DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY 02/09________________________________________________________________ © Copyright 2009 by National Institute of Steel Detailing and Steel Erectors Association of America All rights reserved. No part of this publication may be reproduced without written permission. Published by the National Institute of Steel Detailing and Steel Erectors Association of America 7700 Edgewater Drive, Suite 670 2216 W. Meadowview Rd, Suite 115 Oakland CA 94621-3022 Greensboro NC 27407 www.nisd.org www.seaa.net SEAA Serving Detailers since 1969 Serving Erectors Since 1972

Upload: sergio-cuenca

Post on 05-Jul-2015

330 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

02/09________________________________________________________________

© Copyright 2009 by National Institute of Steel Detailing and Steel Erectors Association of America

All rights reserved.

No part of this publication may be reproduced without written permission. Published by the

National Institute of Steel Detailing and Steel Erectors Association of America 7700 Edgewater Drive, Suite 670 2216 W. Meadowview Rd, Suite 115

Oakland CA 94621-3022 Greensboro NC 27407

www.nisd.org www.seaa.net

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 2: Complete

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

90/20

Disclaimer

While much effort has been expended by many persons to assure the accuracy of the information contained herein, neither the National Institute of Steel Detailing nor the Steel Erectors Association of America or no one involved, in the preparation or presentation of this publication can assume any responsibility for errors resulting from the use of the contents of this manual. The accuracy, adequacy and the applicability of all data should be verified by the user's competent person, engineering staff or consultant.

Page 3: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

I 90/20

TABLE of CONTENTS

-TABLE OF CONTENTS I -PREAMBLE II -THE TEAM III -PRE-DRAFTING IV -CHECKLIST V OSHA MANDATORY SKETCHES (29CFR Subpart R 1926.750 thru 761) (mandatory 7/18/2001) -Critical lifts 1926.751 M1 -Tripping hazards 1926.754(c)(1)(i) M2 -Framed deck openings 1926.754(e)(2)(i)(ii) 1926.754(c)(1)(i) M3 -4-Bolts column anchorage 1926.755(a)(1)(2) (OSHA Mandate) M4a -4-Bolts column anchorage 1926.755(a)(1)(2) (OSHA Mandate) M4b -Minimum 2 bolts connection 1926.756(a)(1)(2) M5 -Perimeter protection 1926.756(e)(1)(2) (Safety lines) M6a -Safety cable connection details 1926.756 (Optional alternative) M6b -Typical safety cable connection details (Optional alternative) M6c -Welded column splice 1926.756(d) (Suggested detail to meet) M7a -Welded column splice 1926.756(d) (Suggested detail to meet) M7b -Heavy column field splice 1926.756(d) (Suggested detail to meet) M7c -Column web safety connection (OSHA Mandate) (Alternate) M8a -Column web safety connection (OSHA Mandate) (Alternate) M8b -Double angle column connections 1926.756(c)(1)(2) (OSHA Mandate) M8c -Beam to column web connection M8d -Column web safety connection (OSHA Mandate) (Alternate) M8e -Typical beam connections (OSHA Mandate) (Alternates) M8f -Typical beam connections (OSHA Mandate) (Alternates) M8g -Beam over column (OSHA Mandate) (Alternates) M8h -Double connection with staggered bolts (OSHA Mandate) (Alternate) M8i -Double connection with end plates (OSHA Mandate) (Alternates) M8j -Bracing minimum connection 1926.756(2)(b) M9 -OSHA.../Joist Girder at column 1926.757 M10 -OSHA.../Steel joists girders 1926.757 M11 -Safety cable connection detail... 1926.760 M12

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 4: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

I 90/20

GOOD PRACTICES SKETCHES -The Erector friendly column S1a -Column/Beam to column checklist S1b -Typical column lift details S1c -Bolt access problems at small columns S2a -Bolting access problems S2b -Beam to column web moment connection S2c -Access problem/Hand trap S3 -Puncture/Snagging hazards S4a -Puncture/Snagging hazards S4b -Self support connections S5a -Self support connections S5b -Roll-over protection S6 -Deck supports S7a -Decking supports near cutouts (beam to beam) S7b - Decking supports near cutouts (beam to column) S7c -Out of position bolting/welding S8 -Double angle beam to beam connection S9 -Tube bracing to beam erection detail S10a -Welded bracing erection detail S10b -Solid bar type bracing erection detail S10c -Spandrel detail S11 -Wind-column & lateral stability of spandrel framing S12a -Joist at wind column S12b -Seated connections at column web S13 -Erection problems with HSS braces S14a -Tube bracing to gusset plate erection detail S14b -Joist slip at hip & valley S15 -Deck issues S16 -HSS lintel beam w/shop-attached angle S17 -Seismic load resisting systems S18a -Seismic load resisting systems S18b -Seismic load resisting systems (access holes requirements) S18c -Seismic load resisting systems (weld requirements) S18d -Seismic load resisting systems (welded flange plate)(WFP) S18e

