company profile infotrax engineering sdn...
TRANSCRIPT
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Company Profile
INFOTRAX ENGINEERING SDN BHD
1. Dimensional Control Survey
2. 3-D Laser Scan
3. Engineering Services
4. Vibration Monitoring
5. Process Control & Monitoring System
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Company Background
Info-Trax Sdn Bhd (ITSB) is a licensed company with PETRONAS was incorporated in 1991. ITSB has been awarded an umbrella contract (Master Price and Service Agreement) by PETRONAS Carigali in the area of Laser Scanning and Dimensional Control Survey on 2013. Working closely with its own Associate Company Infotrax Engineering (M) Sdn Bhd who is leader and specialist in Accuracy Control, Electronic Survey and Measurement we believe this revolutionary technique, would be able to help and complement oil & gas producer to tremendously reduce the time and money due to unplanned and unscheduled shutdown. As a company with the focus in the Dimensional Control& Engineering Services, ITSB is desired to render it services to Malaysian Oil & Gas company in the area of Dimensional Control Survey & Engineering Services. The services that we could provide starting from Laser Point & Laser Scan Survey until the production of the fabrication drawing and finally the as built drawing.
The provision of 3D CAD models of millimetric accuracy of existing and replacement equipment, utilizing electronic laser data capture methods became the enabler for innovation and subsequent major cost & program savings on both new build and brown-field modification projects.
With this major step forward in technology, ITSB has established a leading position in Malaysia.
Complete Dimensional Survey Service
ITSB and its partner have more than 100 surveyors who are highly experienced in all aspects of new build projects and modifications to fixed platforms and FPSOs. All the survey personnel are equipped with the latest electronic survey instruments and software enabling them to deliver quality results on every project. They are fully conversant in both 2D and 3D drafting to complement their reports and deliverables. Major operators and engineering and construction companies contract us worldwide on both minor and major projects.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Engineering Services
Our engineering divisions fully complement each other when clients specify a complete engineering package as the final deliverable. Our engineers and designers are experienced in brown-field modification projects and are conversant with most mainstream design software systems. We also provide in-house training such as modeling, spec creation, piping & support design, shop drawing production which utilizing the most recent engineering software used (e.g PDMS, Cyclone, AutoCAD, SP3D) to ensure good quality of our people when we place them in client organization. We provide the support to our staff whenever required in performing the duties at the client site.
In house training Detail Design Work
Engineering Department
Infotrax EngineeringCompany Registration No: 723031-W_________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial CentreTaman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884Email: [email protected] Website: www.infotraxeng.com
Organizational Chart
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
What is Laser Scanning? Objective: To provide a fast, accurate, cost effective solution to obtaining 3D ‘as-built models of your facilities, in the format of your choice. (AutoCAD, Micro Station, PDS, PDMS)
1. Site visit to capture real data in the onshore or offshore environment. 2. 360 degree scans of 5000 points per second enable extremely rapid data collection.
3. Construction of model elements in 3D
environment. 4. Fully rendered model for design, clash checking, visualization and communication.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Dimensional Control Survey – How does it work? Objective: First Time Fit, Clash Free Installation, Zero On-Site welding.
1. Customer supplied design sketch or similar drawings 2. Site Survey to establish as-built coordinate of tie-ins and proposed routing corridor (Rapid capture of pertinent data to + 1mm) 3. Actual as-built surveyed data automatically imported into CAD model space. 4. Actual Tie-in point positions and deviations Computed automatically from Infotrax ScanMaster Software. 5. Details of tie-in-flange deviation geometry are automatically transferred to the fabrication isometric.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
6. Customer’s design sketch route centre-line incorporated into 3D model and adjusted to fit between tie-in points. 7. 3D pipe components and equipment items added to the adjusted design centre-line. 9. As-built corridor model exported to visualization and clash detection software 10. Design model of the new pipe-work imported to the as-built corridor model and clash check performed. 11. Clashes detected reported and resolved
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
12. Construction review to ensure practicality / ease of installing spools and equipment.
13. Semi-automatic Fabrication Isometric Generation. 14. Fabrication conformance verification surveys to international standard tolerances. 15. First Time Fit of New Design. Zero rework. Zero growth. Zero risk.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Examples of Dimensional Control Project
Module support frame installation. As-build of new module support frame overlay with offshore laser and clash report produced.
Piping modifications on fixed platform. All the interconnecting pipework was surveyed and fabricated prior to the installation of the topside modules, these spools were loaded out inside the modules. Once the modules were installed the spools were lifted into position and bolted. Major cost savings for all.
FPSO deck layout model from client 2D design and we survey of existing deck equipment. Inter discipline clash checks done for all existing deck equipment, new piping systems, new pipe rack, new module support frames and modules and new deck equipment. Isometrics produced for all piping systems.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
3D As-Built Modeling: Discernable Benefits to End User “The Most Accurate Brownfield Asset Capture”
The deliverable provides 3D modelling services from cloud data to clients who require highly accurate documentation of their facilities. Various types of 3D models are offered to client for the as-built solutions as per below types: 1. Primitive 3D model (Primitive) 2. Semi-Intelligent 3D model (Semi-I) 3. Full-Intelligent 3D model (Fully-I). The translation of the as-built data which captured from the cloud data are translate into millimetre-accurate 3D CAD model using software such as Leica Cyclone, SmartPlant 3D (S3D), PDMS, PDS, AutoCAD, Microstation etc. The cloud data that offered from the laser scanning are compatible for current modelling software that available in the market.
Primitive 3D Model Geometry model only with no attributes or tags attached. Drawings cannot be automatically extracted from 3D model.
Semi-Intelligent 3D Model Primitive model with tag numbers attached in accordance with the P&ID. No attributes are attached and drawings cannot be automatically extracted from the 3D model.
General Work Flow for Point Cloud conversion into various type of 3D model.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
P&ID mark-up for Piping & Equipment tagging for Semi-I modeling QAQC
Semi-I model output completed with tagging in dedicated hierarchy for Petronas Project
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Sample output of 3D Primitive & Semi-I model in PDMS mode
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Full-Intelligent 3D Model
The Intelligent model may be created from the Semi-Intelligent model with all attributes, specs and catalogues dissolved in one active model using intelligent 3D software (e.g PDMS, SP3D, CadWorx etc). In certain cases, the intelligent model also can be created directly from the Point Cloud or Survey raw information as an optional method to suit with. Drawings generally can be extracted automatically from this model. Under normal circumstances, the intelligent model is created in the ‘As-Built’ condition. In the explanation further below describes where the model is required to be manipulated or ‘squared-off’. Where the client has requested that the ‘As-Built’ model is squared off in order to get a presentable ‘As-Built’ engineering drawing output; the manipulation of 3D As-built conditions to square pipework, steelwork, etc need to be carried out in some limitations & guidelines.
