competitions samples

26
COMPETITION SAMPLES

Upload: susana-soares-saraiva

Post on 30-Mar-2016

255 views

Category:

Documents


0 download

DESCRIPTION

Think.Create.Be competitions portfolio

TRANSCRIPT

  • COMPETITION SAMPLES

  • for more information please go to:

    http://issuu.com/think.create.be http://be.net/aliceinwonderland

    http://thinkcreatebe.wordpress.com/

  • TEKTONICA 08NAME life container

    TITLE mobile village for a green community

    LOCATION itinerant

    DATE 2008

    ORGANIZER tektnica

    CLASSIFICATION 4th place

    CREDITS Susana Soares Saraiva

    TEAM Susana Soares Saraiva

    Competition for a self-sufficient and sustainable mobile village for a nomad community.

    the goal of the competition was to design a mobile village whose purpose was to travel along a defined itiner-

    ary, informing locals about the need to take action on preserving the natural habitat.

    the project aims to develop a mobile habitat unit for a larger and more flexible use. easy to built, easy to trans-

    port, optimized but flexible and economic so that it could serve as temporary and mobile residence in natural

    areas for tourism or research, and for shelter and support in areas stroke by disaster.

    this is the story of de reutilization of an object design to transport all kind of commodity into a mobile, tempo-

    rary, flexible, self-sufficient and sustainable habitable unit.

    An example of how you can occupy natural areas in a non invasive way, for shelter, research, temporary resi-

    dence.

    An example how you can transport a shelter into areas strike by natural disasters, political conflict, like refu-

    gee camps, based on four simple ideas: REUSE, REDUCE, RECYCLE, REHAB.

    REUSE old containers to transport and accommodate people in need;

    REUSE materials like steel and wood from containers, water tanks and plumbing pipes;

    REUSE solar passive energy;

    REDUCE energy consumption form fossil fuels, thru de use of

    photovoltaic panels, and aerogenerators;

    REDUCE energy consumption by using natural ventilation systems;

    REDUCE water consumption by capturing rainwater into non potable water tank and using it to feed irriga-

    tion, toilet, washing machine;

    REDUCE water consumption by using toilet, faucet and shower with low water consumption systems;

    RECYCLE materials like cotton fibber for isolation, wood, aluminum for windows, steel, glass;

    RECYCLE used water and organic waste collected into special tanks;

    REHAB containers that no longer serve their use;

    REHAB people conscience into a sustainable way of living.

  • PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNINTE

    RNAC

    IONAL

    TEK

    TNICA 08 | A

    LDEIA INTINER

    ANTE

    PAR

    A UMA CO

    MUNIDAD

    E VE

    RDE PR

    MIO IN

    TERNAC

    IONAL

    TEK

    TNICA 08 | A

    LDEIA INTINER

    ANTE

    PAR

    A UMA CO

    MUNIDAD

    E VE

    RDE PR

    MIO IN

    TERNAC

    IONAL

    UNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA | ALDEIA ITINERANTE PARA UMA COMUNIDADE VERDE PRMIO

    LIFE CONTAINERhistory of the reuse of an object designed to accommo-date all types of products for transportation, conver-ted into a Housing Unit, temporary, flexible, optimized, self-sufficient and sustainable. An example for occu-pying natural reservation areas in a non-invasive way complying with the concept REUSE REDUCE RECYCLE REHABILITATE

    CONTAINERORIGINSDeveloped by the american Malcom Mc Lean in 1937, as an attempt to find a solve the defective accommodation of cotton bales in NYC harbor. The solution found was big steel cases that could be themsel-ves shipped. Nowadays the container is the prime accommodation structure used for transportation by sea, river, train, land.CHARACTERISTICS The basic container with doors on one side, is normally used for dry loads like food, clothes, furniture.The ventilated container is used for loads that generate heat and re-quire protection against condensations. The doors are ventilated and there is an electric additional ventilation system. The ventilators have protections to prevent water coming inside.DIMENSIONSContainer Dry Box 40_12.192x24.438x2.896m (LxWxH)Container Dry Box 20_6.058x2.438x2.59m (LxWxH)

    in wikipdiaCONCLUSIONEveryday thousands of containers stop fulfilling the function they were designed for. Why not use this tight and ventilated box made of corten steel and giver it a new use with a similar function - transport and ac-commodate people.

    7UN used Containers 40

    ASSEMBLY LINE

    REU

    SE used co

    ntaine

    rs are set fo

    r a stand

    ard assembly line

    2UN Contentores 20usados

    SU_self-sufficient support unit: inclu-des a drinking water tank, non-drinking water tank, water heating system, sewer collector unit, used warted collector unit, photovoltaic panels, micro-wind turbines, batteries for energy stora-ge and electricity inverter from 24V to 230V.

    WC_bathroom unit completely compli-mented to allow simultaneously indivi-dual use: toilet, washbasin, shower

    SA_multi-functional social area com-posed of kitchen, convertible into dining area; living area, convertible into slee-ping space; storage space, convertible into closed laundry; closet, convertible into private dressing space. The space can also be completely open for mee-tings, gatherings and extended to the outside.

    HU_self-sufficient housing unit of 29,72m2, with minimum capacity of 1 person and maximum of 5 people

    SU_community support unit with mini-farm of 14.77m2 and anaerobic digester of 14.77m2. In the case of the farm the outer coat of the container was replaced by recycled polycarbonate to allow maximum passive solar gain

    FARM_mini production farm for the community supply that can also serve as trade for other products necessary in every stop of the movable village

    WT_use of anaerobic digestion for the treatment of organic waste thru a hy-brid BATCH reactor with UASB - con-ditioned to prevent overheating. The system allows the treatment of part of the waste produced by the community originating Biogas - used in the self-su-fficiency of the system; as well as com-post and fertilizer - used in the commu-nity farm. the waste of the anaerobic digestion can be used for trade

    FS_sel-sufficient support unit includes 2 non-drinking water tanks, photovoltaic panels, micro-wind turbines, batteries for energy storage and electricity inver-ter from 24V to 230V for electricity su-pply to the farm and the processing of organic waste. Includes a storage space for crops

    PRODUCTION OF ELECTRICITY*10m2 of photovoltaic panels for the production of energy oriented towards South*9UN micro-wind turbine for the production of energy oriented towards North - sup-port of photovoltaic panels at night and weak solar light days*24V batteries for storage of produced energy*electric inverter from 24V to 230V for use - general electrical needs, tanks, ventila-tion, water heater, appliancesresources management -sustainable decisions*A type appliances (lowest electricity consumption)*automatic on/off light system in bathroom and bedrooms*fluorescent lamps of low consumption

    WATER SUPPLY*1un drinking water tank of 500L, used in water taps, shower, washing machine*1un water heater of 120L*1un non-drinking water tank of 500L, collects water from the roof and uses it for water the farm, toilet and laundry machineresources management -sustainable decisions*toilet with low water consumption*water taps with water flux reduction system*shower with water flux reduction 9L water/minute

    WASTE MANAGEMENT*1un sewer collector*1un used water collector

    SUSTAINABLE UNIT

    self-

    sufficien

    t un

    it

    self-

    sufficien

    t un

    it

    WC

    WC

    relax|ch

    at|assem

    ble|inform

    |present| sen

    sitiz

    eslee

    p

    slee

    pco

    okdinn

    errelax

    projec

    tions|presentations

    exterio

    r area|extension of interio

    r

    North W

    ind

    N

    SELF-SUFFICIENT UNIT

    REDUCE energy consumption of fossil fuel, drinking water and organic waste

    3030

    North W

    ind

    incidncia solar no vero

    incidncia solar no inverno

    PASSIVE SOLAR ENERGY*North|South orientation*openings oriented South protected by manual adjustable shutters for maxi-mum solar gain in winter and protection in summer*double exterior walls (existing outer coating + interior plasterboard with thermic and acoustic isolation) ventila-ted. The undulation of the steel coating of the containers are kept free to ensu-re constant circulation of air thru ope-nings in the bottom and top of the walls. If open prevent over heating in summer, if closed, maximum passive solar gain in winter

    NATURAL VENTILATION*admission of fresh air from North and expulsion of warm air thru ceiling and upper openings*North wind passes under the photovol-taic panels pushing interior warm air out*ventilated windows for permanent air renewal*ventilation openings, manual control, for effective management of interior temperatures