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 5: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

I 90/20

APPENDIXES -The tools of the trade A1 -Suggested notes A2 -Direction north/safety connection/beam marking A3a -Typical safety line holes on beam/column A3b -Swinging beams to beams horizontally A4

-Swinging beams & girders to webs of columns-vertically A5a -Table giving increase “I” in inches A5b

-Swinging beams & girders to plate girder-horizontally A6a -Table of increase “I” of max. length “M” over clear dist. “S” A6b

-REFERENCES VI -CONCLUSIONS VII -ACKNOWLEDGEMENTS VIII

-SKETCHES on CD (Inside of front cover) IX

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 6: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

II 90/20

PREAMBLE The growing trends towards “Design-Build” and “Fast-Track” methods of construction have made it more important than ever that the cooperation between members of the steel industry become even more concentrated. The ever-increasing demands from insurance and bonding interests as well as codifying bodies and government regulators only serve to emphasize the need for unification. To that end the NISD and SEAA have partnered in the production of this manual. The intent is to permit detailers and erectors together to better provide structures that are safer, timely, and more erectable, and to promote the use of structural steel as the material of choice. At the same time the impact of those demands on all of us associated in the steel community must be minimized if we are to be successful in reaching our goals. By working together we can satisfy our purpose of achieving successful project completion that provides a quality product that is accident free, efficient, productive and profitable for all involved. Following are a number of suggested concepts, hints and illustrations for erection procedures, which have been based on the OSHA 2001(29 CFR 1926.750 thru 761) new steel erection standard and the combined experience of SEAA and NISD members. None of the information presented in this guide is meant to supersede project-specific contracts, codes, specifications, or government regulations. Readers are encouraged to refer to the AISC Code of Standard Practice, the AISC Erector Certification Program, the NISD Industry Standard publication and the AISC “New OSHA Rules Advisory” for additional resources. Also, the NISD Guidelines For The Successful Presentation of Steel Design Documents and the AISC publication Working With Structural Steel In Schedule Driven Projects will provide valuable insight. In all cases the role and responsibility of the design engineer of record is paramount to the proper utilization and approval of the actual use of any information contained herein. The information presented in this publication has been prepared for general information only. While it is believed to be accurate, this information should not be used or relied upon for any specific application without competent professional examination and verification of its accuracy, suitability and applicability by a licensed professional engineer, designer, or architect. The publication material contained herein, is not intended as a representation or warranty on the part of the National Institute of Steel Detailing Inc. or the Steel Erectors Association of America Inc. or of any other person named herein, that this information is suitable for any general or particular use or of freedom from infringement of any patent or patents. Anyone making use of this information assumes all liability arising from such use.

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 7: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

III 90/20

THE TEAM Successful steel project completion depends on the cooperative activities of many players. The owner, the architect, the engineer, the controlling contractor, the fabricator, the detailer, the independent suppliers, and the erector all play significant roles. This guideline will focus mainly on the contributions of the detailer and the erector; often two of the last participants to be brought onboard, yet two of the key players in the success of the project. The detailer is often described as an interpreter. He is the “lead off man” on many projects and is often the first to interface with the architect/engineer drawings. His responsibility is to correctly interpret the design information and to relay that data, in the form of shop and field drawings, to the approving agent, the fabricator, and the erector. The exacting nature of the detailer’s work, which requires “zero-defect” production, must account for every piece of steel on the job. He must utilize the design information to produce mill orders and to produce error-free shop drawings. The detailer must provide the erector with not only member placement drawings but also with the assurance that every piece of steel has been detailed, in proper sequence, and that the steel is safely erectable with connections that match, clearances considered, bolt placement possible and all special requirements recognized. If the detailer is one of the first to begin the arduous task of providing successful steel projects, the erector is the last. It is the erector who must make it all come together in the field and the one who is the recipient of any errors or omissions which any of the preceding players may have made. His job, no matter the weather or how challenging the conditions; is to not only bring all the pieces of steel together but to do so with all due consideration to the education and safety of the workers on the job. To permit these players to better accomplish their tasks, communication becomes of utmost importance. Not only must the erector and detailer communicate with each other but the other players must also be involved. Owners should bring all of the players on board as soon as possible and encourage “kick-off” meetings to permit the players to begin to form a team so that communication flows freely and all hands are working towards the common goal. Concepts, methods, and plans must be agreed on; not to mention scheduling. With all players contributing to the best of their ability, from original contract documents to final bolt placement, our project can be brought to the successful completion we all desire.

