LEDONNE CONSTRUCTIONS PTY LTD COMPANY PROFILE SPECIALISTS IN WATER AND WASTEWATER INFRASTUCTURE CONSTRUCTION 20 March 2014

Upload: others

Post on 20-Jun-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L T D

COMPANY PROFILE

SPECIALISTS IN WATER AND WASTEWATER

INFRASTUCTURE CONSTRUCTION 20 March 2014

Page 2: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N W A T ER A N D P A G E 2 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N

COMPANY DETAILS

Company Name: Ledonne Constructions Pty Ltd

A.C.N.: 003 117 717

A.B.N.: 68 003 117 717

Business Address: 43 Planthurst Rd

Carlton NSW 2218

Postal Address: PO Box 3142 Blakehurst NSW 2221

Telephone Number: (02) 9546 1662

Facsimile Number: (02) 9546 1022

Email: [email protected]

Contact Persons: Tony Ledonne – Managerial

Doug Duran – Financial, Management Systems Cassandra Padroth – Contract Management Yok Yong – Technical

Bank: National Australia Bank Limited

Bankstown Business Banking Centre Level 5, 402-410 Chapel Road Bankstown, NSW 2200 Partner: Nelly Nassif Ph. (02) 9780 2357

Accountant: Business and Taxation Concepts

147 Northumberland Street Liverpool NSW 2170 Company Accountant: Domenic Fedele Ph. (02) 9602 1100

Page 3: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N W A T ER A N D P A G E 3 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N

COMPANY HISTORY

Ledonne Constructions Pty Ltd was registered as a company on 10

th June 1986. Prior to that date,

the firm traded as Allawah Constructions, a partnership with three partners. Two of the partners

retired, and the third, Mr. Tony Ledonne remained and is now the Managing Director of Ledonne

Constructions.

The partnership and subsequent company has been contracting to the NSW Public Works,

Sydney Water Corporation, Hunter Water Corporation, local and regional NSW councils, and the

private sector for the construction of the following works for the last 39 years:

sewer supply pipelines

sewerage pumping stations,

pressure sewer systems,

water supply pipelines,

water pumping stations,

stormwater pipelines,

treatment works,

telecommunication services,

tunnelling, pipe jacking, directional drilling, and thrust boring,

associated building works, earthworks, and road construction.

Our head office is at Carlton in Sydney and we also have a North East NSW regional depot at South Grafton and a plant and transport workshop at Somersby on the NSW Central Coast.

Page 4: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N W A T ER A N D P A G E 4 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N

CORPORATE STRUCTURE

Managing Director: Tony Ledonne

39 years experience in managing all aspects of sewer, watermain, stormwater and pumping station construction including overall supervision of staff, site management and liaison and negotiation with client management. Project Management of construction contracts to achieve client’s time, cost quality objectives. Highly experienced in all types of pipe system design, construction, operation and maintenance.

Contracts Administrator: Cassandra Padroth

Over 20 years experience in the construction project team

environment including 8 years with the Sydney Water Corporation on the Warragamba Dam project. Has qualifications in Social Work, a sound knowledge base of contracts law and is currently completing a Bachelor of Construction Management. Cassandra also manages the company's Integrated Management System.

Accounts/Financial Manager: Douglas Duran

Extensive experience in business financial matters.

Responsible for company accounting including financial planning, budgeting and credit control. Doug also has 2 years experience as WHS Administrator, which include the core role of internal auditing of the company's Integrated Management system, including on-site audits.

Project Manager: Kevin Brown

Mechanical Engineer with over 20 years experience in construction contracting in sewer reticulation, carrier mains, pressure sewer systems, stormwater, water and sewage pumping stations. Excellent record of accomplishment in completing projects on time and to the satisfaction of the client. Very knowledgeable in contract administration, WHS, QA and Environmental issues.

Project Manager: Yok Yong

Mechanical Engineer with over 30 years experience in

mining and water and sewerage infrastructure projects including estimation and tendering, management of projects, contract management & administration, quality management, OHS management and environmental management. Includes 25 years experience with Sydney

Page 5: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N W A T ER A N D P A G E 5 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N

Water Corporation in the Project Delivery area of the Asset Solutions division.

Estimator: Ali Nikmardan

Over 6 years experience in construction, as both a Water

and Sewer Networks Designer and an Estimator/Project Engineer. Worked on many projects, most including trenching and pipe laying of water, sewer, gravity and rising mains. Clients have included Hunter water, Sydney Water, and local councils. Also has experience in the management of conduit laying , cable pulling and pit installation for Ausgrid, Telstra and Rail Corp.

Project Engineer: Daniel Civitarese

Civil Engineer responsible for technical aspects of site construction, managing compliance with site safety, environmental and quality plans and personally dealing with all client parties and the local community. Currently Project Engineer on the Sawtell SPS project. 4 years experience with Ledonnes.

Project Engineer: Daniel Ledonne

Graduated with degrees in Civil Engineering & Commerce. Responsible for developing & maintaining company QSE management systems including the internal audit function. Project Engineer on the Loch Sport Sewerage Scheme project. 4 years experience with Ledonnes.

Construction Manager: Shaun Zimmerman

Over 13 years experience in supervision and management

of sewerage and water supply construction for pipelines, pumping stations and pressure sewer systems. Responsible for the supervision and on-site training of the construction workforce and liaison with client management in the absence Project Managers. Extensive training in OH&S, pipe manufacturers courses and environmental courses.

Foreman: Allan Harrigan

Over 44 years experience in building construction &

associated industries both in Australia & overseas.. Qualified Carpenter & Joiner and Licensed Builder for 22 years. Extensive Experienced site manager on sewerage treatment plant construction.

Foreman: Todd McLean

Page 6: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N W A T ER A N D P A G E 6 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N

Over 10 years experience in supervision and management

of sewerage and water supply construction for both pipelines and pumping stations. Extensive training in OH&S, pipe manufacturer’s courses and environmental courses.

