company profile - panoramabh.com company profile.pdf · fabrication, erection, ... activities,...

33
Company Profile Contact Address: P.O. Box 5602, Manama, Kingdom of Bahrain. Tel. No. (+973) 17 729 935 Fax No. (+973) 17 723 330 e-mail: [email protected] “Our Obligation is to Provide Unparalleled Personalized Services, Craftsmanship and Trust." Mechanical & Civil Engineering Works Pumping Stations Ground Water Storage Tanks Elevated Storage Reservoirs Pipelines (Oil, Gas, Water & Sewerage/Drainage) Pressure Vessels Water Tanks Internal Lining (Corrocote) Heavy Structural Steel Fabrication and Erection Cladding Works Earthworks & Concrete works Heavy Duty Access Scaffolding And all Type of Coating Works

Upload: vokien

Post on 21-Jul-2018

601 views

Category:

Documents


31 download

TRANSCRIPT

Page 1: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Company Profile

Contact Address:

P.O. Box 5602,

Manama,

Kingdom of Bahrain.

Tel. No. (+973) 17 729 935

Fax No. (+973) 17 723 330

e-mail: [email protected]

“Our Obligation is to Provide

Unparalleled Personalized

Services, Craftsmanship and

Trust."

Mechanical & Civil Engineering Works Pumping Stations Ground Water Storage Tanks Elevated Storage Reservoirs Pipelines (Oil, Gas, Water & Sewerage/Drainage) Pressure Vessels Water Tanks Internal Lining (Corrocote) Heavy Structural Steel Fabrication and Erection Cladding Works Earthworks & Concrete works Heavy Duty Access Scaffolding And all Type of Coating Works

Page 2: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Values & Beliefs

Provide Value for Money to Customers through Quality Products and Services.

Adhere to Ethical Norms in all Dealings with Employees, Customers, Suppliers, Banks and Clients.

No Compromise on Quality Management System Developed.

Obtain the Satisfaction of Employees and Suppliers through Fulfillment of their Needs.

Recognize and Reward Initiative, Innovativeness and Creativity.

An Organizational Climate Conductive to Trust, Open Communication and Team Spirit is an

Integral Part of Business.

Manage the Environment Effectively to Various Sections of Society and Preserve

Environment.

Achieve the Commitment in an Accelerated Manner, Consistent with Values and Beliefs, by

Continuous Organization Renewal.

The Quality Policy of PANORAMA Contracting & Engineering Services WLL. is founded on the basic motive of customer satisfaction giving utmost emphasis to health, safety, and environmental factors. PANORAMA Management is committed to establish, implement, and maintain quality system according to the requirement of International Standards ISO 9001 at all levels. The project QA/QC Managers on behalf of the Company Project Managers are responsible to ensure that the quality systems are established, implemented, and maintained to the satisfaction of the customer. The implementation of the Quality Policy is regulated and monitored within the well-defined framework of work procedures, inspection test plan and quality plan with the active participation of all employees. Optimum resource availability is given prime importance and training is imparted for the continuous improvement in the quality of service in line with the latest technology and construction techniques. Our prime goal is ‘to be the best among the competitors’ and to uphold the interests of the customer in accordance

to the applicable procedures, standards, specifications and contractual obligations keeping in mind the all round

development of one and all involved.

Quality

Policy

Page 3: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Introduction

Mission Statement

Our goal at PANORAMA Contracting &

Engineering Services WLL. is to provide

our Customers with quality services. We

strive to maintain the principles upon

which our business was founded over 30

years ago. It is these principles of

honesty, integrity, quality and safety that

have enabled us to remain in business

over these 30 years.

We can deliver many products associated

with the Water System, Gas/ Petroleum

Distribution and any Storage Facilities,

Waste/Drainage Water System, Pumping

Station and any other types of Civil

Engineering Works.

PANORAMA Contracting & Engineering Services

WLL. is a major Contractor for Steel Works such as

Fabrication, Erection, Testing and Commissioning

of Pipelines for Gas, Oil, Water and Sewerage/

Drainage. Specialize in EPC Contract for the Steel

Storage Tanks, Pumping Stations and Structural

Building Works.

PANORAMA established in the year 1976 in

Bahrain, with the vision to cater the growing needs

of the industrial development taking place in the

region, having successfully completed major

engineering and contracting projects in the Island.

