L E D O N N E C O N S T R U C T I O N S P T Y L T D
COMPANY PROFILE
SPECIALISTS IN WATER AND WASTEWATER
INFRASTUCTURE CONSTRUCTION 20 March 2014
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N W A T ER A N D P A G E 2 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N
COMPANY DETAILS
Company Name: Ledonne Constructions Pty Ltd
A.C.N.: 003 117 717
A.B.N.: 68 003 117 717
Business Address: 43 Planthurst Rd
Carlton NSW 2218
Postal Address: PO Box 3142 Blakehurst NSW 2221
Telephone Number: (02) 9546 1662
Facsimile Number: (02) 9546 1022
Email: [email protected]
Contact Persons: Tony Ledonne – Managerial
Doug Duran – Financial, Management Systems Cassandra Padroth – Contract Management Yok Yong – Technical
Bank: National Australia Bank Limited
Bankstown Business Banking Centre Level 5, 402-410 Chapel Road Bankstown, NSW 2200 Partner: Nelly Nassif Ph. (02) 9780 2357
Accountant: Business and Taxation Concepts
147 Northumberland Street Liverpool NSW 2170 Company Accountant: Domenic Fedele Ph. (02) 9602 1100
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N W A T ER A N D P A G E 3 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N
COMPANY HISTORY
Ledonne Constructions Pty Ltd was registered as a company on 10
th June 1986. Prior to that date,
the firm traded as Allawah Constructions, a partnership with three partners. Two of the partners
retired, and the third, Mr. Tony Ledonne remained and is now the Managing Director of Ledonne
Constructions.
The partnership and subsequent company has been contracting to the NSW Public Works,
Sydney Water Corporation, Hunter Water Corporation, local and regional NSW councils, and the
private sector for the construction of the following works for the last 39 years:
sewer supply pipelines
sewerage pumping stations,
pressure sewer systems,
water supply pipelines,
water pumping stations,
stormwater pipelines,
treatment works,
telecommunication services,
tunnelling, pipe jacking, directional drilling, and thrust boring,
associated building works, earthworks, and road construction.
Our head office is at Carlton in Sydney and we also have a North East NSW regional depot at South Grafton and a plant and transport workshop at Somersby on the NSW Central Coast.
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N W A T ER A N D P A G E 4 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N
CORPORATE STRUCTURE
Managing Director: Tony Ledonne
39 years experience in managing all aspects of sewer, watermain, stormwater and pumping station construction including overall supervision of staff, site management and liaison and negotiation with client management. Project Management of construction contracts to achieve client’s time, cost quality objectives. Highly experienced in all types of pipe system design, construction, operation and maintenance.
Contracts Administrator: Cassandra Padroth
Over 20 years experience in the construction project team
environment including 8 years with the Sydney Water Corporation on the Warragamba Dam project. Has qualifications in Social Work, a sound knowledge base of contracts law and is currently completing a Bachelor of Construction Management. Cassandra also manages the company's Integrated Management System.
Accounts/Financial Manager: Douglas Duran
Extensive experience in business financial matters.
Responsible for company accounting including financial planning, budgeting and credit control. Doug also has 2 years experience as WHS Administrator, which include the core role of internal auditing of the company's Integrated Management system, including on-site audits.
Project Manager: Kevin Brown
Mechanical Engineer with over 20 years experience in construction contracting in sewer reticulation, carrier mains, pressure sewer systems, stormwater, water and sewage pumping stations. Excellent record of accomplishment in completing projects on time and to the satisfaction of the client. Very knowledgeable in contract administration, WHS, QA and Environmental issues.
Project Manager: Yok Yong
Mechanical Engineer with over 30 years experience in
mining and water and sewerage infrastructure projects including estimation and tendering, management of projects, contract management & administration, quality management, OHS management and environmental management. Includes 25 years experience with Sydney
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N W A T ER A N D P A G E 5 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N
Water Corporation in the Project Delivery area of the Asset Solutions division.
Estimator: Ali Nikmardan
Over 6 years experience in construction, as both a Water
and Sewer Networks Designer and an Estimator/Project Engineer. Worked on many projects, most including trenching and pipe laying of water, sewer, gravity and rising mains. Clients have included Hunter water, Sydney Water, and local councils. Also has experience in the management of conduit laying , cable pulling and pit installation for Ausgrid, Telstra and Rail Corp.
Project Engineer: Daniel Civitarese
Civil Engineer responsible for technical aspects of site construction, managing compliance with site safety, environmental and quality plans and personally dealing with all client parties and the local community. Currently Project Engineer on the Sawtell SPS project. 4 years experience with Ledonnes.
Project Engineer: Daniel Ledonne
Graduated with degrees in Civil Engineering & Commerce. Responsible for developing & maintaining company QSE management systems including the internal audit function. Project Engineer on the Loch Sport Sewerage Scheme project. 4 years experience with Ledonnes.
Construction Manager: Shaun Zimmerman
Over 13 years experience in supervision and management
of sewerage and water supply construction for pipelines, pumping stations and pressure sewer systems. Responsible for the supervision and on-site training of the construction workforce and liaison with client management in the absence Project Managers. Extensive training in OH&S, pipe manufacturers courses and environmental courses.
Foreman: Allan Harrigan
Over 44 years experience in building construction &
associated industries both in Australia & overseas.. Qualified Carpenter & Joiner and Licensed Builder for 22 years. Extensive Experienced site manager on sewerage treatment plant construction.
Foreman: Todd McLean
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N W A T ER A N D P A G E 6 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N
Over 10 years experience in supervision and management
of sewerage and water supply construction for both pipelines and pumping stations. Extensive training in OH&S, pipe manufacturer’s courses and environmental courses.
Foreman: Peter Coles
30 years experience in the construction industry including pipelines, residential building & concrete structures. Over 20 years experience as a construction supervisor with Rous Water before joining Ledonnes in 2011.
