complementary disciplines different experiences innovative...

25

Upload: others

Post on 01-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and
Page 2: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

WHO WE ARE

Smartech Italian Engineering Consultancy is a newly established civil engineering partnership. It is

constituted of companies and highly specialized professionals with extensive experience and cutting edge

know-how in all fields of civil engineering and consulting. This permanent partnership turns its services

particularly to the international markets.

WHY TOGETHER

Consulting Companies | Complementary Disciplines | Different ExperiencesSynergy

Vision

MissionWe joined our technical capacities and our staff resources to strengthen

our approach enabling Smartech to deliver tailored solutions to our Clients

Innovative Thinking | Cutting-edge Technology |

Holistic and Multidisciplinary Approach

Page 3: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

WHERE WE ARE AND OUR STRENGHTS

Presently Smartech can rely on the active involvement in some international projects, in different

engineering sectors. Specifically, Smartech has gained international experience carrying out

infrastructure projects in Algeria, South Africa, Mozambique, Zambia, Oman, Iraq, Kazakhstan,

Philippines and Venezuela.

OFFICES PROJECTS

LocationsPresent in 9

Countries

Turnover > 6,5 Million €

Personnel >90 staff

SMARTECHItalian Independent Consultancy

Page 4: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

OUR CORE BUSINESS

INFRASTRUCTURE AND TRANSPORTATIONRoads, Highways, Bridges, Tunnels, Railways, Airports, Harbours, Ports, Traffic Studies

URBAN PLANNING, ARCHITECTURE AND BUILDINGSUrban/Regional plans, Geotechnics and Structural design, Public and private buildings design, Design and supervision of infrastructure works

TELECOMMUNICATION INFRASTRUCTURESFibre Optic Broadband Infrastructure, Radio Links and wireless networksUrban Video Surveillance Systems

WATER RESOURCES MANAGEMENTDams, Irrigations and Drainage Systems, Hydrologic Modelling, Channels, Site Restoration

SECURITY SYSTEMSVideo Surveillance Systems, Street Lighting, Fire Protection Systems

WATER SUPPLY & SANITATIONWater and Wastewater Networks and Infrastructures

Page 5: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

Detailed design and ConstructionSupervision for the realization of a6,6 Km long bypass road,realization of a vehicular underpassand and cycle-pedestrian underpassunder the existing railway.Realization of 5 roundabouts and 3bridges.

BYPASS ROAD OF THE CITY OF MOGLIANO

VENETO

CLIENT

Province of Treviso

PROJECT DURATION

4 years

COMPLETION DATE

2008

COUNTRY

Italy

BRIDGES

50 mts

ROAD

6,6 km

Page 6: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

WADI ADAIINTERCHANGE BRIDGE, MUSCAT MUNICIPALITY

Detailed Structural design for 2urban road viaducts with compositecross section, with span lenghts up to55 mt.

CLIENT

SCL Costruzionie Montaggi Srl

PROJECT DURATION

1 years

COMPLETION DATE

2010

COUNTRY

Sultanate of Oman

LENGHT

1,340 mt and 2,270 mt

Page 7: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

Structural detailed design withoptimization of the under structures(piers, abutments and relatedfoundations of different types: shallowand deep piles, pits) for 24 railwayviaducts in a highly seismic site.The viaducts are made of a sequenceof supported spans with lengthvariables between 30 mt and 60 mt,for a total length of 8700 mt.

RAILWAY BRIDGES FOR THE NEW RAILROAD BETWEEN

SAN JUAN DE LOS MORROS-SAN FERNANDO

DE APURE, AND CHAGUARAMAS-CABRUTA

CLIENT

Impregilo

PROJECT DURATION

1,5 years

COMPLETION DATE

2009

COUNTRY

Venezuela

LENGHT

8700 mt

Page 8: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

Ayala Bridge, is a steel truss bridgeover the Pasig River in Manila.In 2015, the bridge was closed inMarch for structural repairs, whichincluded strengthening of the bridge'sfoundations, and lifting thestructure by some 70 centimetres.