20Mg Ground Storage Tank Center Column

SITRA WEST VALVE STATION (SWVS)

Page 4: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Ground Storage Tanks Experience

PANORAMA Contracting & Engineering Services WLL., has

been leading in designing, fabricating, erecting and

commissioning Storage Tanks over the Island and for over 30

years built, a field force of experienced Engineer’s,

Superintendents, Foremen and Skilled Manpower, backed by

the energetic Management.

20MG Ground

Storage Tank Center

10MG Ground Storage Tank @ Sitra BS

Gas Pipelines Experience

PANORAMA specializes in the fabrication,

installation, testing and commissioning of

underground pipelines for BAPCO Upstream

(formerly BANOCO). Undertaken the major works

such as Gas Pipelines from ADP to DVS, SWVS to

GCC VS and DVS to Wharf VS.

ABOVEGROUND PIPE LINE

UNDERGROUND PIPE LINE

HYDROTESTING OF PIPE LINE

10Mg GROUND STORAGE TANK

Page 5: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Key Personnel

Salim Ahmed Mannai

The Company Chairman / Managing Director, Founder and Owner of the Company.

Having an Experience in the Construction Industry for more than 42 years.

Bishara N. Nusseir

The Company Director, a Mechanical Engineer in Profession. One of the Owner and

Founder of the Company. Having an Experience in the Construction Industry for more

than 42 years

Ahmed Isa Al Mannai

The Deputy Managing Director of the Company, Responsible in accurately forecasting

revenue, profitability, margins, bill rates and utilization, assures project legal

documents are completed and signed, manages project budget, identifies resources

needed and assigns individual responsibilities, In-charge of the Administration

Section of the Company. Having an Experience in Human Resources and

Administrative Management of Construction Projects for around 16 Years.

Zachariah Thomas

The Director- Projects & Contracting of the Company, responsible for Specifying

project objectives and plans including delineation of scope, budgeting, scheduling,

setting performance requirements, and selecting project participation, Maximizing

resource efficiency through procurement of labor, materials and equipment,

Developing effective communications and mechanisms for resolving conflicts.

Manages project budget, Analyzes project profitability, revenue, margins, bill rates and

utilization, Follows up with clients, when necessary. Have an experience in the

Construction Industry for more than 25 years.

Donrick Erril Joshua

The General Manager of the company, responsible for projects being handled by the

company. Having 15 years experience as Project Manager in Bahrain working on EPC

contracts for EWA/Alstorm Switzerland. Having an overall experience of 33 years in

the construction industry.

Page 6: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Thamizharasan. S

The Project Manager of the Company, direct and monitor the progress of construction

activities, oversee the delivery and use of materials, tools, and equipment, quality of

construction, worker productivity, and safety, review engineering and architectural

drawings and specifications to monitor progress and ensure compliance with plans

and schedules. Responsible for obtaining all necessary permits and licenses. In-

charge for the Tendering, Planning, Construction, Testing and Commissioning of

Storage Tanks, Water, Gas and Oil Pipelines. Having an experience in the Construction

Industry for more than 25 years

Ernesto T. Tumang

The Project Manager of the Company, Responsible for Facilitating team and client

meetings effectively, Tracks and reports team hours and expenses on a weekly basis,

Determines appropriate revenue recognition, ensures timely and accurate invoicing,

and monitors receivables for project. In-charge for the Tendering, Design, Planning,

Construction, Testing and Commissioning of Pumping Stations and Steel Storage

Tanks. Having an experience in the Construction Industry for more than 25 years

Kul Bhushan Chatra

The Project Manager of the Company, responsible for Creating and executing project

work plans and revises as appropriate to meet changing needs and requirements,

Identifies resources needed and assigns individual responsibilities, Reviews

deliverables prepared by team before passing to client, Effectively applies our

methodology and enforces project standards. In-charge for the Tendering, Planning,

Construction, Testing and Commissioning of Pumping Stations, Water, Gas and Oil

Pipelines. Having an experienced in the Construction Industry for more than 30 years

Munnar Parameshwara Bhat

Design Manager of the Company responsible for review of hydraulic and process

design of pumping system for meeting the specified requirements. He is also

responsible for review pumping system control philosophy for efficient operation of the

plants. He was designing various types of pumps for 8 years. He has been involved in

preparing water supply project reports; designing, preparing bid documents, evaluating

of bids, reviewing of contract drawings for various pumping plants equipment for more

than 50 cities. He has 33 years in the contracting

Page 7: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Libu Varghese Mathew

The Quantity Surveyor of the Company, In-charge for the Tendering and Estimation.