Sample output of 3D PDMS fully converted into full intelligent (squared-off mode) with auto drawing extraction from PDMS software
Sample from Petronas Platform
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Sample Monochrome Point Cloud output, Fully-I SP3D Model & As-Built Drawing Production of onshore plant in Kerteh, Terengganu for Petronas Project
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Sample Colored Point Cloud, SP3D Model, As-Built Isometric production & Colored Truview c/w Geotag Generation of offshore platform in Sabah for Petronas Project
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Lean Engineering: Quick & Safe Turnaround Solution “Single Piece flow, concurrent engineering, co-location”
We provide optimal first unit delivered quality engineering, responsiveness to change, waste minimization, safe and just fit-for-purpose in/at the right place, time & quantity Design Engineers must make the right choices, early in the process, to insure client satisfaction and low lifecycle costs. We have a complete set of capable people, processes and tools required to deliver cost effective solutions for the repair order & minor modifications projects as our new bottom up approach especially in topside upstream maintenance area and MOC scope. This allows us to utilize an efficient systems engineering, integrated product teams and recent engineering tools to enable lean engineering processes had a continuous improvement. By using this approach; it was shown that cost and schedule savings are typically significant compared to conventional methods while maintaining safety environment, seamless information flow and quality assurance. Services
2D & 3D Design preparation
Engineering, procurement & fabrication management
Mini work pack (Pre-job & construction)
3D CAD digitizing point cloud (As-Built environment)
Update existing 3d model onto point cloud
2D fabrication detail drawings
Stress Analysis
Benefits
Reduce maintenance spares
Reduce recurring & non-recurring cost against conventional methods
Enables Faster Delivery Times
One stop solution for work packing, engineering, fabrication and construction
Improve cycle time and quality in engineering
Correct first time
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Sample from SHELL Miri Project – Repair Order of Closing Spool Replacement
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Sample from SHELL Miri Project – Repair Order of Instrument Drain Line Replacement
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Sample from VICTORIA PRODUCTION facilities – MOC Scope: Installation of pressurization gas for Coalescer and Produced water collection vessel (3d Design, Clash Checking & Fab Isometric production)
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Repair Order Scope
Method of Statement: 1) Corridor EDM survey & Laser Scanning for the affected areas stated in the
Inspection Report. 2) Processing the point cloud database & EDM survey data. 3) Registration of point cloud to patch all the survey points & scan targets. 4) Generate one consolidated point cloud (whichever using corridor Laser Scanning). 5) Generate As-Built model (whichever using corridor EDM survey). 6) Setting the datum /reference point for global or local system. 7) Generate Semi-I 3D design modelling from the point cloud / corridor survey. 8) Produce 2D ‘Fabrication’ Isometric. 9) Produce 2D ‘Fabrication’ Support Details (if any). 10) Produce Preliminary Bulk MTO for Client’s ordering reference.
1. Laser Scanning & EDM Survey (Site Execution)
Carried out by fully qualified, graduated surveyors who have had full training of surveying all aspects of the mechanical and structural elements in the offshore Oil and Gas industry, adhering to our proven quality procedures and method statements. Our understanding of this major work scope is to supply the necessary trained personnel and equipment to your offshore / onshore installation to complete a 100 % laser scan and EDM survey of all the process, utility systems & structure within the defined areas. As the areas near the header are congested, we will utilise laser scanning techniques in order to capture the as-built data in the shortest time period. The survey team comprises 1 scanning operator & 1 surveyor. A master control network will be established by EDM (Total-Station) survey, based on the as-built platform primary structure for both plan & elevation ordinates. A series of overlapping scans, within & around the required areas to ensure full capture of all equipment, pipe-work & structural items will be carried out & repeated on each deck until all the areas has been scanned. Pre-analysis to ensure complete scan coverage of the required areas, will be carried out on site before team demobilisation. Output from Laser Scanning Activities;
Point cloud (true as-built condition) that can be converted into 3D model in CAD format via point cloud tracing at later stage.
Output from EDM TP & Corridor Survey;
As-Built 3D Model and Tie In Point Details.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
FIGURE 1 (A) – SCOPE OF WORK RECEIVED FROM THE INSPECTION RESULT TO CONDUCT FURTHER SURVEY FOR AFFECTED LINES / AREAS.
Associate item survey
by EDM
TP survey by EDM
FIGURE 1 (B) – CORRIDOR & TP SURVEY OUTPUT USING EDM METHOD & CAD MODELLING
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
2. Point Cloud & Truview Generation (Office Execution)
Following demob from the facility, the scan data is registered in the Point cloud environment. We use LFM software for this work. [LFM Server is the application used to register (orientate individual scans to the master control values) & subsequently, generate the point cloud; this software is provided, under licence by Z+F, the manufacturer of the scanners we own. The database produced by the generation process, becomes the point-cloud deliverable. Once registration & database generation are completed, photo realistic images generated from point cloud can be manipulated and rotated 360 degree as per user requirement. The beauty of this massive capture is we could navigate and expand the original scopes if the client need some further modifications at the other areas nearby.
FIGURE 2 (A) - VIEW OF REGISTERED POINT CLOUD DATABASE IN LFM FOR BOP- A.
Figure 2 (B) - View of registered point cloud database & bubble image in LFM for BODP-B, Malaysia
Water.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Figure 2 (c) - View of Monochrome Truview Navigation
Figure 2 (D) - View of Color Truview Navigation
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
3. Engineering Drawing Production (Office Execution)
Similar with other inspection works, Inspection Execution team will establish and provide final work pack to Winner for evaluation in terms of manpower detail and work duration required for the field and office works. The work pack input must be contained a list of piping and structural for replacement works (sectional replacement or flange to flange replacement marked in the drawing), original as -built drawing, P&ID, criticality and prioritization of works. Replacement scope of work will be referred based on but not limited to the original as-built drawing (if provided), line sketch in the inspection report, damage (corrosion) mechanism factor related to the piping and other requirements in the work pack. For this scope of work, engineering team will undergo several methodologies summarized as per below:
1) Tie-In Point Verification, Redline model & Clash Check 2) Redline Markup onto old / client’s isometric 3) Fabrication Drawing Production
3.1 Tie-In Point Verification, Redline Model & Clash Check
All site survey data regarding flange Tie-In Point such as bolt rotation, flange rating, flange deviation, as-built coordinates & cutline reference will be loaded into PDMS or CAD software. Point cloud will be dumped onto PDMS or CAD software as well for scope re-verification. Affected piping then will be modelled up (As-Built) & squared to suit TP survey. Once all termination points & new redline model were verified, clash checking will be performed in order to have a new established clash free redline model prior 2D drafting activity. In summary; the methodologies are as per below:
Load TP survey data into modeling software.
Load unified Point Cloud into modeling software.
As-Built modeling via Cyclone.
Redline Model via CAD 3D.
Quick clash analysis
Finalize 3D Redline model for replacement.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Figure 3 (A) – TP Surveyed Output & Redline Modeling for Fabrication
3.2 Redline Mark-Up on Existing Client’s Isometric
Every changes or modification required will be marked-up on the existing isometric supplied from client (if provided) based on squared off redline model generated from activity 2.3.1.
Figure 2.3 (B) – Redline Mark-up on existing isometric for fabrication
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
3.3 Fabrication Drawing Production
The survey work is based on like for like replacement work, hence, the drawing must represent the same design as per site. Basic deliverables normally to refer as final isometric fabrication drawing. Optionally, support details drawing & penetration details drawing will be produced wherever required in the final construction workpack.
2D Fabrication Isometric Drawing – Drawing represents the section for replacement, will be submitted immediately once site survey completed. The drawing to be included in the fabrication workpack on client end. New MTO will be extracted from the model via piping specification sheet provided. Any obstruction related to the field joint replacement work will be highlighted clearly in the fabrication drawings together with the details (type of obstruction and length to the obstruction point(s) from selected datum / reference points). Then we will produce 2D Isometric from RLM / Redline model output from activity 2.3.1 & 2.3.2 above. All mark-up details will be back drafted in cad version (.dwg format) came together with new bill of materials for issuance.