Plant Manager: Paddy Zimmerman
Vast experience in repair and maintenance of all types of
machinery. Responsible for the scheduled maintenance of the company’s motor vehicles, construction plant and machinery and the management of the Company’s workshop and storage yard.
Others: In addition to the above management positions, the
company employs five plant operators and six tradesman, pipelayers, labourers and apprentices. All employees have varying degrees of experience in sewerage and water supply construction, and have completed various training courses such as pipe manufacturer’s pipelaying, environmental and land care awareness, WHS and confined spaces.
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N W A T ER A N D P A G E 7 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N
QUALITY MANAGEMENT
Ledonne Constructions is committed to the quality management of our processes and has
developed a Quality Management System to AS/NZS ISO 9001:2008.
Our system has achieved third party accreditation with QMS Certification Services Pty Ltd and has
been certified with an expiry date of 21 April 2016. Prior to that, our system was accredited by NCS
International Pty Ltd and earlier by Quality Assurance Services to AS/NZS ISO 9002.
WORK HEALTH AND SAFETY MANAGEMENT
Ledonne Constructions is committed to sound WHS practices. As such, we have developed an
WHS Management System in compliance with the Work Health and Safety Act, 2011, and the
Workers Compensation Act, 2010.
Ledonne Constructions’ WMS conforms to AS/NZS 4801:2001 and is certified by QMS Certification
Services Pty Ltd with an expiry date of 21 April 2016. It is accredited to the Federal Government
Building and Construction OHS Accreditation Scheme and the NSW Government OH&SMS
Guidelines (4th Edition) by NSW Public Works.
ENVIRONMENTAL MANAGEMENT
The management and staff of Ledonne Constructions are committed to the conservation of the
environment and minimising impact during construction of our works.
We have a wealth of experience in successfully undertaking construction in environmentally
sensitive areas such as The Royal National Park, Blue Mountains, Central Coast, South Coast,
Sutherland, Smiths Lake, etc.
Our Environmental Management System has been accredited by NSW Public Works to the NSW
Government Environmental Management System Guidelines derived in accordance with Australian
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N W A T ER A N D P A G E 8 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N
Standard AS/NZS 14001:1996. Our system has been certified to ISO 14001:2004 by QMS
Certification Services Pty Ltd with an expiry date of 21 April 2016.
INTEGRATED MANAGEMENT SYSTEM
The Company has developed an Integrated Management System combining the 3 management
systems above.
Certification of the IMS by QMS Certification Services Pty Ltd has been achieved with compliance to
ISO 9001:2008, ISO 14001:2004 & AS/NZS 4801:2001 as outlined above.
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N W A T ER A N D P A G E 9 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N
CONSTRUCTION PLANT AND EQUIPMENT
Description Make and Model Rated Capacity
Prime Mover Freightliner C120 80T
Excavator Caterpillar 330L 33T
Excavator Kobelco SK3006A 30T
Excavator Komatsu PC220-5 23T
Excavator Kobelco SK225SR (Registered as 20SR)
23T
Excavator Kato HD1023 23T
Excavator Lishid SC220LC-7 23T
Excavator Kobelco SK135SR 13T
Excavator Komatsu PC120-5 12T
Excavator Komatsu PC120-6EO 12T
Excavator Yanmar SV100 10T
Excavator Kobelco SK70SR 7T
Excavator Kobelco SK70SR 7T
Excavator Doosan DX55E Midi Excavator 5.5T
Excavator Yanmar B50 5T
Excavator Kobelco SK50SR 5T
Excavator Komatsu PC2800-2 3T
Excavator Yanmar B2-5 2T
Excavator Kobelco SK20SR-3 2T
Excavator Kobelco SK20SR 2T
Excavator Yanmar V1015 1.5T
Excavator Yanmar ViO17 Mini Excavator 1.5T
Excavator Kobelco SK10SR Mini Excavator 1T
Excavator Bobcat 316EA Mini Excavator 0.7T
Excavator Bobcat 316EA Mini Excavator 0.7T
Excavator Bobcat 319K Mini Excavator 1.5T
Excavator New Holland E50B Excavator 4.5T
Excavator Kobelco SK135SR-2 Geospec 14T
Backhoe John Deere 315D Turbo 8T
Trencher Vermeer T-650 20T
Trencher Vermeer RT700 5T
Trencher Vermeer RT700 5T
Trencher Case 560 4x4x4 Combo Trencher 3T
Trencher Case 560 4x4x4 Combo Trencher 3T
Trencher Case 560 4x4x4 Combo Trencher 3T
Trencher Vermeer RT100 0.5T
Directional Driller Vermeer Horizontal Drill D9413 4T
Loader CAT 914G00A 10T
Loader Crawler Skid Steer 3T
Loader ASV SR70 Multi Terrain Loader 3T
Loader Skid Steer Bobcat S18502A 2T
Loader Komatsu WA30-1 2T
Loader Mini Skidsteer, Kanga G524 1.5T
Loader Hytec ZL 10A Mini Wheel Loader
Dozer CTRPLR D6 Trackmachine
Track Dumper Marooka MST600 6T