Evaluates the Tender Documents, Studies the feasibility of the Tender and selects the

Tender participation.

Manages all costing related to Tender, from the initial calculations to the final figures.

Surveyors seek to minimize the costs of a project and enhance value for money, while

still achieving the required standards and quality. Involved in a project from the start,

preparing estimates and costs of the work.

Mansoor Mohammed Basha

The Senior QHSE Manager of the Company, In-charge for the preparation of the

companies QHSE documents and supervision of all amendments and revisions,

Control and the distribution of all the companies quality documentation, Monitor all

quality related activities on the project, Perform all internal and external audits on

behalf of the company’s management, Attend client quality management meetings,

Coordinate all QHSE activities with the Project manager, Control all achieve

documentation upon the completion of the project. Having an experience in the

Construction Industry of more than 15 years.

Biju Bhaskaran

The QA/QC Manager of the Company, In-charge for the preparation of the companies

QHSE manual control and supervision of all amendments and revisions, Control and

the distribution of all the companies quality documentation, Monitor all quality related

activities on the project, Attend client quality management meetings, Coordinate all

QA/QC activities with the Project manager, Control all achieve documentation upon

the completion of the project. Having an experience in the Construction Industry of

more than 15 years.

N.Sudhakaran

The Construction Manager of the Company, manages all costs relating to projects,

from the initial calculations to the final figures. Surveyors seek to minimize the costs

of a project and enhance value for money, while still achieving the required standards

and quality. Involved in a project from the start, preparing estimates and costs of the

work.. Having an experience in the Construction of Pumping Stations, Storage Tanks,

Water, Gas, Oil and Sewer Pipelines of more than 20 years.

Mohanan K P

The Tanks Superintend of the Company, Organizes, co-ordinates and controls the

correct performance of the construction and assembly work, even of high complexity,

assisting the construction manager in the management for correct performance and

monitoring of the project, Applies the final, procedures approved by the client, Ensures

observance of the project specifications, Ensures that safety and quality standards are

respected. Having an experienced in the Construction Industry of around 15 years

Page 8: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Sameer KB

The Safety Coordinator of the Company, In-charge for Implementing the

process for reviewing contractor safety performance against applicable laws,

regulations the Planning, Directs the work of Environmental Health and Safety

staff and outside consultants and contractors regarding new construction

safety, Coordinates construction safety program development and implements

activities. Having an experienced in the Construction Industry of more than 8

years.

Swathidev George

The Planning Engineer of the Company, In charge in Providing project control services to the Project Manager in implementation of the project, Responsible for timely issue of project control deliverables & progress reports, Provide leadership to planning engineers, schedulers and cost engineers to plan, monitor, and control the execution of the project within the time and budgetary parameters, optimizing resource utilization. In-charge for the Planning, Construction, Testing and Commissioning of Pumping Stations, Storage Tanks, Water, Gas and Oil Pipelines. Having an experienced in the Construction Industry of around 7 years

Thaha Aliyar Kunju

The Land Surveyor of the Company, responsible to offer valuable land surveying

service to clients, determine the location of boundaries, field surveys and record

details, and perform the projects according to the technical standards. Having an

experience in the Construction of Pumping Stations, Storage Tanks, Water, Gas, Oil

and Sewer Pipelines of more than 20 years.

C Venugopal

The In-charge for the Blasting and painting in Block stage and hull stage, Planning

and organizing Painting works, Quality control of surface preparation and coating

together with Client Painting representative. Having an experience in Scaffolding

Erection for Construction. Also In-charge for Plant & Equipments, involved in

transportation of man power resources according to changing needs, stock control,

warehousing, and ensuring structures are in place to monitor the flow of goods and

materials. Having an experience in the Construction Industry of around 20 years.

Joseph Marydas Antony

The Senior Mechanical Engineer, In-charge for the Fabrication, Testing and

Commissioning of Pumping Stations, Storage Tanks, Water Pipelines. co-ordinates and

controls the correct performance of the construction work, even of high complexity,

assisting the construction manager in the management for correct performance and

monitoring of the project Having an experienced in the Construction Industry of around

10 years.