Figure 3 (C) – Sample of Piping Isometric & MTO Re-produced for Fabrication & Construction
MTO list will be re-checked with Piping Specification spreadsheet supplied from Client. All Engineering QAQC will be implemented with reference to the P&ID’s, 3D Model, Equipment layout, Piping GA’s and existing Point Cloud.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Figure 3 (D) – Sample of Penetration Details & MTO production for Repair Order Scope
Figure 3 (E) – Sample of Pipe Support Details & MTO production for Repair Order
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Figure 3 (F) – General Process Workflow of Repair
LASER SCAN, TP SURVEY,
3D MODELING & CLASH
CHECK
TPs CONFIRMATION ON P&ID
(REPLACEMENT SCOPE)
DESTRUCT ISOMETRIC
CONSTRUCT
ISOMETRIC
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Figure 3(F) – Sample workflow of Fabrication Drawing Production for Repair Order scope
2D Drafting
MTO checking
QAQC
2D Drafting
MTO checking
Insp Workpack Report
Received
TPs Coord. importing
into 3D Model & As-
Built Piping Modelling
3D Piping Model square
off to datum reference
(Redline Model)
Clash Check
Pipe Support
Details
Fabrication
Isometric
2D Drawing
Production
Site Survey Execution
(Laser Scan & TP Survey)
QAQC
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
COMPANY EXPERIENCE
MOST RECENT PROJECT
Project Name/ Installation Client Name Scope Start Date &
End Date
LASER SCANNING & 3D
MODELLING
(PETRONAS PENAPISAN
MELAKA)
GROUP
TECHNICAL
SOLUTION (GTS)
Laser scanning, TP
Survey, 3D Modelling
Sept 2016 –
Present
8 REPAIR ORDER SOW
FOR BARAM A & B
(BAKP-B, BAK-B &
BADP-A)
DAYANG
ENTERPRISE SDN
BHD / PCSB
Laser scanning, TP
Survey, 3D Modelling ,
Produce Fabrication
Drawing & Bulk MTO
Production
May 2016 – June
2016
KIKEH FLEET SUPPORT
2016 – LASER SCAN &
TP’S SURVEY
SBM MALAYSIA
Laser Scanning, TP
Survey, Clash Checking
& Spool Audit Survey
May 2016 -
Current
27 REPAIR ORDER SOW
FOR BARAM A & B
(BADP-B, BAP-B, BAKP-
B, BAK-B, & BAP-A)
DAYANG
ENTERPRISE SDN
BHD / PCSB
Laser scanning, TP
Survey, 3D Modelling ,
Produce Fabrication
Drawing & Bulk MTO
Production
March – April
2016
PROVISION OF DETAIL
DESIGN FOR EPCC OF
F12 FACILITIES
RANHILL
WORLEYPARSONS
SDN BHD
Laser Scanning, Creating
Panoramic Photos &
Truview Layout
March 2016 –
April 2016
3D LASER SCAN
SURVEY AT KNDP-A –
HP COMPRESSOR
UMW / TALISMAN
ENERGY
Laser Scanning & 3D
Modelling March 2016
PROVISION OF
MANPOWER,
EQUIPMENT AND
TOOLS FOR 3D LASER
SCANNING & SURVEY
1) SMG-A
2) EWDP-A
3) TBG-A
4) SFDP-A
SAPURA KENCANA
PINEWELL
Laser scanning and 3D
semi-intelligent modeling
Feb 2016 – May
2016
PLATFORMS AS-
BUILTING AND
INTELLIGENCE DATA
POPULTION INTO P-
EDMS FOR MLNG2
1) B11DR-A
2) M3DR-A
3) M3PQ-A
INTERGRAPH /
PETRONAS MPM
Color laser scanning, 3D
intelligent modeling
(S3D), Updating P&ID,
Drawing Production, and
Data management.
Nov 2015 -
Current
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Project Name/ Installation Client Name Scope Start Date &
End Date
LASER SCANNING & 3D
SEMI-INTELLIGENT
MODELLING FOR
TAPIS-D
WOOD GROUP
MUSTANG /
EXXON
Laser scanning and 3D
semi-intelligent modeling Dec 2015
PROVISION OF
MANPOWER EQUIPMENT ,
TOOLS AND CONSUMABLES TO
CARRY OUT ON SITE
LASER SURVEY FOR TAPI-A
SAPURA KENCANA
PINEWELL
Laser Scanning, Clash
Check design against
point cloud, re-issue IFC.
Dec 2015
D35DP-B WELL TIE IN (9
WELLS)
SAPURA KENCANA
PINEWELL / PCSB
Laser Scanning, Clash
Check design against
point cloud, re-issue IFC,
& Spool Audit
Sep 2015 – Jan
2016
MASTER PRICE and
SERVICE AGREEMENT
(MPSA) FOR SKO
Platforms
Completed Platforms to-
date:
PETRONAS
CARIGALI SDN
BERHAD
Laser scanning and 3D
semi-intelligent modeling
(4+1 years contract)
2014 - Current
1) TBG-A
2) TBG-B
3) E11R-B
4) F9JT-A
5) WLDP-A
6) WLDP-B
7) WLP-A
8) BKP-A
9) BYG-A 10) BYR-A
11) BYP-A
12) BYDP-A
13) MCOT
14) BAP-A
15) BAP-AA
16) BADP-A
17) BAP-B
18) BADP-C
19) BAJT-D
20) BAJT-F 21) BAK-B
22) API-1
23) BNDP-I
24) BNV-A
25) BADP-E
26) BADP-G
27) BAJT-H
28) BA-18
29) TKDP-A
30) TKDP-B
31) TKK-A
32) TKQ-A
33) TKJT-C 34) TKJT-D
35) TKJT-E
36) TKJT-F
37) TKJT-G
38) TKJT-H
39) TK-3
40) BNJT-D
41) BNJT-H
42) WLK-A
43) D35DP-B
44) D35JT-C 45) TEDP-A
46) TEDP-B
47) TEJT-C
PCSB – SKO,SBO,PMO
1) BCOT
2) KUJT-A
3) EWDP-A
4) EWDP-B
INTERGRAPH /
PETRONAS GTS/
PETRONAS PMU
Laser scanning, 3D
intelligent modeling
(S3D), Update P&ID and
Data management.
December 2013 –
December 2015
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Project Name/ Installation Client Name Scope Start Date &
End Date
5) EWVA-A
6) SMDP-A
7) SMJT-C
LASER SCAN & PDMS
INTELLIGENT FOR SKO
PLATFORM (PHASE 1 –
12 PLATFORMS)
PETRONAS/
RANHILL WORLEY
Laser scanning, 3D full
intelligent modeling,
clash checking and re-
engineering drawings
July 2013 – May
2014 1) BODP-A 2) BODP-B
3) BODP-C
4) BOP-A
5) BNP-A
6) BNP-B
7) BN14 8) TKP-A
9) TKP-B
10) WLDP-C
11) TEP-A 12) TEP-B
BARONIA – BNDP-B
WELL TIE IN PACKAGE
(3 WELLS)
PETRONAS
CARIGALI SDN
BERHAD
Laser Scanning, Clash
Check design against
point cloud, re-issue IFC,
& Spool Audit
Feb – Jul 2015
TEJT-T WELL TIE-IN
PACKAGE (2 WELLS)
PETRONAS
CARIGALI SDN
BERHAD
Laser Scanning, Clash
Check design against
point cloud, re-issue IFC.
Feb - Apr 2015
BARONIA – BNDP-A
WELL TIE IN PACKAGE
(2 WELLS)
PETRONAS
CARIGALI SDN
BERHAD
Laser Scanning, Clash
Check design against
point cloud, re-issue IFC,
& Spool Audit
Nov 14 – Apr
2015
SUJT-C WELL TIE-IN
PACKAGE (2 WELLS)
PETRONAS
CARIGALI SDN
BERHAD
Laser Scanning, Clash
Check design against
point cloud, re-issue IFC,
& Spool Audit
Aug - Dec 2014
TBG-A & TBG-B WELL
TIE IN PACKAGE (4
WELLS)
PETRONAS
CARIGALI SDN
BERHAD
Laser Scanning, Clash
Check design against
point cloud, re-issue IFC,
& Spool Audit
Jun - Sept 2014
MMC-SKO PRICE
AGREEMENT 1) TEP-A & TEP-B
2) CLUSTER 12
(7 PLATFORMS)
3) D18MP-A & BYP-A
MMC
Laser scanning, 3D semi-
intelligent modeling,
Clash checking and re-
engineering drawings.
(2+1 years contract)
January – March
2014
FPSO PERISAI KAMELIA EMAS
Laser scanning and 3D
semi-intelligent
modeling, Clash
checking and re-
engineering drawings.
Apr-14
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Project Name/ Installation Client Name Scope Start Date &
End Date
SEPAT FSO & MOPU MMC/PCSB Laser scanning and 3D
semi-intelligent modeling Jun-14
E11RC TECHNIP /
PCSB
Laser scanning and 3D
semi-intelligent
modeling, Clash
checking and re-
engineering drawings.
May - June 2014
BEKOK-C TECHNIP / PCSB
Laser scanning and 3D
semi-intelligent
modeling, Clash
checking .
October –
November 2014
JN23 TECHNIP / SHELL
Laser scanning and 3D
modeling, Clash
checking and re-
engineering drawings.