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 8: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

VI 90/20

PRE – DRAFTING Prior to the start of the detailing process, we suggest that (at a kick-off meeting, if possible) the following checklist items be considered:

1) Sequence & schedule of erection: Grid lines, floors, derricking, size, tonnage.

2) Shipping requirements: Site layout, access and lay-down area, splice requirements, and shipping methods. 3) Crane capacity weight and reach constraints and hazards.

4a) Types of Connection: (e.g. seated, shear-tab, moment, girts hung or seated, etc.)

4b) Bolting requirements: (e.g. types, installation “snug-tight”, “slip critical”, Direct Tension Indicators (DTI), etc., clearance for torque guns or tools.

5) Safety requirements: prevailing codes, OSHA’s requirements, fall protection, perimeter protection, safety aids, egress requirements, etc, etc.

5a) Joist Connections 5b) Fall Protection 5c) Column Splicing 5d) Beam to Column Connections 5e) Bracing

6) Field welding requirements: procedures preferences, joint preparation, and access.

7) Communication channels: between erector, fabricator, detailer, professionals, and inspector.

8) Pre-bid value engineering: best connections, shop assemblies, mechanical penetrations reinforcing, tie joists.

9) Responsibilities; contractual, design, connection design, approvals, revisions, payments.

10) Joist/ Deck/ Floor & Roof openings

11) Erectability: bolt access, shop assemblies, clearances for torque guns, hands and tools, leveling devices.

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 9: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

V 90/20

CHECKLIST

1) Sequence: Erector/Contractor must establish, prior to commencement of work, the sequencing so that material may be ordered and members detailed in proper order. Detailer must indicate on mill lists, shop drawings, and member placement drawings (plans and elevations) the required sequence. Revisions to the chain of sequence are expensive in terms of time and money.

2) Shipping: The erector may visit the site prior to bidding to establish what, if any,

special conditions exist which are not indicated on the contract documents, however it is the controlling contractors responsibility to provide site access or advise if it is not available. In the event conditions warrant special considerations such as splicing, shipping methods, etc., the erector must advise the detailer and fabricator in a timely manner. Suggested resolution, design and/or approval of the special situation must be reviewed by the appropriate parties.

3) Cranes: The erector must notify the detailer and others if there are any special

requirements due to crane reach, availability, or capacity that will affect someone else’s particular operation. Critical lifts of large members, or irregular shapes, lifting lugs, and/or lifting locations should be defined and the detailer advised so that this information may be given on the drawings if necessary. Provided the erector's directives are received in a timely fashion, the detailer and fabricator should consult with the erector and define a plan of how best to proceed. If the center of gravity must be defined the design engineer should provide this information. The erector may request that the detailer show lifting weights or crane locations on the member placement drawings.

4) Types of Connections: If and when connection types are not dictated on the

design documents the fabricator, detailer, and erector must consult as to what type of connection(s) will be utilized and whose responsibility is the adequacy of the connection; are moment connections field bolted or welded? Are beam to column webs seated and how much tolerance should be allowed to prohibit column leaning in multiple bays: Will girt connections at columns be seated or hung? How are spandrels and kickers treated?

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 10: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

V 90/20

5) Bolting: The required type and number of bolts is the responsibility of the design

engineer. However, the detailer must insure that these bolts can not only be entered, but that they can also be tightened. Care must be taken to avoid bolt to bolt interference. Latest bolt specifications must be incorporated. The erector must be made aware of the type of bolt being furnished, the number of washers required and the method of tightening. The introduction of Tension Control Bolts (TCB) and Load Indicator Washers (LIW) has helped the erector to know he has achieved specification requirements. Bolting instructions and requirements must be noted. Bolt placement lists must be accurate and precise.

A minimum of 2 bolts is required at each end of a main member, and recommended at secondary members, for erection. Utilize permanent bolts at beam webs for moment connections whenever possible. When connections to shear tabs require that the bolt hole is located inside the flange, bolt entry and driving clearance become a factor. Try to place bolt holes in a shear tab on the outside of flanges whenever possible (engineer approval may be required if a lever arm is created). If web stiffeners or seats become necessary the ability to erect beams above or below may become a problem.

6) Safety requirements: The OSHA 2001 update requires the engineering community to give certain information to the construction team and identify what creates the lateral stability of a structure when complete; e.g. deck diaphragm shear, concrete cores, masonry shear walls or steel bracing. The detailer and erector should communicate to best solve the issues of temporary bracing and aids. The goal obviously is to stabilize the structure during and after erection. As temporary framing is often not within the detailer’s or fabricator’s scope of work, the erector is responsible for temporary erection bracing, only during the erection process, unless specified otherwise in the contract documents. 6a) Joist OSHA mandates that when columns are not framed in at least two (2) directions with solid members (beams or joist girders) a vertical stabilizer plate shall be provided on each column for an OSHA required bolted steel joist. This plate must be a minimum of 6 inches by 6 inches and located 3 inches below the bottom of the joist with one 13/16 inch diameter hole for guying or plumbing cables.