Page 9: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Item Equipment description QTY. (Nos.) Type

1 Mobile Crane, 200T 2 Telescopic

2 Mobile Crane, 140T 1 Telescopic

3 Mobile Crane, 110T 1 Telescopic

4 Mobile Crane, 50T 1 Telescopic

5 Mobile Crane, 45T 1 Telescopic

6 Mobile Crane, 40T 2 Mechanical

7 Mobile Crane, 35T 1 Telescopic

8 Mobile Crane, 25T 2 Telescopic

9 Over Head Crane, 10T 5

10 Heavy Excavator, 1 m3 26

11 Compressor, 1110 cfm 5

12 Compressor, 400/625 cfm 9

13 Heavy Rock Breaker 16

14 Vermeer Hydrostatic Trencher 1

15 Loader, 4 m3 12 Front Loader

16 Loader with Backhoe, 3 m3 8

17 Compactor Plate 14

18 Roller, 1T to 2T 6

19 Roller 10T 8

20 Generator, 360/400kv 14

21 Generator, 200kv 6

22 Generator, 140kv 4

23 Generator, Atlas Capco 4

24 Welding Machine, Diesel, 400

Amps

26

25 Welding Machine, Electric, 400

Amps

55

26 Welding Machine, Automatic (1

side Horizontal)

4

27 Welding Machine, Automatic (2

side Horizontal)

2

28 Welding Machine, Automatic

(Vertical)

2

Plant & Equipments

Our Fully Own Plant/Equipment is the Best Available for the Work We

Perform. We have the Plant/Equipments to Self-Dependent in all our

Construction Needs.

Craneage/ Mechanical Works

Mobile Cranes Ranging from 15T to 200T Capacity, Trailers (Low and

Flat Bed), Diesel Generators, Air Compressors, Diesel, Electric and

Automatic Welding Machine, Scaffolding and Miscellaneous Erection

Tools.

General Construction Plant/ Equipment

Front Loader with Backhoe, Grader, Heavy Excavator/ Rock Breaker,

Roller/ Compactor (Different Capacities),

Dump Trucks, 10m³

Water Tanker (10,000 Gallons Capacity ) and Other

Miscellaneous Civil Works Equipment

Page 10: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

29 Tract AUTO Welding Mc 4

30 Rolling Machine, up to 40mm

Thick Steel Plate

2

31 Rolling Machine, up to 25mm

Thick Steel Plate

1

32 Hydraulic Press 500 ton 1

33 Shearing Machine Thickness

upto 16mm

1

34 Lathe Machine 6

35 Drilling Machine 6

36 Cutting Sets, Oxy-Acetylene

Gas

28

37 Sand Blasting Unit 10

38 Painting Machine, Corrocote

Internal Coating

4

39 Painting Machine, Paint

Coating

10

40 Hiab Winch Truck, 5 ton

Capacity

6

41 Trailer, Flat Bed, 40 ton

Capacity

14

42 Trailer, Low Bed, 40 ton

Capacity

5

43 Diesel Tanker, 600 Gallon

Capacity

4

44 Water Tanker, 10000 Gallon

Capacity

2

45 Water Tanker, 5000 Gallon

Capacity

5

46 Dump Truck, 5 m3 7

47 Dump Truck, 10m3 10

48 Dump Truck, 20m3 9

49 Bus, 52 Seats 6

50 Bus, 40 Seats 4

51 Bus, 24Seats 12

52 Pick Up, Six Wheelers 38

53 Pipe Bending Machine upto 2’’ 2

Page 11: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Construction Capabilities

Gas/ Oil Pipelines Fabrication, Installation and Welding, Testing, Pigging and Commissioning

Fixed Roof/ Floating Roof Ground Storage Tanks Design and Built to API-650, BSEN 14015 and BS

2654 sized from 0.5Mg to 20Mg Capacity.

Elevated Steel Water Reservoir, Design and Built in AWWA D100 Standard with Different Capacities.

Pressure Vessels, Design and Built as per ASME Standard including Hoppers, Silos and Ducting.

Fire Protection Water Storage Tanks, built to NFPA or FM Specifications with Different Capacities.

Plate rolling up to thickness of 40mm and width of 3000mm.

Pump Stations Construction, Drainage and Sewerage Pipelines.

Mechanical Plant/ Equipment Installation Works.

Steel Structural Fabrication and Installation Works including Cladding Works.

Coating/ Lining Works including Surface Preparation to Sa 2.5 and Sa 3.0 Standard.

Earthworks and Civil or Concreting Works such as Buildings, Foundations, Chambers and any other Civil

Engineering Works.