July 2015
Note:
1. We are the former contract holder for Master Price and Service Agreement (4+1
year’s contract) for PETRONAS CARIGALI SDN BHD.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Other Project in Last 5 Years
Project Name/ Installation Client Name Scope Start Date &
End Date
RBDP-B VIETNAM TECHNIP /
PCSB
Laser Scanning , Clash Check
PDMS + LMI
Apr-11
BEKOK-C DNV/
TECHNIP
Piping As-built survey & P&IDs
notification
June – September
2011
TKDP-A TECHNIP /
PCSB Laser Scanning & 3D modeling
June – September
2011
GUNTONG A, B & C EMEPMI/
TECHNIP
Laser scanning, 3D semi-
intelligent modeling, Clash
checking and re-engineering
drawings.
January – May
2013
MDA & MDPP TECHNIP/
HESS
Laser Scanning , EDM survey ,
3D PDMS modeling
March – May
2012
BOP-A / BKP-A OPE /PCSB Clash check Point Cloud VS new
design for modification project
January – March
2011
ERB WEST (EWDP-
A,EWDP-B,EWG-A &
EWP-A)
MMC /PCSB
Clash check Point Cloud VS new
design for modification project –
PDMS + LMI + LFM
January – March
2011
TCOT: PWSU &
REMEDIAL WORKS
KHL /
EMEPMI
Laser Scanning, Clash Check
design against point cloud, re-
issue IFC.
January – March
2011
FPSO
RUBICON,PHILIPINES
RUBICON
OFFSHORE
Laser Scanning & issue point
cloud for Finite Element Analysis.
March – May
2011
SBO ASSET LASER
SCANNING:
PCSB SBO
Laser Scanning and updating
P&ID for 21 platforms for
PCSB/SBO
April – December
2011
1) EWDP-A
2) EWDP-B
3) EWP-A
4) EWQ-A
5) EWG-A
6) EWV-A
7) KIND-P
8) SMQ-A 9) SMJT-G
10) SMR-A
11) SMG-A
12) SMP-A
13) SMP-B
14) SMP-C
15) SMDP-A
16) SMDP-B
17) SMK-A
18) SMJT-C 19) SMJT-D
20) SMJT-F 21) SMJT-E
SMDP-B MMC/PCSB Laser Scanning & EDM survey
for Samarang IO project
July – October
2011
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Project Name/ Installation Client Name Scope Start Date &
End Date
FPSO KIKEH SBM
Malaysia
Laser Scanning, Clash Check
design against point cloud, re-
issue IFC.
Jun-12
WEST LUTONG ,
BODP-C OPE/ PCSB
3D Laser Scanning, EDM survey
& Clash Checking
July – December
2012
MCOT & BAP-A OPE / PCSB 3D Laser Scanning, EDM survey
& Clash Checking
July – December
2012
BOKOR PHASE 3
AKER
SOLUTION/
PCSB
Laser Scanning & EDM survey,
Clash Check & issue clash free
model.
June – September
2011
BEKOK A RNZ/PCSB
Laser Scanning, 3D modeling
Clash Check & issue clash free
model.
February – June
2012
BEKOK C
RANHILL
WORLEY/
PCSB
Laser Scanning & 3D modeling February – June
2012
BEKOK A & TIONG A RNZ/PCSB Laser Scanning , EDM survey ,
3D PDMS modeling
February – June
2012
YETAGUN A , B & C
YETAGUN
MYAMMAR Laser Scanning , EDM survey ,
3D PDMS full intelligent
modeling
March -
December 2012 TNS/ PCVL
CKP/CKR CARIGALI
HESS
Laser scanning , 3D modeling ,
Clash checking and re-
engineering drawings
June – December
2012
BNDP-I RNZ/
PETROFAC
Laser scanning , 3D modeling ,
Clash checking and re-
engineering drawings
Jul-12
ANPG-A
RANHIL
WORLEY/
PCSB
Laser scanning , 3D modeling ,
Clash checking and re-
engineering drawings
Oct-12
ANPG-A MMC/ PCSB
Laser scanning , 3D modeling ,
Clash checking and re-
engineering drawings
Oct-12
19 PLATFORMS SKO
PIPELINES REJUV
PROJECT: OPE/ PCSB-
SKO
Laser scanning whole platforms
(19 platforms)
October –
December 2012 1) TKDP-A
2) TKJT-E
11) WLDP-C
12) BN-14
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Project Name/ Installation Client Name Scope Start Date &
End Date 3) TKJT-C
4) TKP-B
5) TKJT-F
6) TKJT-D
7) TKJT-G
8) TKJT-3
9) TKP-A 10) SIMP-A
13) BNP-A
14) BNDP-B
15) BNP-B
16) BNG-B
17) E11R-A
18) BODP-A
19) BODP-B
TCOT AND OSC PETRONAS
PMO
Laser scanning, 3D full intelligent
modeling, Clash checking and re-
engineering drawings.
May 2013 – May
2014
LEWEK EMAS FPSO
EMAS/
PTSC
VIETNAM
Laser scanning, 3D modeling,
Clash checking and re-
engineering drawings, Assist
HUC.
Jul-14
GEMUSUP KAKAP PETRA/
SHELL
Laser scanning, 3D modeling,
Clash checking and re-
engineering drawings, Assist
HUC.
August 2013 –
May 2014
BADP-B PCSB/
LEIGHTON
Laser scanning, 3D semi-
intelligent modeling, Clash
checking and re-engineering
drawings
Oct-13
SUDP-A DELEUM /
CETCO
Laser Scanning, TP Survey, £D
Design Model, Clash Report &
Analysis
Apr-14
CKP AND CKR
RNZ /
CARIGALI
HESS
Laser Scanning and Updating
PDMS Model, Spool Audit and
Clash Analysis
Feb-14
D12 & LAILA THHE/
SHELL
Structural Survey and 3D As-
Built Model July-14
BCBF for CKP AND CKR
EPIC /
CARIGALI
HESS
Laser Scanning and Updating
PDMS Model, Spool Audit and
Clash Analysis, Engineering
Rectification by Reproducing
AFC/IFC
August-14
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Company’s Experiences (BRUNEI)
Brunei operations start in March 2010 with over 200 projects already undertaken. Below are the some list awarded Project to Infotrax Engineering (Brunei) in the recent year.
PROJECT
NAME
INSTALLATION CLIENT WORKSCOPE START/END
DATE
CPRP11 REJUVENATION
PROJECT
CPRP11 AKER SOLUTIONS
3D Laser scanning.
Deliverable of 3D full Primitive modeling.
Feb 2016
IRON DUKE WTI POST DRILL
IDDJ01 DAMIT WORLEY
ENGINEERING
WELL TIE IN, EDM Survey , Laser Scanning ,3D modeling
,Clash check , re-
engineering drawings.
Jan 2016
CPDP10
INSTRUMENT
UPGRADE PROJECT
CPDP10 PETROKON EDM Survey , Laser Scanning ,3D modeling
,Clash check , re-
engineering drawings.
Jan 2016
AMCX09 REJUVENATION
PROJECTS
5 PLATFORMS
AMDP09
AMCP09
AMCA09
AMAP09
AMLQ09
DAMIT WORLEY
ENGINEERING
3D Laser scanning.
Deliverable of 3D full
Primitive modeling.
Nov 2015 - Current
CWDP01 – CPRA
WELL TIE IN
CWDP01 SAHID WELL TIE IN, EDM
Survey , Laser Scanning ,3D modeling
,Clash check , re-
engineering drawings.
Nov 2015
BLNG COGEN II PROJECT
BRUNEI LIQUIFIED
NATURAL GAS (BLNG)
FOSTER WHEELER
3D Laser scanning.
Deliverable of 3D
full Primitive modeling.
2014
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
ZERO RED PROJECT
5 PLATFORMS FOR EAST
INSTALLATION.
TECHNIP 3D Laser scanning.
Deliverable of 3D
full Primitive
modeling.
2014
ZERO RED PROJECT
7 PLATFORMS FOR EAST
INSTALLATION.
SAHID SDN.BHD
3D Laser scanning.
Deliverable of 3D
full Primitive
modeling.