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 11: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

V 90/20

6b) Fall Protection: The most common, if not most important, issue is that of fall protection. Multistory structures require guardrail cable at the floor perimeter and at large interior floor and roof openings. While the erector has been providing these devices for years it is required by OSHA 2001 that this be incorporated into the shop details. The method to accomplish this protection should be agreed upon prior to commencement of detailing. The erector may desire that shear studs or other items be shop attached rather than field applied. In these cases adequate fall protection must be provided and detailer/fabricator notified prior to detailing. 6c) Column Splices: The column length should be designed on the contract documents. In cases where they are not, for structures of one or two stories (with or without a basement), a column length in excess of 40 feet is quite long. While the erector might prefer long columns, and would find a way stabilize them with bracing or framing, it may be necessary for safety or shipping purposes to splice the columns. The detailer should consult with the erector to determine if, and where, a splice may be required. The designer and fabricator should also be contacted to give approval and design of the requested splice. When splicing columns on multistory projects, OSHA has mandated that columns be spliced 4 feet above the finished floor elevation. This permits the required perimeter cable to be installed at the necessary heights. Bolted splices are preferred, but when welded splices are used the 4 feet allows the erector/welder to work in a safe, comfortable position. When welded splices are utilized always prepare the upper column for welding. Tiered columns should always have a lifting device or a hole at the top of the shaft for attaching the hoisting mechanism or cable. 6d) Column Bases: OSHA 2001 requires that all columns now have a minimum of 4 anchor bolts. The detailer should reference to the contract documents to determine how much, if any, over-sizing of anchor rod holes should be provided. The use of leveling devices and what type should also be discussed with the erector.

6e) Beam to Column Connections: per OSHA 2001 directives, all double connections at column webs or beam webs over columns must have staggered clip angles or a beam seat or a top flange clip angle. Where not possible to provide these safety connections, the detailer is required by OSHA to add a note of

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 12: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

V 90/20

warning to the erector on the member placement drawings. Deck supports may be required at deck cutouts near beam to beam or beam to column connections. Consult with the erector, fabricator, detailer, and clients to preferred method.

6f) Bracing: A minimum of one bolt at each end of a solid web bracing member shall be used, as directed by OSHA 2001. Holes for erection bolts are required at welded tube bracing. Provide a 1/8 inch oversized slot for erection clearance over gusset and resize the welds accordingly. Check for bolt insertion clearance at gusset plates, end plates, etc. Keep gusset plates to a minimum size by utilizing the uniform force method unless otherwise directed by the contract documents.

7) Field Welding: The erector must advise the detailer prior to shop drawing preparation what type of field welds are desired so that end preparations, root openings etc. may be properly detailed. It is the responsibility of the contract documents, not the erector, to advise the detailer of what and where any NDT is required so that the detailer can identify those areas on the member placement diagrams if requested. Special requirements for seismic considerations should be reviewed.

8) Communication: Contacts and communication are paramount to a successful

project. It is only through the spirit of cooperative communication that success can be achieved and we encourage all parties to appoint a liaison with decision making authority to maintain contact with the other members of the construction/owner team. It should also be remembered by detailer and erector alike that their client should always be contacted whenever work is requested that may affect their client’s scope.

9) Value Engineering: Erectors, detailers, fabricators and others may desire certain

changes be made to the contract documents in order to expedite their portion of the work or to make the design more suitable to their particular operation. There may also be instances where an experienced firm may discover certain changes where, if incorporated, can be beneficial to the firm, the project’s owner, or both. Certain changes may also make the bids more competitive or improve the safety conditions for a supplier. In any event, these changes should naturally be requested as early as possible, prior to bid time if permitted.

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 13: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

V 90/20

Requests for certain type splices, connections, shop assemblies, erection procedures, etc., which were not considered in the contract documents should be presented prior to bid time if possible. Concerns about the availability of information to permit detailing-fabrication-erection to proceed in a timely manner should be communicated at this time; in particular concerns about mechanical openings, spandrels, field measurements, drainage, pour stop attachment, brick relief systems or other supplier required data should be addressed promptly.

10) Responsibility: To ensure that all members of the team are treated fairly it must

be remembered that any required or requested changes which differ from information given in the design documents may have an impact financially on other members of the team. It should also be remembered that these changes may result in additional engineering calculations or approvals and possible schedule adjustments. We highly recommend that the proponent of the change communicate with the other players to insure that no one is unfairly jeopardized.