SCAFFOLDING WORKS

ADP HEADER 20Mg GST ROOF

20Mg GST BOTTOM PLATE SWVS HEADER

Page 12: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Construction Experience

PANORAMA Contracting & Engineering Services WLL. is a Major Player in the Turnkey Project such

as Design, Engineering, Procurement, Construction, Testing and Commissioning of Ground/

Elevated Storage Tanks, High Pressure Spheres/ Vessels, Piping Works such as Water, Gas, Oil,

Drainage and Sewerage Pipeline. Pumping Stations, Earthworks and Civil Engineering/ Concreting

Works.

With the Company ability to construct and commissioned pipelines, we

have also had the opportunity of being involved in the supply, fabrication, erection, testing and

commissioning of complex structures.

With Client appreciation forming the backbone of this product line, The Company are assure that

the skills set will enhance further to satisfy the needs of the Clients.

Gas Pipelines

HEADER FABRICATION

WELDING OF PIPELINES

ABOVE GROUND PIPE LINE

PIPE LAYING IN THE TRENCH

ABOVE GROUND PIPE LINE

Page 13: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

ABOVE GROUND PIPE LINE

HEADER INSTALLATION UNDER GROUND PIPE LINE

GDU K-26

Page 14: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Panorama have constructed and commissioned DI Water Pipelines of various sizes from

Ø150mm to Ø1400mm .With Client appreciation forming the backbone of this product line,

The Company are assure that the skills set will enhance further to satisfy the needs of the

Clients.The experience gained from these various Projects has allowed the Company to

provide better customized solutions to service the actual needs of the Client. Fit for the

purpose, the designs take into consideration not only the unique environmental conditions of

the location but also the specific product to be stored.

Water Pipelines

Page 15: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

With over 200 tanks of various sizes constructed to date, the Company had well earned market

reputation for the tank design and construction whilst meeting the stringent Quality, Safety and

Schedule requirements of the Clients.

The experience gained from these various Projects has allowed the Company to provide better

customized solutions to service the actual needs of the Client. Fit for the purpose, the designs take

into consideration not only the unique environmental conditions of the location but also the specific

product to be stored.

Storage Tanks

ELEVATED STORAGE RESERVOIRS

20Mg GST AT HIDD FS

GST RC FOUNDATION WORKS

BOTTOM PLATE

Page 16: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

From early 80’s various sizes pumping stations were constructed to date at various parts of Bahrain,

the Company had well earned market reputation for the Pumping Station design and construction

whilst meeting the stringent Quality, Safety and Schedule requirements of the Clients.

The experience gained from these various Projects has allowed the Company to provide better

customized solutions to service the actual needs of the Client. Fit for the purpose, the designs take

into consideration not only the unique environmental conditions of the location but also the specific

product to be stored.

PUMPING STATION WORKS

Page 17: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Projects Undertaken The Company has successfully executed a number of turnkey projects since inception. With the Company’s core competence currently concentrated on the storage tanks, piping and other mechanical works, it has developed in house systems to ensure that all EPC projects are effectively and efficiently managed. The constant upgrade of these systems has allowed the Company to develop strong ties with Subcontractors such that there is a seamless management of interfaces. Overall, we have therefore been able to meet or exceed customer expectations by handing over facilities on time and budget, and within the quality and safety tolerances applied. A couple of the projects executed in last 20 years have been listed for information.

CLIENT CLIENT

CONTACT DETAILS

PROJECT DESCRIPTION YEAR

VALUE in

MILLION (BD)

BAPCO 17704040 Provision of Manpower Service for Onshore Bahrain Installation Pipeline Project

2017 .180

Electricity & Water Authority

17 996565 17 996888

Measured Term Contract (WTD MTC – PIPELINES Works)

2017 .4

Electricity & Water Authority

17 996565 17 996888

Water Stations Hidd – Lot A (4618A/2011/3100)

2016 10.5

Diyar Al Muharraq 77 155555 Water Distribution Station at Site A 2016 10

Diyar Al Muharraq 77 155555 Water Transmission Pipelines Supply and Installation

2016 1

Electricity & Water Authority

17 996565

17 996888

Pipeline Hidd Installation Works (4621/2011/3100)

2016 3.5

Electricity & Water Authority

Pipeline East Installation Works (4622/2011/3100)

2016 6.5

Electricity & Water Authority

Water Storage Ground Storage Tanks (4612C/2011/3100)

