compensation

1

Click here to load reader

Upload: pandiangv

Post on 01-Sep-2015

216 views

Category:

Documents


0 download

DESCRIPTION

piping

TRANSCRIPT

  • `Sheet 22

    Rev. 0

    EQPT.

    1 Compensation check for piping As per 104.3.1 (D)

    S.No.01 Item

    Drg. No.

    Item No.

    02 A = Additional Thickness mm mm

    03 Tb = Actual (or) min. wall thickness of branch mm mm

    04 Th = Actual (or) min. wall thickness of header mm mm

    05 Dob = Outside diameter of branch pipe mm mm

    06 Doh = Outside diameter of header pipe mm mm07

    mm mm

    08 tmh = Required min. wall thickness of header mm mm

    09 tmb = Required min. wall thickness of branch mm mm

    10 d2 = Half width of reinforcing Zone

    = The greater of d1 ( or ) (Tb-A)+(Th-A)+(d1/2),

    but in no case more than Doh.

    11 d1 mm mm

    12 (Tb-A) + (Th-A) + (d1/2) mm mm

    12 d2 mm mm

    d2 < Doh13 Fillet / weld leg mm mm

    14 A7 = Required reinforcement area (tmh-A) d1 mm2 mm2

    15 mm2 mm2

    16 A2 = Area provided by excess pipe wall in

    the branch for a distance L4 above the run

    = 2L4 (Tb - tmb)

    L4 =Altitude of reinforcement zone outside of run

    =2.5(Tb-A)+tr or 2.5(Th-A)whichever is smaller

    17 2.5 (Tb-A) + tr mm2 mm2

    18 2.5 (Th-A) mm2 mm2

    19 L4 mm2 mm2

    20 A2 = mm2 mm2

    21 A3 = Area provided by deposited weld mm2 mm2

    22 Provided area A1+ A2+ A3 mm2 mm2

    23 Required area < Provided area

    STRESS CALCULATIONMFR'S

    SERIAL NO. GBE/1842/035STEAM OUTLET PIPING

    DESCRIPTION

    39.70

    2.82

    114.30

    31.75

    Half Coupling

    10-20-05-3023

    09

    d1 = Inside centerline long. dimension of finished branch opening in run of the pipe[ Dob - 2 ( Tb - A )]

    USER UNIT

    5.27

    DATA

    63.50

    SI UNIT0.00

    15.88

    1.38

    0.00

    89.54

    103.64

    31.75

    37.03

    37.03

    Hence reinforcement is not required

    382.08

    0.00

    485.71

    Hence not satisfactory

    A1 = Area provided by excess pipe wall in the run = ( 2 d2 - d1 ) (Th - tmh )

    13.18

    13.18