    MATERIALS*recycled natural cotton fibre - thermic and acoustic isolation*existing wood renovated - pavement*wood from sustainable forests or local wood surplus - furniture*recycled aluminum - window/door fra-mes*recycled steel - structural elements*glass - windws/doors*plasterboard - walls and ceiling*recycled polycarbonate - division pa-nels*recycling of tanks and collectors*recycling of pipes

    REC

    YCLE

    and

    RES

    USE

    materials and

    ene

    rgy

    energy

    water

    waste

    propriedade de www.istockphoto.com

  • PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERN

    INTE

    RNAC

    IONAL

    TEK

    TNICA 08 | A

    LDEIA INTINER

    ANTE

    PAR

    A UMA CO

    MUNIDAD

    E VE

    RDE PR

    MIO IN

    TERNAC

    IONAL

    TEK

    TNICA 08 | A

    LDEIA INTINER

    ANTE

    PAR

    A UMA CO

    MUNIDAD

    E VE

    RDE PR

    MIO IN

    TERNAC

    IONAL

    UNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA | ALDEIA ITINERANTE PARA UMA COMUNIDADE VERDE PRMIO

    LIFE CONTAINERhistory of the reuse of an object designed to accommo-date all types of products for transportation, conver-ted into a Housing Unit, temporary, flexible, optimized, self-sufficient and sustainable. An example for occu-pying natural reservation areas in a non-invasive way complying with the concept REUSE REDUCE RECYCLE REHABILITATE

    CONTAINERORIGINSDeveloped by the american Malcom Mc Lean in 1937, as an attempt to find a solve the defective accommodation of cotton bales in NYC harbor. The solution found was big steel cases that could be themsel-ves shipped. Nowadays the container is the prime accommodation structure used for transportation by sea, river, train, land.CHARACTERISTICS The basic container with doors on one side, is normally used for dry loads like food, clothes, furniture.The ventilated container is used for loads that generate heat and re-quire protection against condensations. The doors are ventilated and there is an electric additional ventilation system. The ventilators have protections to prevent water coming inside.DIMENSIONSContainer Dry Box 40_12.192x24.438x2.896m (LxWxH)Container Dry Box 20_6.058x2.438x2.59m (LxWxH)

    in wikipdiaCONCLUSIONEveryday thousands of containers stop fulfilling the function they were designed for. Why not use this tight and ventilated box made of corten steel and giver it a new use with a similar function - transport and ac-commodate people.

    7UN used Containers 40

    ASSEMBLY LINE

    REU

    SE used co

    ntaine

    rs are set fo

    r a stand

    ard assembly line

    2UN Contentores 20usados

    SU_self-sufficient support unit: inclu-des a drinking water tank, non-drinking water tank, water heating system, sewer collector unit, used warted collector unit, photovoltaic panels, micro-wind turbines, batteries for energy stora-ge and electricity inverter from 24V to 230V.

    WC_bathroom unit completely compli-mented to allow simultaneously indivi-dual use: toilet, washbasin, shower

    SA_multi-functional social area com-posed of kitchen, convertible into dining area; living area, convertible into slee-ping space; storage space, convertible into closed laundry; closet, convertible into private dressing space. The space can also be completely open for mee-tings, gatherings and extended to the outside.

    HU_self-sufficient housing unit of 29,72m2, with minimum capacity of 1 person and maximum of 5 people

    SU_community support unit with mini-farm of 14.77m2 and anaerobic digester of 14.77m2. In the case of the farm the outer coat of the container was replaced by recycled polycarbonate to allow maximum passive solar gain

    FARM_mini production farm for the community supply that can also serve as trade for other products necessary in every stop of the movable village

    WT_use of anaerobic digestion for the treatment of organic waste thru a hy-brid BATCH reactor with UASB - con-ditioned to prevent overheating. The system allows the treatment of part of the waste produced by the community originating Biogas - used in the self-su-fficiency of the system; as well as com-post and fertilizer - used in the commu-nity farm. the waste of the anaerobic digestion can be used for trade

    FS_sel-sufficient support unit includes 2 non-drinking water tanks, photovoltaic panels, micro-wind turbines, batteries for energy storage and electricity inver-ter from 24V to 230V for electricity su-pply to the farm and the processing of organic waste. Includes a storage space for crops

    PRODUCTION OF ELECTRICITY*10m2 of photovoltaic panels for the production of energy oriented towards South*9UN micro-wind turbine for the production of energy oriented towards North - sup-port of photovoltaic panels at night and weak solar light days*24V batteries for storage of produced energy*electric inverter from 24V to 230V for use - general electrical needs, tanks, ventila-tion, water heater, appliancesresources management -sustainable decisions*A type appliances (lowest electricity consumption)*automatic on/off light system in bathroom and bedrooms*fluorescent lamps of low consumption

    WATER SUPPLY*1un drinking water tank of 500L, used in water taps, shower, washing machine*1un water heater of 120L*1un non-drinking water tank of 500L, collects water from the roof and uses it for water the farm, toilet and laundry machineresources management -sustainable decisions*toilet with low water consumption*water taps with water flux reduction system*shower with water flux reduction 9L water/minute

    WASTE MANAGEMENT*1un sewer collector*1un used water collector

    SUSTAINABLE UNIT

    self-

    sufficien

    t un

    it

    self-

    sufficien

    t un

    it

    WC

    WC

    relax|ch

    at|assem

    ble|inform

    |present| sen

    sitiz

    eslee

    p

    slee

    pco

    okdinn

    errelax

    projec

    tions|presentations

    exterio

    r area|extension of interio

    r

    North W

    ind

    N

    SELF-SUFFICIENT UNIT

    REDUCE energy consumption of fossil fuel, drinking water and organic waste

    3030

    North W

    ind

    incidncia solar no vero

    incidncia solar no inverno

    PASSIVE SOLAR ENERGY*North|South orientation*openings oriented South protected by manual adjustable shutters for maxi-mum solar gain in winter and protection in summer*double exterior walls (existing outer coating + interior plasterboard with thermic and acoustic isolation) ventila-ted. The undulation of the steel coating of the containers are kept free to ensu-re constant circulation of air thru ope-nings in the bottom and top of the walls. If open prevent over heating in summer, if closed, maximum passive solar gain in winter

    NATURAL VENTILATION*admission of fresh air from North and expulsion of warm air thru ceiling and upper openings*North wind passes under the photovol-taic panels pushing interior warm air out*ventilated windows for permanent air renewal*ventilation openings, manual control, for effective management of interior temperatures

    MATERIALS*recycled natural cotton fibre - thermic and acoustic isolation*existing wood renovated - pavement*wood from sustainable forests or local wood surplus - furniture*recycled aluminum - window/door fra-mes*recycled steel - structural elements*glass - windws/doors*plasterboard - walls and ceiling*recycled polycarbonate - division pa-nels*recycling of tanks and collectors*recycling of pipes

    REC

    YCLE

    and

    RES

    USE

    materials and

    ene

    rgy

    energy

    water

    waste

    propriedade de www.istockphoto.com

  • ACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALD

    EIA INTIN

    ERAN

    TE PARA U

    MA CO

    MUNIDAD

    E VERDE PR

    MIO IN

    TERNACIO

    NAL TEKT

    NICA 0

    8 | ALDEIA IN

    TINER

    ANTE PAR

    A UMA CO

    MUNIDAD

    E VERDE PR

    MIO IN

    TERNACIO

    NAL TEKT

    NICA 0

    8 | ALDEIA ITIN

    ER

    ANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA ITINERANTE PARA UMA COM

    C-04

    C-05

    C-01

    termoacumulador120L

    C-02 C-02

    C-03 C-03

    C-04

    C-05

    C-01

    inversor de 24V para 320 V para agesto da energia elctrica

    baterias de 24V com capacidade dearmazenamento de 10Kva

    depsito gua no potvel500L

    depsito gua potvel500L

    MLL

    MLR

    ARR

    FR

    FO

    ECO

    ARR

    ARR

    ARR

    30 30

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    30 30 30 30

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    30 30 30 30

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    30 30

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    HOUSING UNIT

    MOBILE UNIT

    train

    sail ship

    truck

    optimization

    adaptation to different uses

    flexibility

    MU_flexible mobile unit, able to be transport by land, sea and river. The transportation means should be picked according to site location and financial resources. However the ideal situa-tion would be able to travel without using fossil energy. The best solution would be the sail ship but that is also expensive and slow. The train presents a good compromise between ecology and economy, but is dependent on the existent network conditioning the stop places of the iti-nerant village. The truck is, no doubt more fle-xible and economic but less ecologic - it could be interesting to use biodiesel.