2014
CPCX-12 TEST FACILITY
UPGRADE
PROJECT
CPCX-12 PETROKON UTAMA
SDN.BHD
3D Laser scanning
Provide Redline
markup
2014
WELL TIE-IN PROJECT (WTI)
CPDP36
CPDP33
BLWJ01
BUDP01
AMDP09
AMDP17 AMDP25
DAWJ01
FADP01
FADP03
DAMIT WORLEY
CPRA
Theoretical trial
fit/Final fit
Provide redline
mark-up for spool
fabrication.
Spool survey
2014-2015
CPCX-10 TEST FACILITY
UPGRADE
PROJECT
CPCX-10 PETROKON UTAMA
SDN.BHD
3D Laser scanning
Provide Redline
markup
2014
AMAP-09 FRESH
WATER MAKER UPGRADE.
AMAP-09 BRUNEI SHELL
PETROLEUM 3D Laser scanning
Provide Redline
markup for spool
fabrication
Spool survey
2015
CPRP-07 SHUT DOWN I SCOPE
CPRP-07 AKER SOLUTION
3D Laser scanning
Provide Redline
markup for spool
fabrication
Spool survey
2015
AMCX-06 REJUVENATION
PROJECT
AMCX-06 DAMIT WORLEY
3D Laser scanning.
Deliverable of 3D
full Primitive modeling.
2015
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Note:
1. We have current long-term project for SHAHID for Well Tie-In EDM Survey
4 INTELLIGENT PIGGING PID
PROJECTS
1. AMWJ31
2. AMWJ80
3. AMDP-03
4. AMPP-17
DAMIT
WORLEY EDM Survey , Laser
Scanning ,3D modeling &Clash check.
2013
AMPA 09 GAS
WSF PROJECT 2011
AMPA 09 DAMIT
WORLEY EDM Survey , Laser
Scanning ,3D modeling
&Clash check.
2011
AMPA 09 GAS WSF PROJECT
2010
AMPA 09 DAMIT
WORLEY EDM Survey , Laser
Scanning ,3D modeling
&Clash check.
2010
CWDP01
INTERIM GAS LIFT HEADER
EXTENSION
CWDP01 DAMIT
WORLEY Assist HUC for
installation. 2011
BNLG- GLASS LEVEL
REPLACEMENT PROJECT
DAMIT WORLEY
EDM Survey , Laser Scanning ,3D modeling
&Clash check.
2011
REPAIR ORDER
WORKS
FAPP-03 SKS WOODS EDM Survey , Laser
Scanning ,3D
modeling, update drawings.
2013
WATERFLOOD
PROJECT 1. CPDP-31
2. CPDP-33
3. CPPP-01
4. CPPP-04
DAMIT
WORLEY
EDM survey ,Laser
Scanning , 3D
modeling Intelligent
2011
SCOT PHASE 1C PUMP
AMRP01 SHAHID EDM Survey , Laser Scanning ,3D modeling
,Clash check , re-
engineering drawings.
2010
34 WELL TIE IN'S
34 Wells SHAHID EDM Survey , Laser Scanning & assit HUC
contractor
2011-2015
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Company’s Experiences (Overseas) Client Details Project Scope
Name: Aker
Contact: K. Johnston
Tel No. 01224 599000
Esso
FPU Balder
1997 – 1999
This vessel had to be completely refurbished.
We were contracted to prove all Aker design for
clash verification and space management. Provided designers to assist with project.
Name: APG
Contact: D. Workman
Tel No. 01224 599000
Texaco – Galley
1996 – 1996
This vessel had to be completely refurbished
and 4 new process modules and equipment
installed. We were contracted to prove engineering studies and produce all pipework
isometrics and supports.
Name: BP Azerbaijan
Contact: Sam McAdam
Azeri West
Production Deck 2004-2006
Build Control and Hook up of Azeri West
platform at SPS yard in Baku Azerbaijan.Team of 6 surveyors.
Name: Harland & Wolff
Contact: Allan Hayley Tel No.
New Build
2 Drill Ships 1998 – 1999
We were contracted to supply dimensional
control services to assist Harland & Wolff in the build of 2 new vessels, i.e. module-ship section
interfaces, super structure to hull and outfitting
of equipment.
Name: Single Buoy Moorings FPSO Falcon 2005
Major upgrade to FPSO Falcon. Responsible for survey of all new pipe routes
and tie-ins and to position new skid packages.
Fabrication check of all new pipespools.
Name: Husky Energy Contact: Kevin Johnson
FPSO White Rose 2002-2005
Control and verification of module support stools and as-build of deck in Korea plus build
control of modules installation in
Newfoundland Canada
Name: Wood Group Engineering
Ian MacKenzie
BP Clair Project
2003 – 2004
Build control of integrated deck to eliminate
offshore hook-up welding.
280 spools installed without any offshore
welding/testing
Name: Single Buoy Moorings FPSO Brasil
conversion
2002
Conversion of tanker to FPSO.
Survey of complete deck layout,pump rooms
and Cargo tanks.Preparation of piping isometrics/support details
Name: Single Buoy Moorings
FPSO Kuito
upgrade
Angola 2002
Major brownfield modifications to install seven
new modules.Installation corridors and hook-up
pipework controlled.
Name: Brown and Root
Contact: Jim McAllister
Tel No. 01224 777000
Alba Upgrade
Phase I & II
1996 – 1997
Major modifications to existing facilities for
product enhancement All new piping design
proven to eliminate all offshore welding.(over 600 spools)
Name: AIOC (BP Azerbaijan) BP Shah Deniz Provide dimensional control services to
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Client Details Project Scope
Contact: Jim McCallum
Project
2004-2007
complete build of Integrated deck for Shah
Deniz field in Caspian
Name: Bluewater Contact:
Tel No.
FPSO Uisge Gorm upgrade
South Africa
Production of structural/piping fabrication drawings.
Dimensional control support to site, Cape
Town, S.A.
Name: Bluewater FPSO Bleo Holm
upgrade
1999 – 2001
Major upgrade to FPSO.
As-build of existing brownfield and clash check
of new design.
Name: AIOC Contact: Derek Patience
BP Azeri Central Project, Baku
2003 – 2007
Fabrication control of new build jacket and integrated deck
to ensure first time fit.Survey of loading barge
to confirm clearances.
Name: Amec Group Contact: T.Telford
FPSO Bonga Nigeria
2002-2005
Build control at Amec yard Wallsend and Hook-up
support onshore/offshore Nigeria
Name: PMEX Contact: I. McGhee
Tel No.
EPC-22 Mexican Gulf
2001-2003
Full Dimensional control of Hook-up 500+ hook-up spools installed with no offshore
welding.
100 % success rate
Name: Marathon Oil Contact:
Tel No.
Alba Phase 2 Equitorial Guinea
2002-2003
Fabrication control and installation of new topside, bridge linked to existing Alba platform
Name: Aker Kvaerner
Contact: Brian Laing Tel No.
Britannia M.P.
Compressor 2003-2004
Full 3D corridor model and clash check of all
new design
Name: AMEC Services
Contact: Tom McQueen Tel No.
Shearwater Hook-
up 2001-2003
Full control of hook-up.
Jackets/topsides/all interfaces resulting in non-weld hook-up
Name: BP Exploration
Contact: Alan Stillwell
Tel No.
ETAP Project Elimination of all offshore hook-up welding by
strict build control. 485 hook-up spools installed
with no offshore welding : 100% success rate
Name: BP America
Contact: Joan Costello
Tel No.
Mad Dog Project
Gulf of Mexico
2002-2004
Elimination of all offshore hook-up welding by
strict build control.380 hook-up spools pre-
fabricated and installed
With no offshore weldind : 100% success rate
Name : KBR Ltd
Contact : Bill Dunnitt
FPSO Carratinga
and
FPSO Barracuda 2005-2006
Provision of Construction Manager and
Commissioning
Manager.Provision of line walking team to establish pre hydrotest completions.
Survey team supplied for hook-up pipework
verification.
Amec Group
Buzzaerd Field Hook-Up
2005-2007
Support project with DC services to install all hook-up and carryover pipework and structural
elements
Aker Kvaerner Offshore Partners Contact Ian Reid
Dumbarton Project on FPSO GP3
2005
Laser scan of compete process deck and Upper deck.
To allow feed study for installation of 7 new
process modules and associated tie-ins.