11) Erectability: Last, but not least on our checklist of items to be considered, is the erectability of the member. Can the bolts be entered and driven? Should certain pieces be shop assembled? Can the member be swung into place or do stiffeners, cap plates, connection angles, doubler plates or other items interfere? Are special notes required? Will the mechanical openings be available prior to installation of deck and siding? The ever growing use by the detailer of reproductions of the design documents as member placement plans require certain cautions by the detailer: is the required erection information fully shown? Is the drawing legible in the field or is it cluttered with superfluous information? (shop information, concrete data, sections and views taken without cross reference to where/from each section or view is cut, or references to drawings not included in the member placement drawing being used by the erector).

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 14: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

V 90/20

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 15: Complete

SEAA

Page 16: Complete

SEAA

Page 17: Complete

SEAA

Page 18: Complete

SEAA

Page 19: Complete

SEAA

Page 20: Complete

SEAA

Page 21: Complete

SEAA

Page 22: Complete

SEAA

Page 23: Complete

SEAA

Page 24: Complete

SEAA

Page 25: Complete

SEAA

Page 26: Complete

SEAA

Page 27: Complete

SEAA

Page 28: Complete

SEAA

Page 29: Complete

SEAA

Page 30: Complete

SEAA

Page 31: Complete

SEAA

Page 32: Complete

SEAA

Page 33: Complete

SEAA

Page 34: Complete

SEAA

Page 35: Complete

SEAA

Page 36: Complete

SEAA

Page 37: Complete

SEAA

Page 38: Complete

SEAA

Page 39: Complete

SEAA

Page 40: Complete

SEAA

Page 41: Complete

SEAA

Page 42: Complete

SEAA

Page 43: Complete

SEAA

Page 44: Complete

SEAA

Page 45: Complete

SEAA

Page 46: Complete

SEAA

Page 47: Complete

SEAA

Page 48: Complete

SEAA

Page 49: Complete

SEAA

Page 50: Complete

SEAA

Page 51: Complete

SEAA

Page 52: Complete

SEAA

Page 53: Complete

SEAA

Page 54: Complete

SEAA

Page 55: Complete

SEAA

Page 56: Complete

SEAA

Page 57: Complete

SEAA

Page 58: Complete

SEAA

Page 59: Complete

SEAA

Page 60: Complete

SEAA

Page 61: Complete

SEAA

Page 62: Complete

SEAA

Page 63: Complete

SEAA

Page 64: Complete

SEAA

Page 65: Complete

SEAA

Page 66: Complete

SEAA

Page 67: Complete

SEAA

Page 68: Complete

SEAA

Page 69: Complete

SEAA

Page 70: Complete

SEAA

Page 71: Complete

SEAA

Page 72: Complete

SEAA

Page 73: Complete

SEAA

Page 74: Complete

SEAA

Page 75: Complete

SEAA

Page 76: Complete

SEAA

Page 77: Complete

SEAA

Page 78: Complete

SEAA

Page 79: Complete

SEAA

Page 80: Complete

SEAA

Page 81: Complete

SEAA

Page 82: Complete

SEAA

Page 83: Complete

SEAA

Page 84: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

02/09 VI

REFERENCES This document takes references to the following steel industry documents:

NATIONAL INSTITUTE OF STEEL DETAILING www.nisd.org

“Industry Standard” “Guideline For the Successful Presentation of Steel Design Documents”

AMERICAN INSTITUTE OF STEEL CONSTRUCTION

www.aisc.org “Detailing For Steel Construction”

“Code of Standard Practice” “Erector Certification Program”

“Working with Structural Steel in Schedule Driven Projects” “Steel Design Guide Series: Column Base Plates”

“Steel Design Guide Series: Facade Attachments to Steel Frame Buildings” “Seismic Design Manual”

“Steel Construction Manual”

OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION www.osha.gov

New Steel Erection Standard - Subpart R-Steel Erection 1926.750 thru 1926.761 with appendixes A thru H

DEPARTMENT of LABOR

FEDERAL REGISTER PART VI 29CFR PART 1926

SAFETY STANDARDS FOR STEEL ERECTION FINAL RULE 01/18/2001

STEEL ERECTORS ASSOCIATION OF AMERICA

www.seaa.net “DETAILING FOR VALUE AND SAFETY”

FEDERAL EMERGENCY MANAGEMENT AGENCY

“FEMA 350-353” RECOMMENDED SEISMIC DESIGN CRITERIA FOR NEW STEEL MOMENT-FRAME BUILDINGS

AMERICAN WELDING SOCIETY

AWS CODE D1.5 & D1.8

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 85: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

02/09 VII

CONCLUSIONS e hope that this document has furnished a greater understanding of those items which erectors and detailers find necessary for the safe and efficient

completion of steel projects. We sincerely hope as well, that you also have gained a greater understanding of the positive contribution that the NISD and the SEAA wish to make by more clearly defining information needed to complete our part of such project. To that end, we believe that we have provided a road map leading to the safe and successful completion of a structural steel frame. The Editors

W

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 86: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

02/09 VIII

ACKNOWLEDGEMENTS

This document would have not been possible without the dedicated work of those who devoted countless unpaid hours of research, meetings, sketching, arguing over, polishing and finally editing for the benefit of the end users…you.