Track Dumper Caterpillar/Mitsu Track Dumper LD1000
12T
Roller Cat/Tandem Vibratory Roller 2T
Roller Rammax Padfoot Roller RW300 1.5T
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N W A T ER A N D P A G E 1 0 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N
Description Make and Model Rated Capacity
Truck Sterling Tipper LT9500 36T
Truck Ford Aeromax 94A Tipper 22T
Truck Isuzu Tray 12T
Truck Mitsubishi FM600 Table Top 9T
Truck Mitsubishi Canter Tipper 8T
Truck Isuzu FTR893A Tipper 8T
Truck Mitsubishi Table Top Crane 8T
Truck Isuzu FSR500 Short 8T
Truck Mitsubishi Canter Fuso 4x2 8T
Truck Mitsubishi Fuso Vacuum Tanker 6T
Truck Isuzu (Pantech) 6T
Truck 4WD Dumpy 6T
Truck Mitsubishi Canter Table Top/Crane 2T
Truck Daihatsu Table Top 2T
Truck 4WD Dumpy Lister 2T
Truck Mitsubishi Canter 2T
Truck Mitsubishi Canter 2T
Truck Isuzu Cab 4x2 Chassis 8T
Truck Mack Vision Tipper 15T
Truck Daihatsu Delta 4x2 Tipper 2T
Truck Isuzu Vacuum Suction Tipper 4T
Truck Isuzu NPR 400 4x2 Cab Chassis
Prime Mover Freightliner C120 80T
Trailer Tagalo Tray 60T
Trailer 3 Axle Tag Tipping Trailer H/MADE Custom Dog Ootrail
23T
Trailer Haulmk L Load (Tag) 20T
Trailer Tag HMADE 2 Axle 8T
Trailer H/MADE 2 Axle 2T
Trailer HMADE TKT Trailer (Light) 2T
Trailer Spitwater HP251/A Pressure Cleaner (Tandem Trailer 8x5 HD)
1T
Trailer Plant, T20 for Kanga Loader 2T
Trailer H/MADE Box Trailer 2T
Trailer Sloane Tipper 25T
Trailer B & M Box 01E (Pipe) 1T
Trailer Handmade Trailer
Trailer Satellite Box Trailer
Trailer 6x4 Box Trailer
Trailer CMAC Dual Trailer
Trailer Shepherd Super Dog Tipping Trailer
25T
Trailer Hercules HEDT-3 Super Dog Tipping Trailer
25.5T
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N W A T ER A N D P A G E 1 1 o f 2 7 W A S T E W A T E R I N F R A S T R U C T U R E C O N S T R U C T I O N
Description Make and Model Rated Capacity
Motor Vehicle Holden Commodore VZ Ute 1T
Motor Vehicle Toyota Landcruiser 92E N/A
Motor Vehicle Holden Rodeo N/A
Motor Vehicle Holden Commodore VY Sedan N/A
Motor Vehicle Toyota Hilux ute N/A
Motor Vehicle Ford Courier Ute N/A
Motor Vehicle VS Commodore Ute N/A
Motor Vehicle Toyota Hiace Van N/A
Motor Vehicle Toyota Hilux Ute N/A
Motor Vehicle Ford Falcon BA XL Super Cab Ute N/A
Motor Vehicle Toyota Landcruiser N/A
Motor Vehicle Ford Falcon BA XL Super Can Ute N/A
Motor Vehicle Toyota Hilux Ute N/A
Motor Vehicle Toyota Hiace Van N/A
Motor Vehicle Toyota Hilux SR5 N/A
Motor Vehicle Daihatsu-Delt 84A Ute N/A
Motor Vehicle Toyota Hilux SR5 3.0LT Diesel N/A
Motor Vehicle Subaru Impreza RS N/A
Motor Vehicle BMW E53X00A N/A
Motor Vehicle Lexus IS2001A N/A
Motor Vehicle Suzuki Swift S N/A
Motor Vehicle Ford Courier 4x4 Pickup N/A
Motor Vehicle Toyota Hilux 145 Series Ute N/A
Motor Vehicle Toyota Hilux Ute Dual Cab Manual N/A
Motor Vehicle Toyota Hilux SR3.0 Ute N/A
Motor Vehicle Toyota Hilux SR Dual Cab Man. N/A
Motor Vehicle Toyota Hilux KUN26R 4WD N/A
Motor Vehicle Holden Captiva CGMY09 SX N/A
Motor Vehicle Nissan Navara Dual Cab 4x4 Ute N/A
Quad Bike Baroni ATV260 4x2 Quad Bike N/A
Traffic Lights 2 Sets from A1 Roadlines N/A
Traffic Lights 4 Sets from The Trailer Factory N/A
Air Compressors 2 x Ingersoll Rand P130WD N/A
Air Compressor Royce RC 20P 18cfm N/A
Compressor Airman PDS90s-08 N/A
Compressor Comet Pump 3600 PS1x2 N/A
Air Compressor BA 11 N/A
Air Compressor Atlas Copco XAS 56 N/A
Street Sweeper DAF TA 186 Scarab N/A
Golf Carts 2 x Ezgo 2 Seater Electric Golf Cart
N/A
Traffic Signs Assorted Traffic Signs N/A
Road Plates 7 Road Plates N/A
Generator Set GF3-32 32KVA N/A
Fencing Portable Fencing N/A
Mower Super Z Hustler Ride on Mower N/A
Portable Building 1 Complex 12x6 N/A
Air Conditioner 4 Air Conditioner Large 1.5 hp N/A
Welding Machine 2 WHD315/90 Hydraulic Butt Welder
N/A
Layer Clamps 2 Clamps to suit WHD315 N/A
Narrow Clamps 2 Clamps to suit WHD315 N/A
Aluminium Stub 2 Stub devices for welding & fitting to suit WHD315
N/A
Containers 2 x 9FT Containers N/A
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 1 2 o f 2 7 A N D C I V I L C O N S T R U C T I O N
RECENT WATER EXPERIENCE
Contract Scope of Work
Value/
Year
Complete
Contract
Period
Client
Client’s
Representative
NH2U - Bellingen Shire Watermain Relocation Works
Relocation of 2 x 0.35km watermains, using 450mm PE pipe, partially encased in a PE sleeve. Sealing of gap between sleeve pipe and watermain with expanding foam, and supply and install of valves and fittings at either ends for connection purposes
$1.0M
In Progress
(70% Complete)
12 weeks Bellingen Shire Council/Lend Lease Engineering
Bonnie Simeonov (02) 6692 2411
Minor Mains Replacement Programme -Packages 1A,
Installation, testing and commissioning of 2.25km of DN125 PE water mains at sites spread across the Nowra/Bomaderry region.