2014 8.1

Electricity & Water Authority

Pipeline South Installation Works (4619/2011/3100)

2013 4

Electricity & Water Authority

Water Stations Elevated Service Reservoirs (4614/2011/3100)

2012 15.6

Electricity & Water Authority

Water Storage Ground Storage Tanks (4612B/2011/3100)

2012 6.5

Electricity & Water Authority

New Al Dur FS, Storage Tank and Modification Works at West Riffa’a II BS and Refinery DS (4606/2010/3100)

2011 22.4

Electricity & Water Authority

Construct 1000mm Dia. Transmission Pipeline from WRBS to HTBS (4603/2009/3100)

2010 1.3

Electricity & Water Authority

Pumping Station Works at West Riffa’a BS, Hamad Town BS, and Al Areen – Package-01

2010 26.2 Pumping Station Works at Samahij BS, Ad Dur FS and Refinery DS – Package-02 (4606/2009/3100)

Page 18: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

HYUNDAI Heavy Industries

17 121121 Construction of Nine (9) Ground Storage Tanks as Ad Dur IWPP

2009 26.2

USCO 17 359359 Water Requirements for USCO/GIIC. Fresh Water Pumping Station Work including Ø600mm Ductile Iron Pipeline

2008 0.8

FALCON Cement Plant

77 144443 Construction of Ø4” Gas Pipeline and Associated Facilities for Cement Plant

2008 0.53

USCO 17 359359 Construction of Ø600mm Water Transmission Line from Hidd FS to USCO/GIIC.

2008 0.65

GAMUDA BERHAD

17 148000 Construction of New Ø12” Gas Pipeline for Replacement of Sitra Bridges Project

2008 1.5

MWH/BAPCO 17 755708 Replacement of Sitra Bridge – New Ø12” Gas Pipeline

2008 1.5

Ministry of Electricity & Water

17 726501 Construction of 3 Nos. 1Mg Elevated Storage Reservoirs at South Alba, Samaheej BS and Durrat Al Bahrain DS

2008 3.9

Ministry of Electricity & Water

17 726501 Construction of 2 Nos. 1Mg Elevated Storage Reservoirs at Tubli DS and Buquwah DS.

2008 3.1

Ministry of Electricity & Water

17 726501 Construction of Ground Storage Tanks: 2 Nos. 10Mg at Buquwah DS, 5 Nos. 54Mg GST’s at Various Stations

2006-08 7.2

Ministry of Electricity & Water

17 726501 5 Nos. 20Mg Ground Storage Tanks at Hidd FS and Salmabad FS

2006-08 13.5

Ministry of Electricity & Water

17 726501 Construction of Ø600mm Water Pipeline at Durrat Al Bahrain

2007-08 1

GAMUDA BERHAD

17 148000 Sewerage Line for Replacement of Sitra Bridges Project

2007-08 0.4

Ministry of Electricity & Water

17 726501 3 Nos. 10Mg Ground Storage Tanks at Refinery DS and Sitra BS

2004-06 4

Ministry of Works & Housing / Tilke & Partners

17 545555

Supply and Installation of Rain Water Drainage Pipes and Chambers, Waste Water Pipes and Chambers and Pumping Stations (Ø300mm to Ø2200 Rain Water Pipeline) Subcontract Works under CYBARCO-WCT

2002-04 5

BAPCO Formerly BANOCO

17 755708 Contract No. C - 545

2002-03 1.3 No. Ø16” Gas Pipeline from SWVS to GCC VS

BAPCO Formerly BANOCO

17 755708 Contract No. C - 306

2001-02 1.2 New 40,000bbl gasoline Tank #964 at Sitra marketing Terminal (Fixed Roof/ Floating Roof)

Page 19: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

BAPCO Formerly BANOCO 17 755708

Contract No. C - 152

2000 0.4 Gas Dehydration Unit (GDU) K26 and K27 Installation of Skids and Interconnecting Piping

BAPCO Formerly BANOCO 17 755708

Contract C – 93 2000 0.2 Facelifting/Upgrading of Sitra/Riffa’a and

Tubli Service Station

BAPCO Formerly BANOCO 17 755708

Contract No. 1829

1999-2000 2

2 x Ø18” dry gas Pipeline from Alba Distribution Point (ADP) to ALDAR Valve Station (DVS) and Revamping Dry Khuff Gas Headers at ADP