1. The editors wish to thank the members of the National Institute of Steel Detailing and the Steel Erectors Association of America for their contribution and support throughout this project. special recognition is given to Robert Beauchamp(NISD), John Metcalfe(NISD), Michel Cloutier(Datadraft), Jim Larson(SEAA) Eddie Williams(SEAA), Duff Zimmerman (SEAA) and Richard Tucker(SEAA) for their efforts.

The Editors

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 87: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

02/09 VIII

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 88: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

_______________________________________________________________________ XI 90/20

SKETCHES PRINTED or on CD In an effort to disseminate information contained in this guide and to lead towards a standardization of practices in the industry, we have provided you, the end user, with a CD-ROM containing ©AutoCAD .dwg format files of the sketches shown within this document . You are authorized to copy this CD or printed sketches (with acknowledgements) and use to suit specific contracts, fit them into erection or shop fabrication standards or certification program requirements. The more you use them, the better the industry will perform and benefit by making steel the material of choice for structures.

CD is enclosed in your Guide.

Thanks for your support

The Editors

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 89: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

_______________________________________________________________________ XI 90/20

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 90: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

90/20

COMMENTS & / or SUGGESTIONS

Comments or suggestions worthy of interest for improvement of this document are welcomed, please e-mail or fax to:

The National Institute of Steel Detailing

[email protected] 510-568-3781

The Steel Erectors Association of America [email protected]

413-208-6936

Your Comments:

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 91: Complete

DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY

90/20

NOTES

SEAA

Serving Detailerssince 1969

Serving Erectors Since 1972

Page 92: Complete

BE

CO

ME

A M

EM

BE

R

of

the

Ste

el E

rec

tor

s A

sso

cia

tio

n o

f A

mer

ica

st

ee

l e

re

ct

or

s

as

so

cia

tio

no

f a

me

ric

a

2216

Wes

t Mea

dow

view

Roa

dSu

ite 1

15G

reen

sbor

o, N

C 2

7407

336.

294.

8880

pho

ne41

3.20

8.69

36 fa

xex

ecut

ived

irect

or@

seaa

.net

ww

w.s

eaa.

net

SEA

A

SEA

A

The

Stee

l Ere

ctor

s As

soci

atio

n of

Am

eric

a is

ded

icat

ed to

ad

vanc

ing

the

com

mon

inte

rest

and

nee

ds o

f all

enga

ged

in b

uild

ing

with

ste

el.

Esta

blis

hed

in 1

972,

the

non-

prof

it as

soci

atio

n w

orks

to p

rom

ote

safe

ty, e

duca

tion

and

train

ing

thro

ugh

com

preh

ensi

ve p

rogr

ams

deve

lope

d by

"e

rect

ors

for e

rect

ors"

.

Page 93: Complete

SE

AA

ME

MB

ER

BE

NE

FIT

S

industr

y rep

res

enta

tion

Wor

king

toge

ther

SEA

A m

embe

rs m

eet w

ith n

umer

ous

gove

rnm

ent a

genc

ies

and

stan

dard

s co

mm

ittee

s in

clud

ing:

appl

icat

ion f

or

mem

ber

ship

Firm

Nam

e

Your

Nam

e

Title

Phys

ical

Add

ress

City

Stat

e Zi

p

Phon

e

Fax

Con

tact

nam

e

Con

tact

Titl

e

Con

tact

Em

ail

Doe

s th

e fir

m p

erfo

rm th

e er

ectio

n of

ste

el

and/

or a

llied

mat

eria

l exc

lusi

vely

?

Yes

N

o

Geo

grap

hic

area

cov

ered

by

your

firm

:

How

did

you

hea

r ab

out S

EAA?

Annu

al M

embe

rshi

p D

ues:

Ja

nuar

y-D

ecem

ber

Erec

tors

bas

ed o

n an

nual

rev

enue

vol

ume:

0-3

mill

ion

$450

3-

5 m

illio

n $7

50

5-10

mill

ion

$100

0

10-u

p m

illio

n $1

250

Fabr

icat

ors:

$75

0

Gen

eral

Con

tract

ors

$750

Sup

p. &

Man

ufac

ture

rs $7

50

Che

cks

shou

ld b

e m

ade

paya

ble

to S

EAA.