$0.5M
In Progress
(45 % Complete)
1A - 14 weeks
2A - 10 weeks
Shoalhaven Water David Banwell (02) 4429 3289
Bowraville Off-River Storage & Associated Works – Package B
Construction of water transfer pump station and a transfer main of 1.9km of DN500 GRP. Also includes other borefield headworks such as a collection tank, new bores & associated pipework with electrical & telemetry work.
$5.0M
2013
52 weeks Nambucca Shire Council / NSW Public Works
David Tarrant (02) 6648 2012
Orange DICL Water Mains Construction
Construction of 0.7 km of DN600 DICLP, 2.8Km of DN300 DICLP & 1.4km of DN250 DICLP water rising mains including road crossings by thrust boring.
$1.9M
2013
26 weeks Orange City Council John Marshall (02) 6393 8506
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 1 3 o f 2 7 A N D C I V I L C O N S T R U C T I O N
Contract Scope of Work
Value/
Year
Complete
Contract
Period
Client
Client’s
Representative
Northern Shoalhaven Water Mains Extensions -Stage 1
Construction of water mains at 5 separate locations involving mainlaying of 320m of DN 375 DICL, 1173m of DN 300 OPVC, 245m of DN 250 OPVC, 480m of 125 DN 125 PE and 255m of DN 100 OPVC with connections to existing mains.
$1.0M
2011
20 weeks Shoalhaven City Council
David Banwell (02) 4429 3289
Highlands Source Project Pumping Station
Construction of a water pumping station with 3 vertical pumping units and 13m x 7m brick superstructure. The suction and delivery pipework involves approximately 160 m of mainly DN 450 DICL with connections to existing pipelines. Also included is the construction of 4 valve chambers, a gravel access road and other site works.
$2.2M
2011
26 weeks Goulburn Mulwaree Council / GHD Pty Ltd
Michael O’Keeffe (02) 6113 3216
Moonee to Woolgoolga Water and Sewer Mains
Construction of mains in connection with RTA road widening of the Pacific Highway north of Coffs Harbour. Involves main laying of 5.2 km of water mains, 3.3 km of sewer rising main and 10.5 km of wastewater reuse mains mainly in DICL pipe from 150 to 500mm NB.
$8.2M
2010
26 weeks Coffs Harbour City Council
Mat Naylor (02) 6648 4419
Barrington Water and Sewer Scheme
Construction of 5.0 km of 200/150 mm oPVC water mains, 6.2 km of 125/110 mm PE sewer mains and 1.5 km of various size PE pressure sewer street mains to serve the village of Barrington.
$1.5M
2010
20 weeks Gloucester Shire Council
Norm Harwood (02) 6538 5212
Design & Construction of Morisset Water Pumping Station
Design development & construction of a water pumping station with 2 horizontal pumping units and brick superstructure. The suction and delivery pipework involves approximately 200 m of DN 600 DICL with connections to existing pipelines. Also included is the construction of a gravel access
$3.3M
2006
26 weeks Wyong Shire Council / NSW Public Works
Paul Shearman
(02) 4908 4977
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 1 4 o f 2 7 A N D C I V I L C O N S T R U C T I O N
Contract Scope of Work
Value/
Year
Complete
Contract
Period
Client
Client’s
Representative
road and sealed hardstand at the WPS site.
Upper Cascade Dam Raw Water PS & Delivery Main
Construction of a water pumping station with 2 horizontal pumping units and brick superstructure. Includes 24 m of 375 mm DICL suction main & 140 m of 300 mm DICL delivery main with sealed access road.
$1.3M
2006
26 weeks Sydney Catchment Authority / NSW Public Works
Krish Krishnananthan
(02) 9795 0820
Sth. Muswellbrook Pinaroo Suction Main
Construction of 878 m of 300 mm DICL and 74 m of 200 mm DICL watermain along the New England Highway. Includes an underbore crossing of the Highway.
$0.4M
2004
8 weeks Muswellbrook Shire Council
Barry Horvath
(02) 6549 3845
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 1 5 o f 2 7 A N D C I V I L C O N S T R U C T I O N
RECENT SEWERAGE EXPERIENCE
Contract Scope of Work
Value/
Year
Complete
Contract
Period
Client
Client’s
Representative
Sawtell Sewer Pump Station and Associated Works
Construction of a 10m diameter x 10m deep wet well using secant pile method, & associated works. Involves outdoor switcboard and generator rooms, pipework and fittings, biofilter system, and dosing unit.
$4.0 M
In Progress
(25% Complete)
44 weeks Coffs Harbour City Council
Glenn O'Grady
(02) 6648
Loch Sport Sewerage Scheme Stage 2 – Progress Rd & Snipe St SPS’s
Construction of 2 Sewer Pumping Stations & associated works. Involves emergency storage, pipework & fittings, mechanical & electrical installation and siteworks.
$3.9M
In progress
(55% Complete)
40 weeks Gippsland Water Wayne Hewitt
(03) 5177 5921
Upgrade of 4 Sewer Pumping Stations at Barraba & Manilla, Tamworth
Construction of 3 new package Sewer Pumping Stations to replace existing SPS’s and upgrade of a 4
th existing SPS. Involves electrical upgrade,
associated pipework and siteworks.
$1.2M
2013
18 weeks Tamworth Regional Council
Michael McGufficke
(02) 6767 5807
Gravity Sewer Pipeline Construction -Sawtell STP
Construction of a gravity sewer pipeline inlet to Sawtell STP involving 315m of DN750, 351m of DN450 and 51m of DN600 GRP with maintenance holes. Includes 135m of DN750 by pipe jacking methods.