BAPCO Formerly BANOCO 17 755708

Contract No. 1724 1998-99

5.0

3 x Ø18” Dry Gas Pipeline from Al Dar VS to Wharf VS Contract No. 1710

1998-99 Construction of GPIC Valve Station – Mechanical Works Contract No. 1560

1998 Construction of Surge Tank No. 2-19 @ TB #3 BAPCO Formerly BANOCO (Feb 1998 – June 1998) Contract No. 8389

1997-98 7,250 BBL Ground Water Storage Tank at Awali Contract No. 8276

1997-98 Design, Construction of 40m Height, 60,000 USG Elevated Water Sphere Tank at Refinery including the RC Foundation

AMA / Ministry of Electricity & Water 17 726501 Construction of Ground Water Storage tank

at Riffa’a 2 (Hidd Power Project Phase II) 1999 2.5

Ministry of Electricity & Water 1772 6501

Laying of Ø800mm, 6.5KM Long D.I. Pipeline from BAPCO Tanks to RDS and Branch Line to West Riffa’a Blending Station

1999 0.5

Ministry of Electricity & Water, Qatar

+974 4485 8585

Design and Construction of seven (7) Ground Storage Tank and Six (6) Pressure Vessel for Air, gas, Oil and Water Storage at Ras Abu Fontas “B” with ABB Sae Sadelmi as the Consultant

1996-97 4.6

ALBA 17 835787

Design, Construction of 37M height, Elevated Water Sphere tank for Cooling System of Cast House No. 2

1997

1.2 Reduction Line 3 Mechanical Installation of 76 Cell Expansion Consist of Installation of Potshells, Anode Beams including Steel Brackets Alumina Bins, Pneumatic Pipeline, Air, gas and Water Pipelibs.

1996

Page 20: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Clients and Consultants to Date

Bahrain Petroleum Company W.L.L. (BAPCO),

Bahrain National Gas Company (BANAGAS),

Gulf Petrochemical Industrial Company (GPIC),

Aluminum Bahrain B.S.C. (ALBA),

Gulf Industrial and Investment Company (GIIC),

Arab Shipbuilding and Repair Yard (ASRY),

Ministry of Housing,

Electricity and Water Authority (EWA),

ELECTROWATTS,

Bechtel/ Lavalin Joint Venture (BLJV),

PROCEDAIR, France,

Black and Veatch International,

HYDER Consulting Middle East Ltd.,

ACER Consultants,

Consolidated Contractors Company (CCC),

Japan Gas Corporation (JGC),

HYUNDAI Heavy Industries

Page 21: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Quality Aspects

With our systems certified by ISO 9001-2000 we are confident in not only providing a sound engineering

solution but also one that meets or exceeds the stringent controls exercised by this certification system.

Our Quality, even prior to this certification, has been one to set the standards with rework percentages of

almost zero since 1975.

Safety Aspects

All our procedures have been designed in line with stringent safety analysis of the activities entailed in our

construction. With the utilization of Safety Officers in each Construction Site, amongst others, we endeavour

to constantly ensure that the hard earned performance of Zero LTIF (Lost Time Injury Frequency) since 1975,

is not in vain.

All site employees undergo a vigorous job related safety induction course at the start of each project. This is

further reinforced with monthly tool box meetings where all safety procedure related to working activities are

reviewed and analyzed to ensure our commitment to NO LTIF’s is effectively communicated and always

maintained.

Visual Inspection Coating Inspection

Salt Contamination Inspection Ultrasonic Inspection

Page 22: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

TOOL BOX MEETIG

Page 23: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Gas Pipelines and Headers

Page 24: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

20Mg Ground Storage Tanks Project

Ø90M 20Mg Ground Storage

Tanks at

HIDD FS & SALMABAD FS

20Mg Ground Storage Tank Coating

Page 25: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

10Mg Ground Storage Tanks Project

Internal Lining (Corrocte)

External Coating

Page 26: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

10Mg Ground Storage Tank s Project

Page 27: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Elevated Storage Reservoirs

Page 28: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates
Page 29: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates
Page 30: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Pressure Vessels

Storage Tanks and Pipelines

Page 31: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates
Page 32: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Miscellaneous Activities at Project

Page 33: Company Profile - panoramabh.com Company Profile.pdf · Fabrication, Erection, ... activities, oversee the delivery ... The Tanks Superintend of the Company, Organizes, co-ordinates

Fabrication Facilities at Workshop