    1_opening of upper shutters

    plan

    C-01

    C-02_sleep

    C-03_living C-03_living

    C-04_kitchen

    2_opening of access stair and shutter-passive heating water tank

    3_opening down shutters + sun exposure| exterior area

    SETTLING EXAMPLE_7Housing Units + 1 Support Unit = 238m2 | community of 20 people-2.86 people/Housing Unit

    REHABILITATE obsolete structure for new program and use

    N

    *housing units e support units can remain in the transport/carrier or placed on the field thru le-veling devices part of the units. This allows mi-nimum invasion of location sites - the units are always rise from the ground.

  • ACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALD

    EIA INTIN

    ERAN

    TE PARA U

    MA CO

    MUNIDAD

    E VERDE PR

    MIO IN

    TERNACIO

    NAL TEKT

    NICA 0

    8 | ALDEIA IN

    TINER

    ANTE PAR

    A UMA CO

    MUNIDAD

    E VERDE PR

    MIO IN

    TERNACIO

    NAL TEKT

    NICA 0

    8 | ALDEIA ITIN

    ERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA INTINERANTE PARA UMA COMUNIDADE VERDE PRMIO INTERNACIONAL TEKTNICA 08 | ALDEIA ITINERANTE PARA UMA COM

    C-04

    C-05

    C-01

    termoacumulador120L

    C-02 C-02

    C-03 C-03

    C-04

    C-05

    C-01

    inversor de 24V para 320 V para agesto da energia elctrica

    baterias de 24V com capacidade dearmazenamento de 10Kva

    depsito gua no potvel500L

    depsito gua potvel500L

    MLL

    MLR

    ARR

    FR

    FO

    ECO

    ARR

    ARR

    ARR

    30 30

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    30 30 30 30

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    30 30 30 30

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    30 30

    incidncia solar no Inverno

    incidncia solar no Vero

    Vento Norte

    Vento Norte

    Vento Norte

    HOUSING UNIT

    MOBILE UNIT

    train

    sail ship

    truck

    optimization

    adaptation to different uses

    flexibility

    MU_flexible mobile unit, able to be transport by land, sea and river. The transportation means should be picked according to site location and financial resources. However the ideal situa-tion would be able to travel without using fossil energy. The best solution would be the sail ship but that is also expensive and slow. The train presents a good compromise between ecology and economy, but is dependent on the existent network conditioning the stop places of the iti-nerant village. The truck is, no doubt more fle-xible and economic but less ecologic - it could be interesting to use biodiesel.

    1_opening of upper shutters

    plan

    C-01

    C-02_sleep

    C-03_living C-03_living

    C-04_kitchen

    2_opening of access stair and shutter-passive heating water tank

    3_opening down shutters + sun exposure| exterior area

    SETTLING EXAMPLE_7Housing Units + 1 Support Unit = 238m2 | community of 20 people-2.86 people/Housing Unit

    REHABILITATE obsolete structure for new program and use

    N

    *housing units e support units can remain in the transport/carrier or placed on the field thru le-veling devices part of the units. This allows mi-nimum invasion of location sites - the units are always rise from the ground.

  • BUILDING FOR BOUWKUNDENAME an end as a start

    TITLE international ideas competition

    LOCATION TU Delft

    DATE 2008

    ORGANIZER TU Delft

    CREDITS work developed for metroquadrado

    TEAM Susana Soares Saraiva a. | Sgio Magalhes a. | Bernardo Portugal d. | Francisca Silva d.

    Introduction

    Whats the use of architecture? What does the faculty of architecture represents? How is it taught here?

    Witch tools are needed to establish that education?

    These are the questions that we asked ourselves while developing the concept idea for the new BOUWKUNDE

    and guided its design.

    The route leading from experimental architecture theory to a building practice dominated by conventions

    passes through a twilight zone of concepts and methods. Regardless of whether one opts for a technical, structur-

    al, artistic, or traditional approach, the transition from theory to practice demands an intervening step. This step

    consists of a series of design-related decisions that can be interpreted as the combination of a concept - otherwise

    defined as the direction that leads to a solution - and a method for converting this solution into concrete rules of

    play. N.J. Habraken

    On 13 May 2008 a great building was lost. Is memory will remain in the mind of all the people who experi-

    enced it throughout the years. They will cherish and share mental images and experiences of the building with

    others. It may figure in architecture books, magazines e wallpapers, but for the rest of us (who didnt have the

    opportunity to see and explore this building) this will no longer be possible, it as disappeared. It is a sad thought,

    but on the other hand, it is interesting to realize how much architecture is able to touch us acting like a living

    organism.

    Unlike other activities, no matter how much theory is transmitted to a person about a specific building, city or

    construction method, it seems that we are not able to completely understand it until we have the opportunity to

    see it for ourselves.

    Le Corbusier said that architecture is about harmony and mathematic order that is able to touch us, and that

    is something that cannot be transmitted by speech but only by practical experience.

    That means that, when a building disappears, it is lost forever, like a person: his teachings remains but the

    intimate relations that it established with people is lost and can never be repeated.

    That is why it is so difficult to copy architecture. Like people each building shares common links between one

    another, it also has a specific conjugation of form, dimensions, proportions that make it unique and makes the

    experience of it unique for each person who visits it. On the other hand, its this same ability to communicate

    to each person differently that makes architecture so inspiring to others leading to new and innovative achieve-

    ments.

    In this case, the end of the BOUWKUNDE (the one that lasted for almost 40 years) is the beginning for a new

    building, a new approach, a new set of experiences based on the same basic principles and tools that have ruled

    architecture and allow us to understand/teach/live this activity.

    AN END AS A START

    to see the entire document please go to

    http://issuu.com/think.create.be/docs/an_end_as_a_start_bk2008-3515

  • PARKING

    OFFICE

    AUDITORIUM

    EXTERIOR TERRACE EXTERIOR COURTYARD

    RAINWATERCOLECTOR

    STORAGE

    MODELLING

    LECTURE HALL

    STUDIO

    GREEN ROOF TOP

    ELEVATED GARDENEXTERIOR PUBLIC SPACE

    GREEN ROOF TOP

    MEKELPARK

    MAIN HALL

    AN END AS A STARTBK2008 - 3515

    LOCATIO

    N SKETCH

    SECTION 1/500

    SOUTH ELEVATION EAST ELEVATION NORTH ELEVATION WEST ELEVATION

    EXTERIOR VIEW _

    ACCESS THROUG

    H MEKELPARK

    CENTRAL LOCATION TOWARDS

    CITY AND CAMPUS

    PERIPH

    ERAL LO

    CATION

    TOWARD

    S CITY A

    ND CAM

    PUS

    CENTRAL LO

    CATION TO

    WARDS CITY

    DYNAMICS OF CITYAND CAMPUS

    WIND ENERGY

    PHOTOVOLTAIC PANEL

  • NORTH ELEVATIONPOLAR BREEZE

    NATURAL VENTILATION north and east winds are canalized on tecnhical floors and distributed through all interior wind passing on rooftops pushes out used air vegetation helps creating a controled microclimate

    SELF-SUSTAINABLE BUILDING

    PASSIVE SOLAR ENERGIE south facade covered in transparent glass for maximum solar gain*trombe wall to maximize the energie gain*north facade with controled openings to minimize the loss of energie*green roof for better control of inside temperature*vegetation near south facade for cooling in summer*shading devices to control overheating in summer

    SOUTH ELEVATIONSUNLIGTH

    60SUMMERNORTH SOUTH

    18WINTER

    GREEN ROOF 60SUMMERNORTH SOUTH

    18WINTER

    GREEN ROOF

    AIR CHAMBER

    AIR CHAMBER

    VEGETATION HELPS COOLING IN SUMMER

    SELF SUSTAINABLE BUILDING collect rainwater water treatment facilities to recycle used and collected rainwater self production of energie - heating, pumping, charging batteries photovoltaic panel to produce energy in summer wind generator to produce energy in winter - only if this is not a migratory route for birds heat pumps as an alternative to wind generator for production of energy in winter