Foreman: Peter Coles

30 years experience in the construction industry including pipelines, residential building & concrete structures. Over 20 years experience as a construction supervisor with Rous Water before joining Ledonnes in 2011.

Plant Manager: Paddy Zimmerman

Vast experience in repair and maintenance of all types of

machinery. Responsible for the scheduled maintenance of the company’s motor vehicles, construction plant and machinery and the management of the Company’s workshop and storage yard.

Others: In addition to the above management positions, the

company employs five plant operators and six tradesman, pipelayers, labourers and apprentices. All employees have varying degrees of experience in sewerage and water supply construction, and have completed various training courses such as pipe manufacturer’s pipelaying, environmental and land care awareness, WHS and confined spaces.

Page 7: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N W A T ER A N D P A G E 7 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N

QUALITY MANAGEMENT

Ledonne Constructions is committed to the quality management of our processes and has

developed a Quality Management System to AS/NZS ISO 9001:2008.

Our system has achieved third party accreditation with QMS Certification Services Pty Ltd and has

been certified with an expiry date of 21 April 2016. Prior to that, our system was accredited by NCS

International Pty Ltd and earlier by Quality Assurance Services to AS/NZS ISO 9002.

WORK HEALTH AND SAFETY MANAGEMENT

Ledonne Constructions is committed to sound WHS practices. As such, we have developed an

WHS Management System in compliance with the Work Health and Safety Act, 2011, and the

Workers Compensation Act, 2010.

Ledonne Constructions’ WMS conforms to AS/NZS 4801:2001 and is certified by QMS Certification

Services Pty Ltd with an expiry date of 21 April 2016. It is accredited to the Federal Government

Building and Construction OHS Accreditation Scheme and the NSW Government OH&SMS

Guidelines (4th Edition) by NSW Public Works.

ENVIRONMENTAL MANAGEMENT

The management and staff of Ledonne Constructions are committed to the conservation of the

environment and minimising impact during construction of our works.

We have a wealth of experience in successfully undertaking construction in environmentally

sensitive areas such as The Royal National Park, Blue Mountains, Central Coast, South Coast,

Sutherland, Smiths Lake, etc.

Our Environmental Management System has been accredited by NSW Public Works to the NSW

Government Environmental Management System Guidelines derived in accordance with Australian

Page 8: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N W A T ER A N D P A G E 8 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N

Standard AS/NZS 14001:1996. Our system has been certified to ISO 14001:2004 by QMS

Certification Services Pty Ltd with an expiry date of 21 April 2016.

INTEGRATED MANAGEMENT SYSTEM

The Company has developed an Integrated Management System combining the 3 management

systems above.

Certification of the IMS by QMS Certification Services Pty Ltd has been achieved with compliance to

ISO 9001:2008, ISO 14001:2004 & AS/NZS 4801:2001 as outlined above.

Page 9: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N W A T ER A N D P A G E 9 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N

CONSTRUCTION PLANT AND EQUIPMENT

Description Make and Model Rated Capacity

Prime Mover Freightliner C120 80T

Excavator Caterpillar 330L 33T

Excavator Kobelco SK3006A 30T

Excavator Komatsu PC220-5 23T

Excavator Kobelco SK225SR (Registered as 20SR)

23T

Excavator Kato HD1023 23T

Excavator Lishid SC220LC-7 23T

Excavator Kobelco SK135SR 13T

Excavator Komatsu PC120-5 12T

Excavator Komatsu PC120-6EO 12T

Excavator Yanmar SV100 10T

Excavator Kobelco SK70SR 7T

Excavator Kobelco SK70SR 7T

Excavator Doosan DX55E Midi Excavator 5.5T

Excavator Yanmar B50 5T

Excavator Kobelco SK50SR 5T

Excavator Komatsu PC2800-2 3T

Excavator Yanmar B2-5 2T

Excavator Kobelco SK20SR-3 2T

Excavator Kobelco SK20SR 2T

Excavator Yanmar V1015 1.5T

Excavator Yanmar ViO17 Mini Excavator 1.5T

Excavator Kobelco SK10SR Mini Excavator 1T

Excavator Bobcat 316EA Mini Excavator 0.7T

Excavator Bobcat 316EA Mini Excavator 0.7T

Excavator Bobcat 319K Mini Excavator 1.5T

Excavator New Holland E50B Excavator 4.5T

Excavator Kobelco SK135SR-2 Geospec 14T

Backhoe John Deere 315D Turbo 8T

Trencher Vermeer T-650 20T

Trencher Vermeer RT700 5T

Trencher Vermeer RT700 5T

Trencher Case 560 4x4x4 Combo Trencher 3T

Trencher Case 560 4x4x4 Combo Trencher 3T

Trencher Case 560 4x4x4 Combo Trencher 3T

Trencher Vermeer RT100 0.5T

Directional Driller Vermeer Horizontal Drill D9413 4T

Loader CAT 914G00A 10T

Loader Crawler Skid Steer 3T

Loader ASV SR70 Multi Terrain Loader 3T

Loader Skid Steer Bobcat S18502A 2T

Loader Komatsu WA30-1 2T

Loader Mini Skidsteer, Kanga G524 1.5T

Loader Hytec ZL 10A Mini Wheel Loader

Dozer CTRPLR D6 Trackmachine

Track Dumper Marooka MST600 6T

Track Dumper Caterpillar/Mitsu Track Dumper LD1000

12T

Roller Cat/Tandem Vibratory Roller 2T

Roller Rammax Padfoot Roller RW300 1.5T

Page 10: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N W A T ER A N D P A G E 1 0 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N