Shell UK Brent Bravo Utility Laser Scan of 50 mt length of Utility shaft leg
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Client Details Project Scope
Contact Ashley Burt shaft upgrade :
2006
to allow clash check of new platforms and
pipework
Shell UK Contact Ashley Burt
Brent Delta Utility shaft upgrade :
2006
Laser Scan of 50 mt length of Utility shaft leg to allow clash check of new platforms and
pipework
KCA Deutag Drilling Ltd Contact Peter Brackenbrough
Chirag 1 : Baku Azerbaijan : 2006
Laser scan of Machine deck and Drill Rig levels 1-4 to accommodate major upgrade
KBR Production Services Ltd
Aberdeen
Contact Murdo McLeod
Forties Alpha
PWRI
Project : 2006
Laser scan of various areas to allow design of
new PWRI
upgrade
SBM Inc
Contact David Wilkinson
FPSO Schiehallion
Turret mods : 2005
Laser scan within Turret of Schiehallion to
allow design of new equipment and pipework
Marathon Oil UK Ltd
Contact Dave Brocklesby
Brae Alpha Enoch
Project : 2006
Laser scan of various areas to allow design of
new module skids and pipework
Aker Kvaerner Offshore Partners
Contact Ian Reid
Hewene Brim
Water Inj upgrade
project :
2004
Laser scan of extensive deck area and central
pipe rack to allow new feed and design to be
carried out.
Transocean Drilling
Cotact Peter Meikle
Sedco 714 New
Mud Pump
installation
Laser scan of pump room to allow feasibility
study to be carried out for additional mud pump.
Aker Kvaerner (Canada) Ltd
Contact Huntley Nesbitt
White Rose
Additional mods
Dimensional survey within utility shaft to prove
new design routings of various mods
Petrobras (Brazil) P40 Upgrade Laser Scan and 3D model of complete process
module to allow major brown field upgrade
Husky Energy Ltd
Contact Kevin Johnston
FPSO Sea Rose
Nov/Dec 2006
Laser scan of complete Turret internal and
externally to enable production of full PDS
model
Husky Energy Ltd Contact Kevin Johnston
FPSO Sea Rose Jan 2007
Laser scan of main deck to assist in feasibility study for major upgrade
WGE North Sea Ltd
Contact George Campbell
BP Magnus
Cold Start Project
Laser scans of wellbays modules 1 and 2 to
allow long term flowline review.
COMPANY EXPERIENCES ON THE UAV
Project Name / Installation Client Name Scope Start date &
End Date
UAV Consultation and Maintenance Service - CAMCOPTER S-100 Rotary Wing Unmanned Aerial Vehicle (UAV)
Malaysian Military
UAV Operation & Maintenance
2012 to Current
UAV Training Programme
Malaysian Military
UAV Training 2012 to Current
UAV Maintenance, Repair and Overhaul (MRO) Provider for Schiebel in Malaysia
Malaysian Military
UAV Maintenance
2012 to Current
Integrated Logistic Support Malaysian Military
Support for Operation
2012 to Current
Oil & Gas Inspection Live and “Cold” Flare Tip Inspections by UAV/drone
KOLOS Group (Norway) Hatch Energy Group (UK & Europe)
Visual, LIDAR & Thermal Inspection by UAV/drone
2015 to Current
Oil & Gas Inspection Derrick Inspections by UAV/drone
KOLOS Group (Norway) Hatch Energy Group (UK & Europe)
Visual, LIDAR & Thermal Inspection by UAV/drone
2015 to Current
Oil & Gas Inspection Exhaust Pipe and Frame Inspections by UAV/drone
KOLOS Group (Norway) Hatch Energy Group (UK & Europe)
Visual, LIDAR & Thermal Inspection by UAV/drone
2015 to Current
Oil & Gas Inspection Communication Tower Inspections by UAV/drone
KOLOS Group (Norway) Hatch Energy Group (UK & Europe)
Visual, LIDAR & Thermal Inspection by UAV/drone
2015 to Current
Oil & Gas Inspection Under Deck Inspections by UAV/drone
KOLOS Group (Norway) Hatch Energy Group (UK & Europe)
Visual, LIDAR & Thermal Inspection by UAV/drone
2015 to Current
Oil & Gas Inspection Platform Leg Inspections by UAV/drone
KOLOS Group (Norway) Hatch Energy Group (UK & Europe)
Visual, LIDAR & Thermal Inspection by UAV/drone
2015 to Current
Oil & Gas Inspection Crane Inspections by UAV/drone
KOLOS Group (Norway) Hatch Energy Group (UK & Europe)
Visual, LIDAR & Thermal Inspection by UAV/drone
2015 to Current
Oil & Gas Inspection Emergency Call Out Inspections by UAV/drone
KOLOS Group (Norway) Hatch Energy Group (UK & Europe)
Visual, LIDAR & Thermal Inspection by UAV/drone
2015 to Current
Oil & Gas Inspection Trailing Tank Inspection by UAV/drone
KOLOS Group (Norway) Hatch Energy Group (UK & Europe)
Visual, LIDAR & Thermal Inspection by UAV/drone
2015 to Current
Blade Works LTD and IRIS group sign agreement for utilising UAV/drone in the wind turbine sector
Blade Works LTD
Visual, LIDAR & Thermal Inspection by UAV/drone
2016 to Current
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Customer Testimonials
Client : PETRONAS CARIGALI SDN BHD Project : LASER SCANNING AND 3D AS-BUILT ( MASTER PRICE SERVICE AGREEMENT 3 + 1 CONTRACT ) Location : SARAWAK AND SABAH
EVALUATED AS “ B “ GRADE CONTRACTOR FOR 2014 AND
“A” GRADE CONTRACTOR FOR 2015.
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Client : AKER SOLUTIONS Project : LONG TERM AGREEMENT FOR ENGINEERING AND HUC Location : BRUNEI WATER
From: <[email protected]>
Date: 5 January 2016 at 18:08:09 GMT+8
To: <[email protected]>
Cc: <[email protected]>
Subject: Aker Solutions Qualification Score
Dear Shamshur, Thank you for your response to our Supplier Qualification Questionnaire. After evaluation of the qualification questionnaire and all necessary documentation, your
questionnaire has earned a score of 78 out of 100. You have now been categorized as a level A supplier in our Supplier Qualification System. Enclosed, the rating sheet with more information about the score. If any major improvements are launched in your organization, feel free to contact us after which we shall increase your score. Best regards, Shailaja Mali Supplier Approval Aker Solutions
Tel: +91 20 6691 8390 | Mob: +91 99231 07393 [email protected] | www.akersolutions.com
Client: Prosafe Production, Singapore Project: DC Survey requirements for Azurite Project FDPSO, May-Jun’08 On Monday afternoon we completed the installation of the last central Piperack section on board the
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Azurite vessel. This was quite an achievement, and used a new innovative approach by Prosafe Module Yard team for FPSO Piperack construction and installation. We planned, constructed and assembled the Piperack section in the module yard at Kencana in exactly the same layout as they would be positioned on the vessel. This also included the welded pipework which was set up butt weld to butt weld with only the necessary weld gap separating the pipes. With the use of an experienced third party Dimensional Control company,’Scopus’ we surveyed the as-built positions in the Module Yard and transferred these to the shipyard support stools. Working with our module installation group for the Azurite project, ‘Masstrans’, we developed a guide and bumper system that would bring the modules into the exact position that we constructed in Kencana. Utilizing ‘Asian Lift Hercules’ vessel we started lifting Piperack sections on Wednesday as per our schedule and completed the lifting safely and on schedule on sunday afternoon. The result of this innovative method was to save approximately 180 butt welds for Piperack hook-up and more importantly costly use of the quayside crane for spool installation. This method will lead to a major schedule saving for Piperack completion and hook-up to existing systems. This was a great example of teamwork starting with the Prosafe team in the module yard, Kencana our fabricators who set up the modules in their fabrication shop in the vessel position, Masstrans who designed and planned the bumper system and installation method, Asian Lift who carried out the Piperack section lifting and installation, Scopus who aligned the module sections and ensured they would fit, Keppel who landed the modules on the deck and took on board our construction philosophy and the Prosafe Vessel Construction team who organized the installation at the vessel side. Innovation and teamwork combined to bring a great result for the Project, well done to all involved.