    AN END AS A STARTBK2008 - 3515

    CONCEPT - DEVELOPMENT

    CONTINUITY

    UNITY

    VISUAL CONECTIONINSIDE-INSIDEINSIDE-OUTSIDEOUTSIDE-INSIDE

    FLEXIBILITY

    GROWTH

    CONCEPTUAL ORIGIN

    THE MORFOADAPTABLE

    FORM

    ELEVATED EXTERIOR SPACE __ GARDEN / EXPOSITIONS

    STUDIO

    AUDITORIUM

    AUDITORIUM / STUDIO / FORM STUDIO

    ENTRANCE

    MORFOADAPTABLE FORM

    PROGRAM ALIGNMENT ALLOWS CONTINUOUS FLOW

    PROGRAM FLEXIBILITY

    5 93 721 232 1013 8 12151 1114 17 616 20 22418 19 24

    HORIZONTAL DISTRIBUTION

    ABILITY TO GROW

    1 5 93 7 112 6 104 8 1214 17 20 2313 16 19 2215 18 21 24

    STUDIO

    OFFICE

    LECT

    URE HAL

    L

    LIBR

    ARY

    MODELLING, COMPU

    TER, SKE

    TCHING

    LABO

    RAT

    ORY

    (SHAR

    ING)

    CONFEREN

    CE / EXHIBITION

    RES

    TAURAN

    T

    PUBL

    IC AREA

    S

    STORAG

    E

    COLLECT RAINWATER

    FOR NON DRINKING USE

    FAN GENERATESENERGY IN WINTER

    PHOTOVOLTAIC PANELGENERATES ENERGY IN SUMMER

    ALTERNATIVE TO WIND FAN: HEAT PUMPS GENERATES ENERGY IN WINTER

    BATTERIES + INVERTER

    BERLAGEWEG

    VAN DER BROEKWEG COMPUTER

    COMPUTERRESTAURANT

    CONNECTION TO EXTERIOR

    SKETCHING

    CONNECTION TO EXTERIOR

    EXHIBITION CONFERENCE

    EXTERIOR LOUNGEAREA

    TERRACE

    W.C VERTICALACESS

    INFO

    INFO

    RESTA

    UR

    AN

    T

    LECTUR

    E HA

    LL

    EXISTING TREES

    CONNECTION TO EXTERIOR

    MODELLING

    BAR

    VERTICALACCESS

    WIND ENERGY

    EXTERIORCOURTYARD

    BOOKSTORE

    ENTRANCE IN LOT

    LIBRARY

    W.C

    VERTICALACCESS

    W.C

    FORM STUDIO

    CONNECTION THROUGH MEKELPARK

    ENTRANCEIN BUILDING

    PHOTOVOLTAICPANEL

    EXTERIOR LOUNGEAREA

    N

    GROUND FLOOR PLAN 1/500

  • ART CENTER GRAA MORAISNAME New Art Centre Graa Morais

    TITLE international Architecture competition

    LOCATION Vila Flor, Bragana, Portugal

    DATE 2009

    ORGANIZER Vila Flor Municipality

    CLASSIFICATION 5th place

    CREDITS work developedz for metroquadrado

    TEAM Susana Soares Saraiva a. | Mrcia Oliveira a. | Bernardo Portugal d. | Francisca Silva d.

    ContextThe project for the Art Centre Graa Morais aims to be a space for the reunion of arts of Vila Flor municipality as well as for all

    the Northen region of Portugal, acting as a dynamic pole for the art and artistic culture of the region.The inspiration came from the painter herself: a search for a symbiotic relationship between tradition and contemporarity that is

    silent but present, timeless in its affirmation, intense, simple, straightforward and emotional.The new building tries to articulate itself with the existing medieval urban structure. The preexisting building (an old burgoise house

    from 19th century - parcel 01) has to be respected but also reinterpreted due to serious alterations during the 20th century. It is impor-tant to restore its importance in the definition of the main square it helps define (republic square).

    The adaptation of the existing building to a new function tries to establish a honest balance between the necessities of the new func-tion with the intrinsic characteristics of the existing structure. The end result is a clear recognition of the old house, restore to its dig-nity with new interventions clearly controlled: an interesting mixed of materials, textures and techniques old and new interconnecting.

    The new intervention (parcel 02) is supposed to exist on a nearby empty plot delimited by beautiful old stone walls, located on the other side of the street Miguel Corte Real. It should be silent and sustainable not disturbing the existing urban fabric, but rather comple-menting it.

    ConceptThe intervention site presents to us some interesting challenges that were selected to orient the definition of the concept: - Definition of the South facade of the main building (parcel 01) - street Miguel Corte Real; - Development of a functional connection between parcel 01 and parcel 02 (separated by street Miguel Corte Real); - Development of a concept that respects the intricate existing urban structure as well as existing buildings | structures.The existing building (parcel 01) presents numerous alterations in its south facade that are de-characterizing it: a confusion set of

    additions with different hight, materials, openings that make the original facade unrecognizable. Beyond the impossibility of reconstruct the original facade we propose the demolition of the garage and wooden structure that define the south part of the plot and the facade of the side street Miguel Corte Real.

    The new released area will be used for access (horizontal and vertical communication) to connect the difference areas of the new museum without compromising the existing interior layout.

    The necessity of defining the South facade as well as establishing a connection between parcel 01 and 02 led to the development of a concept inspired by the traditional wooden structures of Portuguese vernacular architecture reinterpreted in the light of modern technology: a self-supporting structure in wood defines the entire new intervention covering the south facade (and establishing the ac-cess spaces) of the existing building and other demolished areas of the parcel 01; crossing the street Miguel Corte Real suspended and defining the new construction in parcel 02, respecting the existing stone walls that limit it.

    The interior space has a diffuse light that changes constantly thru the day and seasons: the rhythm of the wooden structure is most of the times shown by an interior glass coating (sometimes the wall, others the ceiling, other both). The light never strikes you directly due to the thickness and spacing of the wooden structure.

    The suspended passage is mostly due to the weather of Bragana: dry and hot during the summer and cold and wet (many times snows) in winter. The passage ensures not only a visible but not to imposing connection between the 2 parcels defining one buildings but also allows a comfortable connection between all parts of the program. However it is part of the concept the existence of multiple routes and independent accesses to the building.

    The existing building (parcel 01) hosts the permanent exhibition of the painter Graa Morais, entrance hall|reception|tickets, administration and support services. The cafeteria and store are accessible both from inside and outside (street Miguel Corte Real). The cafeteria is placed in the previous animal house and the store in the old kitchen connected thru the old kitchen patio.

    Parcel 02 hosts the temporary exhibitions, multipurpose room, art classes and general storage. Each one of these spaces have direct entrances from the outside but also accessible from the main building.

    The entire project was developed with a sustainable consciousness that comes from the materials chosen, alternative energy supply and water collection and reuse.

  • CORTE C-02 | 1/100

    PLANTA DE IMPLANTAO | 1/500

    PAINEL SNTESE 1

    CENTRO DE ARTE GRAA MORAIS

    RECONSTRUO DO EDIFCIO

    (ENCONTRO DAS ARTES | ESPAO GRAA MORAIS)CONCURSO PBLICO DE ARQUITECTURA, VILA FLOR

    541.59

    538.57538.50

    541.62

    545.40

    548.91

    545.30

    541.59

    538.20

    541.62

    542.20

    EXPOSIO PERMANENTELOJA

    CAFETARIA

    ESPLANADA EXTERIOR

    CENTRO DE ARTES GRAA MORAIS

    VISTA AREA 1

    VISTA PRAA DA REPBLICA

    537.30

    538.56538.74539.15

    539.39539.47

    540.97

    541.85

    542.65

    543.19

    544.83

    PERFIL GH | 1/100(RUA SO MARTINHO | PARCELA 2)