Description Make and Model Rated Capacity

Truck Sterling Tipper LT9500 36T

Truck Ford Aeromax 94A Tipper 22T

Truck Isuzu Tray 12T

Truck Mitsubishi FM600 Table Top 9T

Truck Mitsubishi Canter Tipper 8T

Truck Isuzu FTR893A Tipper 8T

Truck Mitsubishi Table Top Crane 8T

Truck Isuzu FSR500 Short 8T

Truck Mitsubishi Canter Fuso 4x2 8T

Truck Mitsubishi Fuso Vacuum Tanker 6T

Truck Isuzu (Pantech) 6T

Truck 4WD Dumpy 6T

Truck Mitsubishi Canter Table Top/Crane 2T

Truck Daihatsu Table Top 2T

Truck 4WD Dumpy Lister 2T

Truck Mitsubishi Canter 2T

Truck Mitsubishi Canter 2T

Truck Isuzu Cab 4x2 Chassis 8T

Truck Mack Vision Tipper 15T

Truck Daihatsu Delta 4x2 Tipper 2T

Truck Isuzu Vacuum Suction Tipper 4T

Truck Isuzu NPR 400 4x2 Cab Chassis

Prime Mover Freightliner C120 80T

Trailer Tagalo Tray 60T

Trailer 3 Axle Tag Tipping Trailer H/MADE Custom Dog Ootrail

23T

Trailer Haulmk L Load (Tag) 20T

Trailer Tag HMADE 2 Axle 8T

Trailer H/MADE 2 Axle 2T

Trailer HMADE TKT Trailer (Light) 2T

Trailer Spitwater HP251/A Pressure Cleaner (Tandem Trailer 8x5 HD)

1T

Trailer Plant, T20 for Kanga Loader 2T

Trailer H/MADE Box Trailer 2T

Trailer Sloane Tipper 25T

Trailer B & M Box 01E (Pipe) 1T

Trailer Handmade Trailer

Trailer Satellite Box Trailer

Trailer 6x4 Box Trailer

Trailer CMAC Dual Trailer

Trailer Shepherd Super Dog Tipping Trailer

25T

Trailer Hercules HEDT-3 Super Dog Tipping Trailer

25.5T

Page 11: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N W A T ER A N D P A G E 1 1 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N

Description Make and Model Rated Capacity

Motor Vehicle Holden Commodore VZ Ute 1T

Motor Vehicle Toyota Landcruiser 92E N/A

Motor Vehicle Holden Rodeo N/A

Motor Vehicle Holden Commodore VY Sedan N/A

Motor Vehicle Toyota Hilux ute N/A

Motor Vehicle Ford Courier Ute N/A

Motor Vehicle VS Commodore Ute N/A

Motor Vehicle Toyota Hiace Van N/A

Motor Vehicle Toyota Hilux Ute N/A

Motor Vehicle Ford Falcon BA XL Super Cab Ute N/A

Motor Vehicle Toyota Landcruiser N/A

Motor Vehicle Ford Falcon BA XL Super Can Ute N/A

Motor Vehicle Toyota Hilux Ute N/A

Motor Vehicle Toyota Hiace Van N/A

Motor Vehicle Toyota Hilux SR5 N/A

Motor Vehicle Daihatsu-Delt 84A Ute N/A

Motor Vehicle Toyota Hilux SR5 3.0LT Diesel N/A

Motor Vehicle Subaru Impreza RS N/A

Motor Vehicle BMW E53X00A N/A

Motor Vehicle Lexus IS2001A N/A

Motor Vehicle Suzuki Swift S N/A

Motor Vehicle Ford Courier 4x4 Pickup N/A

Motor Vehicle Toyota Hilux 145 Series Ute N/A

Motor Vehicle Toyota Hilux Ute Dual Cab Manual N/A

Motor Vehicle Toyota Hilux SR3.0 Ute N/A

Motor Vehicle Toyota Hilux SR Dual Cab Man. N/A

Motor Vehicle Toyota Hilux KUN26R 4WD N/A

Motor Vehicle Holden Captiva CGMY09 SX N/A

Motor Vehicle Nissan Navara Dual Cab 4x4 Ute N/A

Quad Bike Baroni ATV260 4x2 Quad Bike N/A

Traffic Lights 2 Sets from A1 Roadlines N/A

Traffic Lights 4 Sets from The Trailer Factory N/A

Air Compressors 2 x Ingersoll Rand P130WD N/A

Air Compressor Royce RC 20P 18cfm N/A

Compressor Airman PDS90s-08 N/A

Compressor Comet Pump 3600 PS1x2 N/A

Air Compressor BA 11 N/A

Air Compressor Atlas Copco XAS 56 N/A

Street Sweeper DAF TA 186 Scarab N/A

Golf Carts 2 x Ezgo 2 Seater Electric Golf Cart

N/A

Traffic Signs Assorted Traffic Signs N/A

Road Plates 7 Road Plates N/A

Generator Set GF3-32 32KVA N/A

Fencing Portable Fencing N/A

Mower Super Z Hustler Ride on Mower N/A

Portable Building 1 Complex 12x6 N/A

Air Conditioner 4 Air Conditioner Large 1.5 hp N/A

Welding Machine 2 WHD315/90 Hydraulic Butt Welder

N/A

Layer Clamps 2 Clamps to suit WHD315 N/A

Narrow Clamps 2 Clamps to suit WHD315 N/A

Aluminium Stub 2 Stub devices for welding & fitting to suit WHD315

N/A

Containers 2 x 9FT Containers N/A

Page 12: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 1 2 o f 2 7 A N D C I V I L C O N S T R U C T I O N

RECENT WATER EXPERIENCE

Contract Scope of Work

Value/

Year

Complete

Contract

Period

Client

Client’s

Representative

NH2U - Bellingen Shire Watermain Relocation Works

Relocation of 2 x 0.35km watermains, using 450mm PE pipe, partially encased in a PE sleeve. Sealing of gap between sleeve pipe and watermain with expanding foam, and supply and install of valves and fittings at either ends for connection purposes

$1.0M

In Progress

(70% Complete)

12 weeks Bellingen Shire Council/Lend Lease Engineering

Bonnie Simeonov (02) 6692 2411

Minor Mains Replacement Programme -Packages 1A,

Installation, testing and commissioning of 2.25km of DN125 PE water mains at sites spread across the Nowra/Bomaderry region.

