compacflt n4 rdml michael s. roesner oif lessons learned & fleet quick hits

13
COMPACFLT N4 RDML Michael S. Roesner RDML Michael S. Roesner OIF Lessons Learned OIF Lessons Learned & & Fleet Quick Hits Fleet Quick Hits

Upload: ella-patterson

Post on 28-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

COMPACFLT N4

RDML Michael S. RoesnerRDML Michael S. Roesner

OIF Lessons LearnedOIF Lessons Learned&&

Fleet Quick HitsFleet Quick Hits

ASDOF Expediting Bandwidth / ADP Vision Transportation / Material Pipeline Ownership Time Phased Force Deployment Data

(TPFDD) Full Spectrum Logistics Support Numbers Matter FRP Surge / Remote Sustainment

OIF Lessons Learned Fleet Quick Hits

Quick HitsLessons Learned

ASDOF

ASDOF initiatives alive and well…

PAPA Postal Navy Cash

Recent initiatives include Cleaning Consolidation and Medical Prime Vendor.

Need to increase attention on Supply OPS.

Need to Refocus on ASDOF!

Quick HitsLessons Learned

Expediting

Fragmented OwnershipFunctionally – few steps in process.Operationally – Pass through various

support, transportation and Tycoms/Fleets. Ground Truth

Too many fingers in the pie, at time’s hard to tell what the answer is.

Need Single Umbrella across Functional/Operational Boundaries.

Desired End State…Streamlined process, manned appropriately, TYCOM controlled

Quick HitsLessons Learned

Bandwidth/ADP

Ensure LOG bandwidth requirements have adequate prioritization and representation.

Factor available bandwidth into effective capability and labor savings of new systems.

ADP Way AheadProceed with ENTCSS implementation with ERP as

the ultimate desired end state.ENTCSS will eliminate afloat legacy systems.

Quick HitsLessons Learned

Need Sponsorship for Bandwidth

Transportation

Transportation Chain Integration Synchronize Airlift with CLF

Quick HitsLessons Learned

Thur13Mar

Fri14Mar

Sat15Mar

Sun16Mar

Mon17Mar

Tues18Mar

Wed19Mar

Thur20Mar

Fri21Mar

72 hour time period

Sat22Mar

Sun23Mar

Mon24Mar

Tue25Mar

Wed26Mar

Thur27Mar

PalletsOH: 60

13th MAR

PalletsOH: 60Fm 13th

PalletsFm 13thShipped

PalletsFm 13th

Arrived“on time”

PalletsWaiting

NextCLF

PalletsFinallyGot onCLF

PalletsWaiting

NextCLF

PalletsWaiting

NextCLF

PalletsWaiting

NextCLF

CLF Load Dates

CLF Delivery DatesPallets

FM 13thArrive

72 hour time periodPalletsOH: 60

13th MAR

PalletsOH: 60Fm 13th

PalletsFm 13thShipped

PalletsFm 13th

ArrivedEarly

PalletsEarly for

NextCLF

PalletsFinallyGot onCLF

PalletsEarly for

NextCLF

PalletsLoadedOn CLF

PalletsWaiting

NextCLF

PalletsFM 13thArrive

TARAWAMet 72 hour

goal, but missed CLF load date!

14 Days BAH to Ship

LINCOLNMet 72 hour goal and was early for load

date!9 Days BAH

to Ship

Right stuff, in the right

place, at the wrong time.

CLF Load DateCLF Delivery Date

MissedOpportunity

Align Metric to CLF Load Dates!

Material Pipeline Ownership

DepotOverhaul

Storage

MPC

Ship

Supply/Maintenance

ATAC

The only piece of the repair cycle that is Fleet controlled!

Quick HitsLessons Learned

TPFDD FLOW

OIF TPFDD force flow was not executed as planned.

Long lead time to deploy forces provided components best sourcing opportunity.

Future conflicts may not provide us with the luxury of time to deploy forces as we experienced during OIF.

Access to Battle Space not Guaranteed.

Quick HitsLessons Learned

Full Spectrum Logistics Support

Full Spectrum Logistics Support should be applied in future conflicts/non-traditional areas….establish “off the shelf” Log Plans.

Planning cell inclusive of DLA, NAVSUP, FLEETS and TYCOMS to provide:

Mobile NOACTs ATACs MPCs Establish Inventories w/out footprint…HULL Prime Vendor

CNAP’s aviation logistics support strategy for OIF was an overwhelming success!

Quick HitsLessons Learned

Numbers Matter

Mission Area Synergies from multiple ARG/CVBG.

Fully develop/exploit this technology to enable rapid logistics reconfiguration of future CSG’s/ESG’s.

Quick HitsLessons Learned

F/A-18C/D APG 65/73 RadarAVDLR Range & Depth

FRP Surge/Remote Sustainment

DLA Partnership Guam … DDC signed Letter of Intent to assume physical distribution

/ MPC operations in CY-04. Sigonella positioning being enhanced. Singapore … looking for DSCP to stand up HULL Prime Vendor,

eliminate footprint Looking for future opportunities

NAVSUPTraditional Support in Non-Traditional Areas to include

LSC, ATAC, NOACT etc.GuamMobile Capability…Potential to team with ELSFOther Blue/Green Opportunities

Sigonella Singapore

Quick HitsLessons Learned

GET READY…STAY READY

FRP Surge/Remote SustainmentQuick Hits

Lessons Learned

FRP Surge/Remote Sustainment

Stock PositioningNeed to make sure material is positioned properly

to enhance readiness and is maintained during IDTC. During both surge (IDRC) and sustainment operations.

Don’t Apply Lesson Learned to Yesterday’s Conflict…Apply them to our Future Vision.

Quick HitsLessons Learned