s Transport Strategy, namely a 65% reduction in KSIs by 2022 against the

2006-09 baseline, a 70% reduction in KSIs by 2030 against the 2010-14 baseline and zero KSIs by 2041. The City of

London is not yet able to apply the back-cast estimates as there is not a full 12 months of verified data since the changes to

the reporting system. The City did not introduce the new recording system at the same time as other London authorities.

Revised data should be available by mid-2019.

*The City of London has proposed an alternative trajectory to 2030 and 2040/2041. These figures are reflected in the table for the 2022 target. This

has been discussed in detail with TfL. Once the back-casting exercise, as described below, has been completed to provide a new baseline for

2005/9 and 2010/14 these targets will be adjusted.

Page 46: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

42

Outcome 3: London's streets will be used more efficiently and have less traffic on them

Reduce the volume of

traffic in London.

Vehicle kilometres in given year. Base year

2015. Reduce overall traffic levels by 10-15

per cent.

80 million

km 2041

The City is aspiring to reduce

motor traffic volumes by 30% by

2030, and by another 50% on top

of this reduction by 2050.

The Transport Strategy sets

ambitious targets which should

contribute positively to MTS

outcome 3, (Proposal 11) with a

combination of measures

designed to take a proactive

approach to traffic reduction.

Reductions in all types of motor

traffic will be required to meet

this.

Reduce the number

of freight trips in the

central London

morning peak.

10 per cent reduction in number of freight

vehicles crossing into central London in the

morning peak period (07:00am - 10:00am)

by 2026.

N/A N/A N/A

Page 47: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

43

Reduce car

ownership in London.

Total cars owned and car ownership per

household, City residents. Quarter of a

million fewer cars owned in London. Base

period 2013/14 - 2015/16.

2,600 2041

The City will support a reduction

in the total number of cars owned

by improving walking and cycling

conditions across the City.

Outcome 4: London's streets will be clean and green

Reduced CO2

emissions.

CO2 emissions (in tonnes) from road

transport within the City. Base year

2015/16.

11,700tn 2041 The City aims to cut all transport

related local air pollution and

carbon emissions to virtually zero

and streets will be quieter more

relaxing places. Together with

wider action to reduce emissions

from buildings and development

this will mean that the City enjoys

some of the cleanest urban air in

the world.

Reduced NOx

emissions.

NOX emissions (in tonnes) from road

transport within the City. Base year 2013. 10tn 2041

Reduced particulate

emissions.

PM10 and PM2.5 emissions (in tonnes) from

road transport within City. Base year 2013. 7/3tn 2041

Page 48: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

44

A good public transport experience

Outcome 5: The public transport network will meet the needs of a growing London

More trips by public

transport - 14-15

million trips made by

public transport every

day by 2041.

Trips per day by trip origin. Reported as

3yr moving average. Base year 2013/14 -

2015/16.

12 2041

The City will continue to work with

TfL to improve public transport

connectivity to the City.

Outcome 6: Public transport will be safe, affordable and accessible to all

Everyone will be able

to travel

spontaneously and

independently.

Reduce the difference between total public

transport network journey time and total

step-free public transport network

4-minute

difference 2041

We will work with TfL to prioritise

investment in accessibility

improvements to Underground

and DLR stations within the

Square Mile, beginning with

making Bank Station accessible.

Our ambition is that all stations

within the Square Mile are

accessible by 2044.

Page 49: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

45

Outcome 7: Journeys by public transport will be pleasant, fast and reliable

Bus journeys will be

quick and reliable, an

attractive alternative

to the car

Annualised average bus speeds, base

year 2015/16 6.7 2041

The City proposes a number of

measures that, in conjunction

with TfL’s proposed changes, will

aim to improve bus journey times.

Our traffic reduction ambitions will

also provide significant bus

priority in the form of better traffic

flow for all street users.

Page 50: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

46

Appendix 1.