$0.5M

In Progress

(45 % Complete)

1A - 14 weeks

2A - 10 weeks

Shoalhaven Water David Banwell (02) 4429 3289

Bowraville Off-River Storage & Associated Works – Package B

Construction of water transfer pump station and a transfer main of 1.9km of DN500 GRP. Also includes other borefield headworks such as a collection tank, new bores & associated pipework with electrical & telemetry work.

$5.0M

2013

52 weeks Nambucca Shire Council / NSW Public Works

David Tarrant (02) 6648 2012

Orange DICL Water Mains Construction

Construction of 0.7 km of DN600 DICLP, 2.8Km of DN300 DICLP & 1.4km of DN250 DICLP water rising mains including road crossings by thrust boring.

$1.9M

2013

26 weeks Orange City Council John Marshall (02) 6393 8506

Page 13: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 1 3 o f 2 7 A N D C I V I L C O N S T R U C T I O N

Contract Scope of Work

Value/

Year

Complete

Contract

Period

Client

Client’s

Representative

Northern Shoalhaven Water Mains Extensions -Stage 1

Construction of water mains at 5 separate locations involving mainlaying of 320m of DN 375 DICL, 1173m of DN 300 OPVC, 245m of DN 250 OPVC, 480m of 125 DN 125 PE and 255m of DN 100 OPVC with connections to existing mains.

$1.0M

2011

20 weeks Shoalhaven City Council

David Banwell (02) 4429 3289

Highlands Source Project Pumping Station

Construction of a water pumping station with 3 vertical pumping units and 13m x 7m brick superstructure. The suction and delivery pipework involves approximately 160 m of mainly DN 450 DICL with connections to existing pipelines. Also included is the construction of 4 valve chambers, a gravel access road and other site works.

$2.2M

2011

26 weeks Goulburn Mulwaree Council / GHD Pty Ltd

Michael O’Keeffe (02) 6113 3216

Moonee to Woolgoolga Water and Sewer Mains

Construction of mains in connection with RTA road widening of the Pacific Highway north of Coffs Harbour. Involves main laying of 5.2 km of water mains, 3.3 km of sewer rising main and 10.5 km of wastewater reuse mains mainly in DICL pipe from 150 to 500mm NB.

$8.2M

2010

26 weeks Coffs Harbour City Council

Mat Naylor (02) 6648 4419

Barrington Water and Sewer Scheme

Construction of 5.0 km of 200/150 mm oPVC water mains, 6.2 km of 125/110 mm PE sewer mains and 1.5 km of various size PE pressure sewer street mains to serve the village of Barrington.

$1.5M

2010

20 weeks Gloucester Shire Council

Norm Harwood (02) 6538 5212

Design & Construction of Morisset Water Pumping Station

Design development & construction of a water pumping station with 2 horizontal pumping units and brick superstructure. The suction and delivery pipework involves approximately 200 m of DN 600 DICL with connections to existing pipelines. Also included is the construction of a gravel access

$3.3M

2006

26 weeks Wyong Shire Council / NSW Public Works

Paul Shearman

(02) 4908 4977

Page 14: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 1 4 o f 2 7 A N D C I V I L C O N S T R U C T I O N

Contract Scope of Work

Value/

Year

Complete

Contract

Period

Client

Client’s

Representative

road and sealed hardstand at the WPS site.

Upper Cascade Dam Raw Water PS & Delivery Main

Construction of a water pumping station with 2 horizontal pumping units and brick superstructure. Includes 24 m of 375 mm DICL suction main & 140 m of 300 mm DICL delivery main with sealed access road.

$1.3M

2006

26 weeks Sydney Catchment Authority / NSW Public Works

Krish Krishnananthan

(02) 9795 0820

Sth. Muswellbrook Pinaroo Suction Main

Construction of 878 m of 300 mm DICL and 74 m of 200 mm DICL watermain along the New England Highway. Includes an underbore crossing of the Highway.

$0.4M

2004

8 weeks Muswellbrook Shire Council

Barry Horvath

(02) 6549 3845

Page 15: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 1 5 o f 2 7 A N D C I V I L C O N S T R U C T I O N

RECENT SEWERAGE EXPERIENCE

Contract Scope of Work

Value/

Year

Complete

Contract

Period

Client

Client’s

Representative

Sawtell Sewer Pump Station and Associated Works

Construction of a 10m diameter x 10m deep wet well using secant pile method, & associated works. Involves outdoor switcboard and generator rooms, pipework and fittings, biofilter system, and dosing unit.

$4.0 M

In Progress

(25% Complete)

44 weeks Coffs Harbour City Council

Glenn O'Grady

(02) 6648

Loch Sport Sewerage Scheme Stage 2 – Progress Rd & Snipe St SPS’s

Construction of 2 Sewer Pumping Stations & associated works. Involves emergency storage, pipework & fittings, mechanical & electrical installation and siteworks.

$3.9M

In progress

(55% Complete)

40 weeks Gippsland Water Wayne Hewitt

(03) 5177 5921

Upgrade of 4 Sewer Pumping Stations at Barraba & Manilla, Tamworth

Construction of 3 new package Sewer Pumping Stations to replace existing SPS’s and upgrade of a 4

th existing SPS. Involves electrical upgrade,

associated pipework and siteworks.

$1.2M

2013

18 weeks Tamworth Regional Council

Michael McGufficke

(02) 6767 5807

Gravity Sewer Pipeline Construction -Sawtell STP

Construction of a gravity sewer pipeline inlet to Sawtell STP involving 315m of DN750, 351m of DN450 and 51m of DN600 GRP with maintenance holes. Includes 135m of DN750 by pipe jacking methods.

