company presentation

18
2012 © Marine Cybernetics | www.marinecyb.com 2012 © Marine Cybernetics | www.marinecyb.com MARINE CYBERNETICS Company presentation

Upload: hrosvik

Post on 17-Jan-2015

90 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com 2012 © Marine Cybernetics | www.marinecyb.com

MARINE CYBERNETICS

Company presentation

Page 2: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

MARINE CYBERNETICS

Page 3: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

THE TECHNOLOGICAL EVOLUTION

Machines

Software

Page 4: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

WHO IS OUR CUSTOMER?

Page 5: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

ERROR MESSAGES

Page 6: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

BLUE-SCREEN

Page 7: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

WHAT IS THE SOFTWARE CHALLENGE?

If (requiredPower >= MAX_POWER * 0.8) { shutdownGenerators(); //remember to remove before final compilation …

Application (DP, PMS, BOP,

DCS, ...)

Operating System

IO / Network

Page 8: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

CONSEQUENCES OF LOSS OF POSITION CASE FOR ACTION

Page 9: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

LISTING INCIDENT DUE TO CONTROL SYSTEM FAULT

Page 10: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

LOSS OF POSITION

Page 11: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

CONSEQUENCES OF LOSS OF POSITION CASE FOR ACTION

Page 12: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

CONTROL SYSTEM INTERDEPENDENCIES

Crane control system

Emergency shutdown

system

Well control systems

BOP control system

Drill floor control system

Integrated automation

system

Power management

system

Dynamic positioning

system Thruster control system

Offloading system

Diving control system

Ballast control system

Testing and verification of

SW has not kept pace with the development

Page 13: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

WHAT IS HIL TESTING? CONTROL SYSTEM IN NORMAL OPERATION - CONTROLLING REAL VESSEL

Page 14: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

WHAT IS HIL TESTING? CONTROL SYSTEM IN NORMAL OPERATION – CONTROLLING SIMULATED VESSEL

Page 15: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

102 NEW BUILDINGS/RETROFITS

21 Platform Supply Vessels (PSV)

14 Anchor Handling Tug Supply (AHTS)

6 Emergency Rescue Recovery Vessels (ERRV)

19 Offshore Construction Vessels • ROV, Diving, IMR, Well intervention

31 Drilling units (semi/drillship/jack-up)

1 Seismic Vessel

10 Shuttle Tankers

Page 16: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

Vessel owners

REFERENCES

E & P Companies

Page 17: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com

Vendors

Yards

REFERENCES

Page 18: Company Presentation

2012 © Marine Cybernetics | www.marinecyb.com 2012 © Marine Cybernetics | www.marinecyb.com