TRANSCRIPT

GAS CONDITIONFOR GAS TURBINES &

MULTITEX designs and ma

Gas Conditioning Skid to pr

at the required pressure

untreated, unregulated Gas

Complete Skid process

guaranteed Performance re

Process Simulation along wProcess Simulation along w

is Also provided as part

Turnkey projects.

All modules are packagedAll modules are packaged

skids or interconnecting pip

NING SKID (GCS)& GAS COMPRESSORS

anufactures a full range of Fuel

rovide clean, dry, metered Gas

and temperature from the

source.

s engineered to provide

equirement.

with 3 D modeling of the Skidswith 3 D modeling of the Skids

of complete plant layout for

d complete on one or mored complete on one or more

ping, valves and instruments.

GAS CONDITIONFOR GAS TURBINES &

Typical combinations of maj

Cyclone Scrubber

Coalescer

Absolute Filter

Filter Separator

Performance Heater

Dew Point Heater

Pressure Regulating Sta

Flow Meter & Flow Comp

C d t H dli S Condensate Handling Sy

Emergency Shutdown &

NING SKID (GCS)& GAS COMPRESSORS

or components are:

tion Start Up Heater

puter

tystem

Vent System

GAS CONDITIONFOR GAS TURBINES &

CONTROL PANEL

The process is controlled

Panel can be locally operat

Explosion Proof CertificationExplosion Proof Certification

G ), but remote control from

The barriers, flow computer

are built into the Cont

commissioning support wit

provided .

Erection, Commissioning

Multitex competent site teMultitex competent site te

Commissioning, Startup & P

NING SKID (GCS)& GAS COMPRESSORS

from a Control Panel. This

ted and are available with with

ns ( DGMS Certified or ATEX 2ns ( DGMS Certified or ATEX 2

m safe area is also possible.

rs, PLCs and other controllers

rol Panels. Integration and

h local SCADA systems also

& Start Up

eam is available for Erectioneam is available for Erection,

PG Test.

GAS CONDITIONFOR GAS TURBINES &

Partial List of Customer / P Partial List of Customer / P

GOT, TRIPURA

THOMASSEN INTL. B.V., HOL

OMAN, RUSAIL

BAPL SAMALKOT BAPL, SAMALKOT

GOT-BARAMURA

KONASEEMA

QPD (JAPAN GAS)

LEKHWAIR PDO OMAN LEKHWAIR, PDO OMAN

CLOUGH, AUSTRALIA

BECHTEL-JAMNAGAR EXPO

ALSTOM, FUJAIRAH F2, UAE

AL-NAJAF POWER PROJECT

RELIANCE

AKAZ GAS POWER PLANT, IR

GTCL, BANGLADESH

SAIH NIYADA CONDENSATE,

BAIJI POWER PLANT, IRAQ

MIRFA IWPP, ABU DHABI, UA

MITSUBISHI HITACHI POWER

ZCINA PROJ., SONATRACH, A

B.C. PETROLEUM, MALAYSIA

AFPC SYRIA

ABB ITLAY

FERNAS, TURKEY

MULTITEX has engineered, manufa

for configurations with Multi-Gas Tur

NING SKID (GCS)& GAS COMPRESSORS

Projects Executed:Projects Executed:-

LLAND

ORT REFINERY

E

T, IRAQ, Q

RAQ

, PDO OMAN

AE

R - IFFCO

ALGERIA

A

actured and supplied Gas Condition Skid

rbine as well as individual Gas Turbines.

GAS CONDITIONFOR GAS TURBINES &

2000 MW IWPP Plant for F

Multitex has an opportun

Conditioning Skid serving MConditioning Skid serving M

Power Generation (5 Frame

GT Frame 9FA) Gas Turbine

NING SKID (GCS)& GAS COMPRESSORS

ujairah Project for Alstom

nity of building single Gas

Multi Gas Turbines for 2000 MWMulti Gas Turbines for 2000 MW

e GT-KAE26 (Equivalent to GE

es)

GAS CONDITIONFOR GAS TURBINES &

Partial List of Fuel Gas Co

individual as well as multi

GE Frame 3

GE Frame 6

GE Frame 9FA

Siemens V94.2

GE Frame 6B

NING SKID (GCS)& GAS COMPRESSORS

onditioning Skid supplied for

gas Turbines

GE Frame 5

GE Frame 9

GE Frame 9E

GE Frame 6FA

Alstom GT-KAE26