AYALA BRIDGE, MANILA

CLIENT

Freyssinet (France)

PROJECT DURATION

11 months

COMPLETION DATE

2015

COUNTRY

Philippines

BRIDGES

139 mts – width 25 mts

Page 9: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

The Cityringen project will form a new circular line in the city center and will consist of two 17.4 km tunnels and 17 new stations (two of which are transfer stations) all at 30 mt below ground level. Structural Detailed Design and optimization of supporting structures of excavations of 14 stations. The work includes metal structures of self-balanced shoring poles and bulkheads and excavation containment diaphragms of up to about 25 mt in depth.

METRO OF COPENHAGENCITYRINGEN

CLIENT

OMBA Impianti &Engineering on behalfof Salini-Impregilo

PROJECT DURATION

15 months

COMPLETION DATE

2014

COUNTRY

Denmark

TUNNELS LENGHT

17,4 km

Page 10: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

Access Road to Airport. The works concern the widening of about 1,2 Km long road in order to achieve a 4-lane road and the construction of 2 roundabouts (Diameters 103 and 91 mt).Parking system. Design of 8 car parks for more than 2.800 parking spaces. The project includes the construction of road infrastructure, technological systems, hydraulic works, landscaping and environmental mitigation and construction of pedestrian walkways covered by roofs.

VENICE AIRPORTACCESS ROAD AND PARKING SYSTEM

CLIENT

ANAS / SAVE SpA

PROJECT DURATION

15 months

COMPLETION DATE

2014 – on going

COUNTRY

Italy

PARKING SPACES

2800

Page 11: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

The main objectives of the project are:• improve the mobility of citizens,

decreasing travel costs and time;• increasing flow while diminishing

private car traffic and consequently decreasing air pollution;

• decrease transportation costs by a rationalization of the system and a reduction of the management and maintenance expenses.

LIGHT RAIL TRANSIT (LRT) SYSTEM IN CAGLIARI

SARDINIA

CLIENT

ARST – Regional Transport of SardiniaProject

PROJECT DURATION

34 months

COMPLETION DATE

December 2014

COUNTRY

Italy

Page 12: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

Traffic flow simulation to provide assessment factors on the suitability of the road network projects. Evaluation of the efficiency of the road system to be designed, providing instructions and considerations in order to give useful support tool to the project designer.

TRANSPORT ANDMOBILITY PLANNING

PROJECT DURATION

Since 2000

COMPLETION DATE

On-going

COUNTRY

Italy

CLIENT

Municipalities and Local Transportation Authorities

Page 13: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

Structural Final and Detaileddesign of the Multipurpose buildingserving the contiguous luxury hotel.The design includes the theatre, theconference hall and the Spa includingswimming pool.

ASTANA EXPO 2017 ENERGY HALL AND PODIUM, ASTANA

CLIENT

SETIN Srl

PROJECT DURATION

6 months

COMPLETION DATE

June 2015

COUNTRY

Kazakhstan

Page 14: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

Project Financing for the design, restructuring, maintenance and management of a part of the building complex called ex Cinema Rossini, located in the historic center of Venice.The project encompassed the realization of three cinema halls, a restaurant, a supermarket, a bar and two apartments.

RESTRUCTURING AND RECOVERY OF CINEMA

ROSSINI, VENICE

CLIENT

Venice Municipality /FinRoss S.r.l.

PROJECT DURATION

3 years

COMPLETION DATE

April 2012

COUNTRY

Italy

Page 15: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

URBAN AND INDUSTRIAL PLANNING AND URBAN

FACILITIES

Page 16: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

EARTHFILL DAM SHEWASOOR,

REGION OF KURDISTAN

CLIENT

Kurdistan Regional Government – Ministry Of Agriculture

PROJECT DURATION

2 years

COMPLETION DATE

2012

COUNTRY

Iraq

LENGTH

330 mt

Detailed design and Assistance to the Client during the constructionKey figures:• Maximum height: 46 mt; • crest Width: 10 mt;• maximum capacity: 7,808,360 m³; • catchment area: 103.67 km²; • excavation volume for cofferdam,

dam, bottom outlet and spillway 500,000 m³;

• volume of the dam body 1,100,000 m³.

Page 17: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

CONCRETE GRAVITY DAM, REGION OF KURDISTAN

CLIENT

Kurdistan Regional Government – Ministry Of Agriculture

PROJECT DURATION

2 years

COMPLETION DATE

2012

COUNTRY

Iraq

Preliminary, Final and Detailed design; assistance to the Client during the construction.Key figures:• height of the Dam: 25.50 mt; • crest Width: 7 mt;• maximum capacity: 2,112,500 m³; • reservoir area: 0.17 km²;• catchment area: 456 km²; • spillway Project Flood: 1,372 m3/s;• spillway global length: 75 mt.

