DefCore Targets:
Cloud Interop & Vendor Clarity
How a community answers “what is OpenStack” ?
DefCore Co-ChairsRob Hirschfeld & Egle Sigler
2
2015A Process (http://bit.ly/defcore2015a)
In Vancouver, we expect the Board to approve the official DefCore Process.
This process defines how the Board will manage core. We spent the last 18 months figuring out the why.
We are seeking community input on the process before the Board votes. Input may include “+1, yes, I like it.”
Our object today is to give you enough background to be an informed reader of the 2015A process.
3
DefCore = Commercial Use
Uses of the OpenStack mark: 1. Community (non-commercial use) 2. Code (integrated release) 3. Commerce (products and services)
DefCore covers #3 only!
4
DefCore = Interoperability
• OpenStack™ should mean something to users• What matters to users?
• OpenStack as a reliable platform (brand)• Common Validation (testing)• Common Implementation (code)• And, don’t impede growth and innovation!
5
What is DefCore?
• DefCore is a process that sets base requirements for all
OpenStack products by defining:
1) must-pass tests of capabilities, and
2) designated sections of code
• These definitions use community resources and involvement
to drive interoperability by creating the minimum standards
for products labeled “OpenStack”.
6
DefCore Process based on Principles
Green Area• Common Core• For All Usages
Blue Area• Reference Code• With Substitutions
Orange Area• community tests• some required• self-testing ok
7
Balanced Process
We are committed to an open and transparentprocess that balancescommunity and vendors.
8
Community
• Interop Map ○ to find widely used capabilities
• Writes Tests• Defines Capabilities
TESTS ARE TRUTH
Note: Not limited to Tempest
9
Vendor Responsibility
• Self-testing• Clear Pass-Fail Results • Transparent Reporting• Can Appeal individual tests
MUST TEST TO USE BRAND
10
• Is the final authority on “What is Core”• Select & Scores Required Capabilities • Acts through the DefCore Committee• Publishes regular guidelines
PICKS REQUIRED TESTS
Foundation role:• manages vendors• enforces brand use
OpenStack Board
11
DefCore Deliverables?Guidelines!
Explains in simple terms what capabilities and code is required for OpenStack platforms and products.
JSON version includes detailed lists of tests.
RST version has high level summaries for review.
OpenStack DefCore 2015.03
Releases Covered: ...
Platform Components Required: Compute, ObjectAdvisory: NoneDeprecated: NoneRemoved: None
Status: approved
Compute Component Capabilities
Required
Advisory
Deprecated
Removed
Compute-auth (nova)Compute-flavors (nova)Compute-images (nova)…Auth-token (keystone)Compute-servers-metadata (nova)
None
None
Designated Sections
Required …
13
Guidelines Cover
Progression: Advisory ↦ Required ↦ Deprecated
• Releases• Platform Components• Capabilities
• Project APIs• Validated by Tests
• Designated Sections• Integrated Projects Only• Required Upstream
Capabilities (API)Designated Section
OpenStack Component
OpenStack Platform
15
Which code gets Designated?
Designated:● code provides the project external REST API, or● code is shared and provides common functionality for all
options, or● code implements logic that is critical for cross-platform
operation
Not Designated:● code interfaces to vendor-specific functions, or● project design explicitly intended this section to be
replaceable, or● code extends the project external REST API in a new or
different way, or● code is being deprecated
16
Capabilities
Capabilities = Groups of API Tests, e.g.:"block-snapshots" :
test_snapshot_create_get_list_update_delete,test_volume_from_snapshot
NOT LIMITED TO TEMPEST
17
2015A Process (http://bit.ly/defcore2015a)
ok, we’re finally ready to show you the process!
18
2015A Process (http://bit.ly/defcore2015a)Time Frame Milestone Activities Lead By
-3 months S-3 "Preliminary” draft (from current) DefCore
-2 months S-2 ID new Capabilities Community
-1 month S-1 Score Capabilities DefCore
Summit S "Solid" draft Community
Advisory/Deprecated items selected
DefCore
+1 month S+1 Self-testing Vendors
+2 months S+2 Test Flagging DefCore
+3 months S+3 Approve Guidance Board
19
2015A Process (http://bit.ly/defcore2015a)
4 phases: 1. Guidelines Draft Phase (A) - 3 months before summit
a. collect data
b. add new and advance advisory requirements
c. score items
2. Guidelines Review Phase (B) - at summit
3. Community Review & Vendor Self-Test (C) - after summit
a. changes tracked and managed in Gerrit
b. vendors work with Foundation on self-testing
4. Guideline Approval (D) - 3 months after summit
20
Call to Action!
User? As your vendor which guidelines they have passed!
Vendor? Validate your products!
We need YOUR HELP:• Review the 2015.Next• Help designate sections• Run Tempest and upload• Rock us some +1s!
21
References
DefCore Github: https://github.com/openstack/defcore/
WE USE GERRIT FOR CHANGES AND REVIEWS
DefCore Wiki: https://wiki.openstack.org/wiki/Governance/DefCoreCommittee
Rob’s Blog: http://robhirschfeld.com/?s=defcore
Please reach out to OpenStack DefCore mailing list!Rob (@zehicle) & Egle (@eglute)