  • C_02

    C_02

    C_03

    C_03

    538.50

    538.50

    538.50

    540.65

    539.00

    541.00

    539.00

    538.50

    538.35538.35

    539.00

    546.14

    546.15

    546.30

    546.08

    544.87

    545.18

    543.81

    542.98

    542.65

    542.10541.81

    541.32

    540.06539.59

    539.39544.87 544.87 544.87

    538.91 538.84 538.64538.08

    537.74

    537.45

    537.49

    537.72

    537.69

    537.60

    537.52

    537.49

    537.91

    537.95

    537.93

    537.98

    537.35

    537.34

    537.34

    537.34

    537.34

    537.14

    539.16

    539.34

    540.53

    538.35

    541.15

    541.23

    541.28

    542.15

    542.51

    543.19

    542.67

    545.05

    544.82

    544.00

    543.94

    C_01

    C_01

    C-04

    C-04C-07

    C-07

    C-06

    C-06

    545.62

    545.46

    545.16

    545.73

    545.43

    545.37

    544.82

    544.83

    544.31

    543.19

    542.65

    543.91

    541.85

    540.97

    542.55

    543.66

    540.15

    539.56

    539.47

    542.61

    542.56

    537.23

    537.39

    537.21

    537.25

    537.30

    537.10

    537.71

    537.75

    538.00

    538.38

    538.09

    538.16

    538.00

    538.08

    538.41

    538.12

    538.62538.25

    538.45

    538.29

    538.37

    538.40

    538.44

    538.48

    538.67

    538.86

    539.03540.53

    540.51

    540.18

    540.23

    539.51

    539.26

    539.20

    542.12

    542.23

    541.81

    538.77

    538.39

    538.51

    538.73

    538.60

    538.36

    538.43

    538.73

    538.39

    538.25

    537.65

    537.70

    538.22

    538.21538.46

    539.21

    541.58

    541.71

    542.29

    543.82

    545.18

    545.66

    545.48

    544.38

    538.21538.96

    540.56

    542.56

    542.55

    542.55

    DEPSITO DOCUMENTOS

    RESERVAS

    BIBLIOTECA

    IS PUBLICO

    ADMINISTRAO

    ECONOMATO

    ARRECADA

    O

    ACESSO PRIV

    ADO/

    SADA EMER

    GNCIA

    PTIO EXTERIOR

    COBERTO ACESSO P

    BLICO

    CASA DE MQUIN

    AS

    CASA DE MQUINAS

    ENTRADA PR

    INCIPAL

    ENTRADA PR

    INCIPAL

    ENTRADA PR

    IVADA

    ARRECADAO

    OFICINAS

    ARQUIVO CORR

    ENTE

    IS PUBLICO

    PORTARIA

    ENTRADA

    ATENDIMENTO

    ACESSO PBLICO

    PAREDE TCN

    ICA

    ENTRADA S.ENTRADA S.

    SADA

    C-05

    C-05

    C-08

    C-08

    C_02

    C_02

    C_03

    C_03C_01

    C_01

    C-04

    C-04C-07

    C-07

    C-06

    C-06

    541.62

    541.62

    544.00

    543.50

    542.20

    544.00

    541.62

    541.59

    541.62

    541.62

    541.62

    541.38

    538.35

    546.14

    546.15

    546.30

    546.08

    544.87

    545.18

    543.81

    542.98

    542.65

    542.10541.81

    541.32

    540.06539.59

    539.39544.87 544.87 544.87

    538.91 538.84 538.64538.08

    537.74

    537.45

    537.49

    537.72

    537.69

    537.60

    537.52

    537.49

    537.91

    537.95

    537.93

    537.98

    537.35

    537.34

    537.34

    537.34

    537.34

    537.14

    539.16

    539.34

    540.53

    538.35

    541.23

    541.28

    542.15

    542.51

    543.19

    542.67

    545.05

    544.82

    544.00

    543.94

    543.50

    542.47

    C-05

    C-05

    C-08

    C-08

    545.62

    545.46

    545.16

    545.73

    545.43

    545.37

    544.82

    544.83

    544.31

    543.19

    542.65

    541.85

    540.97

    540.15

    539.56

    539.47

    542.61

    542.56

    537.23

    537.39

    537.21

    537.25

    537.30

    537.10

    537.71

    537.75

    538.00

    538.38

    538.09

    538.16

    538.00

    538.08

    538.41

    538.12

    538.62538.25

    538.45

    538.29

    538.37

    538.40

    538.44

    538.48

    538.67

    538.86

    539.03540.53

    540.51

    540.18

    540.23

    539.51

    539.26

    539.20

    542.12

    542.23

    541.81

    538.77

    538.39

    538.51

    538.73

    538.60

    538.36

    538.43

    538.73

    538.39

    538.25

    537.65

    537.70

    538.22

    538.21538.46

    539.21

    541.58

    541.71

    542.29

    543.82

    545.18

    545.66

    545.48

    544.38

    538.21538.96

    540.56

    542.56

    542.55

    542.55

    ATELIERNCLEO

    EDUCATIVO

    EXPOSIO P

    ERMANENTE

    EXPOSIO PE

    RMANENTE

    LOJAJARDIM

    AROMTICO

    CASA

    MQUINAS

    IS PUBLICO

    CAFETARIA

    EXPOSIO TEMPORRIA

    ATELIER

    ATELIER

    ACESSO PBLICO

    ACESSO PBLICO

    LIGAO- PARCELA 1 A 2

    PAREDE TCN

    ICA

    ARRECADAO EXPOSIO TEMPORRIA

    ENTRADA S.

    EXPOSIO TEMPORRIA

    ACESSO PRIV

    ADO/

    SADA EMER

    GNCIA

    PLANTA PISO 1 | 1/200

    PAINEL SNTESE 2

    PLANTA PISO 0 | 1/200

    VISTA AREA 2

    538.20

    541.59

    545.30

    548.91

    540.64

    544.00

    541.83

    538.46

    539.21

    540.27

    539.45

    540.72

    541.28

    541.71

    CAFETARIA

    CENTRO DE ARTES GRAA MORAIS

    PERFIL KL | 1/100(RUA MIGUEL CORTE REAL | PARCELA 1)

    537.98538.21

    539.16539.34

    540.53

    541.15 541.23541.58

    542.15 542.29

    542.67

    543.66

    544.38

    545.05

    545.48

    544.00

    1

    EXPOSIES TEMPORRIASNCLEO EDUCATIVOCENTRO DOCUMENTAO

    CENTRO DE ARTES GRAA MORAIS

    PAINEL SNTESE 3

    CORREDOR - SALA DE EXPOSIO PERMANENTESALA DE EXPOSIES TEMPORRIAS

    LIGAO PARCELA 1 E 2 CAFETARIA

    PERFIL IJ | 1/100(RUA MIGUEL CORTE REAL | PARCELA 2)

  • 537.98538.21

    539.16539.34

    540.53

    541.15 541.23541.58

    542.15 542.29

    542.67

    543.66

    544.38

    545.05

    545.48

    544.00

    1

    EXPOSIES TEMPORRIASNCLEO EDUCATIVOCENTRO DOCUMENTAO

    CENTRO DE ARTES GRAA MORAIS

    PAINEL SNTESE 3

    CORREDOR - SALA DE EXPOSIO PERMANENTESALA DE EXPOSIES TEMPORRIAS

    LIGAO PARCELA 1 E 2 CAFETARIA

    PERFIL IJ | 1/100(RUA MIGUEL CORTE REAL | PARCELA 2)

  • FUNDACION ARQUITECTURA CONTEMPORNEANAME new contemporary architecture foundation

    TITLE international ideas competition

    LOCATION Granada, Spain

    DATE 2010

    ORGANIZER Fundacin de Arquitectura Contempornea

    CREDITS work developed for metroquadrado

    TEAM Susana Soares Saraiva a. | Mrcia Oliveira a. | Iss Campos a. | Bernardo Portugal d. | Helder

    Magalhes d.