CC #

Sign

atur

e

Plea

se c

heck

all

cate

gorie

s th

at a

pply.

erec

tors

(see

sca

le)

Stru

ctur

al ste

el, s

teel

joist

sPr

efab

ricat

ed b

uild

ing

and/

or s

idin

gRe

info

rcin

g ste

el a

nd/o

r pos

t ten

sioni

ngM

iscel

laneo

us m

etals

, sta

irs, o

rnam

enta

l iro

nPr

ecas

t con

cret

e - s

truct

ural

Prec

ast c

oncr

ete

- arc

hite

ctur

alM

etal

deck

fabr

icat

ors

($75

0)St

ruct

ural

steel

Stee

l joi

sts -

supp

lier a

nd/o

r sale

sM

etal

deck

- m

anuf

actu

rer

Met

al de

ck- s

uppl

ier a

nd/o

r sale

sRe

info

rcin

g ste

el/w

ire m

esh

Pref

abric

atin

g bu

ildin

gs a

nd/o

r sid

ing

Prec

ast c

oncr

ete

- stru

ctur

alPr

ecas

t con

cret

e - a

rchi

tect

ural

Misc

ellan

eous

met

als, s

tairs

, orn

amen

tal i

ron

gene

ral

cont

ract

ors

($75

0)

supp

liers

and

man

ufac

ture

rs ($

750)

Cran

e sa

les

Wire

rope

, slin

gs, a

cces

sorie

sEq

uipm

ent a

nd/o

r too

lsSa

fety

equ

ipm

ent

Faste

ners

spec

ialt

y se

rvic

es ($

750)

Cran

e an

d eq

uipm

ent r

enta

lsCe

rtifie

d w

eldi

ngM

illwrig

hts,

indu

strial

mac

hine

ry in

stalla

tion

Heav

y eq

uipm

ent m

ovin

g an

d rig

ging

Shea

r stu

d in

stalla

tion

serv

ices

($75

0)Fin

ancia

lIn

sura

nce,

risk

man

agem

ent

Lega

lTe

sting

labs

and

/or i

ndep

ende

nt in

spec

tors

Cran

e ce

rtific

atio

n an

d in

spec

tion

Cons

ultin

g

empl

oye

e saf

ety|

ste

el e

rec

tion t

rai

nin

g

program

s

sea

a an

nual

conve

nti

on &

trad

e show

.

Exp.

2216

Wes

t Mea

dow

view

Roa

d •

Suite

115

• G

reen

sbor

o, N

C 2

7407

• 3

36.2

94.8

880

phon

e •

413.

208.

6936

fax

• ex

ecut

ived

irect

or@

seaa

.net

• w

ww

.sea

a.ne

t

Spec

ialty

Ser

vice

s $7

50

S

ervi

ces

$750

The

SEAA

Con

nect

or� w

as e

xclu

sivel

y de

velo

ped

for i

ts m

embe

rs a

nd p

oten

tial m

embe

rs.

It in

clud

es n

atio

nal e

dito

rials,

boa

rd o

f dire

ctor

pro

files

, Mem

ber D

irect

ory

and

colu

mns

from

w

ell-k

now

n in

dust

ry s

peci

alist

. Re

achi

ng a

ll se

gmen

ts o

f the

ste

el e

rect

or c

omm

unity

, SEA

A Co

nnec

tor m

agaz

ine

is a

grea

t way

to c

onne

ct y

our b

usin

ess

to a

n $8

Billi

on In

dust

ry.

SEAA

’s a

nnua

l con

vent

ion

is a

gre

at o

ppor

tuni

ty to

gat

her w

ith c

olle

ague

s, a

nd fi

nd

solu

tions

to y

our s

hare

d ch

alle

nges

. Th

e co

nven

tion

has

insi

ghtfu

l spe

aker

s, e

xper

t adv

ice,

ed

ucat

iona

l wor

ksho

ps a

nd s

essi

ons,

han

ds-o

n de

mon

stra

tions

with

. Yo

u’ll

take

hom

e va

luab

le in

form

atio

n, n

etw

orki

ng a

nd p

rove

n st

rate

gies

that

will

pro

mot

e yo

ur b

usin

ess.

The

Stee

l Ere

ctor

s As

soci

atio

n of

Am

eric

a (S

EAA)

is a

n ac

tive

parti

cipa

nt in

the

deve

lopm

ent a

nd p

rom

otio

n of

the

indu

stry

Saf

ety

Stan

dard

s th

at im

pact

the

com

mer

cial

con

stru

ctio

n in

dust

ry.

SEAA

has

dev

elop

ed p

artn

ersh

ips

and

allia

nces

with

OSH

A an

d ot

her

Stan

dard

Com

mitt

ees

acro

ss th

e U

SA.