$1.2M
2013
16 weeks Coffs Harbour City Council
Paul Barling
(02) 6648 4413
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 1 6 o f 2 7 A N D C I V I L C O N S T R U C T I O N
Contract Scope of Work
Value/
Year
Complete
Contract
Period
Client
Client’s
Representative
Ulladulla WWTP Sludge Management Augmentation
Augmentation of the sludge treatment & handling infrastructure including 2 new sludge lagoons, modifications & improvement works on 3 existing sludge lagoons & doubling the size of the existing sludge storage area.
$2.4M
2013
36 weeks Shoalhaven City Council
David Macquart
(02) 4429 3515
Broadwater & North Woodburn Sewerage Schemes
Design & construction of a pressure sewer system reticulation & on- property work involving a total of 256 E-one pump units, a transfer pumping station and rising main to Evans Head.
$8.3M
2013
56 weeks Richmond Valley Council/ NSW Public Works
Mark Stalhut
(02) 6626 5643
Burringbar & Mooball Villages Sewerage Reticulation Scheme
Construction of a combined gravity & pressure sewer system involving 98 E-one pump units, 6.0 kms of pressure sewer lines, 2.0 kms of gravity sewers, 4 pump stations, 2.8 kms of rising mains & 2.5 kms of recycle mains.
$3.7M
2012
52 weeks Tweed Shire Council Ted Gibson
(02) 6670 2634
Iluka Sewerage Scheme – D & C of Sewerage Reticulation & Transfer Systems
Design & construction of a pressure sewer system reticulation & on- property work involving 997 pump units, recycled water transfer system, domestic re-use distribution mains and irrigation systems for a golf course and playing fields.
$13.1M
2013
82 weeks Clarence Valley Council/ NSW Public Works
Geoff Gorton
(02) 6648 2004
Decommissioning Pump Station 30 & Construct New Sewer Gravity Main at Coffs Harbour
Decommissioning of sewerage pump station (PS30) and intercept flow via a new sewer gravity main to an existing pump station (PS17). Construction of a total of 228m of mainly DN180 to DN280 DICL gravity sewer line by trenching and thrust boring including 5 manholes to 5m depth.
$0.5M
2011
12 weeks Coffs Harbour City Council
David Doyle
(02) 6648 4494
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 1 7 o f 2 7 A N D C I V I L C O N S T R U C T I O N
Contract Scope of Work
Value/
Year
Complete
Contract
Period
Client
Client’s
Representative
Woodburn Sewerage Augmentation -SPS Modifications & Rising Main Construction
Upgrade of Pump Station No.3 including new pumping units, pipework & fittings, odour dosing unit and electrical upgrade. Construction of 8.4 km of DN250 / DN300 DICL rising main and decommissioning and demolition of Pump Station No.4.
$3.7M
2011
32 weeks Richmond Valley Council / NSW Public Works
Mark Stalhut
(02) 6626 5643
Currarong Beachside Tourist Park Sewerage System
Supply and installation of a pressure sewerage system involving 4 E-one grinder pumping units (3 quadriplex & 1 duplex units), 450m of 40 -63mm PE pressure sewer mains and 125m of 100mm uPVC gravity sewer mains.
$0.3M
2010
8 weeks Shoalhaven City Council
Brad Conway
(02) 4423 0566
Moonee to Woolgoolga Water and Sewer Mains
Construction of mains in connection with RTA road widening of the Pacific Highway north of Coffs Harbour. Involves main laying of 5.2 km of water mains, 3.3 km of sewer rising main and 10.5 km of wastewater reuse mains mainly in DICL pipe from 150 to 500mm dia.
$8.2M
2010
26 weeks Coffs Harbour City Council
Mat Naylor (02) 6648 4419
Barrington Water and Sewer Scheme
Construction of 5.0 km of 200/150 mm oPVC water mains, 6.2 km of 125/110 mm PE sewer mains and 1.5 km of various size PE pressure sewer street mains to serve the village of Barrington.
$1.5M
2010
20 weeks Gloucester Shire Council
Norm Harwood (02) 6538 5212
Grafton and Maclean Sewage Transport Systems
Construction of a 6 Sewage Pumping Stations with pump units, pipework, valves and associated items and modifications to 2 existing Pumping Stations. Includes construction of over 33 kms. of reticulation sewers, rising mains and gravity transport mains.
$21.2M
2010
46 weeks Clarence Valley Council / NSW Public Works
Geoff Gorton
(02) 6648 2004
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 1 8 o f 2 7 A N D C I V I L C O N S T R U C T I O N
Contract Scope of Work
Value/
Year
Complete
Contract
Period
Client
Client’s
Representative
Perisher Valley & Smiggin Holes Sewer Rehabilitation 2009
Rehabilitation of the existing sewerage pipelines and manholes using pipe bursting as well as trenched methods within the Snowy Mountains National Park.
$0.83M
2009
10 weeks NSW National Parks & Wildlife Service / Dept. of Environment & Climate Change
Rob Naisby (02) 6457 4415
North Ballina SPS & Associated Works
Construction of a Sewage Pumping Station with 2 submersible pump units, pipework, valves and associated items. Also included are siteworks, rising main construction and diversions, a deodorisation system and emergency storage.
$1.6M
2009
30 weeks Ballina Shire Council / NSW Public Works
Barry Garland
(02) 6626 5680
Morisset Street SPS, Queanbeyan
Construction of a 11.3m dia. x 13m deep Sewage Pumping Station with 4 submersible pump units, pipework & valves. Included are siteworks, 400 m of DN 600 DICL rising main, decommissioning and demolition of the existing pump station and temporary diversion of flows.
$6.1M
2009
42 weeks Queanbeyan City Council
Bill Webb
(02) 6298 0286
Lake Conjola Pressure Sewer System
On-property design and installation of a pressure sewerage system involving 362 household E/One pump units, approx. 5,000m of 40mm PE property services and 8,000m of street main varying in size from 50 to 160mm.