$1.2M

2013

16 weeks Coffs Harbour City Council

Paul Barling

(02) 6648 4413

Page 16: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 1 6 o f 2 7 A N D C I V I L C O N S T R U C T I O N

Contract Scope of Work

Value/

Year

Complete

Contract

Period

Client

Client’s

Representative

Ulladulla WWTP Sludge Management Augmentation

Augmentation of the sludge treatment & handling infrastructure including 2 new sludge lagoons, modifications & improvement works on 3 existing sludge lagoons & doubling the size of the existing sludge storage area.

$2.4M

2013

36 weeks Shoalhaven City Council

David Macquart

(02) 4429 3515

Broadwater & North Woodburn Sewerage Schemes

Design & construction of a pressure sewer system reticulation & on- property work involving a total of 256 E-one pump units, a transfer pumping station and rising main to Evans Head.

$8.3M

2013

56 weeks Richmond Valley Council/ NSW Public Works

Mark Stalhut

(02) 6626 5643

Burringbar & Mooball Villages Sewerage Reticulation Scheme

Construction of a combined gravity & pressure sewer system involving 98 E-one pump units, 6.0 kms of pressure sewer lines, 2.0 kms of gravity sewers, 4 pump stations, 2.8 kms of rising mains & 2.5 kms of recycle mains.

$3.7M

2012

52 weeks Tweed Shire Council Ted Gibson

(02) 6670 2634

Iluka Sewerage Scheme – D & C of Sewerage Reticulation & Transfer Systems

Design & construction of a pressure sewer system reticulation & on- property work involving 997 pump units, recycled water transfer system, domestic re-use distribution mains and irrigation systems for a golf course and playing fields.

$13.1M

2013

82 weeks Clarence Valley Council/ NSW Public Works

Geoff Gorton

(02) 6648 2004

Decommissioning Pump Station 30 & Construct New Sewer Gravity Main at Coffs Harbour

Decommissioning of sewerage pump station (PS30) and intercept flow via a new sewer gravity main to an existing pump station (PS17). Construction of a total of 228m of mainly DN180 to DN280 DICL gravity sewer line by trenching and thrust boring including 5 manholes to 5m depth.

$0.5M

2011

12 weeks Coffs Harbour City Council

David Doyle

(02) 6648 4494

Page 17: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 1 7 o f 2 7 A N D C I V I L C O N S T R U C T I O N

Contract Scope of Work

Value/

Year

Complete

Contract

Period

Client

Client’s

Representative

Woodburn Sewerage Augmentation -SPS Modifications & Rising Main Construction

Upgrade of Pump Station No.3 including new pumping units, pipework & fittings, odour dosing unit and electrical upgrade. Construction of 8.4 km of DN250 / DN300 DICL rising main and decommissioning and demolition of Pump Station No.4.

$3.7M

2011

32 weeks Richmond Valley Council / NSW Public Works

Mark Stalhut

(02) 6626 5643

Currarong Beachside Tourist Park Sewerage System

Supply and installation of a pressure sewerage system involving 4 E-one grinder pumping units (3 quadriplex & 1 duplex units), 450m of 40 -63mm PE pressure sewer mains and 125m of 100mm uPVC gravity sewer mains.

$0.3M

2010

8 weeks Shoalhaven City Council

Brad Conway

(02) 4423 0566

Moonee to Woolgoolga Water and Sewer Mains

Construction of mains in connection with RTA road widening of the Pacific Highway north of Coffs Harbour. Involves main laying of 5.2 km of water mains, 3.3 km of sewer rising main and 10.5 km of wastewater reuse mains mainly in DICL pipe from 150 to 500mm dia.

$8.2M

2010

26 weeks Coffs Harbour City Council

Mat Naylor (02) 6648 4419

Barrington Water and Sewer Scheme

Construction of 5.0 km of 200/150 mm oPVC water mains, 6.2 km of 125/110 mm PE sewer mains and 1.5 km of various size PE pressure sewer street mains to serve the village of Barrington.

$1.5M

2010

20 weeks Gloucester Shire Council

Norm Harwood (02) 6538 5212

Grafton and Maclean Sewage Transport Systems

Construction of a 6 Sewage Pumping Stations with pump units, pipework, valves and associated items and modifications to 2 existing Pumping Stations. Includes construction of over 33 kms. of reticulation sewers, rising mains and gravity transport mains.

$21.2M

2010

46 weeks Clarence Valley Council / NSW Public Works

Geoff Gorton

(02) 6648 2004

Page 18: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 1 8 o f 2 7 A N D C I V I L C O N S T R U C T I O N

Contract Scope of Work

Value/

Year

Complete

Contract

Period

Client

Client’s

Representative

Perisher Valley & Smiggin Holes Sewer Rehabilitation 2009

Rehabilitation of the existing sewerage pipelines and manholes using pipe bursting as well as trenched methods within the Snowy Mountains National Park.

$0.83M

2009

10 weeks NSW National Parks & Wildlife Service / Dept. of Environment & Climate Change

Rob Naisby (02) 6457 4415

North Ballina SPS & Associated Works

Construction of a Sewage Pumping Station with 2 submersible pump units, pipework, valves and associated items. Also included are siteworks, rising main construction and diversions, a deodorisation system and emergency storage.

$1.6M

2009

30 weeks Ballina Shire Council / NSW Public Works

Barry Garland

(02) 6626 5680

Morisset Street SPS, Queanbeyan

Construction of a 11.3m dia. x 13m deep Sewage Pumping Station with 4 submersible pump units, pipework & valves. Included are siteworks, 400 m of DN 600 DICL rising main, decommissioning and demolition of the existing pump station and temporary diversion of flows.

$6.1M

2009

42 weeks Queanbeyan City Council

Bill Webb

(02) 6298 0286

Lake Conjola Pressure Sewer System

On-property design and installation of a pressure sewerage system involving 362 household E/One pump units, approx. 5,000m of 40mm PE property services and 8,000m of street main varying in size from 50 to 160mm.