The

mem

bers

of S

EAA

are

affil

iate

d st

eel e

rect

ors,

fabr

icat

ors,

arc

hite

cts,

eng

inee

rs, d

etai

lers

, co

de o

ffici

als,

sup

plie

rs, m

anuf

actu

rers

and

ser

vice

com

pani

es.

ww

w.A

ISC

.org

ww

w.S

DI.o

rg w

ww

.SJI.

org

ww

w.A

SA/S

TAC

.com

ww

w.N

CC

ER.o

rg

ww

w.O

SHA.

gov

ww

w.N

ISD

.org

ww

w.N

CC

CO

.org

w

ww

.ABC

.org

ww

w.tc

a.or

g

The

SEAA

has

dev

elop

ed s

afet

y tra

inin

g pr

oduc

ts to

ass

ist o

rgan

izatio

ns w

ith O

SHA

Com

pli-

ance

, wor

kpla

ce s

afet

y an

d pr

ofes

siona

l/cr

aft-w

orke

r dev

elop

men

t. Pr

ogra

ms

are

avai

labl

e in

En

glish

and

Spa

nish

lang

uage

s w

hich

are

des

igne

d to

ass

ist c

ontra

ctor

s, en

gine

ers,

stee

l de

taile

rs, a

rchi

tect

s, an

d ot

her s

afet

y pe

rson

nel i

n un

ders

tand

ing

and

com

plyi

ng w

ith th

e ne

w

Subp

art R

- Ste

el E

rect

ion

Stan

dard

and

its

train

ing

requ

irem

ents

.

seaa

e|n

ews

& s

afet

y al

erts

Perio

dic

publ

icat

ions

to k

eep

mem

bers

info

rmed

on

emer

ging

regu

lato

ry re

quire

men

ts, n

ew

tech

nolo

gies

, saf

ety

aler

ts a

nd N

ews

- tha

t nec

essit

ate

cont

ract

ors

stay

cur

rent

.

Page 94: Complete

National Institute of Steel Detailing Membership Application The annual membership cycle runs from June 1st through May 31st

���� Regular Membership is open to any company that conducts its office in the Americas for, and is regularly engaged in, the business of steel detailing. Such office shall have been conducted for a minimum period of one year. A member in this category may be chapter affiliated or a member-at-large, and has all privileges and benefits of membership including voting and holding office. Fee Schedule: $290 for companies with a gross annual income of less than $250,000 [June-September] Prorated dues when joining October-January $200 February-May $100 $450 for companies with a gross annual income greater than $250,000 [June-September] Prorated dues when joining October-January $305 February-May $155 ���� Associate Membership is open to any company, national or regional trade or professional association interested in enhancing the detailing profession or the activities of the NISD, whose primary business is not in structural steel detailing. This category includes all privileges and benefits of membership except those of voting and holding office. Fee Schedule: Annual membership fee is $360 [June-September]

Prorated dues when joining October-January $245 February-May $125

���� Individual Associate Membership is open to a steel detailer who does not own a company. This category also includes other persons interested in the future of the steel detailing industry who do not fall in the category of Regular or Associate membership. This category has limited privileges and benefits of membership, which precludes them from voting and holding office.

Fee Schedule: Annual membership fee is $65 Annual dues of $65 are renewable on June 1st

���� Overseas Membership is open to any company that conducts a regular office for, and is regularly engaged in, the business of steel detailing outside the Americas. Such office shall have been conducted for a minimum period of one year. Members in this category may vote (no proxy votes), but they may not hold national office.

Fee Schedule: Annual membership fee is $360 [June-September]

Prorated dues when joining October-January $245 February-May $125

���� Member Emeritus Membership is open to any individual who was a former regular member of the NISD and has retired from the competitive field, but wishes to remain active in the NISD. Members in this category may not hold office. Fee Schedule: Annual membership fee is $100 Annual dues of $100 are renewable on June 1st

The undersigned hereby applies for membership in the National Institute of Steel Detailing, Inc.

Name ___________________________________________________Title _________________________________

Company Name__________________________________________________________________________________

Address ______________________________________________________________________________________

City ________________________________ State/Province ______________________Zip/Postal Code____________

Country _______________________________________

Telephone _______________________________________ Fax ___________________________________________

E-mail ________________________________________ Web site _______________________________________

Payment in US Dollars Method of Payment Membership Fee: US$__________ ���� Check, payable to: NISD, Inc.

7700 Edgewater Dr., Suite 670 Postage/handling, add: Oakland, CA 94621-3022

$24 for Canada $__________

$38 for International $__________ ¨̈̈̈ MasterCard ¨̈̈̈ Visa Number:_______________________________ Expiration Date:________ TOTAL ENCLOSED US$__________

Signature:___________________________________________________ ¨ Check this box to receive a free subscription to Modern Steel Construction magazine (U.S., Canada & Mexico only)