$3.9M
2008
46 weeks Shoalhaven City Council / NSW Public Works
Phil Beddoe
(02) 4421 3277
Lake Tabourie Pressure Sewer System
On-property design and installation of pressure sewerage system involving 392 household E/One pump units, approx. 10,000m of 40mm PE property services and 6,400m of street mains varying in size from 50mm to 140mm.
$4.4M
2007
46 weeks Shoalhaven City Council / NSW Public Works
Phil Beddoe
(02) 4421 3277
Tabourie Lake SPS and Transfer Main
Construction of a sewerage pumping station, deodorisation bed and a pressure/gravity transfer main involving 1740m of 180mm PEP, 3980m of 200mm mPVCP and 483m of 300mm mPVCP.
$2.7M
2007
40 weeks Shoalhaven City Council / NSW Public Works
Phil Beddoe
(02) 4421 3277
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 1 9 o f 2 7 A N D C I V I L C O N S T R U C T I O N
Contract Scope of Work
Value/
Year
Complete
Contract
Period
Client
Client’s
Representative
Ross Street STP Goulburn Pump Upgrade
Construction, testing and commissioning of a new effluent transfer pumping station and new stormwater pumping station with delivery pipework at an operational treatment plant. Included an electrical switch room and demolition of existing structures.
$2.2M
2007
36 weeks Goulburn Mulwaree Council / NSW Public Works
Richard Batty
(02) 4872 3716
Summervale Aboriginal Community Sewerage Scheme
Construction, testing and commissioning of a new sewerage scheme for the aboriginal community at Summervale near Tamworth. NSW. Work included the supply and installation of a package pumping station, gravity sewers, rising main and a Sewage Treatment Plant.
$0.7M
2006
20 weeks Guyra Shire Council / NSW Public Works
Ian Regan
(02) 6768 4221
Croobyar Road Sewer, Milton
Construction of a sewerage pumping station, emergency storage tank, 296m of 200 DICL rising main and gravity mains involving the following uPVC pipes: 643m of 150mm, 704m of 225mm and 18m of 300mm.
$1.0M
2006
26 weeks Shoalhaven City Council / NSW Public Works
Rod Stewart
(02) 4429 9927
Tingha Sewerage Scheme
Design and construction of pressure sewerage system involving 220 household E/One pump units and the following PE pipes: 5100m of 40mm, 6,300m of 63mm, 2400m of 90mm, 800m of 110mm and 2100m of 125mm.
$3.5M
2006
49 weeks Guyra Shire Council / NSW Public Works
Ian Regan
(02) 6768 4221
Audley Sewerage Scheme
Construction of 13 package pumping stations with rising mains and 1800 m of 100 mm uPVC pressure gravity main. Work also involves 6 directional drilling sections mainly as river crossings. All work was in the environmentally sensitive Royal National Park.
$3.3M
2005
72 weeks NPWS / NSW Public Works
Krish Krishnananthan
(02) 9795 0820
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 2 0 o f 2 7 A N D C I V I L C O N S T R U C T I O N
PROJECT HISTORY - WATER
Contract Description of Works Value
Client
Lidcombe Olympic Media Village
Construction of 4km of water supply ring main and reticulation for the Lidcombe Olympic Media Village. Most lines constructed within roads with12 live connections.
$1.3M
Olympic Coordination
Authority
Gray’s Hill to Manildra Pipeline
Construction of 8.5 km of 150 mm mPVC watermain in farmland between Cudal and Manildra. Includes 3 creek crossings.
$0.7M NSW Public Works
Dendrobium Mine Water Discharge Pipeline
Construction of 4.5 km of 250 mm DICL mine water discharge pipeline mainly beside a railway line. Includes the attachment of the pipeline to 9 railway bridges.
$0.8M
BHP Billiton Dendrobium Coal
Neath Watermain Adjustments
Staged construction of 2.5km of various size DICL pipes (up to 600 mm) with connections to the existing system all coordinated with Council roadworks.
$0.6M
Cessnock City Council / Hunter Water
Rouse Hill Infrastructure – Stage 2
Construction of 1.7km of various size DICL up to 600mm & SCL up to 1200mm watermains & ancillary works.
$1.4M
Abigroup / Sydney Water
South Wentworth Falls Area 2
Construction of 6.7 km of sewer reticulation lines to serve 170 lots. Includes 5 near horizontal microbores totaling approx. 870 m.
$3.5M Sydney Water
M5 East Motorway Pipeline Adjustments
Construction of various installations & disconnections of watermains & sewer pipelines & chambers
$0.9M BHBB M5 JV
West Wentworth Falls Area 5
Construction of 3.9km of 150mm and 225mm uPVC gravity sewer reticulation, including strict environmental controls, rock excavation, restricted clearance widths and bushland regeneration.
$1.1M AWT
Construction Sydney Water
Mardi Water Tunnel
Refurbishment of Mardi Tunnel consisting of removal of fill material around existing 600mm SCL water main within the tunnel, and removal of 100m of existing 600mm SCL water mains. Shotcrete lining of 100m within tunnel and install 12m of concrete culvert and construct concrete open channel approximately 100m within tunnel.
$0.5M Wyong City
Council
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 2 1 o f 2 7 A N D C I V I L C O N S T R U C T I O N
Contract Description of Works Value
Client
Telstra Access Network CC Service Contract
Installation of extensions to the Telstra Telecommunication Network for new residential and commercial developments. Involves construction of conduits, pits etc and installation of cabling and joining with the existing network and customers MDF.
$0.6M
Transfield Services/ Telstra
West Hazelbrook Area 4 Sewerage
Construction of 1.3km of 150mm and 225mm VC gravity sewer reticulation, including strict environmental controls, rock excavation, restricted working widths & bush regeneration.
$0.5M AWT
Construction Sydney Water
Pacific Palms – Smiths Lake Sewerage
Construction of 25km of 150mm to 375mm uPVC and DICL backlog reticulation sewerage through environmentally sensitive rainforest areas. Includes 10,000 m3 of rock excavation, 2 km of hand digging, 2 tunnels through rock each 120m long and aqueducts.