  • VERDES HUERTA DE SAN PABLO - apertura de algunos jardines privados (convento) / continuida de alzados interiores con vegetacin

    > Verde Propuesto - Muros Verdes> Verde Existente

    A

    F G

    H

    I

    EQUIPAMENTOS RECREATIVOS HUERTA DE SAN PABLO

    F > Espacio Recuperado para CafeA > FAC - Caf e Libreria de la Fundacin de Arquitectura Contemporanea

    G > Campos de Juegos

    I > Edifcio de Aparcamiento de Uso PblicoH > Parque Infantil

    B

    C

    D

    E

    A

    EQUIPAMIENTOS COMPLEMENTARES AL FAC

    B > Espacio Recuperado para Exposiciones ProvisionalesA > FAC - Fundacin de Arquitectura Contemporanea

    C > Sala Orive - Espacio para Exposiciones Provisionales

    E > Coliseu San Andrs - Espacio para Conferencias Puntuales al aire livre

    D > Solar con Edifcio recuperado para Workshops e Aulas

    J

    K

    LM

    B

    C

    D

    E

    AA

    F G

    H

    I

    > EQUIPAMIENTOS HUERTA DE SAN PABLO

    EQUIPAMIENTOS - VARIEDAD DE ACTIVIDADES CULTURALES E RECREATIVAS

    > EQUIPAMIENTOS COMPLEMENTARES AL FAC> EQUIPAMENTOS RECREATIVOS MANZANA DE SAN PABLO

    J > Concejala de Cultura del Ayuntamiento

    L > Ayuntamiento de CrdobaM > Iglesia e Convento de San Pablo

    K > Delegacin de Cultura de la Junta de Andaluca

    PERCURSOS HUERTA DE SAN PABLO - mejores accesos / cruzamiento de direcciones

    > Informacin - incitar la variedad de caminos e direcciones en la Huerta / comunicar

    PERCURSO FAC - Fundacin de Arquitectura Contemporanea Huerta de San Pablo

    PERCURSO ARQUEOLOGICOACCESO - HUERTA DE SAN PABLO

    Pennsula Ibrica

    Espaa - Andaluca

    Reco

    nstit

    uici

    n V

    irtua

    l

    PANTALLA

    PALC

    O

    PALC

    O

    PANTALLA

    PATRIMONIO DE LA HUMANIDAD

    IGLESIA Y CONVENTO DE SAN PABLO

    ANLISIS

    SOLUCIN

    POLINIZACIN 01

    CONCEJALA DE CULTUR

    A DEL

    AYUNTAMIENTO

    DELEGACIN DE CULTURA DE LA JUNTA DE ANDALUCA

    AYUNTAMIENTODE CRDOBA

    CALLE FERNAN PEREZ DE OLIVIA

    CALLE PEDRO LOPEZ

    CALLE CLAUDIO MARCELO

    CALLE SA

    N PABLO

    CALL

    E CA

    PITU

    LAR

    ES

    PLAZA CORREDERA

    CONCURSO INTERNACIONAL DE IDEASpara la Sede de la Fundacin Arquitectura Contempornea y Entorno de la manzana de San Pablo en Crdoba

    Huerta San Pablo

    Crdoba

    FAC

    Estado Runa /abandono de Algunos EdifciosAlzados de alturas muy variadas

    Poca Dignidad de las Instalaciones Pblicas Existentes

    FALTA DE PROMOCIN DE LA CULTURAFalta de infraestructuras de apoyo APARCAMIENTO DIFCIL

    DBIL RELACIN CON LA RED DE ESPACIOS PBLICOS

    ESTTICA DE TRASTEROS

    DIFCIL ACCESO POCO VISIBLE

    Ruinas Circo Oriental

    INFORMACIN

    CONSTRUCIN

    INFORMACIN

    MUROS VERDES

    APARCAMIENTO

    NUEVOS ACCESOS

    INPUT

    > FAC - WIRED/WIRELESS

    NETWORK

    > 3G PROVIDER

    > SATELLITE UP/DOWN LINK

    OUTPUT

    > Workshops

    > Visitas a Obras de Arquitectura

    > Conferencias

    > Exposicin Permanente

    > Seminarios

    > Programa de Actividades

    > Programa cultural

    > Noticias

    LEYENDA

    ACCESO COLISEO SAN ANDRS / HUERTA DE SAN PABLO

    PANEL INFOR

    MACIN

    VEGETACIN VERTICAL PARA UNIFORMAR ALZADOS DE LA HUERTARECUPERAR SOLAR DE LA HUERTA PARA WORKSHOPS E LECCIONESACCESO A FAC / DELEG. DE CULTURA JUNTA DE ANDALUCA E C.CAPITULARES

    PABELLN PARA EPOSICINES PROVISIONALES

    NOVO EDIFICIO FAC - REMATE CALLE CAPITULARES / ENTRADA PBLICA PARA HUERTA SAN PABLO

    PABELLN PARA EXPOSICINES PROVISIONALES

    PANEL DE INFORMACIN MULTIMEDIA CONSTANTE LA POBLACIN

    LIMPIAR PAREDESABRIR LA HUERTA AL JARDN DEL CONVENTO HASTA LA CAPITULARES

    LOCALIZACIN DE CAFETERA EN EL INTERIOR DE LA HUERTA (DEMOLICION DE PRGO

    LA)

    APOYO SALA DE ORIVE E CONCEJALA DE CULTURA DEL AYUNTAMIENTO

    APARCAMIENTO - ESTRUCTURA DE ACERO DE 4 PLANTAS / ALZADOS CON VEGETACIN

    VERT.

    PROTECCIN DE LAS FACHADAS DEGRADADAS CON VEGETACIN VERTICAL

    DETALLE - PER

    CURSO ARQUE

    OLOGICO

    ASCENSOR

    COCHE

    PAGOASCEN

    SOR

    COCHE

    DISCONTINUIDAD FORMAL

  • VERDES HUERTA DE SAN PABLO - apertura de algunos jardines privados (convento) / continuida de alzados interiores con vegetacin

    > Verde Propuesto - Muros Verdes> Verde Existente

    A

    F G

    H

    I

    EQUIPAMENTOS RECREATIVOS HUERTA DE SAN PABLO

    F > Espacio Recuperado para CafeA > FAC - Caf e Libreria de la Fundacin de Arquitectura Contemporanea

    G > Campos de Juegos

    I > Edifcio de Aparcamiento de Uso PblicoH > Parque Infantil

    B

    C

    D

    E

    A

    EQUIPAMIENTOS COMPLEMENTARES AL FAC

    B > Espacio Recuperado para Exposiciones ProvisionalesA > FAC - Fundacin de Arquitectura Contemporanea

    C > Sala Orive - Espacio para Exposiciones Provisionales

    E > Coliseu San Andrs - Espacio para Conferencias Puntuales al aire livre

    D > Solar con Edifcio recuperado para Workshops e Aulas

    J

    K

    LM

    B

    C

    D

    E

    AA

    F G

    H

    I

    > EQUIPAMIENTOS HUERTA DE SAN PABLO

    EQUIPAMIENTOS - VARIEDAD DE ACTIVIDADES CULTURALES E RECREATIVAS

    > EQUIPAMIENTOS COMPLEMENTARES AL FAC> EQUIPAMENTOS RECREATIVOS MANZANA DE SAN PABLO

    J > Concejala de Cultura del Ayuntamiento

    L > Ayuntamiento de CrdobaM > Iglesia e Convento de San Pablo

    K > Delegacin de Cultura de la Junta de Andaluca

    PERCURSOS HUERTA DE SAN PABLO - mejores accesos / cruzamiento de direcciones

    > Informacin - incitar la variedad de caminos e direcciones en la Huerta / comunicar

    PERCURSO FAC - Fundacin de Arquitectura Contemporanea Huerta de San Pablo

    PERCURSO ARQUEOLOGICOACCESO - HUERTA DE SAN PABLO

    Pennsula Ibrica

    Espaa - Andaluca

    Reco

    nstit

    uici

    n V

    irtua

    l

    PANTALLA

    PALC

    O

    PALC

    O

    PANTALLA

    PATRIMONIO DE LA HUMANIDAD

    IGLESIA Y CONVENTO DE SAN PABLO

    ANLISIS

    SOLUCIN

    POLINIZACIN 01

    CONCEJALA DE CULTUR

    A DEL

    AYUNTAMIENTO

    DELEGACIN DE CULTURA DE LA JUNTA DE ANDALUCA

    AYUNTAMIENTODE CRDOBA

    CALLE FERNAN PEREZ DE OLIVIA

    CALLE PEDRO LOPEZ

    CALLE CLAUDIO MARCELO

    CALLE SA

    N PABLO

    CALL

    E CA

    PITU

    LAR

    ES

    PLAZA CORREDERA

    CONCURSO INTERNACIONAL DE IDEASpara la Sede de la Fundacin Arquitectura Contempornea y Entorno de la manzana de San Pablo en Crdoba

