1

Common Issues on Plans

Recertification Training For Level II Introduction to Design

Certified Plan Reviewers and Certified Design Professionals

Issued May 2009

Page 2: Common Issues on Plans

2

Phasing

• Phasing cannot be done on one sheet, it is to be broken down into three separate sheets.

• Where there is no mass grading and BMPs are the same for all three phases, the plan may combine all of the BMPs into a single phase plan.

Page 3: Common Issues on Plans

3

Excavated Sd2s

• Not to exceed one acre

Page 4: Common Issues on Plans

4

Sediment storage

• Sediment storage ponds can not be labeled both Sd3 and Rt at the same time.

• Sediment storage is to be calculated per acre drained, not per the disturbed area

Page 5: Common Issues on Plans

5

Ponds can not be labeled temporary and permanent at the same time

Page 6: Common Issues on Plans

6

Sediment Storage

• When designing an Sd3 be sure it is in the appropriate location.

• When a sediment basin is not to be used, provide a written rationale explaining the decision to not use a basin.

Page 7: Common Issues on Plans

7

Dn1 Calculations

Page 8: Common Issues on Plans

8

Page 9: Common Issues on Plans

9

Double check the plans before submittal

•Make sure to label all BMPs

•Make sure to label proposed contours

Page 10: Common Issues on Plans

10

Limits of disturbance• Label your limits of

disturbance on each phase

• Do not show work outside the limits of disturbance

• Most common items seen outside limits of disturbance

Silt fence

Sediment storage

Stock pile areas

Check dams

Page 11: Common Issues on Plans

11

Example outside limits

Page 12: Common Issues on Plans

12

State Waters

•Label all State Waters.

•Be sure statements match plans.

•Make sure to label the State’s required 25’ buffer along with the LIAs buffer (if applicable).

Page 13: Common Issues on Plans

13

Page 14: Common Issues on Plans

14

Make sure to have all appropriate statements signed

"I certify under penalty of law that this Plan was prepared after a site visit to the locations described herein by myself or my authorized agent, under my supervision."

" I certify that the permittee's Erosion, Sedimentation and Pollution Control Plan provides for an appropriate and comprehensive system of best management practices required by the Georgia Water Quality Control Act and the document "Manual for Erosion and Sediment Control in Georgia" (Manual) published by the State Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, provides for the sampling of the receiving water(s) or the sampling of the storm water outfalls and that the designed system of best management practices and sampling methods is expected to meet the requirements contained in the General NPDES Permit No. GAR 10000_."

Page 15: Common Issues on Plans

15

Design Professional Inspection

The Design Professional must inspect the installation of initial sediment storage requirements and perimeter control BMPs within 7 days after installation.

Page 16: Common Issues on Plans

16

Select the Appropriate Checklist

The appropriate checklist must be

completed and submitted with all

ES&PC plans.

Checklists are available at www.gaepd.org

and

www.gaswcc.georgia.gov

Page 17: Common Issues on Plans

17

Retention of Records

Permittees are required to retain the following records:

Page 18: Common Issues on Plans

18

In accordance with V.G.2.d, the Permittee must

sign the following statement:

" I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that certified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

Page 19: Common Issues on Plans

19

AppropriateWorksheets

Design Professionals must

provide all the appropriate

worksheets from the manual

for structural BMPs.

Page 20: Common Issues on Plans

20

• Make sure to have the Level II certification on each ES&PC sheet (including details).

• Check the details to ensure that there are details for every BMP used.

• Make sure all statements apply to your plans.• Double check your plans for things you might have missed.

Page 21: Common Issues on Plans