$7.0M
Department of Pubic Works/
Mid Coast Water
Cardiff Carrier Main Amplification
Construction of 1.2 km of 900mm “Sintakote”, 1.5km of 750mm “Sintakote” and “Hobas” and 0.6km of 600mm “Sintakote” carrier main. Included 8 large diameter thrust bores under railway and major roads up to 120m each in length.
$3.0M Hunter Water
Woodville Road Watermain Renewal
Construction of 1.2km of 250mm DICL watermain along Woodville Road, Merrylands, including major traffic control, two thrust bores across Woodville Road & 7other road crossings
$0.6M Sydney Water
Honeysuckle Redevelopment – Wharf Boulevard & Associated Services
Construction of 2km of 150mm to 450mm DICL and uPVC sewer and water pipelines and associated pumping station and 1km of asphalt and flexible pavement road construction.
$2.4M Department of Public Works
Sandgate Vacuum Sewerage Scheme
Design and construction of 1km of vacuum sewer servicing 30 lots. Included vacuum pumping station with electrical and mechanical systems.
$0.5M Department of Public Works
Dora Creek Vacuum Sewerage Scheme
Design and construction of 24km of vacuum sewer servicing 800 lots. Included 3 vacuum pumping stations with electrical and mechanical systems, 2 dual river crossings of 110mm and 200mm diameter PE pipe 150m length each.
$3.3M Department of Public Works
Estelville Sewerage
Construction of 2km of uPVC sewers and pumping station. Included access road to pumping station.
$0.4M Department of Public Works
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 2 2 o f 2 7 A N D C I V I L C O N S T R U C T I O N
Contract Description of Works Value
Client
Mt Kiera Water Supply
Construction of 600mm diameter DICL water supply pipelines and 28m*10m*6m above ground major pumping station with electrical substation, switchroom and mechanical systems. Included 600mm welded MSCL pipe creek crossing, two 600mm diameter flowmeter and pit, automatically controlled AICV valve and pit, 5T permanent gantry crane and final landscaping.
$2.6M Sydney Water
Coal Point & Kilaben Bay Sewerage
Construction 20km of 150mm to 375mm diameter uPVC sewers, 150mm to 300mm DICL rising mains and five pumping stations. Included 5.5km of the pipelines and access chambers underwater within Kilaben Bay with associated siltation and environmental controls
$5.2M Department of Public Works
West Dapto – Stage 1 Sewerage
Construction of 14km of 450mm to 525mm diameter VC, 750mm diameter RCP and 150mm to 225mm uPVC diameter sewers, 200mm 375mm diameter DICL water mains and 375mm to 500mm diameter DICL sewer rising mains. Included three 500mm diameter bores under railway and major roads, design and construction of hydrogen peroxide dosing plant.
$1.4M
Australian Water
Technologies/ Sydney Water
Centennial Park 1200mm Waverley Inlet Main Adjustment
Realignment of 35m of the 1200mm SCL inlet main to Waverley Reservoir to accommodate proposed roadworks in Centennial Park. Included pipejacking & cut-ins to existing main.
$0.4M
Centennial Park & Moore Park Trust / Sydney Water
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 2 3 o f 2 7 A N D C I V I L C O N S T R U C T I O N
PROJECT HISTORY - SEWER
Contract
Description of Works
Value
Client
Hardy’s Bay Sewerage Scheme
Construction of 16km of reticulation sewers and three pumping stations. Works included over 300m of pipes laid underwater within Hardy’s Bay.
$3.1M Department of Public Works Gosford
Woronora Vacuum Sewerage Scheme
Design and construction of 2km of vacuum sewer servicing 80 lots. Include vacuum pumping station with electrical and mechanical systems, pump and switchroom building, all in extremely environmentally sensitive area.
$0.8M Sydney Water
Pyrmont Sewer Diversion
Construction of 300m of “Hobas” reticulation sewer adjacent to buildings in trench depths to 7.0m past existing major services.
$0.5M
Australian Water
Technologies Sydney Water
Sunshine Sewer Reticulation and Pumping Stations
Construction of 8km of 150mm to 300mm diameter uPVC reticulation sewers and 3 pumping stations
$1.5M Department of Public Works
Guildford Stormwater Channel Rehabilitation
Construction of new 30m section of open stormwater drain channel.
$0.1M
Australian Water
Technologies Sydney Water
Bankstown Stormwater Channel Rehabilitation
Construction of new 40m section of criblock retaining wall in open stormwater drain channel.
$0.1M
Australian Water
Technologies Sydney Water
McMasters Beach Sewer Reticulation & Pumping Stations
Construction of 15km of reticulation sewers and three pumping stations. Works included twin 375mm diameter polyethylene (PE) 200m submarine rising main lake crossings
$4.0M Department of Public Works Gosford
Copacabana Sewerage Scheme
Construction of 21km of 100 to 300mm diameter uPVC reticulation sewers, 2 pumping station and rising mains
$5.0M Department of Public Works Gosford
Edgeworth Carrier Main
Construction of 600mm VC sewer carrier main and flexible pavement access road.
$0.9M Hunter Water
Westmead Children’s Hospital
Construction of 2100mm to 900mm diameter RCP stormwater pipelines and associated concrete structures. Included extension of existing 225mm VC sewer mains, 450mm horizontal bore.
$1.3M Concrete Constructions/Department of Public Works
Springwood Area 4 Sewer Reticulation & Pumping Station
Construction of 3km of 150mm VC reticulation sewer and pumping station. Included 90% hand digging through environmentally sensitive areas at Springwood, directional bore and aqueducts.
$1.5M Sydney Water
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 2 4 o f 2 7 A N D C I V I L C O N S T R U C T I O N
Contract
Description of Works
Value
Client
North Katoomba Sewer Reticulation
Design and construction of 2km of 150mm diameter VC sewer reticulation at North Katoomba.