    Huerta San Pablo

    Crdoba

    FAC

    Estado Runa /abandono de Algunos EdifciosAlzados de alturas muy variadas

    Poca Dignidad de las Instalaciones Pblicas Existentes

    FALTA DE PROMOCIN DE LA CULTURAFalta de infraestructuras de apoyo APARCAMIENTO DIFCIL

    DBIL RELACIN CON LA RED DE ESPACIOS PBLICOS

    ESTTICA DE TRASTEROS

    DIFCIL ACCESO POCO VISIBLE

    Ruinas Circo Oriental

    INFORMACIN

    CONSTRUCIN

    INFORMACIN

    MUROS VERDES

    APARCAMIENTO

    NUEVOS ACCESOS

    INPUT

    > FAC - WIRED/WIRELESS

    NETWORK

    > 3G PROVIDER

    > SATELLITE UP/DOWN LINK

    OUTPUT

    > Workshops

    > Visitas a Obras de Arquitectura

    > Conferencias

    > Exposicin Permanente

    > Seminarios

    > Programa de Actividades

    > Programa cultural

    > Noticias

    LEYENDA

    ACCESO COLISEO SAN ANDRS / HUERTA DE SAN PABLO

    PANEL INFOR

    MACIN

    VEGETACIN VERTICAL PARA UNIFORMAR ALZADOS DE LA HUERTARECUPERAR SOLAR DE LA HUERTA PARA WORKSHOPS E LECCIONESACCESO A FAC / DELEG. DE CULTURA JUNTA DE ANDALUCA E C.CAPITULARES

    PABELLN PARA EPOSICINES PROVISIONALES

    NOVO EDIFICIO FAC - REMATE CALLE CAPITULARES / ENTRADA PBLICA PARA HUERTA SAN PABLO

    PABELLN PARA EXPOSICINES PROVISIONALES

    PANEL DE INFORMACIN MULTIMEDIA CONSTANTE LA POBLACIN

    LIMPIAR PAREDESABRIR LA HUERTA AL JARDN DEL CONVENTO HASTA LA CAPITULARES

    LOCALIZACIN DE CAFETERA EN EL INTERIOR DE LA HUERTA (DEMOLICION DE PRGO

    LA)

    APOYO SALA DE ORIVE E CONCEJALA DE CULTURA DEL AYUNTAMIENTO

    APARCAMIENTO - ESTRUCTURA DE ACERO DE 4 PLANTAS / ALZADOS CON VEGETACIN

    VERT.

    PROTECCIN DE LAS FACHADAS DEGRADADAS CON VEGETACIN VERTICAL

    DETALLE - PER

    CURSO ARQUE

    OLOGICO

    ASCENSOR

    COCHE

    PAGOASCEN

    SOR

    COCHE

    DISCONTINUIDAD FORMAL

  • TEM

    PLO

    RO

    MA

    NO

    AYU

    NTA

    MIE

    NTO

    DE

    CR

    DO

    BA

    CALL

    E CA

    PITU

    LAR

    ES

    FUN

    DA

    CI

    N D

    E A

    RQ

    UIT

    ECTU

    RA

    CO

    NTE

    MPO

    RA

    NEA

    CON

    VEN

    TO D

    E SA

    N P

    ABL

    O

    ENTR

    AD

    A H

    UER

    TA D

    E SA

    N P

    ABL

    O

    DEL

    EGA

    CI

    N D

    E CU

    LTU

    RA

    DE

    LA JU

    NTA

    DE

    AN

    DA

    LUC

    A

    PAN

    EL D

    E IN

    FOR

    MA

    CI

    N

    PAN

    EL D

    E IN

    FOR

    MA

    CI

    N

    102.74

    SALA

    25 PERSO

    NA

    S

    ARCHIVOALMACN

    INSTALACIN GEOTRMICA

    ANTECOCINA

    proyeccin

    proyeccinC-01

    C-01

    C-02

    C-02

    P-01

    P-01

    110.68

    110.68

    110.68

    C-01

    C-01

    C-02

    C-02

    SALA

    POLIVA

    LENTE 1

    ALMACN librera

    ALMACN

    ENTRADA

    I.S.

    INFORMACIN

    LIBRERA

    P-01

    P-01

    C-01

    C-02

    114.65

    110.68

    P-01 ALMACNI.S.

    SALA

    POLIVA

    LENTE 2

    TIENDASALA POLIVALENTE 2

    TERR

    AZA

    106.71

    106.71

    AREA DE TRABAJO

    SECRETA

    RIO

    EXECU

    TIVO

    GABINETE DIRECTORAREA DE TRABAJO publicaci

    n

    IS

    ALMACN agua pluvial

    C-01

    C-01

    C-02

    C-02

    P-01

    P-01

    Piso -1

    Piso -2

    CONCURSO INTERNACIONAL DE IDEASpara la Sede de la Fundacin Arquitectura Contempornea y Entorno de la manzana de San Pablo en Crdoba

    Pennsula Ibrica

    Espaa - Andaluca

    Huerta San Pablo

    Crdoba

    FAC

    C-01

    C-01

    C-02

    C-02

    P-01

    P-01

    118.62

    SALA POLIVALENTE 3

    CAFETERIAI.S.

    ALMACNI.S.

    TERRAZA

    CAFETER

    IA

    Piso 2

    Piso 1

    C-01

    C-01

    C-02

    C-02

    P-01

    P-01

    Cubierta

    Piso 0

    (EXPOSICIONES / CONFERENCIAS / ACTIVIDADES CULTURALES)

    SALA 1 - 39,20 m2

    SALA 2 - 79,10 m2

    SALA 3 - 57,60 m2

    TIENDA - 23,70 m2

    IS - 35,40 m2

    CAFETERA - 64,10 m2

    LIBRERA - 62,50 m2

    HALL - 36 m2

    CIRCULACIN - 136 m2INST

    ALA

    CIO

    NES

    SALA

    S PO

    LIVA

    LEN

    TES

    REL

    ACC

    IN

    EX

    TER

    IOR

    REA

    TO

    TAL

    533,

    60 m

    2

    SALA DE MQUINAS(PISO -1/-2) - 10 m2

    ASCENSORES - 25 m2

    ARCHIVO - 16,40 m2

    ALMACN GREDAL (PISO -2) - 31,60 m2

    REA SOLAR:358,20 m2

    ALMACENES (PISO 0, 1, 2) - 16,20 m2

    ALMACN LIBRERA- 17,20 m2

    PISO -2 = 185,70 m2

    PISO -1 = 185,70 m2

    PISO 0 = 244,80 m2

    PISO 1 = 228,10 m2

    PISO 2 = 265,50 m2

    AR

    EAS

    TOTA

    LES

    REA

    TO

    TAL

    1.109

    ,80

    m2

    INFR

    AES

    TRU

    CTU

    RA

    TC

    NIC

    AS

    REA

    TO

    TAL

    116,

    40 m

    2

    GABINETE DIRECTOR - 15,40 m2

    SECRETRIO EXECUTIVO - 18,40 m2

    AREA DE TRABAJOE (6 PERSONAS)- 41,90 m2

    SALA DE REUNIONES (25 PERSONAS) - 59,00 m2

    I.S. - 6,60 m2

    AREA DE TRABAJO (GRFICOS E PUBLICACIN)- 33,00 m2

    ANTECOCINA - 11,00 m2

    CIRCULACIONES - 71.80 m2

    AR

    EA D

    E TR

    ABA

    JOIN

    STA

    LACI

    ON

    ESG

    ESTI

    N

    REL

    ACC

    ION

    INTE

    RIO

    R

    REA

    TO

    TAL

    257,

    10 m

    2

    MAQUETA VIRTUAL - CALLE CAPITULARES (DIA)

    MAQUETA VIRTUAL - HUERTA DE SAN PABLO

    P-01 PERFIL LONGITUDINAL

    POLINIZACIN 02

  • TEM

    PLO

    RO

    MA

    NO

    AYU

    NTA

    MIE

    NTO

    DE

    CR

    DO

    BA

    CALL

    E CA

    PITU

    LAR

    ES

    FUN

    DA

    CI

    N D

    E A

    RQ

    UIT

    ECTU

    RA

    CO

    NTE

    MPO

    RA

    NEA

    CON

    VEN

    TO D

    E SA

    N P

    ABL

    O

    ENTR

    AD

    A H

    UER

    TA D

    E SA

    N P

    ABL

    O

    DEL

    EGA

    CI

    N D

    E CU

    LTU

    RA

    DE

    LA JU

    NTA

    DE

    AN

    DA

    LUC

    A

    PAN

    EL D

    E IN

    FOR

    MA

    CI

    N

    PAN

    EL D

    E IN

    FOR

    MA

    CI

    N

    102.74

    SALA

    25 PERSO

    NA

    S

    ARCHIVOALMACN

    INSTALACIN GEOTRMICA

    ANTECOCINA

    proyeccin

    proyeccinC-01

    C-01

    C-02

    C-02

    P-01

    P-01

    110.68

    110.68

    110.68

    C-01

    C-01

    C-02

    C-02

    SALA

    POLIVA

    LENTE 1

    ALMACN librera

    ALMACN

    ENTRADA

    I.S.