City of London Local Implementation Plan – 2019/20 – 2021/22

Requirements for Local Implementation Plan submission

Requirement of Local Implementation Plan submission

Page number

R2 R6 Introduction 3

R3 R4 1. Policy Context 5

R7 R8 R10 R11 2. City of London Transport Strategy delivery of MTS Outcomes 9

R13 (ST01) 3. Linkages between Delivery Plan and Mayor’s Transport Strategy outcomes 10

R17 ST04 4. Three-year programme for TfL funding 12

* Provisional requests 15

R18 Supporting commentary for the three-year programme 19

R15 (ST02) 5. Proposed funding strategy – 3-year programme 20

R16 (ST03) 6. .Delivery Plan Medium to Long-term Programme 27

R14 7. TfL Business Plan 33

R19 (ST05) R20 8. Risks to the delivery of the three-year programme 35

R23 R24 9. Monitoring the delivery of the outcomes of the Mayor’s Transport Strategy 39

Page 51: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

47

R5 Integrated Impact Assessment – separate report

R20 R21 R22 (ST06) Annual spending submission Appdx 2

Page 52: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

Appendix 2: TfL comments on draft LIP Delivery Plan

Page 53: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

TfL comments on draft LIP Delivery Plan

Comment Response

1.LIP guidance requirements

1.1 The City should outline at the start of the Transport Strategy, the democratic process that the City follows in order for the Transport Strategy/LIP to be signed off. This is a requirement set out in the LIP Guidance.

Additional section added to Introduction

1.2 The City should provide a statement in the main Transport Strategy/LIP referencing the IIA that has been completed. It’s noted that an IIA was submitted as part of the draft for consultation.

Further detail added on IIA in Section 1

1.3 The City should give reference to the other core Mayoral strategies that are relevant to the Transport Strategy/LIP, setting out why they are important to the City and how they might influence the Transport Strategy/LIP (other strategies that might be of relevance include the London Plan, London Environment Strategy and strategies on economic development, housing, health and culture).

Further detail added on regional policy in Section 1.

2.Objective setting – Mode share

2.1 It is noted that the City’s Transport Strategy/LIP sets out a clear vision, aims and 10 outcomes detailing how the City will deliver the strategy/LIP.

No action

2.2 We welcome the level of ambition that has been demonstrated in the Transport Strategy/LIP, particularly around reducing traffic volumes and prioritising walking, cycling and public transport.

No action

Page 54: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

3.Objective setting – MTS Outcomes

3.1 All requirements met. No action

3.2 It is important that the City work closely with neighbouring authorities in order for the benefits of traffic reduction, and the other ambitious outcomes set out in the Transport Strategy/LIP, to be felt at a sub-regional level.

Noted – no action in document

3.3 The City could expand on some of the public transport elements that feature in the final section of the Transport Strategy/LIP to outline further aspirations for public transport services to, from and within the City.

As the City supports the aspirations in the MTS for public transport there are no additional points to be included. The Transport Strategy has been updated to include: The Mayor and TfL have laid out ambitious plans for expanding the Capital’s public transport networks to address the additional pressures this growth will place on these services. We will work with TfL to support the delivery of these aspirations to ensure the public transport network continues to meet the needs of people travelling to and through the Square Mile.

Borough targets

4.1 The City needs to set a 2021 target for the Active, efficient and sustainable mode share Outcome – this is a key outcome for the MTS so all boroughs are asked to set a target for both 2021 and 2041.

Section 9 - additional target for 2021 added.

4.2 It is noted that a more ambitious target has also been set for 2041 for Outcome 3a – the City should provide a short narrative in the table provided in the delivery plan submission, however the main Transport Strategy document clearly sets out the City’s ambitions on reducing traffic over the course of the strategy.

Section 9 updated to include: The Transport Strategy sets ambitious targets which should contribute positively to MTS outcome 3, (Proposal 11) with a combination of measures designed to take a proactive approach to traffic

Page 55: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

reduction. Reductions in all types of motor traffic will be required to meet this.

4.3 It is noted that the City has set its Vision Zero target of 0 for 2040, a year earlier than the MTS aim for 2041. If this is intentional then the more ambitious target should be supported by a short narrative explaining why a more ambitious target has been set.

Section 9 updated to include: This date (where the MTS date is 2041) is aligned with the actions in the Transport Strategy which are set to deliver a reduction in KSIs

4.4 Following the moves to new collision reporting systems – the Case Overview and Preparation Application (COPA) for the Metropolitan Police Service and Collision Reporting And Sharing (CRASH) for the City of London Police – we have now completed initial back estimates for the number of people killed or seriously injured (KSI) for each borough between 2005 and 2017 (contained in the 2017 ‘Casualties in Greater London’ factsheet, available on the TfL website alongside supporting data tables at https://tfl.gov.uk/corporate/safety-and-security/road-safety).