$0.3M Sydney Water
Jamberoo Trunk Watermain
Construction of 16km of 200mm diameter “Blue Brute” uPVC watermain. Works included 8 creek crossings of MSCL pipes.
$1.3M Sydney Water
Dundas Creek Rehabilitation
Construction of open stormwater channel with gabion structures and associated environmental diligence and landscaping.
$0.2M Sydney Water
Greaves Creek Spillway
Construction of spillway bridge and parapet wall at Greaves Creek potable water dam.
$0.25M Sydney Water
Woodford Sewer Reticulation
Construction of 7km of 150mm to 300mm VC reticulation sewers and horizontal bore.
$1.5M Sydney Water
Gray’s Point Sewer Reticulation
Construction of reticulation sewers, rising main and design and construction of access jetty and pumping station.
$0.45M Sydney Water
Clareville Sewer Reticulation
Construction of 150mm DICL and VC reticulation sewers. Included 50% hand digging and talus ground.
$0.45M Sydney Water
Barrenjoey Sewer Reticulation
Construction of 150mm to 225mm VC reticulation sewers.
$0.4M Sydney Water
Terrey Hills Rising Main
Construction of 5km of 375mm “Hobas” rising main. Included section through National Park.
$0.8M Sydney Water
Bonnett Bay Sewer Reticulation and Pumping Stations
Construction of 150mm diameter VC and DICL reticulation sewers, PE / ABS rising main and 2 pumping stations. Included hand digging and talus ground, access jetty to pumping station.
$0.6M Sydney Water
Oyster Bay Sewer Reticulation and Pumping station
Construction of 150mm diameter VC and DICL reticulation sewers, PE rising main and pumping station. Included hand digging and talus ground, access jetty to pumping station.
$0.4M Sydney Water
Bensville Rising Main & Pumping Station
Construction of 2.3km of 375mm, 450mm and 525mm diameter DICL and VC diameter rising mains and pumping station.
$0.9M Department of Public Works Gosford
Lisarow Sewerage Scheme
Construction of 1km of 600mm VC carrier main, 5km of 100mm to 225mm VC diameter reticulation sewers and pumping station.
$0.8M Department of Public Works
Woy Woy Bay Sewerage Scheme
Construction of 15km of 150mm to 300mm diameter uPVC and VC reticulation sewers, three pumping stations and uPVC and DICL rising mains. Works included 1.5km of pipes laid underwater within the bay 5m from the shore retaining walls with dewatering and siltation environmental controls.
$3.0M Department of Public Works
Tascott Sewerage Construction of 15km of 100mm to 300mm VC $1.25M Department of
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 2 5 o f 2 7 A N D C I V I L C O N S T R U C T I O N
Contract
Description of Works
Value
Client
Scheme reticulation sewers, pumping station and rising main. Included thrust bores under railway.
Public Works Gosford
Point Clare Sewer Reticulation
Construction of 10km of 150mm to 450mm diameter VC reticulation sewers. Included thrust bores and pipe-jacking under railway.
$0.7M Department of Public Works Gosford
Bowral to Moss Vale Water Main
Construction of 15km of 375mm and 450mm diameter AC water mains. Included 3 thrust bores under railway.
$0.75M Department of Public Works
West Gosford Area 3B Sewerage
Construction of 12km of 100mm to 375mm diameter reticulation sewers.
$0.8M Department of Public Works
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 2 6 o f 2 7 A N D C I V I L C O N S T R U C T I O N
REFEREES
Client
Name
Telephone
NSW Public Works
Geoff Gorton
Project Manager
(02) 6648 5904
NSW Public Works
Mark Stalhut
Project Manager
(02) 6626 5643
NSW Public Works
Glen Mildenhall
Project Manager
(02) 6648 5937
NSW Public Works
Barry Garland
Project Manager
(02) 6626 5680
NSW Public Works
Phil Beddoe
Project Manager
(02) 4421 3277
NSW Public Works
Richard Batty
Project Manager
(02) 4872 3716
NSW Public Works
Paul Shearman
Project Manager
(02) 4908 4977
NSW Public Works
Rod Stewart
Project Manager
(02) 4429 9927
NSW Public Works
Krish Krishnananthan
Project Manager
(02) 9795 0820
NSW Public Works
David Tarrant
Project Manager
(02) 6648 2012
Sydney Water Corporation Mark Turner
Project Engineer
(02) 9364 0659
Sydney Water Corporation Logie Logeswaran
Project Manager
(02) 9364 0659
Sydney Water Corporation Geoff Follett
Project Manager
(02) 9350 4683
L E D O N N E C O N S T R U C T I O N S P T Y L TD C O M P A N Y P R O F I L E
S P E C I A L I S T S I N P I P EL I N E P A G E 2 7 o f 2 7 A N D C I V I L C O N S T R U C T I O N
Client
Name
Telephone
Sydney Water Corporation Sathi Sathiamoorthy
Project Manager
(02) 9644 0267
Hunter Water Corporation Rick Pinson
Project Manager
(02) 4979 9457
National Parks & Wildlife Service
Michael Vader
Manager Regional Capital Works
(02) 9542 0634
Shoalhaven City Council
Robert Horner
Planning & Development Manager
(02) 4429 3111
Shoalhaven City Council David Banwell
Capital Projects Engineer
(02) 4429 3289
Shoalhaven City Council David Macquart
Consultant Projects Engineer
(02) 4429 3515
Tweed Shire Council Ted Gibson
Contracts Engineer
(02) 6670 2634
Orange City Council John Marshall
Senior Projects Manager
(02) 6393 8506
Coffs Harbour City Council Mat Naylor
Project manager
(02) 6648 4419
Coffs Harbour City Council Paul Barling
Project Engineer
(02) 6648 4413