$3.9M

2008

46 weeks Shoalhaven City Council / NSW Public Works

Phil Beddoe

(02) 4421 3277

Lake Tabourie Pressure Sewer System

On-property design and installation of pressure sewerage system involving 392 household E/One pump units, approx. 10,000m of 40mm PE property services and 6,400m of street mains varying in size from 50mm to 140mm.

$4.4M

2007

46 weeks Shoalhaven City Council / NSW Public Works

Phil Beddoe

(02) 4421 3277

Tabourie Lake SPS and Transfer Main

Construction of a sewerage pumping station, deodorisation bed and a pressure/gravity transfer main involving 1740m of 180mm PEP, 3980m of 200mm mPVCP and 483m of 300mm mPVCP.

$2.7M

2007

40 weeks Shoalhaven City Council / NSW Public Works

Phil Beddoe

(02) 4421 3277

Page 19: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 1 9 o f 2 7 A N D C I V I L C O N S T R U C T I O N

Contract Scope of Work

Value/

Year

Complete

Contract

Period

Client

Client’s

Representative

Ross Street STP Goulburn Pump Upgrade

Construction, testing and commissioning of a new effluent transfer pumping station and new stormwater pumping station with delivery pipework at an operational treatment plant. Included an electrical switch room and demolition of existing structures.

$2.2M

2007

36 weeks Goulburn Mulwaree Council / NSW Public Works

Richard Batty

(02) 4872 3716

Summervale Aboriginal Community Sewerage Scheme

Construction, testing and commissioning of a new sewerage scheme for the aboriginal community at Summervale near Tamworth. NSW. Work included the supply and installation of a package pumping station, gravity sewers, rising main and a Sewage Treatment Plant.

$0.7M

2006

20 weeks Guyra Shire Council / NSW Public Works

Ian Regan

(02) 6768 4221

Croobyar Road Sewer, Milton

Construction of a sewerage pumping station, emergency storage tank, 296m of 200 DICL rising main and gravity mains involving the following uPVC pipes: 643m of 150mm, 704m of 225mm and 18m of 300mm.

$1.0M

2006

26 weeks Shoalhaven City Council / NSW Public Works

Rod Stewart

(02) 4429 9927

Tingha Sewerage Scheme

Design and construction of pressure sewerage system involving 220 household E/One pump units and the following PE pipes: 5100m of 40mm, 6,300m of 63mm, 2400m of 90mm, 800m of 110mm and 2100m of 125mm.

$3.5M

2006

49 weeks Guyra Shire Council / NSW Public Works

Ian Regan

(02) 6768 4221

Audley Sewerage Scheme

Construction of 13 package pumping stations with rising mains and 1800 m of 100 mm uPVC pressure gravity main. Work also involves 6 directional drilling sections mainly as river crossings. All work was in the environmentally sensitive Royal National Park.

$3.3M

2005

72 weeks NPWS / NSW Public Works

Krish Krishnananthan

(02) 9795 0820

Page 20: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 2 0 o f 2 7 A N D C I V I L C O N S T R U C T I O N

PROJECT HISTORY - WATER

Contract Description of Works Value

Client

Lidcombe Olympic Media Village

Construction of 4km of water supply ring main and reticulation for the Lidcombe Olympic Media Village. Most lines constructed within roads with12 live connections.

$1.3M

Olympic Coordination

Authority

Gray’s Hill to Manildra Pipeline

Construction of 8.5 km of 150 mm mPVC watermain in farmland between Cudal and Manildra. Includes 3 creek crossings.

$0.7M NSW Public Works

Dendrobium Mine Water Discharge Pipeline

Construction of 4.5 km of 250 mm DICL mine water discharge pipeline mainly beside a railway line. Includes the attachment of the pipeline to 9 railway bridges.

$0.8M

BHP Billiton Dendrobium Coal

Neath Watermain Adjustments

Staged construction of 2.5km of various size DICL pipes (up to 600 mm) with connections to the existing system all coordinated with Council roadworks.

$0.6M

Cessnock City Council / Hunter Water

Rouse Hill Infrastructure – Stage 2

Construction of 1.7km of various size DICL up to 600mm & SCL up to 1200mm watermains & ancillary works.

$1.4M

Abigroup / Sydney Water

South Wentworth Falls Area 2

Construction of 6.7 km of sewer reticulation lines to serve 170 lots. Includes 5 near horizontal microbores totaling approx. 870 m.

$3.5M Sydney Water

M5 East Motorway Pipeline Adjustments

Construction of various installations & disconnections of watermains & sewer pipelines & chambers

$0.9M BHBB M5 JV

West Wentworth Falls Area 5

Construction of 3.9km of 150mm and 225mm uPVC gravity sewer reticulation, including strict environmental controls, rock excavation, restricted clearance widths and bushland regeneration.

$1.1M AWT

Construction Sydney Water

Mardi Water Tunnel

Refurbishment of Mardi Tunnel consisting of removal of fill material around existing 600mm SCL water main within the tunnel, and removal of 100m of existing 600mm SCL water mains. Shotcrete lining of 100m within tunnel and install 12m of concrete culvert and construct concrete open channel approximately 100m within tunnel.

$0.5M Wyong City

Council

Page 21: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 2 1 o f 2 7 A N D C I V I L C O N S T R U C T I O N

Contract Description of Works Value

Client

Telstra Access Network CC Service Contract

Installation of extensions to the Telstra Telecommunication Network for new residential and commercial developments. Involves construction of conduits, pits etc and installation of cabling and joining with the existing network and customers MDF.

$0.6M

Transfield Services/ Telstra

West Hazelbrook Area 4 Sewerage

Construction of 1.3km of 150mm and 225mm VC gravity sewer reticulation, including strict environmental controls, rock excavation, restricted working widths & bush regeneration.

$0.5M AWT

Construction Sydney Water

Pacific Palms – Smiths Lake Sewerage

Construction of 25km of 150mm to 375mm uPVC and DICL backlog reticulation sewerage through environmentally sensitive rainforest areas. Includes 10,000 m3 of rock excavation, 2 km of hand digging, 2 tunnels through rock each 120m long and aqueducts.