Client : PETRONAS CARIGALI SDN BHD Project : WELL TIE IN - HUC Location : SUMANDAK
First and foremost I would like to thanks your team for assisting us during Sumandak Tepi
Well tie-in activity. Indeed application of laser scanning proven to be successful in assisting
us for the scope of work, provided we follow step by step the process. It is also beneficial in
identifying clashes and accurate tie –in which in turn eliminate rework and modification at
site. Just for your info for C07 well tie-in we completed it within one day.
Regards
Mohamad Hafiz B Amran (MHA)
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
“Design it Right,Operate it Right, Maintain It Right”
Client : PETRONAS CARIGALI SDN BHD Project : HUC – HELIDECK LASER SURVEY Location : BARAM – BADP-B PROJECT MGR : A RASHID A AMIN ( PROJ / EORC )
Pictures attached are
Module Yard construction set-up of Piperacks Piperack section being installed by Asian Lift The installed forward Piperack modules The fit-up achieved after installation (the yellow steel is the temporary bumpers set up in
Kencana to provide the close fit-up and no hook-up spool requirement) Regards Richard Richard Glancy Topsides Delivery Manager Azurite Field development Project
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Prosafe Production
Client: Carigali - Schlumberger, Malaysia Project: BOKOR Phase II, Development. Jul’08
Gents
See attached photos of the Main Deck Skid Beams fit-up. TLO achieved a very good fit-up thanks to Infotrax Engineering.
It would have been even better if TLO had used flat 'hook' beams but the trouble was due to some weld distortion on the hook beams built in a rush out of scrap. The final result ok though and accepted.
Regards
Tony Clerk – Structural Engineer, Schlumberger
Client: Carigali HESS / EPIC Mushtari Project: Booster Compression Brownfield (BCBF) Modification Location: MTJDA When the master PDMS database declared superseded (which found not reflecting to As-Built), all piping drawings (Design AFC ISO drawing) are required for re-verification compared to the existing condition. Non-As Built PDMS database will expose inaccuracy information in the AFC/IFC drawing production and definitely affect fabrication and installation during HUC.
Benefits:
- Reduce Shutdown (saved 10 days) - Reduce Hot Works
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
- Reduce Hazard Minimum FFW Regards, Roslan Sallehudin Project Manager Carigali Hess Jayaman Tarmidi Project Manager EPIC Mushtari
Client : DELEUM / PETRONAS CARIGALI /CETCO Project : SUMANDAK BOOSTER PUMP PROJECT Location : SUMANDAK , SABAH
Dear Tengku,
Just to update your team, this Sumandak Booster Pump Project have been discontinued by
PCSB and we have already rig down the system. This pilot project was discontinued due to
after study conducted by PCSB which found that the reservoir aquifer is strong enough to
maintain pressure and production without the booster pump system. Nevertheless, we have
manage to installed and commission the system with success.
We would like to thank you for your team’s support and great work in the design/engineering
phase up to fabrication which help us a lot in our project. We have learn a lot from your
company and look forward on working again with your team in the near future.
Thank you.
Regards,
Mohd Dali Mohd Ismail I Staff Engineer I
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
Deleum Chemical - HQ
No.2 I Jalan Bangsar Utama 9 I Bangsar Utama I 59000 Kuala Lumpur I Malaysia I
D/L: 603-22957627 I H/P: 012-3945594 I
[email protected] I www.deleum.com I
A member of the DELEUM Group and officially an OPITO certified Company
APPENDIX #1: PETRONAS LICENSE
Pada menjalankan kuasa-kuasa yang diberi oleh Seksyen 7, Akta Kemajuan Petroliam, 1974 dan mengikut Peraturan 5, Peraturan-Peraturan Petroliam,1974, yangdiwakilkan kepada saya oleh YAB Perdana Menteri Malaysia, saya dengan ini mengeluarkan lesen dibawah Peraturan 3, Peraturan-Peraturan Petroliam ini bagi tujuandi atas kepada:
Tarikh Dicetak: 21.10.2015INFO-TRAX SDN BHD (229813-M)42-3, JALAN SULAIMAN 1 TAMAN PUTRA SULAIMAN 68000 AMPANGSELANGOR
Butir-butir Lesen adalah seperti berikut:-
Nombor Syarikat : 229813-M
Jenis Syarikat : LESEN
Tempoh Sah Lesen : 07.09.2015 - 06.09.2018
Yuran Lesen : RM 1,500
Bidang pembekalan/perkhidmatan : Seperti di Lampiran 'BIDANG-BIDANG LESEN / PENDAFTARAN'.
Syarat-syarat Khas yang dikenakan ke atas Lesen ini:-
Tertakluk kepada syarat khas seperti di lampiran berkaitan.
Syarat-syarat Am Lesen ini adalah seperti yang tercatit di halaman seterusnya.
LESEN MEMBEKAL PERALATAN/MEMBERI PERKHIDMATAN KEPADASYARIKAT-SYARIKAT CARIGALI DAN PENGELUAR MINYAK/GAS DI MALAYSIA
Peringatan: Pemegang Lesen Hendaklah Memohon Pembaharuan Lesen Tiga (3) Bulan Sebelum Tarikh Tamat Lesen.
Sijil ini dicetak oleh komputer dan tandatangan pihak Petronas tidak diperlukan. Muka Surat 1 / 3
SYARAT-SYARAT AM LESEN PETRONAS
1. Syarikat ini dikehendaki berdaftar, mendapatkan lesen, permit atau kebernaran daripada pihakberkuasa yang berkenaan untuk mengendalikan perkhidmatan atau pembekalan peralatan ataubahan-bahan yang berkaitan dalam operasi atau aktiviti-aktiviti syarikat ini yang diperlukan;
2. Lesen ini tidak boleh dipindahmilik kepada mana-mana syarikat/pihak lain;
3. Lesen ini akan dibatalkan sekiranya syarikat ini didapati berada di dalam proses penyelesaianhutang-hutangnya (liquidation), penggulungan (winding-up) atau pembubaran (dissolution);
4. Syarikat ini hendaklah memaklumkan kepada PETRONAS sebarang perubahan ke atas kedudukansyarikat seperti pemilikan ekuiti, lembaga pengarah dan kakitangan pengurusan dalam masaempat belas (14) hari dari perubahan tersebut berlaku. Kegagalan untuk berbuat demikianboleh mengakibatkan lesen ini dibatalkan;
5. Syarikat ini hendaklah mengambil tindakan segera untuk memenuhi syarat-syarat khas yangdikenakan di dalam lampiran lesen dan memaklumkan kepada PETRONAS atas perkembangantindakan tersebut;
6. Syarikat ini tidak dibenarkan mengambil syarikat lain sebagai prinsipal, agen, sub-kontraktor atausebaliknya untuk memberi apa-apa perkhidmatan atau membekal apa-apa kemudahan, kelengkapanatau peralatan bagi pihaknya tanpa kebenaran bertulis daripada PETRONAS terlebih dahulu;
7. Syarikat hendaklah membenarkan wakil pihak PETRONAS membuat lawatan pemeriksaan/audit keatas premis/syarikat dan menyemak/menyalin dokumen-dokumen serta menemubual kakitangansyarikat dan pihak yang berkaitan;
8. Lesen ini hendaklah ditunjukkan kepada pegawai-pegawai PETRONAS apabila dikehendaki untukdiperiksa;
9. Lesen ini adalah sah untuk memberi perkhidmatan dan membekal peralatan bagi bidang-bidangyang tercatat di lampirannya sahaja;
10. Syarikat ini boleh dikenakan tindakan sekiranya pada pendapat PETRONAS, syarikat melakukansatu atau lebih daripada perkara-perkara seperti berikut;
a. Gagal melaksanakan kerja yang diberikan sehingga selesai.
b. Gagal untuk melaksanakan tanggungjawab kontrak atau mana-mana tanggungjawab lain dibawah undang-undang terhadap rakan kongsi, prinsipal, agen, sub-kontraktor dan sebagainya.
c. Menerima 'garnishee order'.
d. Menghadapi tindakan muflis.
e. Tidak dapat dikesan melalui alamat terakhir.
f. Mengsub-kontrak kerja kepada kontraktor lain tanpa kebenaran bertulis daripada PETRONAS.
g. Menolak mana-mana kontrak atau tender yang diberikan.
h. Memasuki atau menerima kontrak atau tender semasa di dalam penggantungan lesen.
i. Memberi maklumat palsu, tidak tepat atau mengelirukan.
j. Tidak mematuhi peraturan-peraturan dan etika-etika tender meliputi tetapi tidak terhad kepadamenghantar surat layang, memberi rasuah atau melobi;
k. Melakukan kegiatan yang tidak sewajar dengan Lesen ini.