Target amended to include an agreed an interim target for 2030 which reflects a more realistic and deliverable target. The 2040/41 target is in line with the TfL recommendation.

4.5 We will issue a revised set of borough trajectories for Outcome 2 and Vision Zero and need boroughs to update their targets to reflect these new trajectories in their final LIP for 2022 and 2030 (2041 is unchanged at 0). The level of ambition remains unchanged, despite these revised figures. The borough is also asked to include the following text in the final LIP under Outcome 2 explaining the reasoning for the change in trajectories and targets: ‘The Metropolitan Police Service (MPS) introduced a new collision reporting system in November 2016 - the Case Overview and Preparation Application (COPA). The City of London Police also moved to the Collision Reporting And Sharing (CRASH) system in October 2015. This has had a number of impacts on the data that is available to Transport for London (TfL), and the London Boroughs in the ACCSTATS database for collision investigation. Under the new systems officers use an ‘injury-based assessment’ in line with DfT STATS 20 guidance and online self reporting is available. Both of these

See above and City of London is not in a position to undertake the full back casting exercise as it does not yet have full 12 months of data collected under the new system. Data analysed so far though indicates a similar position to other London Local Authorities. The City of London has proposed an alternative trajectory to 2030 and 2040/2041. These figures are reflected in the table for the 2022 target. This has been discussed in detail with TfL. Once the back-casting exercise, as described below, has been completed to provide a new baseline for 2005/9 and 2010/14 these targets will be reviewed. Explanatory text added.

Page 56: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

changes are expected to provide a better assessment of injury occurrence and severity but have made data collected from November 2016 onwards difficult to compare with earlier data. TfL commissioned the Transport Research Laboratory (TRL) to undertake a back-casting exercise to enable pre-November 2016 data to be compared with post November 2016 data. These initial back cast estimates include the number of people killed or seriously injured (KSI) for each borough between 2005 and 2017 and this data has been used to update borough targets to align with those contained in the Mayor’s Transport Strategy, namely a 65 percent reduction in KSIs by 2022 against the 2005-09 baseline, a 70 percent reduction in KSIs by 2030 against the 2010-14 baseline and zero KSIs by 2041. The targets contained in this final version of our LIP have been set against Outcome 2 for Vision Zero to reflect the reporting changes. The level of ambition remains unchanged, despite these revised figures.’

5.Delivery Plan – Longer term

5.1 The City could provide an expanded commentary to support the longer term plan that has been submitted in the LIP delivery plan document. This should reflect how the listed schemes address the relevant MTS outcomes.

Additional commentary provided in Section 6.

6.Delivery Plan – 3 year programme

6.1 All requirements were met for the three year plan section of the LIP delivery plan submission.

No action

Page 57: Committee Report Template Delivery... · Delivery Strategy, and, as a result, no mitigation is required. Cumulatively, the projects within the Delivery Plan are expected to have positive

7.Delivery Plan – 1 year programme

7.1 It is noted that the Pro Forma A was submitted alongside the Transport Strategy/LIP submission. More detailed feedback will be provided by Network Sponsorship, but the form needs to contain more detail as some sections have not been completed.

ASS Proforma A was resubmitted with additional information in December 2018; this will be resubmitted with LIP to reflect final annual settlement figure for 2019/20.

8. Delivery Plan – General

8.1 The LIP delivery plan should be more clearly linked to the main Transport Strategy/LIP document, either by more clearly referencing it in the main document or perhaps by including it within the main document as an appendix.

Noted and additional comment in Transport Strategy: This Strategy, together with a separate LIP Delivery Plan, will form the City of London Corporation’s Local Implementation Plan (LIP). The City Corporation, along with London’s 32 boroughs, is required to produce a LIP that details how we will support the delivery of the MTS. Our draft LIP Delivery Plan is published alongside this draft Strategy and provides more details of the alignment between our visions, aims, outcomes and proposals and the MTS. It sets out schemes and projects to deliver the transport proposals, essentially those funded by TfL, and also supported by other funding as appropriate. This is available on the Transport Strategy website