Development of a Comprehensive Modernization Project at
Polytechnic High School
Community Meeting
Thursday, March 10, 2016
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
2/13
Agenda
Overview
Program Goals
Analysis
Recommendations
Timeline / Next Steps
Questions and Answers
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
3/13
Overview
Polytechnic High School was identified for the development of a
“Comprehensive Modernization Project”
Board of Education approved in March 2015
1 of 11 schools identified…so far
What does this mean?
A large-scale project is being developed to make major improvements
to Polytechnic HS’s facilities
The project will address the most critical physical conditions of school
buildings and grounds Focus on safety
Limit work on less critical items.
The project is developed based on data, analysis, and community input
Approximately 10 Times More Funding Than is Available Would be Needed to Address All the Capital
Needs of All of Our Schools
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
4/13
Board Approved Goals
Schools Should be Physically Safe and Secure
School Building Systems Should be Sound and Efficient
School Facilities Should Align with Instructional Requirements andVision
Projects will modernize, build and repair school facilities to improvestudent health, safety, and educational quality
School Upgrade Program
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
5/13
Comprehensive Modernization ProjectWork Completed
Conceptual Master Plans: 2010-2013
Performed by Architects
Included input from school users and stakeholders Produced a long-range roadmap to assist with future facilities
improvements
Facilities Condition Assessment: 2011-2015
Performed by District Maintenance & Operations professionals
Analyzed the condition of building systems
Identified when building systems are anticipated to require
maintenance and/or replacement
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
6/13
Comprehensive Modernization ProjectWork Completed
Educational Programming: Spring - Fall 2015
Developed by school site administrators and District leadership
Identified school educational vision and academic programs
Ensures facility improvements support educational programs
Polytechnic HS serves ~ 3,000 students
Community Input: Spring 2015 Accessible and safe path of travel for all students needs
improvement
Seismic safety is important
Replacing portables with permanent buildings is important Science and music classrooms need upgrading
Athletic facilities need upgrading
Library needs upgrading
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
7/13
Comprehensive Modernization ProjectWork Completed
Topographic, Geological and Utility surveys: Spring - Fall 2015
Performed by professional surveyors and geotechnical experts
Easements and utilities identified
Soil conditions analyzed
Utilized to gain understanding of various complex site conditions
Infrastructure Analysis: Spring - Summer 2015 Performed by architects and engineers
Capacity and condition of underground and above ground utilities
were analyzed including:
Sewer, storm water, plumbing, electrical, low voltagesystems, heating and cooling, etc.
Utilized for budgeting and scoping major building system
upgrades and/or replacements
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
8/13
Comprehensive Modernization ProjectWork Completed
Seismic Evaluation: Spring - Fall 2015
Performed by structural engineers
Buildings with characteristics identified by the State of
California Assembly Bill 300 were evaluated
Utilized to determine whether seismic upgrades are needed and
the extent of upgrades needed to further ensure safety
Historic Evaluation: Spring - Summer 2015
Performed by architectural historians
Conducted research on history of school facilities and sites
Existing buildings and sites were surveyed and analyzed toidentify character-defining architectural features
Utilized to gain understanding of historic resources
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
9/13
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
10/13
Major Findings
Seismic Evaluation
7 buildings requirestructural upgrades
Campus infrastructure in poorcondition
Security features require upgrade
Polytechnic High SchoolWhat we learned
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
11/13
Proposed Scope of Work
New Building(s) to be Constructed
Classrooms
Gymnasium
Cafeteria
Auditorium
Administration/Library
Site Work
Site Infrastructure
Student drop off
Parking
Renovation of Existing Classroom
Buildings
Roofing
Paint (Interior & Exterior)
Flooring & Base
Anticipated improvements valued at more than $100 Million!
Polytechnic High SchoolWhat we recommend
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
12/13
Anticipated Project Timeline
Project
Development
Environmental
~12-18 months ~2-4 Years
DesignApprovals
~10-12 months
Construction
BOC
BOE
Project
Definition
BOC
BOE
ProjectApproval
BOE
Site
Identification
BOE
CEQA
Certification
(if necessary)
BOE
Construction
Contract
Award
*Timeline Assumes a Traditional
Design, Bid, Build Procurement
-
8/19/2019 Comp Mod Community Presentation Poly HS _3102016
13/13
For More Information Please Contact:
José De Paz, FSD Community Relations Department
• Main Line (213) 241-1340 • Direct Line (213) 241-1334
Questions and Comments