    INFORMACIN

    LIBRERA

    P-01

    P-01

    C-01

    C-02

    114.65

    110.68

    P-01 ALMACNI.S.

    SALA

    POLIVA

    LENTE 2

    TIENDASALA POLIVALENTE 2

    TERR

    AZA

    106.71

    106.71

    AREA DE TRABAJO

    SECRETA

    RIO

    EXECU

    TIVO

    GABINETE DIRECTORAREA DE TRABAJO publicaci

    n

    IS

    ALMACN agua pluvial

    C-01

    C-01

    C-02

    C-02

    P-01

    P-01

    Piso -1

    Piso -2

    CONCURSO INTERNACIONAL DE IDEASpara la Sede de la Fundacin Arquitectura Contempornea y Entorno de la manzana de San Pablo en Crdoba

    Pennsula Ibrica

    Espaa - Andaluca

    Huerta San Pablo

    Crdoba

    FAC

    C-01

    C-01

    C-02

    C-02

    P-01

    P-01

    118.62

    SALA POLIVALENTE 3

    CAFETERIAI.S.

    ALMACNI.S.

    TERRAZA

    CAFETER

    IA

    Piso 2

    Piso 1

    C-01

    C-01

    C-02

    C-02

    P-01

    P-01

    Cubierta

    Piso 0

    (EXPOSICIONES / CONFERENCIAS / ACTIVIDADES CULTURALES)

    SALA 1 - 39,20 m2

    SALA 2 - 79,10 m2

    SALA 3 - 57,60 m2

    TIENDA - 23,70 m2

    IS - 35,40 m2

    CAFETERA - 64,10 m2

    LIBRERA - 62,50 m2

    HALL - 36 m2

    CIRCULACIN - 136 m2INST

    ALA

    CIO

    NES

    SALA

    S PO

    LIVA

    LEN

    TES

    REL

    ACC

    IN

    EX

    TER

    IOR

    REA

    TO

    TAL

    533,

    60 m

    2

    SALA DE MQUINAS(PISO -1/-2) - 10 m2

    ASCENSORES - 25 m2

    ARCHIVO - 16,40 m2

    ALMACN GREDAL (PISO -2) - 31,60 m2

    REA SOLAR:358,20 m2

    ALMACENES (PISO 0, 1, 2) - 16,20 m2

    ALMACN LIBRERA- 17,20 m2

    PISO -2 = 185,70 m2

    PISO -1 = 185,70 m2

    PISO 0 = 244,80 m2

    PISO 1 = 228,10 m2

    PISO 2 = 265,50 m2

    AR

    EAS

    TOTA

    LES

    REA

    TO

    TAL

    1.109

    ,80

    m2

    INFR

    AES

    TRU

    CTU

    RA

    TC

    NIC

    AS

    REA

    TO

    TAL

    116,

    40 m

    2

    GABINETE DIRECTOR - 15,40 m2

    SECRETRIO EXECUTIVO - 18,40 m2

    AREA DE TRABAJOE (6 PERSONAS)- 41,90 m2

    SALA DE REUNIONES (25 PERSONAS) - 59,00 m2

    I.S. - 6,60 m2

    AREA DE TRABAJO (GRFICOS E PUBLICACIN)- 33,00 m2

    ANTECOCINA - 11,00 m2

    CIRCULACIONES - 71.80 m2

    AR

    EA D

    E TR

    ABA

    JOIN

    STA

    LACI

    ON

    ESG

    ESTI

    N

    REL

    ACC

    ION

    INTE

    RIO

    R

    REA

    TO

    TAL

    257,

    10 m

    2

    MAQUETA VIRTUAL - CALLE CAPITULARES (DIA)

    MAQUETA VIRTUAL - HUERTA DE SAN PABLO

    P-01 PERFIL LONGITUDINAL

    POLINIZACIN 02

  • +107.45

    +110.68

    +114.65

    +118.62

    +122.59

    +124.58

    +106.71

    +102.74

    +108.70

    +120.59

    +110.68 +1 +110.50 +110.46 +110.46+110.54 +110.50+110.68

    +114.65

    +118.62

    +122.59

    +124.58

    +106.71

    +102.74

    +110.68

    +114.65

    +118.62

    +122.59

    +124.58

    +106.71

    +102.74

    (PARED LED)

    HOLOGRAMA-VISITAVIRTUAL A EDIFICIO

    +106.05

    +110.68

    +114.65

    +118.62

    +122.59

    +124.58

    +106.71

    +102.74

    (PARED LED)

    HOLOGRAMA-VISITAVIRTUAL A EDIFICIO

    CONCURSO INTERNACIONAL DE IDEASpara la Sede de la Fundacin Arquitectura Contempornea y Entorno de la manzana de San Pablo en Crdoba

    Pennsula Ibrica

    Espaa - Andaluca

    Huerta San Pablo

    Crdoba

    FAC

    C -02 C -01

    ALZADO PRINCIPAL (CALLE CAPITULARES)

    MAQUETA VIR

    TUAL - CALLE

    CAPITULARES

    (NOCHE)

    MAQUETA VIRTUAL - LIBRERA PARA PATIO

    MAQUETA VIRTUAL - PATIO INTERIOR PARA TERRAZA

    MAQUETA VIRTUAL - HUERTA SAN PABLO (NOCHE)

    ALZADO POSTERIOR (HUERTA SAN PABLO)

    TERRAZA PISO 1 PARA CAFETERA

    MAQUETA VIRTUAL - ENTRADA (CALLE CAPITULARES)

    POLINIZACIN 03

  • +107.45

    +110.68

    +114.65

    +118.62

    +122.59

    +124.58

    +106.71

    +102.74

    +108.70

    +120.59

    +110.68 +1 +110.50 +110.46 +110.46+110.54 +110.50+110.68

    +114.65

    +118.62

    +122.59

    +124.58

    +106.71

    +102.74

    +110.68

    +114.65

    +118.62

    +122.59

    +124.58

    +106.71

    +102.74

    (PARED LED)

    HOLOGRAMA-VISITAVIRTUAL A EDIFICIO

    +106.05

    +110.68

    +114.65

    +118.62

    +122.59

    +124.58

    +106.71

    +102.74

    (PARED LED)

    HOLOGRAMA-VISITAVIRTUAL A EDIFICIO

    CONCURSO INTERNACIONAL DE IDEASpara la Sede de la Fundacin Arquitectura Contempornea y Entorno de la manzana de San Pablo en Crdoba

    Pennsula Ibrica

    Espaa - Andaluca

    Huerta San Pablo

    Crdoba

    FAC

    C -02 C -01

    ALZADO PRINCIPAL (CALLE CAPITULARES)

    MAQUETA VIR

    TUAL - CALLE

    CAPITULARES

    (NOCHE)

    MAQUETA VIRTUAL - LIBRERA PARA PATIO

    MAQUETA VIRTUAL - PATIO INTERIOR PARA TERRAZA

    MAQUETA VIRTUAL - HUERTA SAN PABLO (NOCHE)

    ALZADO POSTERIOR (HUERTA SAN PABLO)

    TERRAZA PISO 1 PARA CAFETERA

    MAQUETA VIRTUAL - ENTRADA (CALLE CAPITULARES)

    POLINIZACIN 03