LENGTH

150 mt

Page 18: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

RIVER SANGRO: MASTER PLAN FOR RIVER BASIN

MANAGEMENT AND FLOOD CONTROL OF THE URBAN AND INSUSTRIAL AREA

CLIENT

Abruzzo Region

PROJECT DURATION

2 years

COMPLETION DATE

2009

COUNTRY

Italy

Master Plan, Preliminary and Detailed designs for Integrated Water Resources Management.Activities performed:• data gathering; • topographical surveys;• geological studies including a

geomorphologic survey;• hydrological, geological an

geomorphologic analysis;• building of hydraulic model; • development of an intervention

plan including the definition of priority measures.

Page 19: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

ALTO CHIAMPO WATER AUTHORITY: DUE

DILIGENCE AND REVISION OF TERRITORIAL WATER

RESOURCES PLAN, VICENZA

CLIENT

Acque del Chiampo SpA

PROJECT DURATION

2 years

COMPLETION DATE

2011

COUNTRY

Italy

Project Area:10 municipalities (268 Km²),92,000 Inhabitants;

Objectives:• re-organisation of water

management services based on efficiency, effectiveness and financial criteria and “Industrial” management of water management services.

Main project’s activities performed:• survey of existing assets and

current management practices; • assess current service level and

set target service levels;• survey of current water resources

use and surface/ground water quality;

• definition of the Investment Program;

• definition of the Organization and Management Model;

• topographical surveys;• geological studies including a

geomorphologic survey;• definition of the Financial Plan;• tariff Calculation.

Page 20: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

REHABILITATION AND UPGRADING OF WATER SUPPLY & SANITATION

SYSTEM IN CHOMA

CLIENT

Ministry of Local Government and Housing

PROJECT DURATION

1,5 years

COMPLETION DATE

2017

COUNTRY

Zambia

Detailed design and preparation of bidding documents for the Choma Town Water Supply and Sewerage Services Improvement Project; project and Contract Management; construction Supervision.

Page 21: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

UPGRADING OFMODENA SEWAGE TREATMENT PLANT

CLIENT

Municipality of Modena and HERA

PROJECT DURATION

6 years

COMPLETION DATE

on-going

COUNTRY

Italy

Detailed Design and Works Supervision;• the plant serves the city of

Modena and other surrounding municipalities for a total capacity of 500,000 PE;

• total treatment capacity: 35,524 m³/year

Page 22: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

UNDERWATER SEWER TO COLLECT WATER SPILLAGE AND DELIVER IT TO THE

FINAL MAIN SEWER NETWORK IN PROXIMITY TO THE FIUME BRENTA

CLIENT

Thetis SpA

PROJECT DURATION

2 years

COMPLETION DATE

2011

COUNTRY

Italy

Preliminary, Final, Detailed Design and Works Supervision.

Page 23: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

Network Designed

TELECOMMUNICATION INFRASTRUCTURE IN

FRIULI VENEZIA GIULIA REGION

CLIENT

Insiel SpA

PROJECT DURATION

5 years

COMPLETION DATE

on-going

COUNTRY

Italy

Design for the creation of fiber optic network along the entire territorial fabric of the Region (7,845 Km²).To date, more than 12 projects have been carried out, including Works Supervision and testing for a total of more than 1,500 Km of built backbone network.

BACKBONE NETWORK

+1500 km

CITIES SERVED

+140

WIRED INDUSTRIAL AREAS

+30

Page 24: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

Broadband infrastructure technology also allows the implementation of other types of innovative urban services. Making use of the broadband infrastructure it is possible to implement video surveillance, security systems, wi-fi network and urban internet, interactive information boards/panels with changing messaging system, street lighting, etc.

SECURITY SYSTEMS, VIDEO SURVEILLANCE

AND SMART CITIES

Page 25: Complementary Disciplines Different Experiences Innovative ...smartech-iec.com/pdf/Smartech-Brochure.pdfThe Cityringen project will form a new circular line in the city center and

CONTACTS:

Maurizio Bortolato

[email protected]

Phone

+39 335 7518409