$7.0M

Department of Pubic Works/

Mid Coast Water

Cardiff Carrier Main Amplification

Construction of 1.2 km of 900mm “Sintakote”, 1.5km of 750mm “Sintakote” and “Hobas” and 0.6km of 600mm “Sintakote” carrier main. Included 8 large diameter thrust bores under railway and major roads up to 120m each in length.

$3.0M Hunter Water

Woodville Road Watermain Renewal

Construction of 1.2km of 250mm DICL watermain along Woodville Road, Merrylands, including major traffic control, two thrust bores across Woodville Road & 7other road crossings

$0.6M Sydney Water

Honeysuckle Redevelopment – Wharf Boulevard & Associated Services

Construction of 2km of 150mm to 450mm DICL and uPVC sewer and water pipelines and associated pumping station and 1km of asphalt and flexible pavement road construction.

$2.4M Department of Public Works

Sandgate Vacuum Sewerage Scheme

Design and construction of 1km of vacuum sewer servicing 30 lots. Included vacuum pumping station with electrical and mechanical systems.

$0.5M Department of Public Works

Dora Creek Vacuum Sewerage Scheme

Design and construction of 24km of vacuum sewer servicing 800 lots. Included 3 vacuum pumping stations with electrical and mechanical systems, 2 dual river crossings of 110mm and 200mm diameter PE pipe 150m length each.

$3.3M Department of Public Works

Estelville Sewerage

Construction of 2km of uPVC sewers and pumping station. Included access road to pumping station.

$0.4M Department of Public Works

Page 22: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 2 2 o f 2 7 A N D C I V I L C O N S T R U C T I O N

Contract Description of Works Value

Client

Mt Kiera Water Supply

Construction of 600mm diameter DICL water supply pipelines and 28m*10m*6m above ground major pumping station with electrical substation, switchroom and mechanical systems. Included 600mm welded MSCL pipe creek crossing, two 600mm diameter flowmeter and pit, automatically controlled AICV valve and pit, 5T permanent gantry crane and final landscaping.

$2.6M Sydney Water

Coal Point & Kilaben Bay Sewerage

Construction 20km of 150mm to 375mm diameter uPVC sewers, 150mm to 300mm DICL rising mains and five pumping stations. Included 5.5km of the pipelines and access chambers underwater within Kilaben Bay with associated siltation and environmental controls

$5.2M Department of Public Works

West Dapto – Stage 1 Sewerage

Construction of 14km of 450mm to 525mm diameter VC, 750mm diameter RCP and 150mm to 225mm uPVC diameter sewers, 200mm 375mm diameter DICL water mains and 375mm to 500mm diameter DICL sewer rising mains. Included three 500mm diameter bores under railway and major roads, design and construction of hydrogen peroxide dosing plant.

$1.4M

Australian Water

Technologies/ Sydney Water

Centennial Park 1200mm Waverley Inlet Main Adjustment

Realignment of 35m of the 1200mm SCL inlet main to Waverley Reservoir to accommodate proposed roadworks in Centennial Park. Included pipejacking & cut-ins to existing main.

$0.4M

Centennial Park & Moore Park Trust / Sydney Water

Page 23: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 2 3 o f 2 7 A N D C I V I L C O N S T R U C T I O N

PROJECT HISTORY - SEWER

Contract

Description of Works

Value

Client

Hardy’s Bay Sewerage Scheme

Construction of 16km of reticulation sewers and three pumping stations. Works included over 300m of pipes laid underwater within Hardy’s Bay.

$3.1M Department of Public Works Gosford

Woronora Vacuum Sewerage Scheme

Design and construction of 2km of vacuum sewer servicing 80 lots. Include vacuum pumping station with electrical and mechanical systems, pump and switchroom building, all in extremely environmentally sensitive area.

$0.8M Sydney Water

Pyrmont Sewer Diversion

Construction of 300m of “Hobas” reticulation sewer adjacent to buildings in trench depths to 7.0m past existing major services.

$0.5M

Australian Water

Technologies Sydney Water

Sunshine Sewer Reticulation and Pumping Stations

Construction of 8km of 150mm to 300mm diameter uPVC reticulation sewers and 3 pumping stations

$1.5M Department of Public Works

Guildford Stormwater Channel Rehabilitation

Construction of new 30m section of open stormwater drain channel.

$0.1M

Australian Water

Technologies Sydney Water

Bankstown Stormwater Channel Rehabilitation

Construction of new 40m section of criblock retaining wall in open stormwater drain channel.

$0.1M

Australian Water

Technologies Sydney Water

McMasters Beach Sewer Reticulation & Pumping Stations

Construction of 15km of reticulation sewers and three pumping stations. Works included twin 375mm diameter polyethylene (PE) 200m submarine rising main lake crossings

$4.0M Department of Public Works Gosford

Copacabana Sewerage Scheme

Construction of 21km of 100 to 300mm diameter uPVC reticulation sewers, 2 pumping station and rising mains

$5.0M Department of Public Works Gosford

Edgeworth Carrier Main

Construction of 600mm VC sewer carrier main and flexible pavement access road.

$0.9M Hunter Water

Westmead Children’s Hospital

Construction of 2100mm to 900mm diameter RCP stormwater pipelines and associated concrete structures. Included extension of existing 225mm VC sewer mains, 450mm horizontal bore.

$1.3M Concrete Constructions/Department of Public Works

Springwood Area 4 Sewer Reticulation & Pumping Station

Construction of 3km of 150mm VC reticulation sewer and pumping station. Included 90% hand digging through environmentally sensitive areas at Springwood, directional bore and aqueducts.

$1.5M Sydney Water

Page 24: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 2 4 o f 2 7 A N D C I V I L C O N S T R U C T I O N

Contract

Description of Works

Value

Client

North Katoomba Sewer Reticulation

Design and construction of 2km of 150mm diameter VC sewer reticulation at North Katoomba.