11. Menurut peraturan 9, Peraturan-Peraturan Petroliam 1974, seseorang yang memulakan ataumeneruskan sesuatu urusan atau perkhidmatan yang tersebut dalam Peraturan 3 tanpa lesen atautidak mematuhi apa-apa syarat lesen tersebut adalah melakukan suatu kesalahan dan apabiladisabitkan boleh dikenakan denda tidak lebih daripada RM 50,000.00 (Ringgit Lima Puluh Ribu)atau penjara selama tempoh tidak lebih daripada dua (2) tahun atau kedua-duanya dan mengenaisesuatu kesalahan yang berterusan ia boleh dikenakan denda lanjutan RM 1,000.00 (Ringgit Seribu)tiap-tiap satu (1) hari atau sebahagian daripada satu (1) hari kesalahan itu berterusan selepas haripertama sabitan itu direkodkan;
12. Kelulusan ini bukan satu perjanjian/jaminan bahawa syarikat tuan akan dipanggil untuk menyertaitender atau sebutharga oleh PETRONAS atau anak-anak syarikatnya;
13. Syarikat ini sama ada secara dengan sendirinya, melalui pekerja-pekerjanya, pengarah-pengarahnya,agen-agennya atau kakitangan-kakitangannya:-
a. Tidak dibenarkan menggunakan logo titisan minyak (oil drop) PETRONAS atau perkataan"PETRONAS" atau menggunakan sebarang tanda, logo atau perkataan atau memakai gayacetakan (typeface), gaya huruf (font), rupa atau warna yang menyerupai cap-cap daganganyang dimiliki atau yang digunakan oleh PETRONAS ataupun anak-anak syarikatnya ("cap-capdagangan PETRONAS") dalam sebarang bentuk sekalipun sama ada pada bahan cetakan, lamanweb ataupun papan tangan; dan
b. Tidak dibenarkan melakukan apa-apa perbuatan atau dalam apa-apa cara sama ada secaralangsung atau tidak langsung mengaku bahawa ia adalah rakan kongsi atau mempunyaisebarang kaitan/hubungan dengan PETRONAS dan/atau anak-anak syarikatnya,MELAINKAN DAN KECUALI Syarikat ini dibenarkan menggunakan rujukan [Syarikat] inidilesenkan oleh PETRONAS [No. lesen], di bawah Peraturan 3 Peraturan-peraturan Petroliam1974.
14. Lesen ini boleh dibatalkan, digantung atau disenaraihitamkan pada bila-bila masa jika mana-manasyarat di atas, syarat-syarat am pelesenan dan pendaftaran PETRONAS dan syarat-syarat lain yangterkandung didalam Panduan Am Permohonan Lesen dan Pendaftaran PETRONAS tidak dipatuhi.
Muka Surat 2 / 3
NAMA SYARIKAT : INFO-TRAX SDN BHD (229813-M)
NO LESEN : 229813-M
TEMPOH SAH LESEN : 07.09.2015 - 06.09.2018
S Y A R A T K H A S L E S E NANNUAL AUDITED REPORT Syarikat dikehendaki mengemukakan salinan Laporan Kewangan Tahunan yang telah diaudit bagi tahun berakhir 31 Januari 2016 dan kedudukan "shareholders' funds" hendaklah
positif sebelum 01 November 2016. Kegagalan berbuat demikian akan mengakibatkan syarikat tidak lagi disenaraikan dalam "List of Licensed / Registered Companies (LLRC)"PETRONAS
ANNUAL AUDITED REPORT Syarikat dikehendaki mengemukakan salinan Laporan Kewangan Tahunan yang telah diaudit bagi tahun berakhir 31 Januari 2017 dan kedudukan "shareholders' funds" hendaklahpositif sebelum 01 November 2017. Kegagalan berbuat demikian akan mengakibatkan syarikat tidak lagi disenaraikan dalam "List of Licensed / Registered Companies (LLRC)"PETRONAS
PRINCIPAL APPOINTMENT Syarikat dikehendaki mengemukakan salinan surat perlantikan agensi yang eksklusif daripada prinsipal PROGNOST SYSTEM GMBH yang telah diperbaharui dan mengikut formatyang ditetapkan oleh PETRONAS sepertimana yang dinyatakan di dalam Panduan Am sebelum 30 April 2016. Kegagalan berbuat demikian akan mengakibatkan syarikat tidak lagidisenaraikan dalam "List of Licensed/Registered Companies (LLRC)" PETRONAS bagi bidang yang berkaitan.
COMPANY OTHERS Syarikat dikehendaki mengemukakan salinan Laporan Kewangan Tahunan yang telah diaudit bagi tahun berakhir 31 Januari 2015 dan kedudukan "shareholders' funds" hendaklahpositif sebelum 01 November 2015. Kegagalan berbuat demikian akan mengakibatkan syarikat tidak lagi disenaraikan dalam "List of Licensed / Registered Companies (LLRC)"PETRONAS
B I D A N G - B I D A N G L E S E N / P E N D A F T A R A NBIDANG-BIDANG LESEN YANG DILULUSKAN
(Approved License Categories)L/R Kod Perkhidmatan / Bekalan
(Service / Supplier Code)Bentuk Operasi(Mode of Operation)
Nama Produk / Rig / Kapal(Bila Mana Berkaitan)
Tarikh Lulus /Masa
Tarikh Tamat
L PI1090500INSTR-MONITORING EQUIP-MACHINERY CONDITION MONITORING SYSTEM
AGENT PROGNOST SYSTEM GMBH 08.10.201512:39:14
06.09.2018
L PO1120106OFFICE/RESIDENTIAL/OPERATIONAL EQUIP & SUPPLIES-LABORATORY-LABORATORY EQUIP-GENERAL LABORATORY EQUIP/APPARATUS (Reclassifiedfrom PO1120100-OFFICE/OPERATIONAL EQUIP-LABORATORY-EQUIP)
DEALER NOT APPLICABLE 07.09.201509:18:22
06.09.2018
L SG3010500GEOMATICS SERVICES-GENERAL SURVEY-3-D STRUCTURAL SURVEY (SE3050000reclass to SG3010500)
SELF-OPERATED NOT APPLICABLE 07.09.201509:18:22
06.09.2018
L SM5120300MECHANICAL ENG MAINT-ACOUSTIC INSULATION WORK
SELF-OPERATED NOT APPLICABLE 08.10.201512:39:13
06.09.2018
L SS1020100SPECIAL CATEGORIES MAINT-CBM DATACOLLECTION,MONITORING&ANALYSIS (Reclassified from SS1020200-SPECIALCATEGORIES MAINT-LUBE OIL ANALYSIS)
SELF-OPERATED NOT APPLICABLE 08.10.201512:39:14
06.09.2018
R E M A R K V D P / O T H E R SSS1020100 Excluding East Malaysia Operation (VDP)
*** TAMAT ***
Sijil ini dicetak oleh komputer dan tandatangan pihak Petronas tidak diperlukan. Muka Surat 3 / 3
Infotrax Engineering Company Registration No: 723031-W _________________________________________________________________________________________________________________________________________________________________
No. 1-3-3A, Blok 1, City Garden Commercial Centre Taman Nirwana, 68000 Ampang, Selangor Darul Ehsan
Tel: +603 9212 3888 Fax: +603 9212 3884 Email: [email protected] Website: www.infotraxeng.com
APPENDIX #2: ISO CERTIFICATION