$0.3M Sydney Water

Jamberoo Trunk Watermain

Construction of 16km of 200mm diameter “Blue Brute” uPVC watermain. Works included 8 creek crossings of MSCL pipes.

$1.3M Sydney Water

Dundas Creek Rehabilitation

Construction of open stormwater channel with gabion structures and associated environmental diligence and landscaping.

$0.2M Sydney Water

Greaves Creek Spillway

Construction of spillway bridge and parapet wall at Greaves Creek potable water dam.

$0.25M Sydney Water

Woodford Sewer Reticulation

Construction of 7km of 150mm to 300mm VC reticulation sewers and horizontal bore.

$1.5M Sydney Water

Gray’s Point Sewer Reticulation

Construction of reticulation sewers, rising main and design and construction of access jetty and pumping station.

$0.45M Sydney Water

Clareville Sewer Reticulation

Construction of 150mm DICL and VC reticulation sewers. Included 50% hand digging and talus ground.

$0.45M Sydney Water

Barrenjoey Sewer Reticulation

Construction of 150mm to 225mm VC reticulation sewers.

$0.4M Sydney Water

Terrey Hills Rising Main

Construction of 5km of 375mm “Hobas” rising main. Included section through National Park.

$0.8M Sydney Water

Bonnett Bay Sewer Reticulation and Pumping Stations

Construction of 150mm diameter VC and DICL reticulation sewers, PE / ABS rising main and 2 pumping stations. Included hand digging and talus ground, access jetty to pumping station.

$0.6M Sydney Water

Oyster Bay Sewer Reticulation and Pumping station

Construction of 150mm diameter VC and DICL reticulation sewers, PE rising main and pumping station. Included hand digging and talus ground, access jetty to pumping station.

$0.4M Sydney Water

Bensville Rising Main & Pumping Station

Construction of 2.3km of 375mm, 450mm and 525mm diameter DICL and VC diameter rising mains and pumping station.

$0.9M Department of Public Works Gosford

Lisarow Sewerage Scheme

Construction of 1km of 600mm VC carrier main, 5km of 100mm to 225mm VC diameter reticulation sewers and pumping station.

$0.8M Department of Public Works

Woy Woy Bay Sewerage Scheme

Construction of 15km of 150mm to 300mm diameter uPVC and VC reticulation sewers, three pumping stations and uPVC and DICL rising mains. Works included 1.5km of pipes laid underwater within the bay 5m from the shore retaining walls with dewatering and siltation environmental controls.

$3.0M Department of Public Works

Tascott Sewerage Construction of 15km of 100mm to 300mm VC $1.25M Department of

Page 25: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 2 5 o f 2 7 A N D C I V I L C O N S T R U C T I O N

Contract

Description of Works

Value

Client

Scheme reticulation sewers, pumping station and rising main. Included thrust bores under railway.

Public Works Gosford

Point Clare Sewer Reticulation

Construction of 10km of 150mm to 450mm diameter VC reticulation sewers. Included thrust bores and pipe-jacking under railway.

$0.7M Department of Public Works Gosford

Bowral to Moss Vale Water Main

Construction of 15km of 375mm and 450mm diameter AC water mains. Included 3 thrust bores under railway.

$0.75M Department of Public Works

West Gosford Area 3B Sewerage

Construction of 12km of 100mm to 375mm diameter reticulation sewers.

$0.8M Department of Public Works

Page 26: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 2 6 o f 2 7 A N D C I V I L C O N S T R U C T I O N

REFEREES

Client

Name

Telephone

NSW Public Works

Geoff Gorton

Project Manager

(02) 6648 5904

NSW Public Works

Mark Stalhut

Project Manager

(02) 6626 5643

NSW Public Works

Glen Mildenhall

Project Manager

(02) 6648 5937

NSW Public Works

Barry Garland

Project Manager

(02) 6626 5680

NSW Public Works

Phil Beddoe

Project Manager

(02) 4421 3277

NSW Public Works

Richard Batty

Project Manager

(02) 4872 3716

NSW Public Works

Paul Shearman

Project Manager

(02) 4908 4977

NSW Public Works

Rod Stewart

Project Manager

(02) 4429 9927

NSW Public Works

Krish Krishnananthan

Project Manager

(02) 9795 0820

NSW Public Works

David Tarrant

Project Manager

(02) 6648 2012

Sydney Water Corporation Mark Turner

Project Engineer

(02) 9364 0659

Sydney Water Corporation Logie Logeswaran

Project Manager

(02) 9364 0659

Sydney Water Corporation Geoff Follett

Project Manager

(02) 9350 4683

Page 27: Company Profile - ledonne.com.auMar 20, 2014  · Truck Mack Vision Tipper 15T Truck Daihatsu Delta 4x2 Tipper 2T Truck Isuzu Vacuum Suction Tipper 4T Truck Isuzu NPR 400 4x2 Cab Chassis

L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E

S P E C I A L I S T S I N P I P EL I N E P A G E 2 7 o f 2 7 A N D C I V I L C O N S T R U C T I O N

Client

Name

Telephone

Sydney Water Corporation Sathi Sathiamoorthy

Project Manager

(02) 9644 0267

Hunter Water Corporation Rick Pinson

Project Manager

(02) 4979 9457

National Parks & Wildlife Service

Michael Vader

Manager Regional Capital Works

(02) 9542 0634

Shoalhaven City Council

Robert Horner

Planning & Development Manager

(02) 4429 3111

Shoalhaven City Council David Banwell

Capital Projects Engineer

(02) 4429 3289

Shoalhaven City Council David Macquart

Consultant Projects Engineer

(02) 4429 3515

Tweed Shire Council Ted Gibson

Contracts Engineer

(02) 6670 2634

Orange City Council John Marshall

Senior Projects Manager

(02) 6393 8506

Coffs Harbour City Council Mat Naylor

Project manager

(02) 6648 4419

Coffs Harbour City Council Paul Barling

Project Engineer

(02) 6648 4413